Professional Documents
Culture Documents
Aramco Questions-1
Aramco Questions-1
3) Welding qualification testing groove is in horizontal & pipe is in vertical position? What is
the position?
2G
5) What is the diameter of pipe when you welding external line-up clamp in pipeline?
For pipelines less than16” diameter, either internal or external line up clamp may be
used.
8) Which documents required for welding inspection when you are going for inspection?
Approved drawing, Approved weld map, calibration certificates, approved welder JCC
9) What is discontinuity?
A lack of continuity or cohesion; an intentional or unintentional interruption in the
physical structure or configuration of a material or component.
17) What is the best method to reduce the residual stresses except PWHT?
Peening, post heating
18) What is the delay time between root pass & hot pass in cross country pipeline?
15 mins for vertical up & 5 mins for vertical down
PQR is a supporting document of WPS which records the result of testing a test
coupon
38) Welder qualified for 14mm thickness how much he will be qualified?
ASME SEC IX max to be qualified
API-1104 4.8 to 19.1mm
48) Major difference between MIG/MAG & SMAW welding in nickel steel?
MIG/MAG: Semi-automatic or automatic, wire feed is automatic and active or inert gas is
used
SMAW: Electrodes are used with no filler metal addition
63) What is the main difference between the welding processes GTAW/SMAW?
GTAW: Non-consumable tungsten electrode is used with filler metal addition and
shielding gas is used from the cylinder
SMAW: Electrodes are used, no shielding gas is used
64) If a discontinuity is found in NDE under the acceptance limit it shall be?
Accepted
67) During qualification of a WPS, tension test is performed, what is the minimum acceptable
rapture stress if a specimen breaks in the base metal?
95%
68) What type of power sources characteristics is required for autogenous welding?
Constant current
80) As per the ASME B31.3 cracks to be found in the RT report what you will do?
Accept/Reject
89) While welding in root area if current is too high which defect will occur?
Burn through and Excess penetration
105) Root bend test done and crack happened on root area is this?
a. Accepted
b. Rejected
106) One elbow joint cut out, which test you will conduct before fit-up the same area as a
new bevel?
DPT
108) Welder qualified in 5G position, which are the positions he can weld?
Flat, Vertical & Overhead
110)PT cannot carried out temperature range 5 degree Celsius to 52 degree Celsius in a
specific joint. What is the next step for that?
a. Need to perform procedure test again
b. Clean the area and do it again
c. Dwell time select aw per ASME V appendix
d. Stop the PT
111) PT cannot carried out temperature below range 5 degree Celsius and above 52 degree
Celsius in a specific joint. PT cannot carried out above 60 degree Celsius.
121)Cross-country pipe line for welding heat input should not exceed.?
a. 1.4kj/mm
b. 1.5/0.8/1.8 kj/mm
122)Welder welded 6 inch pipe and the min weld length how much required to take RT?
6 inch length
127) The welder doing slow speed the crack where will appear?
a. Toe
b. Weld center
c. Any where
d. Root
136)A weld joint has hoop stress of 20% in B31.8 what acceptance code?
a. API 1104
b. B31.8
c. ASW D1.1
137) Electrode E6010 requires how much time for drying in oven?
a. 2hrs.
b. 4hrs.
c. 1hrs.
d. Not required. ( As per ASME SEC II Table A.3)
143) In FCAW process how can we protect the arc during windy climate?
a. Shielding gas
b. Flux in filler wire
c. Wind shielding usages
d. All of the above
146) Which NDT method used to check finished weld surface defect by MIG process on
aluminum alloy pipe?
a. MT
b. PT
c. RT
d. UT
149) When changed non-essential variable. What will you do for that particular WPS to use in
site?
a. Rewrite and revise the WPS and after approval use the same in site
b. Use a WPS with the that changed non-essential variable in the site
155) A welder welded with ER 316 electrode, he can weld with ER 70S2?
a. True
b. False
165). What you will check first, when welding automatic machine?
a. Machine condition
b. Calibration certificate
c. Welding current
d. Voltage
166) which gauge use to checking mis-match on the bevel joint?
a. Hilo gauge
167) which electrode is not baking?
a. 7018
b. 7010/6010 (cellulosic electrode)
168) Pre welding helps to welds meets:
a. reducing cracks and slow down the cooling rate.
b. reducing toughness & cracks
c. increase brittleness & slow down cooling rate
169) how many bend test required for 5G position?
a. 4 (as per sec IX QW 452.1 (a) Note No.1)
b. 6
c.7
d.2
170) Best method for stress reliving?
PWHT
171) Planner & Non Planner defects?
1. UT & RT
2. PT & MPT
3. ET
172) PT abbreviations
a. Penetration test
b. Liquid Penetration test
c. Both A&B