Download as pdf or txt
Download as pdf or txt
You are on page 1of 156

INS Vikrant (2013)

INS Vikrant (pronounced [vikraːnt̪ə])[20] is an


aircraft carrier in service with Indian Navy.
The carrier is India's fourth carrier and the
first to be built in India. It was constructed
by the Cochin Shipyard Limited (CSL) in
Kochi, Kerala. The namesake Vikrant is a
tribute to India's first aircraft carrier INS
Vikrant (1961). Vikrant means
"courageous" in Sanskrit.[21] The motto of
the ship, "जयेम सम् युधिस्पृधः" (Sanskrit),
means "I defeat those who dare to
challenge me" (English).

Work on the ship's design began in 1999.


The keel was laid in 2009. The carrier was
floated out of dry dock in December
2011[22] and launched in August 2013.[23]
Basin trials were completed in December
2020,[24] and sea trials started in August
2021.[25] Its commissioning ceremony was
held on 2 September 2022.[26] Aircraft
flight trials will be completed in
2023.[25][27] The total cost of the project is
approximately ₹23,000 crore (equivalent to
₹260 billion or US$3.2 billion in 2023) at
the time of first sea trials.[4][5]
Vikrant's air group
can consist up to 26
Rafale M fighters[28]
and up to 4 Kamov
INS Vikrant
Ka-31,[29] or 2 HAL
Dhruv NUH[30] or 4 History
MH-60R[31] India
helicopters.[5] It is Name Vikrant

262 metres (860 ft) Namesake Vikrant (1

in length, with a top Operator Indian


speed of 28 knots Navy
(52 km/h; 32 mph) Ordered 2004
and endurance of Builder Cochin
7,500 nautical miles Shipyard
(13,900 km; Limited
8,600 mi). The ship
has 2,300 Cost ₹23,000 crore
compartments (equivalent to
manned by 1,700 ₹260 billion

seamen. It has a or
US$3.2 billion
hospital complex,
in 2023)[4][5]
cabins for female
Laid 28
officers, eight
down February
kilometres (5.0 mi)
2009
of corridors, and
Launched 12
eight generators
August
capable of lighting
2013
up a city of 2 million
Acquired 28 July
people.[32]
2022 [1]

Commissioned 2
Septe
2022
Background
Identification Pennan
numbe
In 1999, Defence
R11
Minister George
Fernandes Motto जयेम सं
युधिस्पृधः
authorised the
(Sanskrit)
development and
"I defeat
construction of an
those who
aircraft carrier, INS
fight
Vikrant, under the against
Project 71 Air me"
Defence Ship (translated)
(ADS).[33] By that Nickname(s) IAC-1
time, given the
Status In active
ageing Sea Harrier service[2][3]
fleet, the letter of Badge
intent called for a
carrier that would
carry more modern General

jet fighters. In 2001, characteristics

Cochin Shipyard Displacement 45,0


Limited (CSL) dis

released a graphic 45,0

illustration showing lon


ton
a 32,000-tonne
(31,000-long-ton; Length 262 m

35,000-short-ton) (860 ft)

STOBAR (Short Beam 62 m

Take-Off But (203 ft)

Arrested Recovery) Height 59 m


design with a (194 ft)[6]
pronounced ski Draught 8.4 m
jump. (28 ft)

Depth 25.6 m
The aircraft carrier
(84 ft)
project received
Decks 14
formal government
Installed 4 × Gener
approval in January
power Electric
2003. By then,
LM2500
design updates
Gas
called for a 37,500-
Turbine
tonne (36,900-long- (88 MW)
ton; 41,300-short- 2 × Elecon
ton) carrier to COGAG
operate the Mikoyan Gearbox
MiG-29K. India Propulsion Two
opted for a three- shafts
carrier fleet Speed 30 kn
consisting of one (56 km/h;
carrier battle group 35 mph)[17]

stationed on each Range 8,000 nmi


seaboard, and a (15,000 km;

third carrier held in 9,200 mi)[7]

reserve, in order to Crew 196


continuously protect officers,

both its flanks, to 1,449


sailors
protect economic
(including
interests and
air
mercantile traffic,
crew)[12]
and to provide
Sensors Elta EL
humanitarian
and 2248 M
platforms in times
STAR
of disasters, since a
carrier can provide a processing multif
self-generating systems radar.

supply of fresh Selex R

water, medical 40L 3D


Band A
assistance or
Survei
engineering
Radar
expertise to
Electronic DRDO
populations in need
warfare Shakti
for assistance.[34]
& decoys suite[17

In August 2006, Kavach


Chief of the Naval anti-

Staff Admiral Arun missile


system
Prakash stated that
Maareec
the designation for
Advanc
the vessel had been
Torped
changed from Air Defenc
Defence Ship (ADS) System

to Indigenous Armament 2×32 ce


Aircraft Carrier VLS Ba

(IAC). The 8 SAM


(Range
euphemistic ADS
0.5 km
had been adopted in
(0.31 m
planning stages to
to 100
ward off concerns (62 mi
about a naval build-

up. Final revisions to Otobre
the design 76 mm
increased the (3 in) d
displacement of the purpos
carrier from 37,500 canno

tons to over 45,000


tons. The length of 4 × AK-6
the ship increased CIWS[1

from 252 metres Aircraft 36 Aircraft


(827 ft) to 262 carried Fixed-wing
metres (860 ft).[35] Rafale
order
Design
MiG-2
(Trial

A schematic diagram of INS Vikrant HAL T


(Trial
INS Vikrant is 262
HAL T
metres (860 ft) long
devo
and 62 metres
HAL A
(203 ft) wide, and
cons
displaces about
Rotary-win
45,000 tonnes
Kamo
(44,000 long tons; AH-64
50,000 short (In

tons).[36] It features cons

a STOBAR HAL P
(Trial
configuration.[37] It
can carry an air MH-60

group of up to thirty- HAL D

six aircraft,[38] Aviation 12,500


including 26 fixed- facilities m2 flight

wing combat deck[9]

aircraft,[39] and a
mix of Dhruv MK-III, Sikorsky MH-60R and
Kamov Ka-31 helicopters. The Ka-31 will
fulfil the airborne early warning (AEW) role,
MH-60R will provide anti-surface and anti-
submarine warfare (ASW) capabilities,[40]
and Dhruv will be used mainly for search
and rescue operations.[41]

Vikrant is powered by four General Electric


LM2500+ gas turbines on two shafts,
generating over 80 megawatts
(110,000 hp) of power. The gearboxes for
the carriers were designed and supplied by
Elecon Engineering.[22][42][43]

The ship's combat management system


(CMS) was developed by Tata Advanced
Systems.[18] It is the first CMS developed
by a private company for the Indian Navy
and was handed over to the Navy on 28
March 2019.[44][45]
Carrier air group

The maiden landing of a MiG-29K


onboard INS Vikrant (R11)

Earlier, the Indian Navy considered fielding


MiG-29K,[46] and LCA Navy on Vikrant.[47]
At the same time, in 2009, the then navy
Chief Admiral Nirmal Kumar Verma hinted
that the Navy was carrying out a concept
study for a more capable naval fighter,[47]
which turned out to be the HAL TEDBF,
unveiled at 2021 Aero India airshow.[48] In
June 2012, Flight Global reported that the
Indian Navy was considering the purchase
of Dassault Rafale M (Naval variant) for
Vikrant.[49] The Rafale was by then
declared the winner of IAF's MMRCA
competition.[50]

In 2016, the Navy announced that the


Tejas was overweight for carrier
operations, and other alternatives would
be looked at.[51][52] In 2017, a request for
proposal was issued for 57 "Multi-Role
Carrier Borne Fighters",[53] which was later
cut down to 26 fighters act as a stop gap
measure until the TEDBF is developed.[54]
In December 2020, Boeing Defense, Space
& Security, in coordination with the United
States Navy, demonstrated F/A-18E/F
Super Hornet's capability to operate from
STOBAR carrier.[55][56][57]

HAL Dhruv onboard Vikrant during


sea trials

In 2022, the Indian Navy began testing the


Rafale M and Boeing F/A-18E/F Super
Hornet at a shore-based test facility at INS
Hansa in Goa.[58][59][60][61] The Navy started
the fixed wing aviation trials with Tejas
Naval variant. This to be followed by MiG-
29K trials.[62]

On 6 February 2023, two arrested landings


were made by MiG-29Ks, and also by a
HAL Tejas (Naval Variant).[63]

Ultimately, the Indian military chose the


Rafale M from France for compatibility
with its logistics system.[64] During his visit
on 14 July 2023, PM Narendra Modi will be
the guest of honor at the Bastille Day
parade in France, during which India is
expected to announce the purchase of 24
to 30 Rafale fighter jets.[65][66] The Indian
government announced the selection of
the naval variant of Rafale jets to equip the
Indian Navy with the latest-generation
fighter, Dassault Aviation said on July
15.[11]
The prototype of the TEDBF is to be
readied by 2026 and its production is to
begin by 2032. Naval Tejas being a
technology demonstrator development of
niche technology for deck based fighter
operations, paving the way for TEDBF.[54]

Construction

IAC-1 on its maiden sea voyage.

Vikrant is the first aircraft carrier to be


designed by the Warship Design Bureau
(formerly Directorate of Naval Design) of
the Indian Navy and the first warship to be
built by Cochin Shipyard. Its construction
involved participation of a large number of
private and public firms.

The Defence Metallurgical Research


Laboratory (DMRL) and Steel Authority of
India Limited (SAIL) created facilities to
manufacture the DMR 249 grade steel in
India.[22][67] Reportedly, 26,000 tonnes
(26,000 long tons; 29,000 short tons) of
three types of special steel for the hull,
flight deck and floor compartments were
manufactured at the Bokaro Steel Plant,
Jharkhand, Bhilai Steel Plant, Chhattisgarh
and Rourkela Steel Plant, Odisha. Due to
this, Vikrant is the first ship of the Indian
Navy to be built completely using
domestically produced steel.[68]

The main switch board, steering gear and


water tight hatches have been
manufactured by Larsen & Toubro in
Mumbai and Talegaon; high-capacity air
conditioning and refrigeration systems
have been manufactured in Kirloskar
Group's plants in Pune; most pumps have
been supplied by Best and Crompton;
Bharat Heavy Electricals (BHEL) supplied
the Integrated Platform Management
System (IPMS), which is being installed by
Avio, an Italian company; the gear box was
supplied by Elecon Engineering; and the
electrical cables are being supplied by
Nicco Industries.[69] Fincantieri provided
consultancy for the propulsion package
while Russia's Nevskoye Design Bureau
designed the aviation complex.[70]

The keel for Vikrant was laid by Defence


Minister A.K. Antony at the Cochin
Shipyard on 28 February 2009.[71][72] The
ship uses modular construction, with 874
blocks joined for the hull. By the time the
keel was laid, 423 blocks weighing over
8,000 tons had been completed.[73] In
August 2011, the Defence Ministry
reported to the Lok Sabha that 75% of the
construction work for the hull of the lead
carrier had been completed and the carrier
would be first launched in December 2011,
following which further works would be
completed until commissioning.[74][75] On
29 December 2011, the completed hull of
the carrier was first floated out of its dry
dock at CSL, with its displacement at over
14,000 tonnes (14,000 long tons; 15,000
short tons).[42] Interior works and fittings
on the hull would be carried out until the
second half of 2012, when it would again
be dry-docked for integration with its
propulsion and power generation
systems.[7][22] By late 2012, work
commenced for the next stage of
construction, which included the
installation of the integrated propulsion
system, the superstructure, the upper
decks, the cabling, sensors and
weapons.[76]

Launch

INS Vikrant during its launch in


August 2013

In July 2013, Defence Minister Antony


announced that Vikrant would be launched
on 12 August at the Cochin Shipyard. The
ship was launched by his wife, Elizabeth
Antony, on 12 August 2013.[77]
According to Admiral Robin Dhowan,
about 83% of the fabrication work and 75%
of the construction work had been
completed at the time of launching. He
said that 90% of the body work of the
aircraft carrier had been designed and
made in India, about 50% of the propulsion
system, and about 30% of its weaponry.
He also said that the ship would be
equipped with a long range missile system
with multi-function radar and a close-in
weapon system (CIWS).[78] After the
launch, Vikrant would be re-docked for the
second phase of construction, in which the
ship would be fitted with various weapons
and sensors, and the propulsion system,
flight deck and the aircraft complex would
be integrated.[69]

Undocking and fitting-out

INS Vikrant during its undocking in


June 2015

Vikrant was undocked on 10 June 2015


after the completion of structural work.
Cabling, piping, heat and ventilation works
were scheduled to be completed by 2017
with sea trials to begin thereafter.[79] By
October 2015, the construction of the hull
was close to 98 percent complete, with
flight deck construction underway.[80] The
installation of machinery, piping and the
propeller shafts was in progress by
January 2016; it was reported, however,
that there were delays in the delivery of
equipment from Russia for the carrier's
aviation complex.[81] By May 2017, the
carrier's fitting-out was 62% complete, with
trials of the auxiliary systems scheduled
by late 2017.[12]

In February 2020, all major structural and


outfitting work was declared complete.[82]
Harbour and sea trials

Basin trials of the aircraft carrier.

On 31 October 2019, Cochin Shipyard


received a ₹30 billion (equivalent to
₹37 billion or US$470 million in 2023)
contract for the Phase-III of the project.[83]
This contract included funds for the
harbour trials, sea trials and support for
the ship during its weapons and aviation
trials after its delivery.[84] In December
2019, it was reported the engines had
been switched on.[85] By September 2020,
Vikrant had completed harbour trials while
the basin trials started from October 2020
to check propulsion, electric transmission
and shafting systems.[86] On 30 November
2020, the basin trials were completed,
paving the way for sea trials, the final
phase of the IAC-I project.[87][88]

A Westland WS-61 Sea King


approaches Vikrant while on sea trials

In April 2021, it was reported work had


begun to integrate the long-range surface-
to-air missile (LRSAM) onboard
Vikrant.[89][90][91] On 15 June 2021, Vikrant
was moved to the Ernakulam Wharf in
Kochi, Kerala.[92] On 4 August 2021, sea
trials finally began.[93] The first phase of
the sea trials was successfully completed
on 8 August 2021.[94] The second phase of
the trials was conducted on 24 October
2021,[95] followed by the third phase from
9–17 January 2022,[96][97][98] both of which
were completed successfully.[99] On 10
July, the fourth and final phase of the sea
trials was successfully completed. This
phase involved integrated trials of most of
the equipment and systems aboard
Vikrant, including portions of the Aviation
Facilities Complex.[100] On 26 May 2023
Indian built Mikoyan MiG-29K successfully
landed on its deck during night sea trials
lauding praise from defense ministry for
Navy's dependence on Atmanirbhar
Bharat.[101]

Completion and
commissioning

Prime Minister Narendra Modi


commissioned INS Vikrant on 2
September 2022 in Kochi, Kerala.

Prime Minister Narendra Modi


commissioned INS Vikrant on 2
September 2022 in a grand ceremony at
Cochin Shipyard.[26][102] Earlier, INS Vikrant
was delivered to the Indian Navy on 28
July 2022.[2] Flight trials of its aircraft
complement are expected to be
completed by mid-2023, after which the
ship will be fully operational.[25] In March
2020, it was revealed that after its
commissioning, the Navy will deploy
Vikrant at Larsen & Toubro's shipyard in
Kattupalli near Chennai. This was done as
the planned naval base in Rambilli near
Vishakhapatnam was not ready yet.[103]

The Navy wants to lease a 260 m berth at


Kattupalli shipyard for 8 years between
2022 and 2030 for interim berthing of the
ship, by which time the naval base at
Rambilli is expected to be available.[103] On
6 February 2023, the naval variant of the
Tejas became the first fixed wing fighter to
launch from and recover to Vikrant.[104] On
22 March 2023, the Vice Chief of Navy
Staff, Vice Admiral SN Ghormade, returned
the bell originally placed on the previous
Vikrant to Commodore Vidhyadhar Harke,
the new ship's first commanding officer. In
1997, the bell of the decommissioned
namesake ship was placed at the
residence of Indian Navy Vice Chief, 5
Motilal Nehru Marg, New Delhi.[105]

LCA Tejas maiden landing onboard


INS Vikrant (R11)
Following the Formal Commissioning of
Vikrant, a proposal was made to build
another IAC class carrier before INS Vishal
. By November 2023 a ₹400 Billion worth
proposal for a new carrier was on track to
be approved by the Defense Acquisition
Council — the country's top defense
decision-making body headed by defense
minister, Rajnath Singh.[106][107]

The new carrier, which can hold at least 28


fighter jets and helicopters will displace
45,000 tons of water and will be flying the
French Rafale jets intiallly, but will soon fly
HAL TEDBF fighters[108]
Commanding officers
Took Left
Name Notes
command command

Captain
31 December
Vidhyadhar Harke 7 May 2021 First CO of Vikrant.[109]
2023
VSM

Captain Birendra S 31 December Commissioning CO of


Present
Bains VSM 2023 INS Visakhapatnam (D66).[110][111]

Project delays

The construction plan originally called for


the carrier to be launched in 2010,[112] sea
trials to commence in 2013, and to be
commissioned in 2016.[113][114] However,
the project experienced some delays such
as delay in the delivery of main gearboxes,
aviation equipments etc., and cost
overrun.[115] The supplier of gearboxes,
Elecon, attributed it to technical
complexities due to the length of the
propulsion shafts.[116]

A part of the blame for the delay in delivery


of Vikrant was attributed to the delay in
the supply of aviation equipment from
Russia. In response to a question in the
Rajya Sabha, Sripad Naik, the Minister of
State for Defence, stated: "Ship's targeted
delivery was affected due to delay in
supply of aviation equipment from
Russia".[117] Later due to the Covid-19
pandemic, sea trials of the carrier were
further postponed to late 2020,[118] but
eventually began in August 2021. The
carrier was commissioned on 2
September 2022.[119][120][121]
Gallery
Vikrant with Vikrant and Vikrant and
INS Vikrama Vikramadity Vikramadity
ditya a during an a with two
undertaking exercise. Kolkata-
joint carrier class
operations. destroyer
and a
Talwar-
class
frigate.
Vikrant Vikrant Vikrant with
performing undertaking INS Kolkata
manoeuvres a during sea
with replenishme trials.
Vikramadity nt at sea
a. with
INS Deepak.
Vikrant Vikrant
during sea during sea
trials. trials.

See also

Future of the Indian Navy


List of active Indian Navy ships
List of aircraft carriers in service
INS Vikramaditya
INS Viraat

References

1. "Indigenous aircraft carrier INS Vikrant


handed over to Indian Navy" (https://india
nexpress.com/article/india/cochin-shipya
rd-delivers-countrys-first-indigenously-ma
de-aircraft-carrier-vikrant-to-navy-805663
7/) . 29 July 2022. Archived (https://web.a
rchive.org/web/20220728172703/https://i
ndianexpress.com/article/india/cochin-sh
ipyard-delivers-countrys-first-indigenously-
made-aircraft-carrier-vikrant-to-navy-8056
637/) from the original on 28 July 2022.
Retrieved 28 July 2022.
2. "Delivery of Indigenous Aircraft Carrier
(IAC) 'Vikrant' " (https://pib.gov.in/PressRe
leasePage.aspx?PRID=1845871) . Press
Information Bureau of India. 28 July 2022.
Archived (https://web.archive.org/web/20
220829082134/https://pib.gov.in/PressRe
leasePage.aspx?PRID=1845871) from
the original on 29 August 2022. Retrieved
28 August 2022.
3. "Aircraft carrier Vikrant completes third
sea trials, returns to Kochi harbour" (http
s://www.newindianexpress.com/nation/2
022/jan/17/aircraft-carrier-vikrant-complet
es-third-sea-trials-returns-to-kochi-harbour
-2407857.amp) . The New Indian Express.
Archived (https://web.archive.org/web/20
220515145814/https://www.newindianex
press.com/nation/2022/jan/17/aircraft-ca
rrier-vikrant-completes-third-sea-trials-retu
rns-to-kochi-harbour-2407857.amp) from
the original on 15 May 2022. Retrieved
17 January 2022.
4. "India's first indigenous aircraft carrier INS
Vikrant sets off for sea trials from Kochi"
(https://www.newindianexpress.com/nati
on/2021/aug/04/indias-first-indigenous-ai
rcraft-carrier-ins-vikrant-sets-off-for-sea-tri
als-from-kochi-2340044.html) . The New
Indian Express. 4 August 2021. Archived
(https://web.archive.org/web/202108051
13319/https://www.newindianexpress.co
m/nation/2021/aug/04/indias-first-indige
nous-aircraft-carrier-ins-vikrant-sets-off-for
-sea-trials-from-kochi-2340044.html)
from the original on 5 August 2021.
Retrieved 4 August 2021.
5. "IAC Vikrant, India's first indigenously-built
aircraft carrier, commissioned on
September 2" (https://www.msn.com/en-i
n/news/india/iac-vikrant-india-s-first-indig
enously-built-aircraft-carrier-to-be-commis
sioned-on-september-2/) . msn. Retrieved
23 August 2022.
6. "Commencement of Sea Trials of
Indigenous Aircraft Carrier IAC-P71
"VIKRANT" " (https://pib.gov.in/PressRelea
sePage.aspx?PRID=1742282) . Press
Information Bureau. Government of India.
4 August 2021. Archived (https://web.arch
ive.org/web/20220227035553/https://pib.
gov.in/PressReleasePage.aspx?PRID=174
2282) from the original on 27 February
2022. Retrieved 6 August 2021.
7. "India Floats out Its First Indigenous
Aircraft Carrier" (https://web.archive.org/
web/20150213103829/http://www.defenc
enow.com/news/449/india-floats-out-its-fi
rst-indigenous-aircraft-carrier-ins-vikrant-fr
om-cochin.html) . DefenceNow.com. 2
January 2012. Archived from the original
(http://www.defencenow.com/news/449/i
ndia-floats-out-its-first-indigenous-aircraft-
carrier-ins-vikrant-from-cochin.html) on
13 February 2015. Retrieved 18 May 2015.
8. Farley, Robert. "An Update on India's
Aircraft Carrier Aspirations" (https://thedip
lomat.com/2020/10/an-update-on-indias-
aircraft-carrier-aspirations/) .
thediplomat.com. Archived (https://web.ar
chive.org/web/20220120225015/https://t
hediplomat.com/2020/10/an-update-on-in
dias-aircraft-carrier-aspirations/) from the
original on 20 January 2022. Retrieved
25 October 2020.
9. "INS Vikrant: Inside India's newly-
commissioned aircraft carrier" (https://ww
w.bbc.com/news/world-asia-india-627493
45) . BBC News. 1 September 2022.
Archived (https://web.archive.org/web/20
220903074155/https://www.bbc.com/ne
ws/world-asia-india-62749345) from the
original on 3 September 2022. Retrieved
4 February 2023.
10. Anand, Nisha (25 August 2022). "India's
indigenous aircraft carrier Vikrant to be
commissioned on Sept 2" (https://www.hi
ndustantimes.com/india-news/indias-indi
genous-aircraft-carrier-vikrant-to-be-comm
issioned-on-sept-2-101661418602860.ht
ml) . Hindustan Times. Archived (https://
web.archive.org/web/20230204051708/ht
tps://www.hindustantimes.com/india-new
s/indias-indigenous-aircraft-carrier-vikrant
-to-be-commissioned-on-sept-2-10166141
8602860.html) from the original on 4
February 2023. Retrieved 4 February 2023.
11. "India selects naval version of Rafale:
Dassault Aviation" (https://www.thehindu.
com/news/national/india-selects-naval-ve
rsion-of-rafale-dassault-aviation/article67
083110.ece) . The Hindu. 15 July 2023.
ISSN 0971-751X (https://www.worldcat.or
g/issn/0971-751X) . Archived (https://we
b.archive.org/web/20230715082834/http
s://www.thehindu.com/news/national/indi
a-selects-naval-version-of-rafale-dassault-
aviation/article67083110.ece) from the
original on 15 July 2023. Retrieved 15 July
2023.
12. Anandan, S. (13 May 2017). "In the heart
of the iron beast" (http://www.thehindu.co
m/news/national/kerala/in-the-heart-of-th
e-iron-beast/article18440534.ece) . The
Hindu. Archived (https://web.archive.org/
web/20170828014829/http://www.thehin
du.com/news/national/kerala/in-the-heart
-of-the-iron-beast/article18440534.ece)
from the original on 28 August 2017.
Retrieved 13 May 2017.
13. "Annual Report 2019–20" (https://cochins
hipyard.com/uploads/anualreport/973b9f
482337cbdec7c3c7761a973555.pdf)
(PDF). Cochin Shipyard Ltd. Archived (http
s://web.archive.org/web/2020101820475
6/https://cochinshipyard.com/uploads/an
ualreport/973b9f482337cbdec7c3c7761a
973555.pdf) (PDF) from the original on 18
October 2020. Retrieved 25 September
2020.
14. Philip, Snehesh Alex (25 June 2021). "Sea
trials of first indigenous aircraft carrier INS
Vikrant in July, commissioning mid-2022"
(https://theprint.in/defence/sea-trials-of-fi
rst-indigenous-aircraft-carrier-ins-vikrant-in
-july-commissioning-mid-2022/684286/) .
ThePrint. Retrieved 14 December 2023.
15. "List of Aircraft Carriers Under
Construction: 2013" (http://world-defece-r
eview.blogspot.com/2013/02/list-of-aircra
ft-carriers-under.html#ixzz2nvBh8WNd) .
World Defense Review. Archived (https://w
eb.archive.org/web/20150519090716/htt
p://world-defece-review.blogspot.com/201
3/02/list-of-aircraft-carriers-under.html#ix
zz2nvBh8WNd) from the original on 19
May 2015. Retrieved 17 May 2015.
16. Navy to go for VISHAL | Vikrant's Lift
10x14m (https://www.youtube.com/watc
h?v=6CXLp926P20) on YouTube
17. "Indigenous Aircraft Carrier, to be named
INS Vikrant, is biggest ship made in India"
(https://www.thehindu.com/news/nationa
l/indigenous-aircraft-carrier-to-be-named-i
ns-vikrant-is-biggest-ship-made-in-india/ar
ticle34970142.ece) . The Hindu. 25 June
2021. ISSN 0971-751X (https://www.world
cat.org/issn/0971-751X) . Archived (http
s://web.archive.org/web/2021062817420
2/https://www.thehindu.com/news/nation
al/indigenous-aircraft-carrier-to-be-named-
ins-vikrant-is-biggest-ship-made-in-india/a
rticle34970142.ece) from the original on
28 June 2021. Retrieved 10 July 2021.
18. Philip, Snehesh Alex (2 September 2022).
"Floating airfield — PM Modi commissions
INS Vikrant, India's first indigenous aircraft
carrier" (https://theprint.in/defence/floatin
g-airfield-pm-modi-commissions-ins-vikra
nt-indias-first-indigenous-aircraft-carrier/1
112678/) . ThePrint. Archived (https://we
b.archive.org/web/20230204055059/http
s://theprint.in/defence/floating-airfield-pm
-modi-commissions-ins-vikrant-indias-first
-indigenous-aircraft-carrier/1112678/)
from the original on 4 February 2023.
Retrieved 4 February 2023.
19. "LM2500 Engines To Power India's First
Indigenous Aircraft Carrier" (https://www.n
avalnews.com/naval-news/2022/08/lm25
00-engines-to-power-indias-first-indigenou
s-aircraft-carrier/) . Naval News. Archived
(https://web.archive.org/web/202301291
54336/https://www.navalnews.com/naval
-news/2022/08/lm2500-engines-to-power-
indias-first-indigenous-aircraft-carrier/)
from the original on 29 January 2023.
Retrieved 10 December 2022.
20. Gady, Franz-Stefan. "India's First
Homegrown Aircraft Carrier to Enter Sea
Trials in Early 2020" (https://thediplomat.c
om/2018/07/indias-first-homegrown-aircr
aft-carrier-to-enter-sea-trials-in-early-202
0/) . The Diplomat. Archived (https://web.
archive.org/web/20190330140422/http
s://thediplomat.com/2018/07/indias-first-
homegrown-aircraft-carrier-to-enter-sea-tri
als-in-early-2020/) from the original on 30
March 2019. Retrieved 5 April 2019.
21. Singh, Harmeet (12 August 2013). "India
unveils home-built aircraft carrier, INS
Vikrant" (http://edition.cnn.com/2013/08/
12/world/asia/india-aircraft-carrier/index.
html) . CNN. Archived (https://web.archiv
e.org/web/20150517035330/http://editio
n.cnn.com/2013/08/12/world/asia/india-
aircraft-carrier/index.html) from the
original on 17 May 2015. Retrieved 18 May
2015.
22. Anandan, S.; Martin, K. A. (30 December
2011). "Navy floats out first Indigenous
Aircraft Carrier" (http://www.thehindu.co
m/news/national/article2758985.ece) .
The Hindu. Archived (https://web.archive.
org/web/20120104111832/http://www.th
ehindu.com/news/national/article275898
5.ece) from the original on 4 January
2012. Retrieved 18 May 2015.
23. "India launches first indigenous aircraft
carrier INS Vikrant" (https://timesofindia.in
diatimes.com/india/India-launches-first-in
digenous-aircraft-carrier-INS-Vikrant/articl
eshow/21774409.cms) . The Time of
India. 12 August 2013. Archived (https://w
eb.archive.org/web/20160820063657/htt
p://timesofindia.indiatimes.com/India/Indi
a-launches-first-indigenous-aircraft-carrier
-INS-Vikrant/articleshow/21774409.cms)
from the original on 20 August 2016.
24. Vavasseur, Xavier (30 November 2020).
"India's New Aircraft Carrier IAC 1 – INS
Vikrant Passes Basin Trials" (https://www.
navalnews.com/naval-news/2020/11/indi
as-new-aircraft-carrier-iac-1-ins-vikrant-pa
sses-basin-trials/) . Naval News. Archived
(https://web.archive.org/web/202011301
82035/https://www.navalnews.com/naval
-news/2020/11/indias-new-aircraft-carrier
-iac-1-ins-vikrant-passes-basin-trials/)
from the original on 30 November 2020.
Retrieved 5 December 2020.
25. Pandit, Rajat (5 August 2021). "India's first
indigenous aircraft carrier, to be named
INS Vikrant, finally begins sea trials" (http
s://timesofindia.indiatimes.com/india/indi
as-first-indigenous-aircraft-carrier-to-be-na
med-ins-vikrant-finally-begins-sea-trials/ar
ticleshow/85031100.cms) . The Times of
India. Archived (https://web.archive.org/w
eb/20210805112318/https://timesofindia.
indiatimes.com/india/indias-first-indigeno
us-aircraft-carrier-to-be-named-ins-vikrant-
finally-begins-sea-trials/articleshow/8503
1100.cms) from the original on 5 August
2021. Retrieved 5 August 2021.
26. "PM Commissions INS Vikrant" (http://ww
w.ptinews.com/news/13670227_PM-Com
missions-INS-Vikrant.html) . Press Trust
of India. 2 September 2022. Archived (http
s://web.archive.org/web/2022090405071
3/http://www.ptinews.com/news/136702
27_PM-Commissions-INS-Vikrant.html)
from the original on 4 September 2022.
Retrieved 2 September 2022.
27. "Navy's long-term plan is to have three
aircraft carriers, says Navy chief Admiral
Karambir Singh" (https://www.thehindubus
inessline.com/news/indian-navys-long-ter
m-plan-is-to-have-three-aircraft-carriers-na
vy-chief-admiral-karambir-singh/article301
47141.ece) . Business Line. 3 December
2019. Archived (https://web.archive.org/w
eb/20210806032515/https://www.thehind
ubusinessline.com/news/indian-navys-lon
g-term-plan-is-to-have-three-aircraft-carrier
s-navy-chief-admiral-karambir-singh/articl
e30147141.ece) from the original on 6
August 2021. Retrieved 4 December 2019.
28. Gupta, Shishir (10 July 2023). "Indian Navy
to get 26 Rafale-M fighters and three
attack submarines from France" (https://w
ww.hindustantimes.com/india-news/india
n-navy-to-get-26-rafale-m-fighters-and-thre
e-attack-submarines-from-france-1016889
53456665.html) . Hindustan Times.
Archived (https://web.archive.org/web/20
230712072327/https://www.hindustantim
es.com/india-news/indian-navy-to-get-26-r
afale-m-fighters-and-three-attack-submari
nes-from-france-101688953456665.html)
from the original on 12 July 2023.
Retrieved 11 July 2023.
29. Raghuvanshi, Vivek (16 May 2022). "India
halts Ka-31 helicopter deal with Russia" (h
ttps://www.defensenews.com/global/asia
-pacific/2022/05/16/india-halts-ka-31-heli
copter-deal-with-russia/) . Defense News.
Archived (https://web.archive.org/web/20
220904050721/https://www.defensenew
s.com/global/asia-pacific/2022/05/16/in
dia-halts-ka-31-helicopter-deal-with-russi
a/) from the original on 4 September
2022. Retrieved 29 May 2022.
30. "India's First Indigenous Aircraft Carrier -
INS Vikrant" (https://web.archive.org/web/
20160312125852/http://pib.nic.in/newsit
e/efeatures.aspx?relid=98885) . Archived
from the original (http://pib.nic.in/newsit
e/efeatures.aspx?relid=98885) on 12
March 2016.
31. Negi, Manjeet; Bhalla, Abhishek (17 July
2021). "Indian Navy receives first two 24
MH-60R helicopters from US" (https://ww
w.indiatoday.in/india/story/indian-navy-rec
eives-first-two-mh-60r-helicopters-from-us
-1829217-2021-07-17) . India Today.
Archived (https://web.archive.org/web/20
220529081540/https://www.indiatoday.i
n/india/story/indian-navy-receives-first-tw
o-mh-60r-helicopters-from-us-1829217-20
21-07-17) from the original on 29 May
2022. Retrieved 18 July 2021.
32. "IAC Vikrant, India's first indigenously-built
aircraft carrier, to be commissioned on
September 2" (https://www.msn.com/en-i
n/news/india/iac-vikrant-india-s-first-indig
enously-built-aircraft-carrier-to-be-commis
sioned-on-september-2/) . msn. Retrieved
23 August 2022.
33. "Indian Aircraft Carrier (Project-71)" (http
s://web.archive.org/web/2012021718502
5/http://www.bharat-rakshak.com/NAVY/
Ships/Future/185-Indian-Aircraft-Carrier.ht
ml) . Bharat Rakshak. Archived from the
original (http://www.bharat-rakshak.com/
NAVY/Ships/Future/185-Indian-Aircraft-Ca
rrier.html) on 17 February 2012.
34. Rehman, Iskander (1 June 2010). "India's
Future Aircraft Carrier Force and the Need
for Strategic Flexibility" (https://web.archiv
e.org/web/20130406065524/http://www.i
dsa.in/idsacomments/IndiasFutureAircraf
tCarrierForceandtheNeedforStrategicFlexi
bility_irehman_010610) . idsa.in. Archived
from the original (http://www.idsa.in/idsac
omments/IndiasFutureAircraftCarrierForc
eandtheNeedforStrategicFlexibility_irehma
n_010610) on 6 April 2013. Retrieved
17 March 2019.
35. "Antony lays keel of first Indigenous
Aircraft Carrier" (https://web.archive.org/
web/20110114043451/http://pib.nic.in/rel
ease/release.asp?relid=48166) .
Pib.nic.in. Archived from the original (htt
p://pib.nic.in/release/release.asp?relid=48
166) on 14 January 2011. Retrieved
1 February 2011.
36. Farley, Robert. "An Update on India's
Aircraft Carrier Aspirations" (https://thedip
lomat.com/2020/10/an-update-on-indias-
aircraft-carrier-aspirations/) .
thediplomat.com. Archived (https://web.ar
chive.org/web/20220120225015/https://t
hediplomat.com/2020/10/an-update-on-in
dias-aircraft-carrier-aspirations/) from the
original on 20 January 2022. Retrieved
10 July 2021.
37. Shrivastava, Sanskar (25 August 2013).
"Comparison of Chinese Aircraft Carrier
Liaoning and Indian INS Vikrant" (http://w
ww.theworldreporter.com/2013/08/aicraft
-carrier-liaoning-vs-indian-ins-vikrant.htm
l) . The World Reporter. Archived (https://
web.archive.org/web/20130828195035/ht
tp://www.theworldreporter.com/2013/08/
aicraft-carrier-liaoning-vs-indian-ins-vikran
t.html) from the original on 28 August
2013. Retrieved 18 May 2015.
38. "INS Vikrant: 10 things about India's first
indigenous aircraft carrier - 37,500-tonne
carrier" (https://economictimes.indiatime
s.com/infrastructure/ins-vikrant-10-things-
about-indias-first-indigenous-aircraft-carri
er/37500-tonne-carrier/slideshow/217772
52.cms) . The Economic Times. Archived
(https://web.archive.org/web/202302040
54237/https://economictimes.indiatimes.
com/infrastructure/ins-vikrant-10-things-a
bout-indias-first-indigenous-aircraft-carrie
r/37500-tonne-carrier/slideshow/2177725
2.cms) from the original on 4 February
2023. Retrieved 4 February 2023.
39. Ramsay, Sushil (March 2014). "Force
Projection and Modernization of Indian
Navy" (https://web.archive.org/web/2014
0504171903/http://www.spsnavalforces.c
om/ebook.asp?Id=140203043725-c916f5
2beb13022808869dac8e2950ae&Name=s
p_s_naval_forces_01_-_2014&Info=SP%27
s%20Naval%20Forces%20February%20-%
20March%202014&t=1359441862394&r=
85&mob=10055951&year=2014) . SP's
Naval Forces. pp. 4–6. Archived from the
original (http://www.spsnavalforces.com/
ebook.asp?Id=140203043725-c916f52beb
13022808869dac8e2950ae&Name=sp_s_
naval_forces_01_-_2014&Info=SP%27s%2
0Naval%20Forces%20February%20-%20M
arch%202014&t=1359441862394&r=85&
mob=10055951&year=2014) on 4 May
2014. Retrieved 18 May 2015.
40. Parsons, Dan (15 May 2020). "India buys
two dozen MH-60R sub-hunting
helicopters for $900 million" (https://vertic
almag.com/news/india-buys-two-dozen-m
h-60r-sub-hunting-helicopters-for-900-milli
on/) . Vertical Magazine. Archived (http
s://web.archive.org/web/2023020405395
9/https://verticalmag.com/news/india-bu
ys-two-dozen-mh-60r-sub-hunting-helicopt
ers-for-900-million/) from the original on
4 February 2023. Retrieved 4 February
2023.
41. Dominguez, Gabriel; Bedi, Rahul (20 April
2021). "Indian Navy commissions first
squadron of Dhruv ALH Mk III helicopters"
(https://www.janes.com/defence-news/ne
ws-detail/indian-navy-commissions-first-s
quadron-of-dhruv-alh-mk-iii-helicopters) .
Janes.com. Archived (https://web.archive.
org/web/20230204060703/https://www.j
anes.com/defence-news/news-detail/indi
an-navy-commissions-first-squadron-of-dh
ruv-alh-mk-iii-helicopters) from the
original on 4 February 2023. Retrieved
4 February 2023.
42. Vora, Rutan (26 December 2011). "Elecon
to supply gears for India's first aircraft
carrier" (http://www.business-standard.co
m/india/news/elecon-to-supply-gears-for-i
ndias-first-aircraft-carrier/459654/) .
Business Standard. Archived (https://web.
archive.org/web/20220904050719/http
s://www.business-standard.com/article/c
ompanies/elecon-to-supply-gears-for-india
-s-first-aircraft-carrier-111122600005_1.ht
ml) from the original on 4 September
2022. Retrieved 18 May 2015.
43. "India starts work on second indigenous
aircraft carrier" (http://economictimes.indi
atimes.com/news/politics/nation/India-st
arts-work-on-second-indigenous-aircraft-c
arrier/articleshow/15004643.cms) . The
Economic Times. 16 July 2012. Archived
(https://web.archive.org/web/201708300
02907/http://economictimes.indiatimes.c
om/news/politics/nation/India-starts-wor
k-on-second-indigenous-aircraft-carrier/art
icleshow/15004643.cms) from the
original on 30 August 2017. Retrieved
18 May 2015.
44. Gurung, Shaurya Karanbir (29 March
2019). "Indian Navy gets combat
management system for INS Vikrant" (http
s://economictimes.indiatimes.com/news/
defence/indian-navy-gets-combat-manage
ment-system-for-ins-vikrant/articleshow/6
8635755.cms) . The Economic Times.
Archived (https://web.archive.org/web/20
190703214612/https://economictimes.in
diatimes.com/news/defence/indian-navy-
gets-combat-management-system-for-ins-
vikrant/articleshow/68635755.cms) from
the original on 3 July 2019. Retrieved
3 July 2019.
45. "Indian Navy gets most critical, made in
India, CM system for its indigenous
Aircraft Carrier" (https://www.financialexpr
ess.com/defence/indian-navy-gets-most-c
ritical-made-in-india-cm-system-for-its-indi
genous-aircraft-carrier/1532128/) . The
Financial Express. 29 March 2019.
Archived (https://web.archive.org/web/20
190703214611/https://www.financialexpr
ess.com/defence/indian-navy-gets-most-c
ritical-made-in-india-cm-system-for-its-indi
genous-aircraft-carrier/1532128/) from
the original on 3 July 2019. Retrieved
3 July 2019.
46. Pandit, Rajat (18 January 2010). "India,
Russia to ink $1.2 bn deal for 29 more
MiG-29Ks" (http://articles.timesofindia.ind
iatimes.com/2010-01-18/india/28115936
_1_refit-rechristened-ins-vikramaditya-larg
est-defence-supplier) . The Times of India.
Archived (https://web.archive.org/web/20
140202145014/http://ibnlive.in.com/new
s/indigenous-aircraft-carrier-to-be-launche
d-in-august-ak-antony/391008-3.html)
from the original on 2 February 2014.
47. Sandeep Unnithan (2 December 2009).
"First indigenous aircraft carrier to be
launched next year: Navy chief: LATEST
HEADLINES: India Today" (http://indiatoda
y.intoday.in/site/Story/73256/Top%20Stor
ies/First+indigenous+aircraft+carrier+to+
be+launched+next+year:+Navy+chief.htm
l) . Indiatoday.intoday.in. Archived (https://
web.archive.org/web/20100126052127/ht
tp://indiatoday.intoday.in/site/Story/7325
6/Top%2BStories/First%2Bindigenous%2B
aircraft%2Bcarrier%2Bto%2Bbe%2Blaunch
ed%2Bnext%2Byear%3A%2BNavy%2Bchie
f.html) from the original on 26 January
2010. Retrieved 1 February 2011.
48. Jennings, Gareth (4 February 2021). "Aero
India 2021: Indian TEDBF naval fighter
showcased by HAL" (https://www.janes.co
m/defence-news/news-detail/aero-india-2
021-indian-tedbf-naval-fighter-showcased-
by-hal) . Janes.com. Archived (https://we
b.archive.org/web/20210806144616/http
s://www.janes.com/defence-news/news-d
etail/aero-india-2021-indian-tedbf-naval-fig
hter-showcased-by-hal) from the original
on 6 August 2021. Retrieved 3 February
2023.
49. "IAC enters trial as navy eyes Rafale" (htt
p://www.flightglobal.com/news/articles/in
dian-aircraft-carrier-enters-sea-trials-as-na
vy-eyes-rafale-372925/) . Flight magazine.
12 June 2012. Archived (https://web.archi
ve.org/web/20120623224451/http://www.
flightglobal.com/news/articles/indian-airc
raft-carrier-enters-sea-trials-as-navy-eyes-r
afale-372925/) from the original on 23
June 2012. Retrieved 1 August 2012.
50. Deepalakshimi, K. (16 April 2016). "All you
need to know about the Rafale deal" (http
s://www.thehindu.com/specials/in-depth/
All-you-need-to-know-about-Rafale-deal/ar
ticle60529965.ece) . The Hindu.
ISSN 0971-751X (https://www.worldcat.or
g/issn/0971-751X) . Archived (https://we
b.archive.org/web/20230203164057/http
s://www.thehindu.com/specials/in-depth/
All-you-need-to-know-about-Rafale-deal/ar
ticle60529965.ece) from the original on 3
February 2023. Retrieved 3 February 2023.
51. "Navy rejects Tejas, says "overweight"
fighter does not meet its requirements" (ht
tp://timesofindia.indiatimes.com/india/Na
vy-rejects-Tejas-says-overweight-fighter-d
oes-not-meet-its-requirements/articlesho
w/55756350.cms) . The Times of India.
Archived (https://web.archive.org/web/20
161206075145/http://timesofindia.indiati
mes.com/india/Navy-rejects-Tejas-says-o
verweight-fighter-does-not-meet-its-requir
ements/articleshow/55756350.cms)
from the original on 6 December 2016.
Retrieved 22 December 2016.
52. "Navy rules out deploying "overweight"
Tejas on aircraft carriers" (http://indianexp
ress.com/article/india/navy-rules-out-depl
oying-overweight-tejas-on-aircraft-carriers-
4407349/) . indianexpress.com. 2
December 2016. Archived (https://web.arc
hive.org/web/20161220195429/http://indi
anexpress.com/article/india/navy-rules-o
ut-deploying-overweight-tejas-on-aircraft-c
arriers-4407349/) from the original on 20
December 2016. Retrieved 22 December
2016.
53. Siddiqui, Huma (18 April 2018). "Requests
for proposals: Indian Navy looks to buy 57
fighters for Rs 95,000 crore" (https://www.
financialexpress.com/defence/requests-f
or-proposals-indian-navy-looks-to-buy-57-fi
ghters-for-rs-95000-crore/1136675/) . The
Financial Express. Archived (https://web.a
rchive.org/web/20210429051930/https://
www.financialexpress.com/defence/reque
sts-for-proposals-indian-navy-looks-to-buy-
57-fighters-for-rs-95000-crore/1136675/)
from the original on 29 April 2021.
Retrieved 29 April 2021.
54. Singh, Rahul (6 February 2023). "WATCH |
Naval Light Combat Aircraft operates from
INS Vikrant for 1st time" (https://www.hind
ustantimes.com/india-news/naval-light-co
mbat-aircraft-operates-from-ins-vikrant-for
-1st-time-101675682185590.html) .
Hindustan Times. Archived (https://web.ar
chive.org/web/20230206152244/https://
www.hindustantimes.com/india-news/nav
al-light-combat-aircraft-operates-from-ins-
vikrant-for-1st-time-101675682185590.ht
ml) from the original on 6 February 2023.
Retrieved 6 February 2023.
55. Peri, Dinakar (21 December 2020). "F/A-18
operation on Indian carriers successfully
demonstrated: Boeing" (https://www.thehi
ndu.com/news/national/boeing-says-succ
essful-demonstration-of-f-18s-landing-on-i
ndian-navy-carriers/article33383680.ec
e) . The Hindu. ISSN 0971-751X (https://w
ww.worldcat.org/issn/0971-751X) .
Archived (https://web.archive.org/web/20
210310104851/https://www.thehindu.co
m/news/national/boeing-says-successful-
demonstration-of-f-18s-landing-on-indian-
navy-carriers/article33383680.ece) from
the original on 10 March 2021. Retrieved
29 April 2021.
56. Pubby, Manu (21 December 2020).
"Boeing announces Super Hornet
demonstrated compatibility with Indian
carriers - The Economic Times" (https://m.
economictimes.com/news/defence/boein
g-announces-super-hornet-demonstrated-
compatibility-with-indian-carriers/amp_arti
cleshow/79836191.cms) . The Economic
Times. Archived (https://web.archive.org/
web/20210429051932/https://m.economi
ctimes.com/news/defence/boeing-annou
nces-super-hornet-demonstrated-compati
bility-with-indian-carriers/amp_articlesho
w/79836191.cms) from the original on
29 April 2021. Retrieved 29 April 2021.
57. Gupta, Shishir (30 May 2022). "India to buy
26 fighters for INS Vikrant on G-2-G basis"
(https://www.hindustantimes.com/india-n
ews/india-to-buy-26-fighters-for-ins-vikrant
-on-g-2-g-basis-101653881468920.html) .
Hindustan times. Archived (https://web.ar
chive.org/web/20220530034419/https://
www.hindustantimes.com/india-news/indi
a-to-buy-26-fighters-for-ins-vikrant-on-g-2-
g-basis-101653881468920.html) from
the original on 30 May 2022. Retrieved
30 May 2022.
58. P, Rajat (6 January 2022). "Demonstration
of Rafale fighter for Navy begins at Goa,
F/A-18 next in March | India News - Times
of India" (https://timesofindia.indiatimes.c
om/india/demonstration-of-rafale-fighter-
begins-for-navy-at-goa-f/a-18-next-in-marc
h/articleshow/88740199.cms) . The
Times of India. Archived (https://web.archi
ve.org/web/20220106190746/https://tim
esofindia.indiatimes.com/india/demonstr
ation-of-rafale-fighter-begins-for-navy-at-g
oa-f/a-18-next-in-march/articleshow/8874
0199.cms) from the original on 6 January
2022. Retrieved 6 January 2022.
59. Gupta, Shishir (1 January 2022). "Navy to
test Rafale-M jet for INS Vikrant" (https://
www.hindustantimes.com/india-news/indi
a-set-to-conduct-trials-of-rafale-fighter-s-n
aval-version-101640980226180.html) .
Hindustan Times. Archived (https://web.ar
chive.org/web/20220106080902/https://
www.hindustantimes.com/india-news/indi
a-set-to-conduct-trials-of-rafale-fighter-s-n
aval-version-101640980226180.html)
from the original on 6 January 2022.
Retrieved 6 January 2022.
60. Dubois, Gastón (3 January 2022). "Rafale
M to begin Ski-Jump take-off trials for
Indian Navy" (https://www.aviacionline.co
m/2022/01/rafale-m-to-begin-ski-jump-tak
e-off-trials-for-indian-navy/) .
Aviacionline.com (in Spanish). Archived (h
ttps://web.archive.org/web/20220106080
900/https://www.aviacionline.com/2022/
01/rafale-m-to-begin-ski-jump-take-off-trial
s-for-indian-navy/) from the original on 6
January 2022. Retrieved 6 January 2022.
61. "Indian Navy to conduct flight tests of
Rafale-M fighter jet" (https://www.naval-te
chnology.com/news/indian-navy-tests-raf
ale-m-fighter/) . Naval Technology. 4
January 2022. Archived (https://web.archi
ve.org/web/20220106082403/https://ww
w.naval-technology.com/news/indian-navy
-tests-rafale-m-fighter/) from the original
on 6 January 2022. Retrieved 6 January
2022.
62. Anandan, S. (27 August 2022). " 'Vikrant to
take a finite time to be fully ready for
deployment' " (https://www.thehindu.com/
news/national/kerala/vikrant-to-take-a-fini
te-time-to-be-fully-ready-for-deployment/ar
ticle65818801.ece) . The Hindu.
ISSN 0971-751X (https://www.worldcat.or
g/issn/0971-751X) . Archived (https://we
b.archive.org/web/20230203181136/http
s://www.thehindu.com/news/national/ker
ala/vikrant-to-take-a-finite-time-to-be-fully-
ready-for-deployment/article65818801.ec
e) from the original on 3 February 2023.
Retrieved 3 February 2023.
63. Raghuvanshi, Vivek (7 February 2023).
"India successfully lands light combat
aircraft, MiG-29K on carrier" (https://www.
defensenews.com/global/asia-pacific/202
3/02/07/india-successfully-lands-light-co
mbat-aircraft-mig-29k-on-carrier/) .
Defense News.
64. Siddiqui, Huma (10 July 2023). "India's
fighter jet selection for INS Vikrant: An
evolving scenario" (https://www.financiale
xpress.com/business/defence-indias-fight
er-jet-selection-for-ins-vikrant-an-evolving-
scenario-3163110/) . Financial Express.
Archived (https://web.archive.org/web/20
230711190554/https://www.financialexpr
ess.com/business/defence-indias-fighter-j
et-selection-for-ins-vikrant-an-evolving-sce
nario-3163110/) from the original on 11
July 2023. Retrieved 11 July 2023.
65. Ghosh, Sanchari (10 July 2023). "PM Modi
to ink deal with France to acquire Rafale-M
fighters, attack submarines" (https://www.
livemint.com/news/india/pm-modi-to-ink-
deal-with-france-to-acquire-26-rafale-m-fig
hters-three-attack-submarines-116889749
92564.html) . Mint. Archived (https://web.
archive.org/web/20230712012030/http
s://www.livemint.com/news/india/pm-mo
di-to-ink-deal-with-france-to-acquire-26-raf
ale-m-fighters-three-attack-submarines-11
688974992564.html) from the original on
12 July 2023. Retrieved 11 July 2023.
66. Singh, Akhilesh; Thakur, Pradeep (9 July
2023). "Navy zeroes in on naval Rafale; jet
deal likely during PM's France visit" (http
s://timesofindia.indiatimes.com/india/nav
y-zeroes-in-on-naval-rafale-jet-deal-likely-d
uring-pms-france-visit/articleshow/10160
3082.cms?from=mdr) . The Times of
India. ISSN 0971-8257 (https://www.world
cat.org/issn/0971-8257) . Archived (http
s://web.archive.org/web/2023071119055
4/https://timesofindia.indiatimes.com/ind
ia/navy-zeroes-in-on-naval-rafale-jet-deal-li
kely-during-pms-france-visit/articleshow/1
01603082.cms?from=mdr) from the
original on 11 July 2023. Retrieved 11 July
2023.
67. Shukla, Ajai (29 August 2013). "INS
Vikrant's first victory: Being built from
Indian steel" (https://www.business-stand
ard.com/article/current-affairs/ins-vikrant-
s-first-victory-being-built-from-indian-steel-
113080701287_1.html) . The Business
Standard. Archived (https://web.archive.or
g/web/20160305071316/http://www.busi
ness-standard.com/article/current-affair
s/ins-vikrant-s-first-victory-being-built-from
-indian-steel-113080701287_1.html) from
the original on 5 March 2016. Retrieved
18 March 2015.
68. Shukla, Ajai (7 August 2013). "INS
Vikrant's first victory: being built from
Indian steel" (http://www.business-standar
d.com/article/current-affairs/ins-vikrant-s-
first-victory-being-built-from-indian-steel-1
13080701287_1.html) . Business
Standard. Archived (https://web.archive.or
g/web/20130811162648/http://www.busi
ness-standard.com/article/current-affair
s/ins-vikrant-s-first-victory-being-built-from
-indian-steel-113080701287_1.html) from
the original on 11 August 2013. Retrieved
18 May 2015.
69. " 'Vikrant' Reborn in Indigenous Avtar" (htt
p://www.indiandefencereview.com/news/
vikrant-reborn-in-indigenous-avtar/) .
Indian Defence Review. 12 August 2013.
Archived (https://web.archive.org/web/20
140226025811/http://www.indiandefence
review.com/news/vikrant-reborn-in-indige
nous-avtar/) from the original on 26
February 2014. Retrieved 18 May 2015.
70. Anandan, S. (13 May 2017). "In the heart
of the iron beast, INS Vikrant" (http://www.
thehindu.com/news/national/kerala/in-the
-heart-of-the-iron-beast/article18440534.e
ce) . The Hindu. Archived (https://web.arc
hive.org/web/20170828014829/http://ww
w.thehindu.com/news/national/kerala/in-t
he-heart-of-the-iron-beast/article1844053
4.ece) from the original on 28 August
2017. Retrieved 30 September 2017.
71. "Govt overhauls coastal security; gives
overall charge to Navy" (http://www.dnain
dia.com/india/report-govt-overhauls-coast
al-security-gives-overall-charge-to-navy-12
35004) . dnaindia. 19 November 2013.
Archived (https://web.archive.org/web/20
160410173245/http://www.dnaindia.com/
india/report-govt-overhauls-coastal-securi
ty-gives-overall-charge-to-navy-1235004)
from the original on 10 April 2016.
Retrieved 7 April 2016.
72. "India overhauls coastal security, Navy
gets charge" (https://archive.today/20120
908225312/http://www.ndtv.com/converg
ence/ndtv/story.aspx?id=NEWEN2009008
5124) . NDTV.com. 28 February 2009.
Archived from the original (http://www.ndt
v.com/convergence/ndtv/story.aspx?id=N
EWEN20090085124) on 8 September
2012. Retrieved 1 February 2011.
73. Ray, Kaylan (1 March 2009). "India joins
elite warships club" (https://www.webcitat
ion.org/query?url=http%3A%2F%2Farchiv
e.deccanherald.com%2FContent%2FMar1
2009%2Fscroll20090301121399.asp&date
=2012-07-15) . Deccan Herald. Archived
from the original (http://archive.deccanher
ald.com/Content/Mar12009/scroll200903
01121399.asp) on 15 July 2012.
Retrieved 18 May 2015.
74. "Indigenous aircraft carrier launch this
Dec" (http://zeenews.india.com/news/nati
on/indigenous-aircraft-carrier-launch-this-
dec_723865.html) . Zeenews. 2 August
2011. Archived (https://web.archive.org/w
eb/20150609184600/http://zeenews.indi
a.com/news/nation/indigenous-aircraft-ca
rrier-launch-this-dec_723865.html) from
the original on 9 June 2015. Retrieved
18 May 2015.
75. "First indigenous aircraft carrier to be
completed by Dec: Govt" (https://web.arch
ive.org/web/20121107013318/http://ibnli
ve.in.com/generalnewsfeed/news/first-ind
igenous-aircraft-carrier-to-be-completed-b
y-dec-govt/773900.html) . Ibnlive.in.com.
2 August 2011. Archived from the original
(http://ibnlive.in.com/generalnewsfeed/ne
ws/first-indigenous-aircraft-carrier-to-be-c
ompleted-by-dec-govt/773900.html) on 7
November 2012.
76. Pandit, Rajat (16 August 2014). "PM Modi
inducts India's largest indigenously built
warship INS Kolkata" (http://timesofindia.i
ndiatimes.com/india/PM-Modi-inducts-Ind
ias-largest-indigenously-built-warship-INS-
Kolkata/articleshow/40313665.cms) .
The Times of India. Archived (https://web.
archive.org/web/20151002101358/http://
timesofindia.indiatimes.com/india/PM-Mo
di-inducts-Indias-largest-indigenously-built
-warship-INS-Kolkata/articleshow/403136
65.cms) from the original on 2 October
2015. Retrieved 18 May 2015.
77. "India launches home-built, 37,500-tonne
aircraft carrier in a shot across the bow to
China" (https://www.webcitation.org/quer
y?url=http%3A%2F%2Fnews.nationalpost.
com%2F2013%2F08%2F12%2Findia-launc
hes-first-aircraft-carrier-and-powers-up-nu
clear-sub-a-shot-across-the-bow-to-china-f
or-pacific-dominance%2F&date=2013-08-1
4) . National Post. Associated Press. 12
August 2013. Archived from the original (h
ttp://news.nationalpost.com/2013/08/12/
india-launches-first-aircraft-carrier-and-po
wers-up-nuclear-sub-a-shot-across-the-bo
w-to-china-for-pacific-dominance/) on 14
August 2013. Retrieved 18 May 2015. "The
37,500 tonne INS Vikrant is expected to go
for extensive trials in 2016 before being
inducted into the navy by 2017, reports
say. With this, India joins the select group
of countries comprising the United States,
the United Kingdom, Russia and France
capable of building such a vessel."
78. Sen, Sudhi Ranjan (11 August 2013). "INS
Vikrant, first Indian-made aircraft carrier,
enters water next week" (http://www.ndtv.
com/article/india/ins-vikrant-first-indian-m
ade-aircraft-carrier-enters-water-next-week
-402556) . NDTV. Archived (https://web.ar
chive.org/web/20131214202405/http://w
ww.ndtv.com/article/india/ins-vikrant-first-
indian-made-aircraft-carrier-enters-water-n
ext-week-402556) from the original on 14
December 2013. Retrieved 18 May 2015.
79. Anandan, S. (10 June 2015). "Cochin
Shipyard undocks INS Vikrant" (http://ww
w.thehindu.com/news/national/kerala/ins
-vikrant-undocked/article7301993.ece) .
The Hindu. Archived (https://web.archive.
org/web/20150717115715/http://www.th
ehindu.com/news/national/kerala/ins-vikr
ant-undocked/article7301993.ece) from
the original on 17 July 2015. Retrieved
12 June 2015.
80. Gupta, Jayanta (15 October 2015).
"Aircraft carrier INS Vikrant will be
delivered to Navy on time: Cochin
Shipyard chief" (http://timesofindia.indiati
mes.com/india/Aircraft-carrier-INS-Vikrant
-will-be-delivered-to-Navy-on-time-Cochin-
Shipyard-chief/articleshow/49392647.cm
s) . The Times of India. Archived (https://
web.archive.org/web/20151018021433/ht
tp://timesofindia.indiatimes.com/india/Air
craft-carrier-INS-Vikrant-will-be-delivered-t
o-Navy-on-time-Cochin-Shipyard-chief/arti
cleshow/49392647.cms) from the
original on 18 October 2015. Retrieved
18 October 2015.
81. "Navy chief reviews Vikrant project" (htt
p://www.thehindu.com/news/cities/Koch
i/navy-chief-reviews-vikrant-project/article
8115862.ece) . The Hindu. 17 January
2016. Archived (https://web.archive.org/w
eb/20160117014638/http://www.thehind
u.com/news/cities/Kochi/navy-chief-revie
ws-vikrant-project/article8115862.ece)
from the original on 17 January 2016.
Retrieved 30 March 2016.
82. Gurung, Shaurya Karanbir (10 February
2020). "Structural and outfitting work of
India's first indigenous aircraft carrier
complete" (https://economictimes.indiati
mes.com/news/defence/structural-and-o
utfitting-work-of-indias-first-indigenous-air
craft-carrier-complete/articleshow/74070
075.cms) . The Economic Times. Archived
(https://web.archive.org/web/202011101
50101/https://economictimes.indiatimes.
com/news/defence/structural-and-outfitti
ng-work-of-indias-first-indigenous-aircraft-
carrier-complete/articleshow/74070075.c
ms) from the original on 10 November
2020. Retrieved 12 February 2020.
83. "Cochin Shipyard hits 52-week high after
bagging Rs 3,000-crore contract" (https://
www.moneycontrol.com/news/business/
stocks/cochin-shipyard-hits-52-week-high-
after-bagging-rs-3000-crore-contract-4593
411.html) . Moneycontrol. 1 November
2019. Archived (https://web.archive.org/w
eb/20191101140707/https://www.money
control.com/news/business/stocks/cochi
n-shipyard-hits-52-week-high-after-baggin
g-rs-3000-crore-contract-4593411.html)
from the original on 1 November 2019.
Retrieved 1 November 2019.
84. Narasimhan, T. E. (1 November 2019).
"Cochin Shipyard bags Rs 3,000 crore
contract for aircraft carrier Vikrant" (http
s://www.business-standard.com/article/c
urrent-affairs/cochin-shipyard-bags-rs-3-0
00-crore-contract-for-aircraft-carrier-vikran
t-119110100290_1.html) . Business
Standard India. Archived (https://web.arch
ive.org/web/20191101104634/https://ww
w.business-standard.com/article/current-
affairs/cochin-shipyard-bags-rs-3-000-cror
e-contract-for-aircraft-carrier-vikrant-1191
10100290_1.html) from the original on 1
November 2019. Retrieved 1 November
2019.
85. Pubby, Manu (2 December 2019). "Engines
fired up, basin trials next for Indigenous
Aircraft Carrier" (https://economictimes.in
diatimes.com/news/defence/engines-fire
d-up-basin-trials-next-for-indigenous-aircra
ft-carrier/articleshow/72324320.cms) .
The Economic Times. Archived (https://we
b.archive.org/web/20200212051636/http
s://economictimes.indiatimes.com/news/
defence/engines-fired-up-basin-trials-next-
for-indigenous-aircraft-carrier/articlesho
w/72324320.cms) from the original on
12 February 2020. Retrieved 2 December
2019.
86. Singh, Mayank (21 August 2020). "India's
first Indigenous Aircraft Carrier "ready" for
basin trials in September" (https://www.ne
windianexpress.com/nation/2020/aug/2
1/indias-first-indigenous-aircraft-carrier-re
ady-for-basin-trials-in-september-218647
8.html) . The New Indian Express.
Archived (https://web.archive.org/web/20
200824030443/https://www.newindianex
press.com/nation/2020/aug/21/indias-fir
st-indigenous-aircraft-carrier-ready-for-bas
in-trials-in-september-2186478.html)
from the original on 24 August 2020.
Retrieved 23 August 2020.
87. @DefencePROkochi (30 November 2020).
"Tweet from Public Relations Ministry of
Defence" (https://twitter.com/DefencePRO
kochi/status/1333423115913728003)
(Tweet) – via Twitter.
88. "Major Milestone Achieved by IAC - Basin
Trials Successful" (https://web.archive.or
g/web/20220314225911/https://indianna
vy.nic.in/content/major-milestone-achieve
d-iac-basin-trials-successful) . Indian
Navy. 30 November 2020. Archived from
the original (https://www.indiannavy.nic.i
n/content/major-milestone-achieved-iac-b
asin-trials-successful) on 14 March 2022.
Retrieved 2 December 2020.
89. "LRSAM system to equip the future Indian
aircraft carrier INS Vikrant" (https://www.n
avyrecognition.com/index.php/news/defe
nce-news/2021/april/9973-lrsam-system-t
o-equip-the-future-indian-aircraft-carrier-in
s-vikrant.html) .
www.navyrecognition.com. Archived (http
s://web.archive.org/web/2021041312250
8/https://www.navyrecognition.com/inde
x.php/news/defence-news/2021/april/99
73-lrsam-system-to-equip-the-future-india
n-aircraft-carrier-ins-vikrant.html) from
the original on 13 April 2021. Retrieved
13 April 2021.
90. "INS Vikrant to get LRSAM Cover Soon" (ht
tps://www.eletimes.com/ins-vikrant-to-get
-lrsam-cover-soon) . www.eletimes.com. 9
April 2021. Archived (https://web.archive.
org/web/20210410125450/https://www.e
letimes.com/ins-vikrant-to-get-lrsam-cover
-soon) from the original on 10 April 2021.
Retrieved 10 April 2021.
91. "INS Vikrant to get LRSAM Cover Soon" (ht
tps://www.defenceaviationpost.com/202
1/04/ins-vikrant-to-get-lrsam-cover-soo
n/) . Defence News India. 10 April 2021.
Archived (https://web.archive.org/web/20
210410125451/https://www.defenceaviati
onpost.com/2021/04/ins-vikrant-to-get-lrs
am-cover-soon/) from the original on 10
April 2021. Retrieved 10 April 2021.
92. "Outlook India Photo Gallery - Jun 15,
2021" (https://www.outlookindia.com/pho
tos/dayin/6/15/2021?photo-271573) .
www.outlookindia.com/. Archived (https://
web.archive.org/web/20210618144738/ht
tps://www.outlookindia.com/photos/dayi
n/6/15/2021?photo-271573) from the
original on 18 June 2021. Retrieved
18 June 2021.
93. Pandit, Rajat (5 August 2021). "India's first
indigenous aircraft carrier, to be named
INS Vikrant, finally begins sea trials" (http
s://timesofindia.indiatimes.com/india/indi
as-first-indigenous-aircraft-carrier-to-be-na
med-ins-vikrant-finally-begins-sea-trials/ar
ticleshow/85031100.cms) . Times of
India. Archived (https://web.archive.org/w
eb/20210804065851/https://timesofindia.
indiatimes.com/india/indias-first-indigeno
us-aircraft-carrier-to-be-named-ins-vikrant-
finally-begins-sea-trials/articleshow/8503
1100.cms) from the original on 4 August
2021. Retrieved 4 August 2021.
94. "Vikrant successfully completes 5-day
maiden sea voyage - Rediff.com" (https://
www.rediff.com/news/report/pix-vikrant-s
uccessfully-completes-5-day-maiden-sea-
voyage/20210808.htm) . Archived (http
s://web.archive.org/web/2022021001433
8/https://www.rediff.com/news/report/pix
-vikrant-successfully-completes-5-day-mai
den-sea-voyage/20210808.htm) from the
original on 10 February 2022. Retrieved
11 August 2021.
95. "India's first indigenous aircraft carrier, INS
Vikrant begins second phase of sea trials"
(https://www.thehindu.com/news/nationa
l/indias-first-indigenous-aircraft-carrier-ins
-vikrant-begins-second-phase-of-sea-trial
s/article37150139.ece) . The Hindu. 24
October 2021. Archived (https://web.archi
ve.org/web/20220109110516/https://ww
w.thehindu.com/news/national/indias-firs
t-indigenous-aircraft-carrier-ins-vikrant-beg
ins-second-phase-of-sea-trials/article3715
0139.ece) from the original on 9 January
2022. Retrieved 24 October 2021.
96. "India's first indigenous aircraft carrier INS
Vikrant begins another set of sea trials" (h
ttps://www.timesnownews.com/india/arti
cle/indias-first-indigenous-aircraft-carrier-i
ns-vikrant-begins-another-set-of-sea-trials/
847808) . Archived (https://web.archive.or
g/web/20220109110756/https://www.tim
esnownews.com/india/article/indias-first-i
ndigenous-aircraft-carrier-ins-vikrant-begin
s-another-set-of-sea-trials/847808) from
the original on 9 January 2022. Retrieved
9 January 2022.
97. "Indigenous Aircraft Carrier Vikrant heads
out for next round of sea trials" (https://w
ww.thehindu.com/news/national/indigeno
us-aircraft-carrier-vikrant-heads-out-for-ne
xt-round-of-sea-trials/article38203234.ec
e) . The Hindu. 9 January 2022. Archived
(https://web.archive.org/web/202201091
23915/https://www.thehindu.com/news/n
ational/indigenous-aircraft-carrier-vikrant-
heads-out-for-next-round-of-sea-trials/arti
cle38203234.ece) from the original on 9
January 2022. Retrieved 9 January 2022.
98. Bhalla, Abhishek; Negi, Manjeet (9 January
2022). "India's first indigenous aircraft
carrier Vikrant enters third phase of trials
Top Points" (https://www.indiatoday.in/ind
ia/story/india-s-first-indigenous-aircraft-ca
rrier-vikrant-1897963-2022-01-09) . India
Today. Archived (https://web.archive.org/
web/20220109133727/https://www.indiat
oday.in/india/story/india-s-first-indigenou
s-aircraft-carrier-vikrant-1897963-2022-01-
09) from the original on 9 January 2022.
Retrieved 9 January 2022.
99. "EXPLAINED: Why Indigenous Aircraft
Carrier INS Vikrant Puts India In Select
Group Of Nations" (https://www.news18.c
om/news/explainers/explained-why-indig
enous-aircraft-carrier-ins-vikrant-puts-india
-in-select-group-of-nations-4667084.htm
l) . News18. 17 January 2022. Archived (h
ttps://web.archive.org/web/20220118064
936/https://www.news18.com/news/expl
ainers/explained-why-indigenous-aircraft-
carrier-ins-vikrant-puts-india-in-select-grou
p-of-nations-4667084.html) from the
original on 18 January 2022. Retrieved
18 January 2022.
100. "Indigenous Aircraft Carrier Vikrant:
Completion of Fourth Phase of Sea Trials"
(https://pib.gov.in/PressReleasePage.asp
x?PRID=1840608) . Press Information
Bureau of India. 10 July 2022. Archived (ht
tps://web.archive.org/web/202207130434
18/https://www.pib.gov.in/PressReleaseP
age.aspx?PRID=1840608) from the
original on 13 July 2022. Retrieved 13 July
2022.
101. "MiG-29K Lands On India's Aircraft Carrier
At Night For First Time" (https://www.ndtv.
com/india-news/video-mig-29k-lands-on-i
ndias-aircraft-carrier-ins-vikrant-at-night-fo
r-first-time-4065510/amp/1) . New Delhi
Television. 27 May 2023.
102. "INS Vikrant, 1st India-Made Aircraft
Carrier, Commissioned By PM" (https://ww
w.ndtv.com/india-news/ins-vikrant-indias-f
irst-home-built-aircraft-carrier-commissio
ned-by-pm-narendra-modi-3308900) .
NDTV.com. Archived (https://web.archive.
org/web/20220904050721/https://www.n
dtv.com/india-news/ins-vikrant-indias-first
-home-built-aircraft-carrier-commissioned-
by-pm-narendra-modi-3308900) from the
original on 4 September 2022. Retrieved
2 September 2022.
103. "Indian Navy to berth new aircraft carrier
at private shipyard" (https://www.livemint.
com/news/india/indian-navy-to-berth-new
-aircraft-carrier-at-private-shipyard-115842
81200203.html) . livemint.com. 15 March
2020. Archived (https://web.archive.org/w
eb/20200921105413/https://www.livemin
t.com/news/india/indian-navy-to-berth-ne
w-aircraft-carrier-at-private-shipyard-1158
4281200203.html) from the original on
21 September 2020. Retrieved 16 March
2020.
104. "In Pics: INS Vikrant Landed Its First Fixed-
Wing Aircraft Crossing A New Milestone"
(https://www.timesnownews.com/videos/
times-now/india/in-pics-ins-vikrant-landed
-its-first-fixed-wing-aircraft-crossing-a-new
-milestone-video-97650053) . TimesNow.
6 February 2023. Archived (https://web.ar
chive.org/web/20230206150736/https://
www.timesnownews.com/videos/times-n
ow/india/in-pics-ins-vikrant-landed-its-first
-fixed-wing-aircraft-crossing-a-new-milesto
ne-video-97650053) from the original on
6 February 2023. Retrieved 6 February
2023.
105. Negi, Manjeet. "INS Vikrant receives
original bell as gift from retired vice chief
of Indian Navy" (https://web.archive.org/w
eb/20230410142752/https://www.msn.co
m/en-in/money/topstories/ins-vikrant-rec
eives-original-bell-as-gift-from-retired-vice-
chief-of-indian-navy/ar-AA19EzEN) . msn.
Archived from the original (https://www.m
sn.com/en-in/money/topstories/ins-vikran
t-receives-original-bell-as-gift-from-retired-
vice-chief-of-indian-navy/ar-AA19EzEN)
on 10 April 2023. Retrieved 9 April 2023.
106. "India to add $5 billion aircraft carrier to
fleet to counter China" (https://timesofindi
a.indiatimes.com/india/india-to-add-5-billi
on-aircraft-carrier-to-fleet-to-counter-chin
a/articleshow/105568818.cms) . The
Times of India. 28 November 2023.
ISSN 0971-8257 (https://www.worldcat.or
g/issn/0971-8257) . Retrieved
28 November 2023.
107. Sen, Sudhi Ranjan (28 November 2023).
"India to Add $5 Billion Aircraft Carrier to
Fleet to Counter China" (https://www.bloo
mberg.com/news/articles/2023-11-28/ind
ia-said-to-add-5-billion-aircraft-carrier-to-c
ounter-china) . Bloomberg. Retrieved
30 December 2023.
108. Ray, Kaylan (28 November 2023). "Indian
Navy's proposal on second indigenous
aircraft carrier cleared by Defence
Procurement Board" (https://www.deccan
herald.com/india/indian-navys-proposal-o
n-second-indigenous-aircraft-carrier-cleare
d-by-defence-procurement-board-278816
7) . Deccan Herald. Retrieved
28 November 2023.
109. Som, Vishnu (15 August 2021). "Vikrant,
First Made-In-India Aircraft Carrier, Not A
Liability: Navy" (https://www.ndtv.com/indi
a-news/vikrant-first-made-in-india-aircraft-
carrier-not-a-liability-navy-2510905) .
www.ndtv.com. Archived (https://web.arch
ive.org/web/20210816050347/https://ww
w.ndtv.com/india-news/vikrant-first-made-
in-india-aircraft-carrier-not-a-liability-navy-
2510905) from the original on 16 August
2021. Retrieved 16 August 2021.
110. @IN_R11Vikrant (31 December 2023).
"Vikrant witnessed a change of helm with
Capt Birendra S Bains, VSM assuming
command from Capt Vidhyadhar Harke,
VSM in an impressive change of
command Divisions on-board" (https://twit
ter.com/IN_R11Vikrant/status/174141587
9160824026) (Tweet) – via Twitter.
111. "Navy to commission 'vigilant', 'valiant' INS
Visakhapatnam in Mumbai today" (https://
www.hindustantimes.com/india-news/indi
an-navy-to-commission-ins-visakhapatna
m-in-mumbai-today-101637453111656.ht
ml) . Hindustan Times. 21 November
2021.
112. "CHAPTER II: PERFORMANCE AUDIT ON
CONSTRUCTION OF INDIGENOUS
AIRCRAFT CARRIER - page 39" (https://ca
g.gov.in/sites/default/files/audit_report_fil
es/Chapter%202%20%20Performance%20
Audit%20on%20Construction%20of%20In
digenous%20Aircraft%20Carrier.pdf)
(PDF). Comptroller and Auditor General
(CAG) of India. Government of India.
Archived (https://web.archive.org/web/20
160728130644/http://www.cag.gov.in/sit
es/default/files/audit_report_files/Chapte
r%202%20%20Performance%20Audit%20
on%20Construction%20of%20Indigenou
s%20Aircraft%20Carrier.pdf) (PDF) from
the original on 28 July 2016. Retrieved
17 January 2020.
113. Unnithan, Sandeep (18 February 2009).
"Keel laying of indigenous aircraft carrier
next week" (https://web.archive.org/web/
20090727031555/http://indiatoday.intoda
y.in/index.php?option=com_content&task
=view&id=29613&sectionid=4&issueid=93
&Itemid=1) . Indiatoday. Archived from the
original (http://indiatoday.intoday.in/index.
php?option=com_content&task=view&id=
29613&sectionid=4&issueid=93&Itemid=
1) on 27 July 2009. Retrieved 18 May
2015.
114. Sharma, Suman (7 October 2010).
"Indigenous Aircraft Carrier's nucleus
ready" (http://www.dnaindia.com/india/re
port_indigenous-aircraft-carrier-s-nucleus-
ready_1448720) . Dnaindia.com. Archived
(https://web.archive.org/web/201102101
44906/http://www.dnaindia.com/india/rep
ort_indigenous-aircraft-carrier-s-nucleus-re
ady_1448720) from the original on 10
February 2011. Retrieved 18 May 2015.
115. Sen, Sudhi Ranjan (20 November 2012).
"Indian aircraft carrier: More costly,
already delayed" (http://www.ndtv.com/art
icle/india/indian-aircraft-carrier-more-costl
y-already-delayed-294997) . Ndtv.com.
Archived (https://web.archive.org/web/20
140709004118/http://www.ndtv.com/artic
le/india/indian-aircraft-carrier-more-costly-
already-delayed-294997) from the
original on 9 July 2014. Retrieved 18 May
2015.
116. Anandan, S. (12 March 2011). "Indigenous
aircraft carrier a year behind schedule" (htt
p://www.thehindu.com/todays-paper/tp-n
ational/tp-kerala/article1530996.ece) .
The Hindu. Archived (https://web.archive.
org/web/20131214055340/http://www.th
ehindu.com/todays-paper/tp-national/tp-k
erala/article1530996.ece) from the
original on 14 December 2013. Retrieved
18 May 2015.
117. "Delay in supply of equipment from Russia
affected delivery of India's aircraft carrier"
(https://www.defencestar.in/military/india
n-navy-news/defence-news-india-updates-
delay-in-supply-of-equipment-from-russia-
affected-delivery-of-indias-aircraft-carrier-i
ns-vikrant/amp) . Defence Star. 14
February 2020.
118. "Delivery date of Indian Navy Aircraft
Carrier INS Vikrant once again delayed" (ht
tps://www.navyrecognition.com/index.ph
p/news/defence-news/2020/may-2020/8
477-delivery-date-of-indian-navy-aircraft-c
arrier-ins-vikrant-once-again-delayed.htm
l) . Navy Recognition. 25 May 2020.
Archived (https://web.archive.org/web/20
200704093448/https://www.navyrecogniti
on.com/index.php/news/defence-news/2
020/may-2020/8477-delivery-date-of-india
n-navy-aircraft-carrier-ins-vikrant-once-aga
in-delayed.html) from the original on 4
July 2020. Retrieved 24 August 2020.
119. Lendon, Brad; Sud, Vedika; Mitra, Esha;
Gupta, Swati (2 September 2022). "INS
Vikrant: India's first homegrown aircraft
carrier puts it among world's naval elites -
CNN" (https://amp.cnn.com/cnn/2022/0
9/02/asia/india-indigenous-aircraft-carrier
-vikrant-commissioned-intl-hnk-ml/index.h
tml?amp_gsa=1&amp_js_v=a9&usqp=mq3
31AQKKAFQArABIIACAw%3D%3D#amp_tf
=From%20%251%24s&aoh=16621330204
142&referrer=https%3A%2F%2Fwww.goog
le.com&ampshare=https%3A%2F%2Fww
w.cnn.com%2F2022%2F09%2F02%2Fasi
a%2Findia-indigenous-aircraft-carrier-vikra
nt-commissioned-intl-hnk-ml%2Findex.ht
ml) . CNN. Archived (https://web.archive.o
rg/web/20220904050715/https://amp.cn
n.com/cnn/2022/09/02/asia/india-indige
nous-aircraft-carrier-vikrant-commissione
d-intl-hnk-ml/index.html?amp_gsa=1&amp
_js_v=a9&usqp=mq331AQKKAFQArABIIA
CAw%3D%3D#amp_tf=From%20%251%24
s&aoh=16621330204142&referrer=https%
3A%2F%2Fwww.google.com&ampshare=h
ttps%3A%2F%2Fwww.cnn.com%2F2022%
2F09%2F02%2Fasia%2Findia-indigenous-a
ircraft-carrier-vikrant-commissioned-intl-h
nk-ml%2Findex.html) from the original on
4 September 2022. Retrieved 2 September
2022.
120. Som, Vishnu; Mitra, Chandrajit (2
September 2022). "INS Vikrant, "City on
the Move": 18 Floors, 1,600 Crew, 16-Bed
Hospital" (https://www.ndtv.com/india-ne
ws/ins-vikrant-in-numbers-2-football-fields
-18-floors-16-bed-hospital-3308664/amp/
1?amp_gsa=1&amp_js_v=a9&usqp=mq33
1AQKKAFQArABIIACAw%3D%3D#amp_tf=
From%20%251%24s&aoh=166213302041
42&referrer=https%3A%2F%2Fwww.googl
e.com&ampshare=https%3A%2F%2Fwww.
ndtv.com%2Findia-news%2Fins-vikrant-in-
numbers-2-football-fields-18-floors-16-bed
-hospital-3308664) . ndtv.com. Archived
(https://web.archive.org/web/202209040
50720/https://www.ndtv.com/india-news/
ins-vikrant-in-numbers-2-football-fields-18-
floors-16-bed-hospital-3308664#amp_tf=F
rom%20%251%24s&aoh=1662133020414
2&referrer=https%3A%2F%2Fwww.google.
com&ampshare=https%3A%2F%2Fwww.n
dtv.com%2Findia-news%2Fins-vikrant-in-n
umbers-2-football-fields-18-floors-16-bed-
hospital-3308664) from the original on 4
September 2022. Retrieved 2 September
2022.
121. "Inside India's newly-commissioned
aircraft carrier" (https://www.bbc.com/ne
ws/world-asia-india-62749345) . BBC
News. 1 September 2022. Archived (http
s://web.archive.org/web/2022090307415
5/https://www.bbc.com/news/world-asia-i
ndia-62749345) from the original on 3
September 2022. Retrieved 2 September
2022.

External links

Delay in equipment Wikimedia


Commons
from Russia affected
has media
the delivery schedule of related to
INS
INS Vikrant (https://ww
Vikrant
w.defencestar.in/militar
y/indian-navy-news/def (ship,
2013).
ence-news-india-updat
es-delay-in-supply-of-equipment-from-ru
ssia-affected-delivery-of-indias-aircraft-c
arrier-ins-vikrant/)
Images during the launch of Vikrant (htt
ps://web.archive.org/web/20130815055
217/http://www.indianexpress.com/pict
ure-gallery/the-ins-vikrant-know-all-abou
t-the-carrier/3204-1.html)
Making of Indigenous Aircraft Carrier (ht
tp://www.indiandefencereview.com/new
s/making-of-indigenous-aircraft-carrier/
0/) , Transition to Guardianship: The
Indian Navy 1991-2000, Vice Adm (Retd)
G M Hiranandani
Indigenous Aircraft Carrier on Bharat
Rakshak (https://web.archive.org/web/2
0120217185025/http://www.bharat-raks
hak.com/NAVY/Ships/Future/185-India
n-Aircraft-Carrier.html)

Retrieved from
"https://en.wikipedia.org/w/index.php?
title=INS_Vikrant_(2013)&oldid=1197312181"

This page was last edited on 20 January 2024, at


00:15 (UTC). •
Content is available under CC BY-SA 4.0 unless
otherwise noted.

You might also like