Jumlah Penghuni Kebutuhan air Total Kebutuhan

No Gedung Ruangan
(orang) (liter/hari) air(liter/hari)
1 SC1 SC1-01 26 20 520
SC1-04 26 20 520
SC1-05 26 20 520
SC1-06 26 20 520
SC1-08 26 20 520
R.Teleconference 45 20 900
R. Dosen 1 9 20 180
R. Dosen 2 6 20 120
Lab. Komputer 50 20 1000
Toilet Staff 2 20 40
Toilet Mahasiswa 10 20 200
2 SC2 SC1-01 26 20 520
SC1-02 26 20 520
SC1-03 26 20 520
SC1-05 26 20 520
SC1-07 26 20 520
SC1-08 26 20 520
SC1-09 26 20 520
SC1-10 26 20 520
R.Dosen 1 7 20 140
R.Dosen 2 3 20 60
R.Dosen Kaprodi 6 20 120
PBM 2 20 40
Toilet Staff 2 20 40
Toilet Mahasiswa 10 20 200
3 SC3 SC3-1 26 20 520
SC3-2 26 20 520
SC3-3 26 20 520
SC3-4 26 20 520
SC3-6 26 20 520
SC3-7 26 20 520
SC3-8 26 20 520
SC3-9 26 20 520
SC3-10 26 20 520
R.Dosen 11 20 220
PBM 2 20 40
Toilet Staff 2 20 40
Toilet Mahasiswa 10 20 200
TOTAL 14980
Jumlah Penghuni Kebutuhan Air Total Kebutuhan Air
No Gedung Ruangan
(orang) (liter/hari) (liter/hari)
1 GKS Lt 1 Classroom 2 30 20 600
Laboratory 1 26 20 520
Laboratory 2 26 20 520
UPT Bahasa 3 20 60
Arsip Center 3 20 60
R.Arsip 4 20 80
R.Bimbingan 2 20 40
Gudang 0 20 0
R.Sholat 3 20 60
Toilet 10 20 200
2 GKS Lt 2 Classroom 1 20 20 400
Classroom 3 20 20 400
Galeri 30 20 600
UPT TIK 8 20 160
Data Center 2 20 40
Sek.SPMB 7 20 140
P3M 2 20 40
Tax Center 5 20 100
Staff 3 20 60
Toilet 10 20 200
3 GKS Lt 3 R.Make Up 3 20 60
Lecture Room 4 20 80
Dubbing Room 2 20 40
Editing Room 3 20 60
Class Room 26 20 520
Meeting Room 12 20 240
Kontrol Room1 5 20 100
kontrol Room2 5 20 100
Studio 1 50 20 1000
Studio 2 50 20 1000
Property 0 20 0
Head Master 3 20 60
Trans Mission 2 20 40
Toilet 10 20 200
TOTAL 7780