ER's show this further up the

page. TCS to coordinate with Floor Construction:


Demse for electrical cupboard
BS EN 1264 - Type A System
spatial requirements
1
2
1 - Floor covering
M2 ‐ Loop 4 ‐ 200mm ‐ 83m
3 2 - Weight bearing & thermal diffusion layer
3 - Thermal insulation
Master Bathroom 4 - Structural base
Dressing M1 ‐ Loop 8 ‐ 200mm ‐ 68m
Master Bedroom
M1 Is TCS installing floor boxes? To
BOH
be labelled on drawing to be 4

8 PORT
Manifold
setout to EPA dimensions.
M2 ‐ Loop 5 ‐ 200mm ‐ 80m Family Kitchen

1. Typical underfloor heating system construction details are shown above, for further
Review ofregarding
information this drawing is solely
our other systems forfreethe
please feel purpose
to contact us so weofcan discuss your
options with you. conformity with the design concept,
ascertaining
M1 ‐ Loop 7 ‐ 200mm ‐ 64m
2. The performance of insulation can vary with different types. Suitability of the overall floor
profiles, general
should be confirmed priorarrangement
to installation. and general compliance
3. To ensure
with the best results, all heated
information floor areas require
contained in theprovision of thermal floor insulation
contract
which can be subject to building regulations or BS EN 1264, whichever is the higher
documents
requirement. and does not relieve the consultant/
Bathroom
contractor/
a. Minimum sub-contractor ofperany
insulation standards for UFH BS ENdesign
1264:
i. Ground or Exposed Floors = 1.25 m2K/W e.g. 50mm EPS (Expanded Polystyrene)
responsibilities defined in the contract documents.
ii. Upper floors = 0.75 m2K/W e.g. 25mm EPS (Expanded Polystyrene)
4. Perimeter Edge insulation is principally used for purposes of expansion movement and,
where applicable, acoustic performance of the floor.
M2
Manifold
5 PORT EPA
5. WhereNVT Comments;
insulation Drawing
is not provided under is mirrored
the UFH system, fromwill
UFH performance ondiffer from

F
M1 ‐ Loop 2 ‐ 200mm ‐ 55m
site condition,
the information needs
provided withinto
thisbe accurate
design to site.
and further guidance Drawing
should be sought.
6. For BS EN 1264 type A solid floors with underfloor heating, Expansion / stress relief joints
Secondary Bedroom 2 lacking door These
may be required. swingsshouldand doorandstops.
be designed Comments
installed by others. on
Entrance Hall
M2 ‐ Loop 1 ‐ 200mm ‐ 72m Secondary Hall sheet
7. and
For BS EN 1264to be
type approved
A screed floors, the by HL.cover over under floor heating pipes per
minimum
M2 ‐ Loop 3 ‐ 200mm ‐ 35m BSEN8204 is 35mm with Sand/Cement screed, 25mm with Anhydrite based screed ‐ although
manufacturers requirements may differ.
Status
8. For BS ENC 1264 type B floor constructions, the heat diffusion material (plate/foil) must be in
full contact with the floor deck above.
M1 ‐ Loop 1 ‐ 200mm ‐ 67m 9. For BS EN 1264 type B constructions, aluminum plate coverage should be at least 80% of the
Living Room
04/04/24
effective occupied floor area.
10. Where required due to the requirements for the notching of joists it is advised that a
structural engineer is consulted to verify structural integrity.
Secondary Bedroom 1 11.It is the installers responsibility to ensure that the installation fully complies with BS EN 1264.

M2 ‐ Loop 2 ‐ 200mm ‐ 88m

TYPE 3A Powder Room

Bathroom

M1 ‐ Loop 4 ‐ 200mm ‐ 103m

M1 ‐ Loop 5 ‐ 200mm ‐ 111m

M1 ‐ Loop 6 ‐ 150mm ‐ 118m


M1 ‐ Loop 3 ‐ 200mm ‐ 97m
C00 26/03/24 Issued for Approval
REV DATE NOTES

SOURCE DRG REF: EPA‐P4‐B8‐P‐05‐G331‐852


Status B.
SPEC REF: UFH Manifold & Output Summary V2
PHILL.THOMAS
04/04/2024

200mm
Flow Direction

150mm
CC
Thermostat
TCS-P4-B8-DRA-05-G521-005-

F
With Floor Sensor
HL Comments Thermostat
HL review comments from 13/03/2024 have not been addressed. Pipe turn to be 200mm With Remote Sensor
minimum diameter to avoid
Responses to previous review required. any pipe kinking. Thermostat

Manifold
TYPE 3A
Manifold
12 PORT

Pipes must be sleeved when layed


Apartments: Radiator /Towel Rail close together (ie, at manifold)

B8.05.02

General Notes
Pipework layout / system performance Floor Surface Temperature Floor coverings Clearance Zone 100mm
Colour coding of loops are for identification during installation only The floor surface temperatures provided are the average zone floor surface temperature  Prior to installing the floor covering, the floor covering installer shall verify the suitability
BAUMAN‐22 ‐ with LT Do TCS provision for any of
The pipework layout shown is based upon the latest plans provided by the client to 'TCS based upon the heat outputs stated. Floor surface temperatures may vary in areas of for installing the floor covering over the UFH system. The floor coverings are stored and Pump Set 0
1
2
3
0
1
2
3
0
1
2
3
0
1
2
3
0
1
2
3
0
1
2
3
these? All towel rails to be in
Contracting', if there are an discrepancies these must be reported to 'TCS Contracting' congested/uncontrolled pipe work (i.e. leaving manifolds and in transitional areas such as installed according to the relevant standards and the manufacturer's instructions.
4 4 4 4 4 4

to ensure the system will perform as designed, failure to do so may effect the output of hallways and corridors), peripheral zones and areas subject to direct sunlight or auxiliary heat  The floor surface may exceed 27˚C……this information should be passed to your flooring bathrooms. No radiators.
the system and invalidate the indemnity offered by 'TCS Contracting'. sources. Floor surface temperatures are managed by control using thermostats and further contractor. A pre‐assembled stainless‐steel
The layout is designed as a guide, however site conditions may not always enable the influenced by water temperature controls.  Consideration should be given to movement joints where screed, hardwood or tiled floor manifold with an additional TCS Screeding Ltd
design to be followed exactly. areas exceed 40m2
Pump Set fitted on site. C/W Unit 4 Kingfisher House, Crayfields Business Park,
Unless otherwise stated, no heat loss calculations have been made within this design. Transition pipes  Per BS-EN-1264, a default TOG rating of 1.0 tog is used for system performance
Where appropriate, we recommend the use of towel rails in all bathrooms and en-suites BS EN 1264-3 states that the heat output of transition pipes not serving the room through  Per BS EN-1264, floor covering TOG rating shouldn't exceed 1.5 tog. pressure gauge, auto air valve, Orpington, Kent
due to the potential for limited outputs of effective heated floors in these rooms. which they pass must be limited so that any room temperature should not be increased  Hardwood flooring should preferably be a maximum of 22mm. integral flow control valves, BR5 3QG
substantially.  Typical TOG rating for TILES = 0.0 tog integral double regulating 01322 663984
Heat Outputs We would recommend that pipework in these areas is sleeved.  Typical TOG rating for HARDWOOD = 1.0 tog admin@tcscontracting.co.uk
Heat outputs are based on the parameters in the tables above. All heat outputs and  Typical EFFECTIVE TOG rating for Carpet and Underlay = 1.5 tog
lockshield with flowmeter
floor surface temperatures are adjusted per m2/ of effective floor area and, unless Attachment system Typical tog reduction for carpet manufacturers stated tog to effective tog = 1.0 tog per function and isolation valves.
otherwise stated, are based upon a BS EN-1264 compliant system. BS EN 1264-4 states that the pipes and their attachment systems shall be secured such that
their horizontal and vertical positions are maintained as planned. BS EN 1264-4 also shows a
BEAMA Underfloor Carpet Study (assumes wool/nylon blend and UFH compatible underlay) Isolation Valves can be mounted PROJECT Chelsea Barracks_Phase 4
vertically or horizontally
Underfloor Heat outputs may vary from the values stated above depending upon the
specific relationship between the following set of values:
vertical tolerance of + 5mm at any point, and a horizontal tolerance of +/- 10mm at the
attachment points. These requirements are not applicable in areas of bends and deflections.
Thermostats
All thermostat wiring should be BS 7671 compliant. Thermostat positions are intended as Clearance Zone 200mm DRAWING TCS‐P4‐B8‐DRA‐05-G521‐005
a.Design Water Temperature
b.Flow Rate
e.Floor Construction
f.Pipework Spacing Holes in floor
indicative only. We recommend that thermostat and sensors are positioned on internal walls,
out of direct sunlight and potential thermal gain and not in enclosed spaces (ie behind doors). DATE :26/03/24 TCS UFH Installation Layout - Type 3A
c. Design Room Temperature g.Net/Effective Heated Floor Area BS EN 1264-4 states that each hole in floor shall have been preformed before the floor Port 2 3 4 5 6 7 8 9 10 11 12
d.Floor Covering h.Limits set by BSEN-1264 heating is installed in order to avoid any drilling thereafter.
L 182 232 282 332 382 432 482 532 582 632 682 DRAWN : ML CHECK : JGT SCALE: 1:100 @A3
No. AYUK/EPA/HL Comments TCS Response Notes
Please show actual floor makeup. The detailed floor build up is shown in the TCS screed drawings issued Available via Builderstorm.
separately, this drawing purely shows the UFH layout and related ancillaries,
1 and a diagram of a typical BS EN 1264 UFH floor construction.

Please confirm sleeving material and method of installation to be Sleeving is a corrugated polypropylene plastic conduit. Datasheet uploaded and attached.
used for all transition pipework for the actual floor makeup.
2

Please confirm the method to be used to maintain the pipework Plastic staples. Diagram on drawing.
loops as shown on the drawings for the actual floor makeup.
3

Please ensure coordination with all drainage pipework where Noted – this will mostly be accommodated within the insulation levels at the
routing in the floor build up. time of installation.
4