Ref: UTGC/QTN/2024/33 May 05, 2024

M/s NAS REAL ESTATE


Qatar

Kind Attn: Engineer Mohd Saif

Sub: QUOTATION

Sl No. Descriptions Qty Amount (AED)


1 L.V. Room
a LV panels/Capacitor banks check against flood damages. 6 Nos. 25,000.00
B Replacement of water damaged 630 Amps 3 pole MCB 3 Nos. 17,000.00
C Replacement of water damaged 1,000 Amps 3 pole Isolator 1 Nos. 6,000.00
d Repair and service of water damaged 400 KVAR Capacitor bank 2 Nos. 70,000.00
Replacement of 2500 Amps ACB with CT
Coil, all indicator and CT meter, including required incoming/outgoing
E 1 Nos. 110,000.00
busbar modification for ACB replacement, including panel servicing and
drying up for MDB-1.
Replacement of 2500 Amps ACB with CT
Coil, all indicator and CT meter, including required incoming/outgoing
F 1 Nos. 110,000.00
busbar modification for ACB replacement, including panel servicing and
drying up for MDB-2.
Replacement of 2500 Amps ACB with CT
Coil, all indicator and CT meter, including required incoming/outgoing
G 1 Nos. 130,000.00
busbar modification for ACB replacement, including panel servicing and
drying up for MDB-3.
Replacement of 2500 Amps ACB with CT
Coil, all indicator and CT meter, including required incoming/outgoing
h 1 Nos. 130,000.00
busbar modification for ACB replacement, including panel servicing and
drying up for MDB-4.
I SEWA submittal and inspection fees for re-energizing the service 1 Nos. 15,000.00
2 Generator Room 2 Nos.
a Replacement of water damaged Batteries. LS 13,000.00
Full servicing and drying up Generator 150KVA including replacement
b LS 20,000.00
of lubricant, coolant fluids and filters.
3 Pump Room
Replacement of water damaged 20 HP Water Pump including full service
A 1 Nos. 25,000.00
and replacement of control panel damaged parts.
Draining, cleaning and sanitizing of underground water tank to rectify
B the mixture of flood/drain water with domestic water, including fit to 1 Nos. 35,000.00
use certificate.
4 Elevator
A Replacement of water damaged control boards. 4 Nos. 24,000.00
Replacement of water damaged level sensors/limit switches at ground
8 Nos. 12,000.00
level doors
5 Paints & Moisture treatment for water flooded areas
a Moisture treatment for flooded area walls and floors. LS 5,000.00
b Re-paint for water damaged walls LS 5,000.00
c Marble polish and re-grouting after moisture treatment LS 7,500.00
6 Fire Alarm and Fire Fighting
Replacement of power supply card for Main FACP “short damage from
a
water”.
Replacement of supply card for clean agent panel “short damage from
b
water”.
c Replacement of water shorted loop cards.
d Replacement of water damaged detectors at electrical cables trenches.
LS 95,000.00
Replacement of water damaged clean agent release nozzles at
e
electrical cables trenches.
f Reprogramming
g Replacement of Diesel fire pump batteries.
Full servicing and drying up of fire pump set including replacement of
h
lubricant, coolant fluids and filters for Diesel Pump.
7 Repair of Main sliding glass door and replacement of damaged parts 3,000.00
8 CCTV
a Replacement of water damaged DVR and network switches LS 18,000.00
9 Furniture and Equipment
a Revolving chairs 6 Nos. 9,000.00
b Sofa set 2 Nos. 7,550.00
c Computer 3 Nos. 7,500.00
TOTAL 899,550.00
VAT 5% 44,977.50
GRAND TOTAL 944,527.50

Terms & Conditions:

 Any additional works which are not included in this descriptions will be charged extra.
 LPO will be issued before commencement of the work and payment terms must be mentioned.
 Any approvals or anything else which may affect the work must be done from your side.
Payment Terms:
50% of the total amount as advance.
40% upon the progress of the work.
10% after completion of the work

Thanks & Regards,


For UNITED TECHNOLOGIES GENERAL CONTRACTING LLC

Prepared By: Checked By: Approved By:


Joy Nelson Martin Fernandez Saeb Said