Book # 8 Jfyn Lss Project Record Book Haradh Area, Jfyn Lss Index No. - B8.2B.1.7.1

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

SUBCONTRATOR - PETROJET CONTRACTOR - SAUDI ARABIAN SAIPEM CO. LTD.

CLIENT - SAUDI ARAMCO

Project - South Gas Compression Plant (SGCP) Pipeline CONTRACT NO. - 1248435 JOB NO. - 084418 BI-10-01996-0006

Project Record Book Book # 8 HARADH AREA, JFYN LSS Index No. - B8.2B.1.7.1 JFYN LSS
ARAMC
SAIPEM
O
Sr. Date of Time of Line Tag / INSPEC PTJ / SAIPEM EPM INSPECTION Vol.
Contractor Rfi NO EPM NO Location Discipline SATIP # Activity SAIC DRG NO & REV. Description of Activity INSPEC PID Insp. SAPMT File No. Remarks
No. Inspection Inspection Location TION Inspector STATUS No.
TION
LEVEL
LEVEL

Compaction testing inspection of backfilling selectfill 3RD layer for


JFYN LSS-SUPPLY Sleeper support foundation Pedestal PS-19 (Type SLS-03C) GL: M.SAEED / ANGELO
1 PTJ-SGCP-CIV-20919 1400487978 29-Sep-21 11:15 AM JFYN LSS CIV SATIP-A-114-01 3.3 SAIC-A-1005 TA-148878-002,003,004 I W EDGARDO BANGCO Ali Al-Gmman DONE 1 3
FILL-PLANT L/21,23 (02nos), GL: M/22 (01no) & PS-19A (Type SLS-03D) GL: GUINTO
K/18,27 (02nos) at JFYN LSS

Compaction testing inspection of backfilling selectfill 3RD layer for


JFYN LSS-SUPPLY Sleeper support foundation Pedestal PS-19 (Type SLS-03C) GL: M.SAEED / ANGELO
2 PTJ-SGCP-CIV-20920 1400487978 29-Sep-21 11:30 AM JFYN LSS CIV SATIP-A-114-01 3.3 SAIC-A-1005 TA-148878-001,002,004 I W EDGARDO BANGCO Ali Al-Gmman DONE 1 3
FILL-PLANT 15/D,E,G,H,J (05nos) & PS-19A (Type SLS-03D) GL: 15/F (01no) at GUINTO
JFYN LSS

Compaction testing inspection of backfilling selectfill 4TH layer for


JFYN LSS-SUPPLY M.SAEED / ANGELO
3 PTJ-SGCP-CIV-20953 1400487978 30-Sep-21 11:00 AM JFYN LSS CIV SATIP-A-114-01 3.3 SAIC-A-1005 TA-148878-002,003,004 Sleeper support foundation Pedestal PS-19 (Type SLS-03C) GL: I W EDGARDO BANGCO Ali Al-Gmman DONE 1 3
FILL-PLANT GUINTO
K/16, 17,19,20,24,25,26 (07nos) at JFYN LSS

Compaction testing inspection of backfilling selectfill 4TH layer for


JFYN LSS-SUPPLY Sleeper support foundation Pedestal PS-19 (Type SLS-03C) GL: M.SAEED / ANGELO
4 PTJ-SGCP-CIV-20954 1400487978 30-Sep-21 11:15 AM JFYN LSS CIV SATIP-A-114-01 3.3 SAIC-A-1005 TA-148878-002,003,004 I W EDGARDO BANGCO Ali Al-Gmman DONE 1 3
FILL-PLANT L/21,23 (02nos), GL: M/22 (01no) & PS-19A (Type SLS-03D) GL: GUINTO
K/18,27 (02nos) at JFYN LSS

Compaction testing inspection of backfilling selectfill 4TH layer for


JFYN LSS-SUPPLY Sleeper support foundation Pedestal PS-19 (Type SLS-03C) GL: M.SAEED / ANGELO
5 PTJ-SGCP-CIV-20955 1400487978 30-Sep-21 11:30 AM JFYN LSS CIV SATIP-A-114-01 3.3 SAIC-A-1005 TA-148878-001,002,004 I W EDGARDO BANGCO Ali Al-Gmman DONE 1 3
FILL-PLANT 15/D,E,G,H,J (05nos) & PS-19A (Type SLS-03D) GL: 15/F (01no) at GUINTO
JFYN LSS

Compaction testing inspection of backfilling selectfill 5TH layer for


JFYN LSS-SUPPLY M.SAEED / ANGELO
6 PTJ-SGCP-CIV-20983 1400487978 2-Oct-21 11:00 AM JFYN LSS CIV SATIP-A-114-01 3.3 SAIC-A-1005 TA-148878-002,003,004 Sleeper support foundation Pedestal PS-19 (Type SLS-03C) GL: I W EDGARDO BANGCO Ali Al-Gmman DONE 1 3
FILL-PLANT GUINTO
K/16, 17,19,20,24,25,26 (07nos) at JFYN LSS

Compaction testing inspection of backfilling selectfill 5TH layer for


JFYN LSS-SUPPLY Sleeper support foundation Pedestal PS-19 (Type SLS-03C) GL: M.SAEED / ANGELO
7 PTJ-SGCP-CIV-20984 1400487978 2-Oct-21 11:15 AM JFYN LSS CIV SATIP-A-114-01 3.3 SAIC-A-1005 TA-148878-002,003,004 I W EDGARDO BANGCO Ali Al-Gmman DONE 1 3
FILL-PLANT L/21,23 (02nos), GL: M/22 (01no) & PS-19A (Type SLS-03D) GL: GUINTO
K/18,27 (02nos) at JFYN LSS

Compaction testing inspection of backfilling selectfill 5TH layer for


JFYN LSS-SUPPLY Sleeper support foundation Pedestal PS-19 (Type SLS-03C) GL: M.SAEED / ANGELO
8 PTJ-SGCP-CIV-20985 1400487978 2-Oct-21 11:30 AM JFYN LSS CIV SATIP-A-114-01 3.3 SAIC-A-1005 TA-148878-001,002,004 I W EDGARDO BANGCO Ali Al-Gmman DONE 1 3
FILL-PLANT 15/D,E,G,H,J (05nos) & PS-19A (Type SLS-03D) GL: 15/F (01no) at GUINTO
JFYN LSS
JFYN LSS-148930-
003-VS-03G- TA-148935-013,TA-
Formwork inspection for Valve support Pedestals VS-03G (04nos) at M.SAEED / ANGELO
9 PTJ-SGCP-CIV-20986 1400487978 2-Oct-21 9:45 AM 001,JFYN LSS- JFYN LSS CIV SATIP-Q-001-02 3.2 SAIC-Q-1012 148930-003,011 H H EDGARDO BANGCO Ali Al-Gmman DONE 1 3
JFYN LSS GUINTO
148930-003-VS-
03G-002,JFYN
JFYN LSS-148930-
003-VS-03G- TA-148935-013,TA-
Embedded items installation inspection for Valve support Pedestals M.SAEED / ANGELO
10 PTJ-SGCP-CIV-20987 1400487978 2-Oct-21 9:50 AM 001,JFYN LSS- JFYN LSS CIV SATIP-Q-001-02 3.3 SAIC-Q-1013 148930-003,011 H H EDGARDO BANGCO Ali Al-Gmman DONE 1 3
VS-03G (04nos) at JFYN LSS GUINTO
148930-003-VS-
03G-002,JFYN
JFYN LSS-148930-
003-VS-03G- TA-148935-013,TA-
Concrete sampling, testing & placement inspection for Valve M.SAEED / ANGELO
11 PTJ-SGCP-CIV-20988 1400487978 2-Oct-21 9:55 AM 001,JFYN LSS- JFYN LSS CIV SATIP-Q-001-02 3.4 SAIC-Q-1060 148930-003,011 I W EDGARDO BANGCO Ali Al-Gmman DONE 1 3
support Pedestals VS-03G (04nos) at JFYN LSS GUINTO
148930-003-VS-
03G-002,JFYN
JFYN LSS-148871-
001-panel rack- TA-148871-001,TA-
Formwork inspection for foundation footing panel rack type - 2 M.SAEED / ANGELO
12 PTJ-SGCP-CIV-20989 1400487978 2-Oct-21 10:00 AM 001,JFYN LSS- JFYN LSS CIV SATIP-Q-001-02 3.2 SAIC-Q-1012 148892-010,TA-149064- H H EDGARDO BANGCO Ali Al-Gmman DONE 1 3
(02nos) & Foundation footing CP-RECTIFIER (01no) at JFYN LSS GUINTO
148871-001-panel 017
rack-002,JFYN
JFYN LSS-148871-
001-panel rack- TA-148871-001,TA- FBE Rebar & Embedded items installation inspection for
M.SAEED / ANGELO
13 PTJ-SGCP-CIV-20990 1400487978 2-Oct-21 10:05 AM 001,JFYN LSS- JFYN LSS CIV SATIP-Q-001-02 3.3 SAIC-Q-1013 148892-010,TA-149064- foundation footing panel rack type - 2 (02nos) & Foundation footing H H EDGARDO BANGCO Ali Al-Gmman DONE 1 3
GUINTO
148871-001-panel 017 CP-RECTIFIER (01no) at JFYN LSS
rack-002,JFYN
JFYN LSS-148871-
001-panel rack- TA-148871-001,TA- Concrete sampling, testing & placement inspection for foundation
M.SAEED / ANGELO
14 PTJ-SGCP-CIV-20991 1400487978 2-Oct-21 10:10 AM 001,JFYN LSS- JFYN LSS CIV SATIP-Q-001-02 3.4 SAIC-Q-1060 148892-010,TA-149064- footing panel rack type - 2 (02nos) & Foundation footing CP- I W EDGARDO BANGCO Ali Al-Gmman DONE 1 3
GUINTO
148871-001-panel 017 RECTIFIER (01no) at JFYN LSS
rack-002,JFYN

Soil sampling and testing inspection for selected fill and marl
15 PTJ-SGCP-CIV-21010 1400487978 3-Oct-21 11:00 AM GEN JFYN LSS CIV SATIP-A-114-01 1.1 SAIC-A-1001 TA-223092-012 materials of borrow pit#03 & 04 For RTP-407 berm construction at RH/H RH/H PATEL / ED GABRIEL EDGARDO BANGCO Daniel Istrate DONE 1 3
JFYN LSS km 13 to km 14 in between.

JFYN LSS-148872-
002-PFD-21-
TA-148872-002,TA- FBE Rebar inspection prior to form closure for pedestals PFD-21 M.SAEED / ANGELO
16 PTJ-SGCP-CIV-21015 1400487978 3-Oct-21 9:00 AM 001,JFYN LSS- JFYN LSS CIV SATIP-Q-001-02 3.3 SAIC-Q-1013 H H EDGARDO BANGCO Ali Al-Gmman DONE 1 3
148942-002 (02nos) & PFD-01B (02nos) at JFYN LSS GUINTO
148872-002-PFD-
01B-001,
JFYN LSS-148872-
002-JCF- TA-148872-002,TA- FBE Rebar inspection prior to form closure for JIB CRANE Pedestal
M.SAEED / ANGELO
17 PTJ-SGCP-CIV-21016 1400487978 3-Oct-21 9:10 AM 001,JFYN LSS- JFYN LSS CIV SATIP-Q-001-02 3.3 SAIC-Q-1013 148935-013,TA-149063- (JCF) (01no) & Scraper Handling Facility (SHF) Pedestals (02nos) at H H EDGARDO BANGCO Ali Al-Gmman DONE 1 3
GUINTO
148872-002-SHF- 002,TA-149064-009 JFYN LSS
001,
JFYN LSS-148872-
002-IJB-001,JFYN TA-148872-002,TA- FBE Rebar inspection prior to form closure for pedestals
M.SAEED / ANGELO
18 PTJ-SGCP-CIV-21017 1400487978 3-Oct-21 9:20 AM LSS-148872-002- JFYN LSS CIV SATIP-Q-001-02 3.3 SAIC-Q-1013 148064-002,TA-149066- Instrument Junction Box IJB-1 (02nos) & Sleeper support Pedestal H H EDGARDO BANGCO Ali Al-Gmman DONE 1 3
GUINTO
IJB-001,JFYN LSS- 002 SLS-03 (01no) at JFYN LSS
148872-002-SLS-
JFYN LSS-148872-
002- 2-6''-600- FBE Rebar inspection prior to form closure for Pedestals 6''(NON-
TA-148872-001,TA- M.SAEED / ANGELO
19 PTJ-SGCP-CIV-21018 1400487978 3-Oct-21 9:30 AM 001,JFYN LSS- JFYN LSS CIV SATIP-Q-001-02 3.3 SAIC-Q-1013 MATLIC) Temprary Scraper Handling Type 2-6''-600# (04nos) at H H EDGARDO BANGCO Ali Al-Gmman DONE 1 3
149073-002 GUINTO
148872-002- 2-6''- JFYN LSS
600-002,JFYN LSS-
Compaction testing inspection of backfilling MARL CAPPING FINAL
layer for Sleeper support foundation Pedestal PS-18 (Type SLS-03A)
JFYN LSS-SUPPLY M.SAEED / ANGELO
20 PTJ-SGCP-CIV-21049 1400487978 5-Oct-21 10:45 AM JFYN LSS CIV SATIP-A-114-01 3.3 SAIC-A-1005 TA-148878-001/004 GL: A/ 1,3,4,5,6,10,11,13,14,15A(10nos), GL: B/7,9 (02nos), GL: I W EDGARDO BANGCO Ali Al-Gmman DONE 1 3
FILL-PLANT GUINTO
C/8 (01no) & PS-18A (Type SLS-03B) GL: A/2,12 (02nos) at JFYN
LSS

Compaction testing inspection of backfilling MARL CAPPING FINAL


JFYN LSS-SUPPLY M.SAEED / ANGELO
21 PTJ-SGCP-CIV-21050 1400487978 5-Oct-21 11:00 AM JFYN LSS CIV SATIP-A-114-01 3.3 SAIC-A-1005 TA-148878-002,003,004 layer for Sleeper support foundation Pedestal PS-19 (Type SLS-03C) I W EDGARDO BANGCO Ali Al-Gmman DONE 1 3
FILL-PLANT GUINTO
GL: K/16, 17,19,20,24,25,26 (07nos) at JFYN LSS

Compaction testing inspection of backfilling MARL CAPPING FINAL


JFYN LSS-SUPPLY layer for Sleeper support foundation Pedestal PS-19 (Type SLS-03C) M.SAEED / ANGELO
22 PTJ-SGCP-CIV-21051 1400487978 5-Oct-21 11:15 AM JFYN LSS CIV SATIP-A-114-01 3.3 SAIC-A-1005 TA-148878-002,003,004 I W EDGARDO BANGCO Ali Al-Gmman DONE 1 3
FILL-PLANT GL: L/21,23 (02nos), GL: M/22 (01no) & PS-19A (Type SLS-03D) GUINTO
GL: K/18,27 (02nos) at JFYN LSS

Compaction testing inspection of backfilling MARL CAPPING FINAL


JFYN LSS-SUPPLY layer for Sleeper support foundation Pedestal PS-19 (Type SLS-03C) M.SAEED / ANGELO
23 PTJ-SGCP-CIV-21052 1400487978 5-Oct-21 11:30 AM JFYN LSS CIV SATIP-A-114-01 3.3 SAIC-A-1005 TA-148878-001,002,004 I W EDGARDO BANGCO Ali Al-Gmman DONE 1 3
FILL-PLANT GL: 15/D,E,G,H,J (05nos) & PS-19A (Type SLS-03D) GL: 15/F GUINTO
(01no) at JFYN LSS

Page 1 of 3
Saipem Classification - General Use
#
SUBCONTRATOR - PETROJET CONTRACTOR - SAUDI ARABIAN SAIPEM CO. LTD. CLIENT - SAUDI ARAMCO

Project - South Gas Compression Plant (SGCP) Pipeline CONTRACT NO. - 1248435 JOB NO. - 084418 BI-10-01996-0006

Project Record Book Book # 8 HARADH AREA, JFYN LSS Index No. - B8.2B.1.7.1 JFYN LSS
ARAMC
SAIPEM
O
Sr. Date of Time of Line Tag / INSPEC PTJ / SAIPEM EPM INSPECTION Vol.
Contractor Rfi NO EPM NO Location Discipline SATIP # Activity SAIC DRG NO & REV. Description of Activity INSPEC PID Insp. SAPMT File No. Remarks
No. Inspection Inspection Location TION Inspector STATUS No.
TION
LEVEL
LEVEL
JFYN LSS-148872-
002-PFD-21-
TA-148872-002,TA- Formwork inspection for pedestals PFD-21 (02nos) & PFD-01B M.SAEED / ANGELO
24 PTJ-SGCP-CIV-21081 1400487978 6-Oct-21 9:45 AM 001,JFYN LSS- JFYN LSS CIV SATIP-Q-001-02 3.2 SAIC-Q-1012 H H EDGARDO BANGCO Ali Al-Gmman DONE 1 3
148942-002 (02nos) at JFYN LSS GUINTO
148872-002-PFD-
01B-001,
JFYN LSS-148872-
002-PFD-21-
TA-148872-002,TA- Embedded items installation inspection for pedestals PFD-21 M.SAEED / ANGELO
25 PTJ-SGCP-CIV-21082 1400487978 6-Oct-21 9:50 AM 001,JFYN LSS- JFYN LSS CIV SATIP-Q-001-02 3.3 SAIC-Q-1013 H H EDGARDO BANGCO Ali Al-Gmman DONE 1 3
148942-002 (02nos) & PFD-01B (02nos) at JFYN LSS GUINTO
148872-002-PFD-
01B-001,
JFYN LSS-148872-
002-PFD-21-
TA-148872-002,TA- Concrete sampling, testing & placement for pedestals PFD-21 M.SAEED / ANGELO
26 PTJ-SGCP-CIV-21083 1400487978 6-Oct-21 9:55 AM 001,JFYN LSS- JFYN LSS CIV SATIP-Q-001-02 3.4 SAIC-Q-1060 I W EDGARDO BANGCO Ali Al-Gmman DONE 1 3
148942-002 (02nos) & PFD-01B (02nos) at JFYN LSS GUINTO
148872-002-PFD-
01B-001,
JFYN LSS-148872-
002-IJB-001,JFYN TA-148872-002,TA-
Formwork inspection for pedestals Instrument Junction Box IJB-1 M.SAEED / ANGELO
27 PTJ-SGCP-CIV-21084 1400487978 6-Oct-21 9:30 AM LSS-148872-002- JFYN LSS CIV SATIP-Q-001-02 3.2 SAIC-Q-1012 148064-002,TA-149066- H H EDGARDO BANGCO Ali Al-Gmman DONE 1 3
(02nos) & Sleeper support Pedestal SLS-03 (01no) at JFYN LSS GUINTO
IJB-001,JFYN LSS- 002
148872-002-SLS-
JFYN LSS-148872-
002-IJB-001,JFYN TA-148872-002,TA- Embedded items installation inspection for pedestals Instrument
M.SAEED / ANGELO
28 PTJ-SGCP-CIV-21085 1400487978 6-Oct-21 9:35 AM LSS-148872-002- JFYN LSS CIV SATIP-Q-001-02 3.3 SAIC-Q-1013 148064-002,TA-149066- Junction Box IJB-1 (02nos) & Sleeper support Pedestal SLS-03 H H EDGARDO BANGCO Ali Al-Gmman DONE 1 3
GUINTO
IJB-001,JFYN LSS- 002 (01no) at JFYN LSS
148872-002-SLS-
JFYN LSS-148872-
002-IJB-001,JFYN TA-148872-002,TA- Concrete sampling, testing & placement inspection for pedestals
M.SAEED / ANGELO
29 PTJ-SGCP-CIV-21086 1400487978 6-Oct-21 9:40 AM LSS-148872-002- JFYN LSS CIV SATIP-Q-001-02 3.4 SAIC-Q-1060 148064-002,TA-149066- Instrument Junction Box IJB-1 (02nos) & Sleeper support Pedestal I W EDGARDO BANGCO Ali Al-Gmman DONE 1 3
GUINTO
IJB-001,JFYN LSS- 002 SLS-03 (01no) at JFYN LSS
148872-002-SLS-
JFYN LSS-148872-
002-JCF-
TA-148872-002,TA- Formwork inspection for JIB CRANE 2ton capacity Pedestal (JCF) M.SAEED / ANGELO
30 PTJ-SGCP-CIV-21087 1400487978 6-Oct-21 10:05 AM 001,JFYN LSS- JFYN LSS CIV SATIP-Q-001-02 3.2 SAIC-Q-1012 H H EDGARDO BANGCO Ali Al-Gmman DONE 1 3
149064-009 (01no) at JFYN LSS GUINTO
148872-002-SHF-
001,
JFYN LSS-148872-
002-JCF-
TA-148872-002,TA- Embedded items installation inspection for JIB CRANE 2ton M.SAEED / ANGELO
31 PTJ-SGCP-CIV-21088 1400487978 6-Oct-21 10:10 AM 001,JFYN LSS- JFYN LSS CIV SATIP-Q-001-02 3.3 SAIC-Q-1013 H H EDGARDO BANGCO Ali Al-Gmman DONE 1 3
149064-009 capacity Pedestal (JCF) (01no) at JFYN LSS GUINTO
148872-002-SHF-
001,
JFYN LSS-148872-
002-JCF-
TA-148872-002,TA- Concrete sampling, testing & placement inspection for JIB CRANE M.SAEED / ANGELO
32 PTJ-SGCP-CIV-21089 1400487978 6-Oct-21 10:15 AM 001,JFYN LSS- JFYN LSS CIV SATIP-Q-001-02 3.4 SAIC-Q-1060 I W EDGARDO BANGCO Ali Al-Gmman DONE 1 3
149064-009 2ton capacity Pedestal (JCF) (01no) at JFYN LSS GUINTO
148872-002-SHF-
001,
JFYN LSS-148872-
002- SHF-
TA-148872-002,TA- Formwork inspection for Pedestals Scraper Handling Facility (SHF) M.SAEED / ANGELO
33 PTJ-SGCP-CIV-21090 1400487978 6-Oct-21 10:20 AM 001,JFYN LSS- JFYN LSS CIV SATIP-Q-001-02 3.2 SAIC-Q-1012 H H EDGARDO BANGCO Ali Al-Gmman DONE 1 3
149063-002 (02nos) at JFYN LSS GUINTO
148872-002-SHF-
002,
JFYN LSS-148872-
002- SHF-
TA-148872-002,TA- Embedded items installation inspection for Pedestals Scraper M.SAEED / ANGELO
34 PTJ-SGCP-CIV-21091 1400487978 6-Oct-21 10:25 AM 001,JFYN LSS- JFYN LSS CIV SATIP-Q-001-02 3.3 SAIC-Q-1013 H H EDGARDO BANGCO Ali Al-Gmman DONE 1 3
149063-002 Handling Facility (SHF) (02nos) at JFYN LSS GUINTO
148872-002-SHF-
002,
JFYN LSS-148872-
002- SHF-
TA-148872-002,TA- Concrete sampling, testing & placement inspection for Pedestals M.SAEED / ANGELO
35 PTJ-SGCP-CIV-21092 1400487978 6-Oct-21 10:30 AM 001,JFYN LSS- JFYN LSS CIV SATIP-Q-001-02 3.4 SAIC-Q-1060 I W EDGARDO BANGCO Ali Al-Gmman DONE 1 3
149063-002 Scraper Handling Facility (SHF) (02nos) at JFYN LSS GUINTO
148872-002-SHF-
002,
JFYN LSS-148871-
001- PANEL RACK-
TA-148871-001,TA- FBE Rebar inspection prior to form closure for Pedestals panel rack M.SAEED / ANGELO
36 PTJ-SGCP-CIV-21126 1400487978 7-Oct-21 9:00 AM 001,JFYN LSS- JFYN LSS CIV SATIP-Q-001-02 3.3 SAIC-Q-1013 H H EDGARDO BANGCO Ali Al-Gmman DONE 1 3
148892-010 type - 2 (02nos) at JFYN LSS GUINTO
148871-001-
PANEL RACK-002,
JFYN LSS-148872-
001- 2-6''-600-
TA-148872-001 Formwork inspection for Pedestals 6''(NON-MATLIC) Temprary M.SAEED / ANGELO
37 PTJ-SGCP-CIV-21166 1400487978 10-Oct-21 9:45 AM 001,JFYN LSS- JFYN LSS CIV SATIP-Q-001-02 3.2 SAIC-Q-1012 H H EDGARDO BANGCO Ali Al-Gmman DONE 1 3
TA-149073-002 Scraper Handling Type 2-6''-600# (04nos) at JFYN LSS GUINTO
148872-001- 2-6''-
600-002,JFYN LSS-
JFYN LSS-148872-
001- 2-6''-600- Embedded items installation inspection for Pedestals 6''(NON-
TA-148872-001 M.SAEED / ANGELO
38 PTJ-SGCP-CIV-21167 1400487978 10-Oct-21 9:50 AM 001,JFYN LSS- JFYN LSS CIV SATIP-Q-001-02 3.3 SAIC-Q-1013 MATLIC) Temprary Scraper Handling Type 2-6''-600# (04nos) at H H EDGARDO BANGCO Ali Al-Gmman DONE 1 3
TA-149073-002 GUINTO
148872-001- 2-6''- JFYN LSS
600-002,JFYN LSS-
JFYN LSS-148872-
001- 2-6''-600- Concrete sampling, testing & placement inspection for Pedestals
TA-148872-001 M.SAEED / ANGELO
39 PTJ-SGCP-CIV-21168 1400487978 10-Oct-21 9:55 AM 001,JFYN LSS- JFYN LSS CIV SATIP-Q-001-02 3.4 SAIC-Q-1060 6''(NON-MATLIC) Temprary Scraper Handling Type 2-6''-600# I W EDGARDO BANGCO Ali Al-Gmman DONE 1 3
TA-149073-002 GUINTO
148872-001- 2-6''- (04nos) at JFYN LSS
600-002,JFYN LSS-
JFYN LSS-148871-
001- PANEL RACK-
TA-148871-001 Formwork inspection for Pedestals panel rack type - 2 (02nos) at M.SAEED / ANGELO
40 PTJ-SGCP-CIV-21169 1400487978 10-Oct-21 10:00 AM 001,JFYN LSS- JFYN LSS CIV SATIP-Q-001-02 3.2 SAIC-Q-1012 H H EDGARDO BANGCO Ali Al-Gmman DONE 1 3
TA-148892-010 JFYN LSS GUINTO
148871-001-
PANEL RACK-002,
JFYN LSS-148871-
001- PANEL RACK-
TA-148871-001 Embedded items installation inspection for Pedestals panel rack M.SAEED / ANGELO
41 PTJ-SGCP-CIV-21170 1400487978 10-Oct-21 10:05 AM 001,JFYN LSS- JFYN LSS CIV SATIP-Q-001-02 3.3 SAIC-Q-1013 H H EDGARDO BANGCO Ali Al-Gmman DONE 1 3
TA-148892-010 type - 2 (02nos) at JFYN LSS GUINTO
148871-001-
PANEL RACK-002,
JFYN LSS-148871-
001- PANEL RACK-
TA-148871-001 Concrete sampling, testing & placement inspection for Pedestals M.SAEED / ANGELO
42 PTJ-SGCP-CIV-21171 1400487978 10-Oct-21 10:10 AM 001,JFYN LSS- JFYN LSS CIV SATIP-Q-001-02 3.4 SAIC-Q-1060 I W EDGARDO BANGCO Ali Al-Gmman DONE 1 3
TA-148892-010 panel rack type - 2 (02nos) at JFYN LSS GUINTO
148871-001-
PANEL RACK-002,
HRDH-RH-JFYN-
149168-003-SLS3-
TA-149168-003,TA- Grade and site preparation inspection for Sleeper support M.SAEED / ANGELO
43 PTJ-SGCP-CIV-21230 1400487978 12-Oct-21 1:00 PM 1,HRDH-RH-JFYN- JFYN LSS CIV SATIP-Q-001-02 3.1 SAIC-Q-1011 I W EDGARDO BANGCO Ali Al-Gmman DONE 1 3
149066-002 foundations PS-18 type SLS-03A (02nos) at JFYN LSS GUINTO
149168-003-SLS3-
2

Page 2 of 3
Saipem Classification - General Use
#
SUBCONTRATOR - PETROJET CONTRACTOR - SAUDI ARABIAN SAIPEM CO. LTD. CLIENT - SAUDI ARAMCO

Project - South Gas Compression Plant (SGCP) Pipeline CONTRACT NO. - 1248435 JOB NO. - 084418 BI-10-01996-0006

Project Record Book Book # 8 HARADH AREA, JFYN LSS Index No. - B8.2B.1.7.1 JFYN LSS
ARAMC
SAIPEM
O
Sr. Date of Time of Line Tag / INSPEC PTJ / SAIPEM EPM INSPECTION Vol.
Contractor Rfi NO EPM NO Location Discipline SATIP # Activity SAIC DRG NO & REV. Description of Activity INSPEC PID Insp. SAPMT File No. Remarks
No. Inspection Inspection Location TION Inspector STATUS No.
TION
LEVEL
LEVEL
HRDH-RH-JFYN-
149168-003-SLS3-
TA-149168-003,TA- Compaction testing inspection of subgrade for Sleeper support M.SAEED / ANGELO
44 PTJ-SGCP-CIV-21231 1400487978 12-Oct-21 1:10 PM 1,HRDH-RH-JFYN- JFYN LSS CIV SATIP-A-114-01 3.3 SAIC-A-1005 I W EDGARDO BANGCO Ali Al-Gmman DONE 1 3
149066-002 foundations PS-18 type SLS-03A (02nos) at JFYN LSS GUINTO
149168-003-SLS3-
2
HRDH-RH-JFYN-
149168-003-SLS3-
TA-149168-003,TA- Lean concrete sampling, testing & placement inspection for Sleeper M.SAEED / ANGELO
45 PTJ-SGCP-CIV-21232 1400487978 12-Oct-21 1:20 PM 1,HRDH-RH-JFYN- JFYN LSS CIV SATIP-Q-001-02 3.4 SAIC-Q-1060 I W EDGARDO BANGCO Ali Al-Gmman DONE 1 3
149066-002 support foundations PS-18 type SLS-03A (02nos) at JFYN LSS GUINTO
149168-003-SLS3-
2
HRDH-RH-JFYN-
149168-001-PF-1- TA-149168-001,002,TA- Grade and site preparation inspection for Valve support
M.SAEED / ANGELO
46 PTJ-SGCP-CIV-21233 1400487978 12-Oct-21 1:30 PM 1,HRDH-RH-JFYN- JFYN LSS CIV SATIP-Q-001-02 3.1 SAIC-Q-1011 148930-003,TA-148939- foundations VS-03 (02nos) & Platform foundation SHPF-01/PF-01 I W EDGARDO BANGCO Ali Al-Gmman DONE 1 3
GUINTO
149168-001-VS-3- 005 (04nos) at JFYN LSS
1,HRDH-RH-JFYN-
HRDH-RH-JFYN-
149168-001-PF-1- TA-149168-001,002,TA- Compaction testing inspection of subgrade for Valve support
M.SAEED / ANGELO
47 PTJ-SGCP-CIV-21234 1400487978 12-Oct-21 1:40 PM 1,HRDH-RH-JFYN- JFYN LSS CIV SATIP-A-114-01 3.3 SAIC-A-1005 148930-003,TA-148939- foundations VS-03 (02nos) & Platform foundation SHPF-01/PF-01 I W EDGARDO BANGCO Ali Al-Gmman DONE 1 3
GUINTO
149168-001-VS-3- 005 (04nos) at JFYN LSS
1,HRDH-RH-JFYN-
HRDH-RH-JFYN-
149168-001-PF-1- TA-149168-001,002,TA- Lean concrete sampling, testing & placement inspection for Valve
M.SAEED / ANGELO
48 PTJ-SGCP-CIV-21235 1400487978 12-Oct-21 1:50 PM 1,HRDH-RH-JFYN- JFYN LSS CIV SATIP-Q-001-02 3.4 SAIC-Q-1060 148930-003,TA-148939- support foundations VS-03 (02nos) & Platform foundation SHPF- I W EDGARDO BANGCO Ali Al-Gmman DONE 1 3
GUINTO
149168-001-VS-3- 005 01/PF-01 (04nos) at JFYN LSS
1,HRDH-RH-JFYN-
HRDH-RH-JFYN-
149168-003-
TA-149168-003,TA- Formwork inspection for Sleeper support foundation footings PS-18
49 PTJ-SGCP-CIV-21325 1400487978 17-Oct-21 9:30 AM SLS3A-1,HRDH- JFYN LSS CIV SATIP-Q-001-02 3.2 SAIC-Q-1012 H H M.SAEED/ ED GABRIEL EDGARDO BANGCO Ali Al-Gmman DONE 1 3
149066-002 type SLS-03A (02nos) at JFYN LSS
RH-JFYN-149168-
003-SLS3A-2
HRDH-RH-JFYN-
149168-003-
TA-149168-003,TA- FBE Rebar installation inspection for Sleeper support foundation
50 PTJ-SGCP-CIV-21326 1400487978 17-Oct-21 9:35 AM SLS3A-1,HRDH- JFYN LSS CIV SATIP-Q-001-02 3.3 SAIC-Q-1013 H H M.SAEED/ ED GABRIEL EDGARDO BANGCO Ali Al-Gmman DONE 1 3
149066-002 footings PS-18 type SLS-03A (02nos) at JFYN LSS
RH-JFYN-149168-
003-SLS3A-2
HRDH-RH-JFYN-
149168-003- Concrete sampling, testing & placement inspection for Sleeper
TA-149168-003,TA-
51 PTJ-SGCP-CIV-21327 1400487978 17-Oct-21 9:40 AM SLS3A-1,HRDH- JFYN LSS CIV SATIP-Q-001-02 3.4 SAIC-Q-1060 support foundation footings PS-18 type SLS-03A (02nos) at JFYN I W M.SAEED/ ED GABRIEL EDGARDO BANGCO Ali Al-Gmman DONE 1 3
149066-002
RH-JFYN-149168- LSS
003-SLS3A-2
HRDH-RH-JFYN-
149168-001-PF-1-
TA-149168-001 Formwork inspection for Platform foundation footings SHPF-01/PF-
52 PTJ-SGCP-CIV-21328 1400487978 17-Oct-21 10:00 AM 1,HRDH-RH-JFYN- JFYN LSS CIV SATIP-Q-001-02 3.2 SAIC-Q-1012 H H M.SAEED/ ED GABRIEL EDGARDO BANGCO Ali Al-Gmman DONE 1 3
TA-148939-005 01 (04nos) at JFYN LSS
149168-001-PF-1-
2,HRDH-RH-JFYN-
HRDH-RH-JFYN-
149168-001-PF-1-
TA-149168-001 FBE Rebar installation inspection for Platform foundation footings
53 PTJ-SGCP-CIV-21329 1400487978 17-Oct-21 10:05 AM 1,HRDH-RH-JFYN- JFYN LSS CIV SATIP-Q-001-02 3.3 SAIC-Q-1013 H H M.SAEED/ ED GABRIEL EDGARDO BANGCO Ali Al-Gmman DONE 1 3
TA-148939-005 SHPF-01/PF-01 (04nos) at JFYN LSS
149168-001-PF-1-
2,HRDH-RH-JFYN-
HRDH-RH-JFYN-
149168-001-PF-1-
TA-149168-001 Concrete sampling, testing & placement inspection for Platform
54 PTJ-SGCP-CIV-21330 1400487978 17-Oct-21 10:10 AM 1,HRDH-RH-JFYN- JFYN LSS CIV SATIP-Q-001-02 3.4 SAIC-Q-1060 I W M.SAEED/ ED GABRIEL EDGARDO BANGCO Ali Al-Gmman DONE 1 3
TA-148939-005 foundation footings SHPF-01/PF-01 (04nos) at JFYN LSS
149168-001-PF-1-
2,HRDH-RH-JFYN-

HRDH-RH-JFYN- TA-149168-002,TA-
Formwork inspection for Valve support foundation footing VS-03
55 PTJ-SGCP-CIV-21331 1400487978 17-Oct-21 10:20 AM 149168-002-VS- JFYN LSS CIV SATIP-Q-001-02 3.2 SAIC-Q-1012 148930-003,TA-148930- H H M.SAEED/ ED GABRIEL EDGARDO BANGCO Ali Al-Gmman DONE 1 3
(01no) at JFYN LSS
03-1 011

HRDH-RH-JFYN- TA-149168-002,TA-
FBE Rebar installation inspection for Valve support foundation
56 PTJ-SGCP-CIV-21332 1400487978 17-Oct-21 10:25 AM 149168-002-VS- JFYN LSS CIV SATIP-Q-001-02 3.3 SAIC-Q-1013 148930-003,TA-148930- H H M.SAEED/ ED GABRIEL EDGARDO BANGCO Ali Al-Gmman DONE 1 3
footing VS-03 (01no) at JFYN LSS
03-1 011

HRDH-RH-JFYN- TA-149168-002,TA-
Concrete sampling, testing & placement inspection for Valve
57 PTJ-SGCP-CIV-21333 1400487978 17-Oct-21 10:30 AM 149168-002-VS- JFYN LSS CIV SATIP-Q-001-02 3.4 SAIC-Q-1060 148930-003,TA-148930- I W M.SAEED/ ED GABRIEL EDGARDO BANGCO Ali Al-Gmman DONE 1 3
support foundation footing VS-03 (01no) at JFYN LSS
03-1 011

Concrete surface Preparation & moisture test inspection for


foundations pedestals VS-03G (01no), VS-03J (01no),TS-05
58 PTJ-SGCP-CIV-21350 1400487978 18-Oct-21 8:00 AM GEN JFYN LSS CIV SATIP-H-003-01 3.1 SAIC-H-1003 TA-148872-002 H H M.SAEED/ ED GABRIEL EDGARDO BANGCO Ali Al-Gmman DONE 1 3
(01no),TS-06 (01no), SHF (01no), IJB - 1 (02nos), PFD-021 (01no)
& PFD-01B (01no) at JFYN LSS

Concrete surface Preparation & moisture test inspection for Sleeper


59 PTJ-SGCP-CIV-21362 1400487978 18-Oct-21 8:05 AM GEN JFYN LSS CIV SATIP-H-003-01 3.1 SAIC-H-1003 TA-148878-003 H H M.SAEED/ ED GABRIEL EDGARDO BANGCO Ali Al-Gmman DONE 1 3
support foundation SLS-03C (02nos) at JFYN LSS

Concrete surface Preparation & moisture test inspection for


TA-148872-001,TA- foundations pedestals Area Lighting pole ALF-02 (02nos), F9 (01no),
60 PTJ-SGCP-CIV-21363 1400487978 18-Oct-21 8:10 AM GEN JFYN LSS CIV SATIP-H-003-01 3.1 SAIC-H-1003 H H M.SAEED/ ED GABRIEL EDGARDO BANGCO Ali Al-Gmman DONE 1 3
148872-002 F16 (01no), F21 (01no), VAPF-01A (02nos), H2S (04nos) at JFYN
LSS

JFYN LSS-148872- Grade and site preparation inspection for pipe support foundation
61 PTJ-SGCP-CIV-21364 1400487978 18-Oct-21 10:15 AM JFYN LSS CIV SATIP-Q-001-02 3.1 SAIC-Q-1011 TA-148872-001 I W M.SAEED/ ED GABRIEL EDGARDO BANGCO Ali Al-Gmman DONE 1 3
001-F16-001, F16 (01no) at JFYN LSS

Page 3 of 3
Saipem Classification - General Use
#