Job Safety Analysis of Asphalt Overlay Works
Job Safety Analysis of Asphalt Overlay Works
Page 1 of 15
JSA No: RGC-JSA-ST-338 Rev.03
Activity: Asphalt Concrete Pavement
Date: 18-02-2024
Work Location: STAR Facility, King Abdul Aziz Sea Port, Dammam-KSA
Page 1 of 15
JOB SAFETY ANALYSIS WORK SHEET
Page 2 of 15
JSA No: RGC-JSA-ST-338 Rev.03
Activity: Asphalt Concrete Pavement
Date: 18-02-2024
Work Location: STAR Facility, King Abdul Aziz Sea Port, Dammam-KSA
➢ Fast moving ➢ Speed limit signs must be posted with warning sign from the entry point, blinking lights, and rubber
vehicles cone shall be installed.
➢ Survey the work area and address safe work method, hazards, and precautions.
➢ JSA and working permit shall be displayed at site near the work area.
➢ Drawing shall be thoroughly studied to identify locations and prevent damage to underground
utilities.
➢ Avoid working, parking, or stocking of any materials outside the project perimeter area
➢ Work location must be with necessary permits for the activity
➢ Ensure job area is free from unnecessary materials or debris that may affect or obstruct work
execution prior to start of work.
➢ Slip, Trip, Fall, ➢ All personnel to wear appropriate PPE required for the job. Site Engineer / HSE
5 Area Preparation
Personal injury ➢ Work area shall be provided with barricades and appropriate warning signs. Engineer/Supervisor
➢ Only authorized personnel can perform the job.
➢ Daily inspection of equipment shall be performed by operator.
➢ All tools and equipment shall be inspected and color coded. Only tools and equipment in good
working condition shall be used at site.
➢ All required 3rd party certifications of equipment and operators shall be ready at the work site. SAG
license is required for the drivers.
➢ Close supervision of work is required during the whole duration of any site preparation and
earthworks activities.
➢ All personnel required to work at heights more than 6ft must use safety harness must be trained in
the use and inspection of their harness.
➢ Worker must carry the card which ensure that he has attended the training for working at heights.
➢ Ensure workers are wearing appropriate full body harness and tie-off 100%.
➢ Fall of Workers
➢ A yellow scaffold means workers can access the scaffold but it requires wearing of full body harness
Removal/ while working at
& 100% tie-off Site Engineer / HSE
6 dismantling of height
➢ A red tag and untagged scaffold mean no work can be done on the scaffolding. Engineer/Supervisor
Parking Shelters
➢ A green tag means a scaffold can be used without requiring wearing full body harness.
➢ No one should access a scaffold if there is a red tag or no tag.
➢ Works on scaffold must be supervised at all times.
➢ Unapproved ladder ➢ Ensure that only approved ladder shall be used for ascending and descending scaffolding. Scaffolding
tube must not be use as ladder.
Page 2 of 15
JOB SAFETY ANALYSIS WORK SHEET
Page 3 of 15
JSA No: RGC-JSA-ST-338 Rev.03
Activity: Asphalt Concrete Pavement
Date: 18-02-2024
Work Location: STAR Facility, King Abdul Aziz Sea Port, Dammam-KSA
➢ Slip, trip, fall ➢ Ensure that tools and equipment shall not be stored on the scaffold at all times. Walkway shall be
clear at all times.
➢ Fall of Shelter, ➢ Ensure proper dismantling method while removing parking shelter.
Material, Tools etc.
➢ All Drivers shall have a Saudi Arabian Government driver’s license.
➢ All mobile equipment shall be equipped with all the warning devices such as PWAS beacon light,
reverse warning horn, etc.) prior to mobilization.
➢ All traffic rules, speed limit and signs shall be followed. A trained flagman with red visibility vest and
red/green flag shall be posted to direct the movement of equipment.
➢ The drivers shall be made aware of the approved routes.
➢ Uncontrolled
➢ Pedestrian safety precautions shall be discussed in daily TBT.
pedestrian and
➢ Walkways shall be provided for workers separated from equipment. Work force including visitors
vehicle
must have to wear visibility vest.
➢ Close supervision of work is required during the whole duration of any site activities.
➢ Appropriate traffic signage shall be posted at site.
Mobilization of
➢ Equipment operators must have valid Certification corresponding to the equipment they are Equipment Operators /
heavy equipment,
7 certified to operate. Drivers / Site Engineer /
vehicles and tools
➢ All moving heavy equipment must be installed a horn and reversing alarm. HSE Engineer/Supervisor
to worksite
➢ The drivers shall be made aware of the approved routes and shall direct the driver/operator to their
destinations inside the work premises.
➢ Traffic Route
➢ Traffic route signs must be posted at site.
➢ Traffic route drawing must be provided.
➢ Location of any underground services and/or trenches including utilities and drainage arrangements
that may affect integrity of the ground during mobilization must be marked and barricaded.
➢ Maintain a safe distance from the edge of excavation while travelling.
➢ Vehicle Tip over ➢ A well compacted access must be provided.
➢ Do not overload the equipment.
➢ Drivers/operators must conduct daily inspection of their equipment for any defect to ensure it is in
good working condition.
➢ Vehicle may hit ➢ Ensure valid PTW is made along with relevant documents. Equipment Operators /
Excavation for
8 workers / ➢ Barricade and install the warning signs (3 feet from the edge of the excavation) and blinking lights Drivers / Site Engineer /
Rainwater pits
personnel, Vehicle on the edges of excavation to prevent falling of vehicles, personnel and others at night. HSE Engineer/Supervisor
Page 3 of 15
JOB SAFETY ANALYSIS WORK SHEET
Page 4 of 15
JSA No: RGC-JSA-ST-338 Rev.03
Activity: Asphalt Concrete Pavement
Date: 18-02-2024
Work Location: STAR Facility, King Abdul Aziz Sea Port, Dammam-KSA
with JCB up to 1.5- may contact with ➢ Ensure clearance from mechanical and electrical department for any underground utilities before
meter depth underground starting excavation.
utilities, Toppling ➢ Ensure only trained operator should be allowed to operate JCB/Excavator
of Vehicle, Falling ➢ JCB Operator must have valid driving license, along with third party certificate for JCB.
into Excavation, ➢ Ensure restriction of unauthorized person in work activity area.
Means of Access & ➢ Signal man should be available with JCB backhoe loader to guide operator.
Egress / Exit and ➢ If working in night, signal man must have baton light for traffic control.
Entry. ➢ Ensure proper lighting while working in night.
➢ Ensure barricading of the area & provide proper signage.
➢ Ensure proper inspection of JCB backhoe loader before start of work.
➢ Ensure continuous supervision for excavation activity.
➢ If any person has to enter the excavation, ensure shoring, planking, supports and strutting of
excavated wall sides should be done.
➢ Check the soil classification to install proper protection against cave-in.
➢ Keep heaps of excavated soil at least 1.5m from the edge of excavation. Keep all machines and
equipment’s at least 2m away from the edges.
➢ Provide escape ladder at suitable distance.
➢ Ensure proper PPE’s for work activities.
➢ Must ensure to remove all excavated material from the site.
➢ Gas test must be taken prior to any entry into excavation.
➢ Check the excavation for any hazards before entering into it.
➢ If excavation is deeper than 4 feet, provide proper ladder extending 1m above from the edges of the
excavation.
➢ Ensure confined space entry permit if acquired when entering inside excavation.
➢ Only use asphalt cutter or jack hammer for cutting the concrete/Asphalt layer.
➢ Nearby structures must be maintained and secured.
➢ Post all required road warning signs, barricades & blinking lights.
➢ Flagman must be assigned wearing reflective vest to divert and control the traffic.
➢ Make sure that that enough sign boards for "stop"" Slow Down" in are provided in the site.
➢ Fall of person, ➢ Ensure safe material handling at site.
Hard barricading Site Supervisor / HSE
9 material or ➢ Provide hard barricading at minimum distance of 1 meter from excavated area.
of excavated area Engineer/Supervisor
equipment ➢ Maintain minimum 2-meter distance from excavated area for vehicle movement.
Page 4 of 15
JOB SAFETY ANALYSIS WORK SHEET
Page 5 of 15
JSA No: RGC-JSA-ST-338 Rev.03
Activity: Asphalt Concrete Pavement
Date: 18-02-2024
Work Location: STAR Facility, King Abdul Aziz Sea Port, Dammam-KSA
➢ Ensure proper signages are placed to warn people of the deep excavation.
➢ Obtain required Hot Work Permit before carrying out any job.
➢ Ensure all required certificates/checklists (Enclosed space entry certificate, confined space entry
checklist, rescue from confined Space, PTW assessment checklist, confined space entry log) have
been prepared and authorized prior to start of work, along with work permit.
➢ Clean up area to prevent slippery surface and tripping hazard.
➢ Make proper access and egress from rain water pit using ladder and make sure access should be free
Shuttering work
of tripping materials.
for walls of New ➢ Slippery surface & Site Supervisor / HSE
➢ Use mandatory PPE’s
Rain Water Pits tripping hazard Engineer/Supervisor
➢ No unauthorized personnel should be allowed to enter the work area.
➢ Put proper signages for the work area.
➢ Ensure Pre-job meeting is carried out before start of activity and all the hazards are conveyed to the
relevant personnel.
i) Preparatory
➢ Standby man must be present outside the enclosed space and keep log of trained personnel entering
works and
and leaving the enclosed space, without being involved in the work activity in any way.
manual handling
➢ Check gas testing inside enclosed space at regular intervals.
of material
10 ➢ Sharp edges / ➢ Keep hands away from sharp edges / surfaces Site Supervisor / HSE
surfaces ➢ Wear appropriate PPE’s w.r.t the activity and as mentioned on the work permit. Engineer/Supervisor
➢ Barricade the working area.
➢ Assess the weight to be lifted. Site Supervisor / HSE
➢ Hit by material
➢ Follow buddy system for handling lengthy/heavy objects. Engineer/Supervisor
➢ Follow safe manual handling techniques.
➢ Cutting machine guard should be in place.
➢ Contact with sharp ➢ Use safety goggles, face shield and hand gloves at the time of cutting of plywood material.
ii) Shutter Site Supervisor / HSE
edges / surfaces, ➢ Skilled carpenter to be deployed for shuttering work.
making Engineer/Supervisor
Nail cut hazard ➢ Ensure proper PPE’s are worn at all times.
➢ Continuous supervision to be provided.
iii) Storing of ➢ Improper storing of ➢ Ensure proper shutter stacking with sufficient stacking height.
Site Supervisor / HSE
shutters / shutters / fall of ➢ Properly secure or tie stored shutters.
Engineer/Supervisor
formwork objects
iv) Formwork / ➢ Inadequate load ➢ Ensure proper tying/fixing of plywood shuttering. Site Supervisor / HSE
shuttering carrying capacity of ➢ Properly support shuttering at both ends. Engineer/Supervisor
Page 5 of 15
JOB SAFETY ANALYSIS WORK SHEET
Page 6 of 15
JSA No: RGC-JSA-ST-338 Rev.03
Activity: Asphalt Concrete Pavement
Date: 18-02-2024
Work Location: STAR Facility, King Abdul Aziz Sea Port, Dammam-KSA
Page 6 of 15
JOB SAFETY ANALYSIS WORK SHEET
Page 7 of 15
JSA No: RGC-JSA-ST-338 Rev.03
Activity: Asphalt Concrete Pavement
Date: 18-02-2024
Work Location: STAR Facility, King Abdul Aziz Sea Port, Dammam-KSA
Page 7 of 15
JOB SAFETY ANALYSIS WORK SHEET
Page 8 of 15
JSA No: RGC-JSA-ST-338 Rev.03
Activity: Asphalt Concrete Pavement
Date: 18-02-2024
Work Location: STAR Facility, King Abdul Aziz Sea Port, Dammam-KSA
➢ Ensure required work permit has been obtained including all relevant checklists before
commencement of works.
➢ Ensure that equipment and workers movement will be observed.
➢ No other workers shall stay near the machine while pouring.
➢ No unauthorized personnel should be allowed to enter the work area.
➢ Personnel and
➢ Barricade the area with proper signages and flag man for maneuvering of traffic.
equipment
➢ Ensure proper distance of worker from concrete mixer arm pipe.
interference,
➢ Ensure workers shall not stand underneath the suspended arm of concrete mixer.
Slips/Trips/Falls,
Concrete pouring ➢ Ensure workers are wearing proper PPE’s including disposable coverall, gum shoes, rubber gloves,
Equipment fall
for floor and walls face mask, face shield during concrete pouring.
over, Site Supervisor / HSE
of New Rain Water ➢ Ensure proper access and egress have been provided.
12 Entanglement, Engineer/Supervisor/
Pits ➢ Ensure the equipment shall not position in the unstable condition and banksman should be available
equipment failure, Driver / Flagman
at times in the area.
fall of person, Eye
➢ Ensure proper tools are used for the job.
injury, Backing of
➢ Ensure that full supervision is in place.
equipment,
➢ Proper housekeeping shall be done to prevent accidental slips, trips and falls.
Chemical /
➢ Defensive and responsible driving must be followed. Flagman must assist driver.
concrete burns
➢ Make sure no worker comes under line of fire.
➢ Inspect work area, move material that may cause trips prior to performing work.
➢ Use chute man to swing concrete chute back and forth and signal concrete truck driver. Chute man
needs to communicate with the rest of the crew when moving chutes or repositioning truck.
➢ Ensure personnel keeps a safe distance when concrete is being poured.
➢ Proper planning of the activity must be taken prior commencing of activity.
➢ Adequate supervision must be required at all times.
➢ Signalman must be required.
➢ Striking with
➢ Dump truck shall be positioned in even ground when offloading backfilling materials. Offloading shall
Asphalt cutting moving vehicles Equipment Operators /
be performed gradually.
13 with milling Drivers / Site Engineer /
➢ Make sure the work area is hard barricaded along with proper signage to avoid movement of
machine HSE Engineer/Supervisor
unauthorized persons and vehicles.
➢ Flying objects and ➢ All workforce must wear required PPE’s (hard hat, safety shoes, safety spectacles, dust mask, hearing
dust hazards protection).
➢ Make sure there’s no unnecessary movement near the machines.
Page 8 of 15
JOB SAFETY ANALYSIS WORK SHEET
Page 9 of 15
JSA No: RGC-JSA-ST-338 Rev.03
Activity: Asphalt Concrete Pavement
Date: 18-02-2024
Work Location: STAR Facility, King Abdul Aziz Sea Port, Dammam-KSA
Page 9 of 15
JOB SAFETY ANALYSIS WORK SHEET
Page 10 of 15
JSA No: RGC-JSA-ST-338 Rev.03
Activity: Asphalt Concrete Pavement
Date: 18-02-2024
Work Location: STAR Facility, King Abdul Aziz Sea Port, Dammam-KSA
➢ Equipment cabin shall not be covered with sun protector so as not to obstruct the view of the
operator.
➢ Avoid simultaneous operation of equipment movement in congested areas.
➢ Backfilling equipment are the only permitted equipment within 2 meters of the edge of excavation.
➢ Assign trained flagman to control traffic movement.
➢ Provide directional signage and post speed limit.
➢ Unauthorized personnel shall be prevented from entering the work area. Provide appropriate
signage and barricade the work area.
➢ Avoid continues operation of the equipment. Turn off when not in use.
➢ Equipment shall be provided with fire extinguisher.
➢ Assign trained fire watch during equipment operation.
➢ Chance of Fire
➢ No smoking except in designated smoking areas.
➢ Instill good housekeeping.
➢ Refuel only at designated area with equipment turned off and closely monitored by fuel tender.
➢ Ensure work rotation of personnel or take regular break to prevent hand-arm and body vibration
➢ Vibration and illness to personnel.
Noise Hazard ➢ Use appropriate gloves when using portable concrete breaker.
➢ Use appropriate Ear Protection.
➢ High Winds / ➢ Work is strictly prohibited during sandstorm and project personnel are not allowed to stay outdoor.
Working in Sandstorms ➢ Use dust mask during sandstorms.
Site Engineer / HSE
16 Adverse Weather ➢ If water gets accumulated, wait to subside before resuming the work.
Engineer/Supervisor
Conditions ➢ Rain ➢ If water is present in the area, dewatering shall be performed. Re-assess the area if equipment can
work safely.
➢ Adequate water coolers with disposable cups must be provided.
➢ Assign welfare crew coordinator to ensure following actions are in place:
➢ Continuous (uninterrupted) supply and replenishment of cool drinking water / rehydration drinks to
➢ Lack of drinking work force preferably every 3 hours. Site Engineer / HSE
17 Welfare Facilities
water ➢ On time delivery / collection of drinking water containers. Engineer/Supervisor
➢ Fulltime supervision of welfare crew
➢ Coordination with field HSE / supervision.
➢ Pre-delivery quality check of drinking water / rehydration fluids.
Page 10 of 15
JOB SAFETY ANALYSIS WORK SHEET
Page 11 of 15
JSA No: RGC-JSA-ST-338 Rev.03
Activity: Asphalt Concrete Pavement
Date: 18-02-2024
Work Location: STAR Facility, King Abdul Aziz Sea Port, Dammam-KSA
Page 11 of 15
JOB SAFETY ANALYSIS WORK SHEET
Page 12 of 15
JSA No: RGC-JSA-ST-338 Rev.03
Activity: Asphalt Concrete Pavement
Date: 18-02-2024
Work Location: STAR Facility, King Abdul Aziz Sea Port, Dammam-KSA
➢ Accidents due to ➢ Ensure required work permit has been obtained including all relevant checklists before
poor illumination / commencement of works.
personnel injury / ➢ Ensure that equipment and workers movement will be observed.
Working during property damage ➢ Ensure proper lighting in the work area. Site Engineer / HSE
21
Night Time ➢ The whole work place and all access and egress should be well illuminated in night time. Engineer/Supervisor
➢ High visibility vest to be provided for all workforces at night.
➢ A competent and certified electrician shall be available at site for monitor and maintain the lighting
arrangement.
Page 12 of 15
JOB SAFETY ANALYSIS WORK SHEET
Page 13 of 15
JSA No: RGC-JSA-ST-338 Rev.03
Activity: Asphalt Concrete Pavement
Date: 18-02-2024
Work Location: STAR Facility, King Abdul Aziz Sea Port, Dammam-KSA
Page 13 of 15
JOB SAFETY ANALYSIS WORK SHEET
Page 14 of 15
JSA No: RGC-JSA-ST-338 Rev.03
Activity: Asphalt Concrete Pavement
Date: 18-02-2024
Work Location: STAR Facility, King Abdul Aziz Sea Port, Dammam-KSA
Page 14 of 15
JOB SAFETY ANALYSIS WORK SHEET
Page 15 of 15
JSA No: RGC-JSA-ST-338 Rev.03
Activity: Asphalt Concrete Pavement
Date: 18-02-2024
Work Location: STAR Facility, King Abdul Aziz Sea Port, Dammam-KSA
Approval
JSA Team Members
1 Mr. Nasir Chaudhary Name Signature Date
Page 15 of 15