9. Walls less than 200mm thick to have hoop iron at
alternate courses.
10 . Heavy duty polythene sheeting and anti-termite
treatment to be provided on underground floor slabs.
11. All materials and works to be approved on site.
Any discrepancy to be referred to the architect.
12. Depth of foundation to be determined on site.
13. All construction to comply with the latest KBS stds
code of practice.
400
DEEP END 14. All rooms without natural ventilation to have
2M DEPTH mechanical ventilation.
8,000
15. The levels shown are architectural floor finish levels.
16. The Contractor needs to match the indicated levels
with that of the Surveyor .
BABY POOL
4,000
600MM DEPTH
FIRE NOTES.
1. All doors to have one hour fire resistance.
2. All materials used in construction should be fire
proof unless otherwise approved by the
architect before installation.
400
3. Provide for fire portables in corridor after every
455 4,400 400
30m interval as directed by the MEP Engineer.
1,400
4. All staircase should be constructed of fire
proof materials as per architects spec.ifications.
5. Provide adequate exit signs through
out the building (illuminated).
6. Provide 3 x30mts hose reel per floor
with shut off nozzle.
7. 1. Provide 3 x 9kg water fire extinguisher
2. Provide 3 x 5kg Dry powder fire extinguisher
3. Provide 3 x 5kg CO2 extinguisher per floor.
25,000
25,000
9,000
blanket at the restaurant kitchen.
MAIN POOL
POOL DECK
10M x 25M
f.f_300x300mm slate mazeras
f.f_100x100mm blue ceramic tiles
COPYRIGHT
THE COPYRIGHT OF THIS DRAWING IS RESERVED
USED ON THE SITE FOR WHICH IT WAS PREPARED
UNLESS OTHERWISE AUTHORIZED BY THE
ARCHITECTS
OUTDOOR LOUNGE
+150mm No. DATE REVISIONS
14,900
f.f_slate Mazeras Pavilion to 01 28.07.2021 Revised column sizes and positions
later design 02 28.07.2021 wall on grid D,1 aligned with grid
& detail 03 28.07.2021 wall on grid B,1 aligned with grid
Overflow Channel
Pergolas above @3600mm to later detail
8,000
A B C D D F
SHALLOW END
1.2M DEPTH
L[02]02
outdoor shower
1 below pavilion 1
100
200
200
D21_T7
300
400
400
200 600 3,000 600 200 1,950 4,000 1,950 418
400
10,000 400 200 2,182 2,400 200
2,200
Kitchen planter
t.o.s. +600mm
1,100
600x600mm porcelain tiles 1
2
PRECINCT
550 400
3
5,000
200
Terrace
f.f_600x 600mm porcelain tiles
2,600
t.o.s. +450mm
D20_T2
900
2,600
200 500 200 3,500 200 1,500 1,800 4,200 1,100 1,800 2,000 1,800 2,000 1,800 2,000 1,800 1,200
750
200
200
2 2
200
200
200
1,425
Corridor
1,400
1,500
1,500
1,500
L[01]01 200 500 200 3,500 7,925 150 3,625 200 10,900 200
200
16
17
18
19
20
21
22
23
15
W01_T1
150
150
1,800
seat D15_T2 D06_T2
seat
fire katani road syokimau,
14
D19_T6
1,000
cleaners
duct
13
closet
600x600mm porcelain tiles
5,000
12
lockers
lockers
200
10
seat
Restaurant
tel: +254 707 675 661
Gents changing room
lockers
2,200
t.o.s. +450mm
t.o.s. +600mm
1,400
150
300
info@ morphosis.co.ke
In-built seat
Main stair to
morphosis
UP
Custom Text
L[02]04
L[02]03
S.E's details
www.morphosis.co.ke
1,000 150
design+architecture
1,000
D14_T3
D07_T3
seat
3 3
wc
wc
200
200
W02_T1
Reception desk
1,800
6,100
1,000 150
150
to later design
Back Office
Reception Area
t.o.s. +600mm
D13_T3
D08_T3
whb
t.o.s. +600mm
whb
600x600mm
JOB TITLE
Lounge
sh
sh
2,700
porcelain tiles
600x600mm porcelain tiles
PROPOSED BUXTON REDEVELOPMENT ON LR
2,175
3,900
t.o.s. +600mm
1,000 150
W06_T1
3,800
D09_T3
D12_T3
MSA/BLOCKXVII/1776/-BUXTON, MOMBASA
1,450
W05_T1 W04_T1 W03_T1
sh
sh
planter
1,000 150
AY
D10_T3
D11_T3
W07_T2 W06_T2
200
sh
sh
planter CLIENT
LKW
4 4
400
D16_T4
200
200
200
600
1,800
3,100
2,800
3,100
Entry porch
f.f_600x 600mm porcelain tiles
PARKING
IAN
100
PARKING
200
5 5
400
SHEET TITLE
300
200
200
2
EDE
100 4,400 4,100 3,800 3,800 11,100 300 CLUB HOUSE_GROUND FLOOR
PLAN LAYOUT
eP
27,600
wid
L[02]01
CHECKED BY: YB
DESTRIAN WALKWAY
5M WIDE DRIVEWAY
f.f_Paving blocks
SCALE 1:100 A1
Issued for: Revision
FOR INFORMATION 04
Project No. Sheet No.
ML_1819 001
Project start date: Sheet plot date:
01/07/2019 2022-07-22
Path: \\mlservermain\ML-Projects\Current Projects\2019\ARCHITECTURE\ML_1819_BUXTON REDEVELOPMENT\08_Drawings\08_01
_WIP\08_01_02_Construction\CLUB HOUSE\Cad\CLUBHOUSE.pln
NOTES
FIRE NOTES.
1. All doors to have one hour fire resistance.
2. All materials used in construction should be fire
proof unless otherwise approved by the
architect before installation.
A B C D D F A B C D D F
3. Provide for fire portables in corridor after every
30m interval as directed by the MEP Engineer.
4. All staircase should be constructed of fire
proof materials as per architects spec.ifications.
L[02]02 L[02]02 5. Provide adequate exit signs through
out the building (illuminated).
1 1 1 1
250
250
100
100
6. Provide 3 x30mts hose reel per floor
with shut off nozzle.
7. 1. Provide 3 x 9kg water fire extinguisher
2. Provide 3 x 5kg Dry powder fire extinguisher
3. Provide 3 x 5kg CO2 extinguisher per floor.
5,200
5,100
blanket at the restaurant kitchen.
5,200
5,200
5,200
Terrace
27,600
f.f_600x600mm exterior tiles to spec's
2,350
t.o.s. +4150mm
4,400 4,100 3,800 3,800 11,100 400 COPYRIGHT
200
12,800 550 1,800 2,000 1,800 2,000 1,800 2,000 1,800 800 200 600 200 7,600 200 THE COPYRIGHT OF THIS DRAWING IS RESERVED
200
USED ON THE SITE FOR WHICH IT WAS PREPARED
W01_T1 W02_T1 W03_T1 W04_T1
D01_T1 D02_T1 UNLESS OTHERWISE AUTHORIZED BY THE
400
200
2 2 2 2 ARCHITECTS
200
200
200
Corridor
1,025
600x600mm porcelain tiles
1,500
t.o.s. +4200mm
DOWN
18
19
20
21
22
23
150
15
W05_T1
14,500
1,800
D12_T2 D03_T2
14
fire seat
02 28.07.2021 wall on grid D,1 aligned with grid
D16_T6
seat
cleaners
fire
duct
13
5,200
5,200
closet
void void
2,450
5,000
5,000
12
Ceramic tiles to spec's
ROOF TOP
Circulation Lobby
11
t.o.s. +7800mm
t.o.s. +4200mm
lockers
lockers
lockers
10
TERRACE/
6,300
seat Gym
17,700
Gents changing room
18,150
18,150
lockers
Rubber flooring
Ladies changing room
RESTAURANT
9
2,200
t.o.s. +4200mm
300
Main stair to
9,200
UP
Custom Text
L[02]04
L[02]03
L[02]04
L[02]03
S.E's details
1,000 150
D04_T3
D15_T4
D11_T3
seat
3 3 3 3
wc
wc
1,100 200
200
W06_T1
1,800
1,000 150
D10_T3
D05_T3
whb
whb
sh
sh
4,000
4,000
1,000 150
W12_T1
200 1,050
1,800
1,800
t.o.s. +7800mm
3,800
Yoga/ Aerobics
D06_T3
D09_T3
Timber flooring
W09_T1 W08_T1 W07_T1
t.o.s. +4200mm
sh
sh
1,000 150
D07_T3
D08_T3
200
200 8,300 200 18,500 200 200
900
900
W11_T2 W10_T2
sh
sh
4 4 4 4
200
100
200
200
100
300 300 200 200
5,000 800 800 800 500 675 900 4,250 900 675 700 1,800 2,000 1,800 2,000 1,800 1,200 200 8,300 200 18,700 200
200 8,300 200 3,625 150 3,625 200 10,900 400 100 4,400 4,100 3,800 3,800 11,100 400
4,225
3,200
3,200
100 4,400 4,100 3,400 400 3,800 11,100 300 100 27,600
3,100
3,100
3,400
27,600
PRECINCT
Terrace
f.f_600x 600mm exterior tiles to spec's
t.o.s. +4150mm
5 5 5 5
300
300
L[02]01 L[02]01
A B C D D F A B C D D F
info@ morphosis.co.ke
morphosis www.morphosis.co.ke
L[02]02 design+architecture
1 1
JOB TITLE
CLIENT
2 2
200
SHEET TITLE
5,200
23 DEGREES SLOPE PITCHED ROOF TO S.E'S DETAILS & ROOF FLOOR PLAN LAYOUT
10,000
L[02]03
CHECKED BY: YB
4,000
A1
3,800
SCALE 1:100
L[--]04_ROOF PLAN 200 8,300 200 19,000 Project start date: Sheet plot date:
SCALE 1:100
100 4,400 4,100 3,800 3,800 11,100 400 01/07/2019 2022-07-22
27,700 Path: \\mlservermain\ML-Projects\Current Projects\2019\ARCHITECTURE\ML_1819_BUXTON REDEVELOPMENT\08_Drawings\08_01
_WIP\08_01_02_Construction\CLUB HOUSE\Cad\CLUBHOUSE.pln
NOTES
6,518
9. Walls less than 200mm thick to have hoop iron at
400
alternate courses.
10 . Heavy duty polythene sheeting and anti-termite
treatment to be provided on underground floor slabs.
11. All materials and works to be approved on site.
Any discrepancy to be referred to the architect.
12. Depth of foundation to be determined on site.
13. All construction to comply with the latest KBS stds
code of practice.
14. All rooms without natural ventilation to have
400
DEEP END mechanical ventilation.
2M DEPTH 15. The levels shown are architectural floor finish levels.
8,000
16. The Contractor needs to match the indicated levels
with that of the Surveyor .
BABY POOL
4,000
600MM DEPTH FIRE NOTES.
1. All doors to have one hour fire resistance.
2. All materials used in construction should be fire
proof unless otherwise approved by the
architect before installation.
3. Provide for fire portables in corridor after every
400
30m interval as directed by the MEP Engineer.
455 4,400 400
4. All staircase should be constructed of fire
1,400
proof materials as per architects spec.ifications.
5. Provide adequate exit signs through
out the building (illuminated).
6. Provide 3 x30mts hose reel per floor
with shut off nozzle.
7. 1. Provide 3 x 9kg water fire extinguisher
2. Provide 3 x 5kg Dry powder fire extinguisher
3. Provide 3 x 5kg CO2 extinguisher per floor.
25,000
25,000
9,000
MAIN POOL
POOL DECK
10M x 25M
f.f_300x300mm slate mazeras
f.f_100x100mm blue ceramic tiles COPYRIGHT
THE COPYRIGHT OF THIS DRAWING IS RESERVED
USED ON THE SITE FOR WHICH IT WAS PREPARED
UNLESS OTHERWISE AUTHORIZED BY THE
ARCHITECTS
14,900
f.f_slate Mazeras Pavilion to 02 28.07.2021 wall on grid D,1 aligned with grid
later design 03 28.07.2021 wall on grid B,1 aligned with grid
& detail
Overflow Channel
Pergolas above @3600mm to later detail
8,000
A B C D D F
SHALLOW END
1.2M DEPTH
L[02]02
outdoor shower
1 below pavilion 1
100
200
200
D21_T7
300
400
400
200 600 3,000 600 200 1,950 4,000 1,950 418
400
10,000 400 200 2,182 2,400 200
2,200
Kitchen planter
t.o.s. +600mm
1,100
600x600mm porcelain tiles 1
PRECINCT
2
550 400
3
5,000
200
Terrace
f.f_600x 600mm porcelain tiles
2,600
t.o.s. +450mm
D20_T2
900
2,600
200 500 200 3,500 200 1,500 1,800 4,200 1,100 1,800 2,000 1,800 2,000 1,800 2,000 1,800 1,200
750
200
200
2 2
200
200
200
1,425
Corridor
1,400
1,500
1,500
1,500
L[01]01 200 500 200 3,500 7,925 150 3,625 200 10,900 200
200
16
17
18
19
20
21
22
23
15
katani road syokimau,
W01_T1
150
150
1,800
seat D15_T2 D06_T2
seat
fire
14
1,000
cleaners
duct
13
Circulation Lobby
nairobi - kenya.
2,200
closet
600x600mm porcelain tiles
5,000
12
lockers
lockers
200
10
seat
Restaurant
Gents changing room
lockers
JOB TITLE
CLIENT
400 400
BUXTON POINT APARTMENTS LTD
P.O BOX, 76632-00508, MOMBASA
1,200 100
100
pool
CLIENT'S SIGNATURE DATE:
2022-07-22
2,000
SHEET TITLE
SCALE 1:100 A1
Issued for: Revision
FOR INFORMATION 04
Project No. Sheet No.
ML_1819 003
L[01]01_SECTION
Project start date: Sheet plot date:
SCALE 1:50 01/07/2019 2022-07-22
Path: \\mlservermain\ML-Projects\Current Projects\2019\ARCHITECTURE\ML_1819_BUXTON REDEVELOPMENT\08_Drawings\08_01
_WIP\08_01_02_Construction\CLUB HOUSE\Cad\CLUBHOUSE.pln
NOTES
600
Approved 300mm x 150mm thick precast
Pitched roof to S.E's details to be of cast iron type or encased in 150mm concrete
Approved 300mm x 150mm thick precast
3,000
coping to detail A[41]02 coping to detail A[41]02 surround.
1,050
9. Walls less than 200mm thick to have hoop iron at
900mm high masonry parapet wall to detail A[41]
1100mm high masonry parapet wall to detail A +10800mm 03 plastered with12mm thick plaster and finished alternate courses.
[41]03 plastered with12mm thick plaster and ROOF LEVEL 02 with quality exterior paint to approval
finished with quality exterior paint to approval Circulation Lobby 10 . Heavy duty polythene sheeting and anti-termite
+7800mm t.o.s. +7950mm
ROOF LEVEL 01 FLAT ROOF TO S.E's DETAILS treatment to be provided on underground floor slabs.
11. All materials and works to be approved on site.
150mm high riser finished with Any discrepancy to be referred to the architect.
3,000
Plaster detail to detail A[41]01 granite tiles
12. Depth of foundation to be determined on site.
13. All construction to comply with the latest KBS stds
1100mm high masonry parapet wall to detail A
3,600
[41]03 plastered with12mm thick plaster and code of practice.
10,200
finished with quality exterior paint to approval
+7800mm 14. All rooms without natural ventilation to have
ROOF LEVEL 01
mechanical ventilation.
200mm thick structural masonry load bearing wall 15. The levels shown are architectural floor finish levels.
to S.Es details plastered and finished to approval Circulation Lobby 16. The Contractor needs to match the indicated levels
+4200mm t.o.s. +4200mm
1ST FLOOR LEVEL 200mm thick structural masonry load bearing wall with that of the Surveyor .
to S.Es details plastered and finished to approval
300mm wide treads finished with Aluminum window to schedule
granite tiles
11,850
3,600
FIRE NOTES.
Floor notes 1. All doors to have one hour fire resistance.
1,100 150
1,100 150
Approved ceramic tiles of approved colour and R.c concrete staircase to S.E's
3,600
pattern on 25mm thick sand cement screed on details 2. All materials used in construction should be fire
150mm thick vibrated r.c floor bed on a single
layer of 1000 gauge polythene sheet DPM +4200mm proof unless otherwise approved by the
reinforced with BRC mesh on 50mm thick 1ST FLOOR LEVEL
murram blinding on 300mm thick well compacted
architect before installation.
hardcore.
3. Provide for fire portables in corridor after every
300
Planter
Restaurant Corridor 200mm thick structural masonry load bearing wall
Circulation Lobby to S.Es details plastered and finished with coral
+600mm
t.o.s. +600mm t.o.s. +600mm t.o.s. +600mm stone cladding to approval 30m interval as directed by the MEP Engineer.
GROUND FLOOR LEVEL
4. All staircase should be constructed of fire
600
600
3,600
GROUND LEVEL +0mm
4,200
200mm thick masonry foundation wall bedded 5. Provide adequate exit signs through
3,750
3,900
jointed and pointed in cement and sand [1:3]
mortar: reinforced with 25 x 3mm hoop iron strip out the building (illuminated).
laid horizontally every alternate course to S.Es
details 6. Provide 3 x30mts hose reel per floor
400 26,300 200 600 with shut off nozzle.
+600mm
GROUND FLOOR LEVEL 7. 1. Provide 3 x 9kg water fire extinguisher
300 11,100 3,800 3,800 4,100 4,400
600
600
2. Provide 3 x 5kg Dry powder fire extinguisher
GROUND LEVEL +0mm
600x600mmx200mm thick r.c foundation 27,500 3. Provide 3 x 5kg CO2 extinguisher per floor.
base to S.Es details.
4,325 8,675 5,000
50mm thick insitu concrete blinding
L[--]03_ELEVATION 03 8. Provide 3 x 5kg CO2 fire extinguishers,3 no.fire
under column bases to S.Es details SCALE 1:100 300 3,200 4,000 5,200 5,200 100 blanket at the restaurant kitchen.
18,000
L[01]01_SECTION 01
SCALE: 1_100 F D D C B A
COPYRIGHT
THE COPYRIGHT OF THIS DRAWING IS RESERVED
USED ON THE SITE FOR WHICH IT WAS PREPARED
D UNLESS OTHERWISE AUTHORIZED BY THE
F D C B A ARCHITECTS
600
ROOF LEVEL 02 with quality exterior paint to approval Pitched roof to S.E's details
Approved 300mm x 150mm thick precast
coping to detail A[41]02
1,050
Approved 300mm x 150mm thick precast 900mm high masonry parapet wall to detail A[41]
coping to detail A[41]02 +10800mm 03 plastered with12mm thick plaster and finished
ROOF LEVEL 02 with quality exterior paint to approval
3,000
3,000
+7800mm to S.Es details plastered and finished to approval
ROOF LEVEL 01
3,600
11,850
3,600
+4200mm
1ST FLOOR LEVEL
PRECINCT
1,100 150
1,100 150
200mm thick structural masonry load bearing wall
to S.Es details plastered and finished with coral
stone cladding to approval
+4200mm
1ST FLOOR LEVEL
3,600
300
Ms door to schedule 200mm thick structural masonry load bearing wall
Aluminum door to schedule to S.Es details plastered and finished with coral
stone cladding to approval
3,600
4,200
+600mm
3,750
GROUND FLOOR LEVEL
3,900
600
600
+600mm
L[--]02_ELEVATION 02 GROUND FLOOR LEVEL
SCALE 1:100
600
600
GROUND LEVEL +0mm katani road syokimau,
p.o. box 2682 - 00202
A B C 4,325 8,675 5,000
D D F L[--]03_ELEVATION 03 nairobi - kenya.
SCALE 1:100 300 3,200 4,000 5,200 5,200 100 tel: +254 707 675 661
18,000
600mm wide x 600mm high x150mm thick P.C.C
quadrant shaped moulding jointed and pointed in
[1:3] cement and sand mortar, fixed to masonry
info@ morphosis.co.ke
parapet wall, plastered with 12mm thicj plaster
and finished with approved quality exterior paint
to approval to detail A[41]04
morphosis www.morphosis.co.ke
design+architecture
Approved 300mm x 150mm thick precast
coping to detail A[41]02
600
ROOF LEVEL 02
+10800mm PROPOSED BUXTON REDEVELOPMENT ON LR
MSA/BLOCKXVII/1776/-BUXTON, MOMBASA
Approved 300mm x 150mm thick precast
coping to detail A[41]02
3,000
CLIENT
3,600
+4200mm
CLUB HOUSE_Sections &
1ST FLOOR LEVEL
Elevations
5,450
3,600
A1
600
600
600
600
600
600
600
Beam level Beam level Beam level
150
900
900
3,000
3,000
2,850
2,100
2,100
f.f level t.o.s level t.o.s level
1,800 900 800
Elevation view Elevation view Elevation view
Type. T1 Type. T4
Opening size. 1800mm wide x2850mm high Opening size. 900mm wide x2100mm high Type. T3
Location. See plan Location. See plan Opening size. 800mm wide x2100mm high
Description. Aluminum sliding door Description. Veneered Flush Door Location. See plan
Door stop. to ironmongery schedule Door stop. to ironmongery schedule Hinges. to ironmongery schedule
Kicking plate. none Kicking plate. none Door stop. to ironmongery schedule
600
600
600
600
600
Beam level Beam level Beam level
600
600
150 800 1,400
3,000
3,000
2,100
2,100
2,850
300
300
1,800
Elevation view Elevation view Elevation view
Opening size. 1800mm wide x2100mm high Opening size. 800mm wide x2100mm high Opening size. 1400mm wide x2100mm high
Description. Aluminum side hang door Description. Ms louvred door Description. Ms louvred door
Door stop. to ironmongery schedule Door stop. to ironmongery schedule Door stop. to ironmongery schedule
600
600
Beam level
150
3,000
2,850
f.f level
3,000
Elevation view
Type. T7
Escutcheon. none
600
400 600
600
400 600
Beam level Beam level
3,000
3,000
2,300
2,300
F F
300
Elevation view Elevation view
Type. T1 T2
Opening size. 1800mm wide x2300mm high 1800mm wide x2300mm high
Frame 100mm x 50mm thick powder coated Aluminum sliding 100mm x 50mm thick powder coated Aluminium top hang
window with 5mm thick clear glass infils. window with 5mm thick clear glass infils.
Opening
Mechanism Sliding top hang