1 L.V. Room a 630 Amps 3 pole MCB 3 Nos. 17,000.00 b 1000 Amps 3 pole Isolator 1 No. 6,050.00 c 400 KVAR Capacitor bank 2 Nos. 64,000.00 d Modification of MD 1 by changing 2500 Amps ACB with CT 90,000.00 coil and all indicator metre and outgoing 2500 Amps ACB e Modification of MD 2 by changing 2500 Amps ACB with CT 90,000.00 coil and all indicator metre and outgoing 2500 Amps ACB f Modification of MD 3 by changing 2500 Amps ACB with CT 130,000.00 coil and all indicator metre and outgoing 2500 Amps ACB g Modification of MD 4 by changing 2500 Amps ACB with CT 130,000.00 coil and all indicator metre and outgoing 2500 Amps ACB 2 Generator Room 2 Nos. a Battery 13,720.00 b Generator 150KVA not working 17,500.00 3 Pump Room a 20 HP Water Pump 1 No. 22,000.00 4 Elevator a All 4 lifts mother board damaged 23,500.00 5 Furnitures a Revolving chairs 6 Nos. 10,000.00 b Sofa set 2 Nos. 7,525.00 6 Paints & moisture treatment for water flooded areas walls a Mositure treatment for flooded area places 9,000.00 b Marble polish and grouting after moisture treatment 7,500.00 7 Replacement of damaged fire alarm parts and 16,700.00 reprogramming 8 Main glass door parts change and reapir 3,000.00 9 Computer’s 3 Nos. 7,000.00 10 CCTV and DVR 17,000.00 TOTAL 681,495.00 VAT 5% 34,074.75 GRAND TOTAL 715,569.75