Professional Documents
Culture Documents
Pre-Post Inspection
Pre-Post Inspection
Department of Education
Caraga Administrative Region
Butuan City Schools Division
BILAY NATIONAL HIGH SCHOOL
Bilay, Butuan City
Members:
The optimized plan to allocate an amount of P 25,500.00 to pay for wage of the labor in
constructing the pathway and to purchase the materials needed for the construction of the rain
pathway was materialized. Currently, the students will no longer be exposed to the heat of the
sun as well as of the rain
Members: