Dem P4 B8 Dra 05 G530 007 Level 5 Type 4B High Level - Epa

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Legends:

PAB not at high PIR PIR Sensor

level. Move B Blind Curtain


8-W 8-V 8-U 8-T
symbol to low 8-S 8-R 8-Q
Future Ceiling Speaker

level drawing. Downlight

Pendant Light
8-1 8-1

854-H LED Lighting HL


854-H
017
BB B B B 024 B
Aspirating Sample Points

Heat Detector
B8-C2by B8-C2aa B8-C2ab HD
854-H
ASPIRATION CAPILLARY SAMPLING POINT
028
B8-C1ai B8-C1al B8-C1bb B8-C1ai B8-D1 B8-D1 B8-D1 B8-D1 Fire Alarm Sounder
854-H 854-H 854-H ASD
ASD
018 019 B8.05.04-30 020
Pipes for ASD
Master Bedroom FIRE ALARM PANEL REF: Advanced Go
FAP Mounting Height 1700mm Top from FFL
B8-P B8-P B8-P 854-H
ASPIRATION 1 PIPE DETECTOR
023 ASP
B8-C1al B8-C1ai B8-C1ai B8-C1bb REF: FAAST FLEX 01

ASPIRATION MEDIUM AREA DETECTOR


B8.05.04-50 ASP
REF: FAAST FLEX 02
854-H 854-H Secondary Bedroom 2 B8.05.04-40
B8-C2bq B8-D1 B8-D1 Secondary Bedroom 1 ASP
ASPIRATION 4 PIPE DETECTOR

016 015 B8-D1 B8-D1


REF: VEP-A00-P

VESDA-E POWER SUPPLY UNIT


ASD PSU
REF: VPS-220-STX5
B8-C1bq ASD
854-H 854-H I/O
INPUT / OUTPUT MODULE
REF: SA4700-102APO Mounting Height TBA
854-H B8.05.04-51 Bathroom Type
8-2 022 026 Bathroom 1
8-2
025 854-H IP2/2
TWIN INPUT / OUTPUT MODULE
REF: SA4700-104APO Mounting Height TBA
Bathroom Type
1 029
Bathroom Type
854-H B8-C1bn B8-D6 B8-D1 B8.05.04-41 PS
MAGNETIC POSITION SWITCH
(COLOUR TO MATCH FRAME)
RK REMOTE KEYPAD
4A
PIR 854-H B8-D1 Bathroom
B8.05.04-31 021 ASD B8.05.04-32 B8-D6 DUAL TECHNOLOGY SU SET/UNSET READER
DT
B8-D6
Master Bathroom B8-D6 B8-D6 Dressing PIR 014 B8-D1 MOVEMENT DETECTOR

B8-D1 B8-D1 B8-D1 B8-D1 B8-D1 PAB PANIC ALARM BUTTON SP SET/UNSET SPEAKER

854-H 854-H
B8-D6 V VIBRATION DETECTOR IS INTERNAL SOUNDER
022 027 854-H

B
B8-C1ac ASD SEP SECURITY EQUIPMENT PANEL ES EXTERNAL SOUNDER
030
IMPORTANT NOTES
B8-D1 B8-D1 B8-D1 B8-D1 B8-D1 B8-D1 All dimensions to be verified by the contractor on site.
B8-C1bn For lighting control requirements please refer to the Demse Load Schedule and relevant notes

B
on the drawing.
All lights circuits feed from KNX box.
854-H Contractor to refer to relevant manufacturer for luminaire installation details.
Controls supplier to confirm exact load on circuit and supply in line resistors if req’d.
032 SD Luminaire manufacturer to confirm exact qty of drivers required against each lighting circuit.
Back boxes, burial tubes and some plaster-in recessed fittings are required at first fix.
Exact location and height of wall lights TBC by EPA.
ASD Exact lengths of linear fittings TBC from site by contractor prior to order.

B8.05.04-60 All drawings are prepared accordingly coordinated low-level and RCP drawings
B8-D1 Refer to: EPA-P4-B8-P-01-G332-101
B8-D1 Secondary Bedroom 3 B8-D1 B8-D1 B8-D1 All remote drivers / transformers to be located within ventilated and accessible areas.
Report discrepancies / conflict to Consultant(s) team immediately.
8-3 8-3 Setting out of ceiling fitting has been made by EPA.
NOTES:
5AMP
-PLEASE REFER TO RELEVANT ELECTRICAL DRAWINGS FOR WALL ARRAY TYPES
B8-D6 854-H B8-C1bn
Bathroom Type -FOR SETTING OUT OF WALL ARRAYS PLEASE REFER TO EPA DRAWINGS
854-H B8.05.04-61
032 1
Bathroom EPA-P4-ZZ-D-AL-G530-600
031 EPA-P4-ZZ-D-AL-G530-601
B8-D1 EPA-P4-ZZ-D-AL-G530-602
JOINERY
854-H ALL WARDROBE LIGHTING LOCATED AT FRONT OF SHELF.
B8-D1 B8-D1 B8.05.04-10 ALL LIGHTING WITHIN UTILITY/STORAGE/EQUIPMENT
B8-C2ad 033
Entrance Hall CUPBOARDS TO BE LOCATED UNDER SHELF OR CUPBOARD

is this High
B

854-H 854-H ASD Level


013 008
B8-D1 information?
898

B8-C2aj
854-H C00 For Construction 26.02.2024 Demse Zeynep Y.
Review of this drawing is solely for the purpose of ascertaining B8-D4 B8-D4 B8-D4 007 ASD Rev Description Date By Chk
ASD
conformity with the design concept, profiles, general arrangement and B8-C1ab
ASD
general compliance with the information contained in the contract 854-H 854-H
B8-C1as
B8-D1 B8-D1 All notes have been indicated in green on
documents and does not relieve the consultant/ contractor/ sub- B8.05.04-21
012 011 layout
Family Kitchen
B8-P B8-P
contractor of any design responsibilities defined in the contract 8-4 854-H
B8.05.04-11 B8-D1
SD
8-4

documents. B8-C1as B8-C1ab Powder Room


034
Project
Chelsea Barracks - Phase 4
Kitchen Type B8-D6
EPA NVT Comments 854-H
HD
C12 Powder Room
Type C1 854-H
010 854-H
B8-D4 B8-D4 B8-D4
001
Client
Awaiting HL comments at time of EPA NVT comments. 009 SD
Qatari Diar
B8-D1
B8-D1
Status B pending HL comments
B

854-H
04.04.24 006
854-H
003
B8-C2am

B8-C1ce
B8-C1aq Main Contractor
ANT Yapi UK
8-5 8-5

854-H 854-H 854-H


005 004 B8.05.04-20 004
B8.05.04-22 Living Room
Dining Room B8-P B8-P B8-P

Subcontractor
Demse Technical System Limited
ASD
B8-C1ce B8-C1aq
ASD

B8-C2bz
B

B B B
Address: Unit 15-16, Peacock Estate,
20 White Hart Ln, London N17 8DT
8-6 8-6
Phone: 02088085413 / 079 1504 9526
Email: info@demsets.com
8-W 8-V 8-U 8-T 8-S 8-R 8-Q Title
LEVEL 5 TYPE 4B HIGH LEVEL COMBINED
ELECTRICAL DRAWING

Size Scale Date Revision


A1 1/50 21/03/2024 C01
Drawing number:
DEM-P4-B8-DRA-05-G530-007

You might also like