Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

Résumé Page 1 of 2

MUBEEN SHAHID
BaghBanPura Lahore
+92 321 8434379
mub99n@outlook.com
 Qualities
I am successful in meeting project schedules on time and within budget. I have worked my way through the ranks and
have developed a thorough hands-on knowledge of the construction and mechanical industry in Pakistan. My strong
points are my leadership qualities, team work, organization and IT skills, problem solving, and human relations.
 Education
2022 University of Management & Technology, MS/MPhil Mechanical Engineering

2013 The University of Lahore, BSc Mechanical Engineering

2009 Punjab Board of Technical Education, D.A.E: Mechanical Engineering.

2001 Punjab Computer College, MS Office.

2007 PITAC, Auto CAD.

2016 Pakistan Engineering Congress, Primavera P6.

2017 ITHEIGHT’S, Earn 35 PDU’s: Project Management Professional.


 Engineering & Management Experience
AZ Engineering Associates Resident Engineer Lahore 05/2020 – Present
I am leading these projects:
 Installation of 2700ton HVAC System, Screw Chiller with AHU’s, FCU’s, Heat Recovery Wheels, Air
Separator, Expansion Tank, Cooling Towers, Primary & Secondary Pumps, MS Piping, G.I duct work, BMS
System at MCH ganga Ram Hospital Lahore
 General Electrical, Central battery System, Fire Alarm work at Nestle Head Office Lahore
 Installation of 800ton Direct fire duel fuel absorption Chiller with MS Piping, duct work, G.I Cladding work at
Children hospital Lahore
 SS piping for Pneumatic & Steam system at Rasco Pharma Raiwind road Lahore
 Installation of 150 ton Centrifugal Chiller with MS piping in Diamond Paints Lahore
 Fire Fighting & Plumbing work at IGI Insurance Tower, Gulberg by Nishat group
 Fire Fighting work at Divine Garden, Qube Lahore
 Plumbing work at Askari Tower, Gulberg
 Installation of VRF System at National History Museum Lahore
I led the supervision team with project Monitoring & Controlling. Build own team and close these projects by them.
Directly monitoring & controlling, close the projects within budget.

Lahore Air Port Project Engineer Mechanical Lahore 04/2018 – 04/2020


From April 2018 I was employed by the MEP Solutions Company (Johor Town), who was an IZHAR owned
construction MEP works firm. I am responsible for the project initiation, Planning and Execution by the
contractors
I am leading a team of engineers and other specialists who were responsible for development and
implementation of project procedures and systems to plan, manage and control project resources like cost,
time, equipment, labor, and documents. I have been employing several project management platforms for
project collaboration and communication during all project phases from master planning to construction.
Complete Ventilation System for Car Parking with G.I ducting, MS frame work and Fire Suppression System
and Plumbing works.

Atlas Air Conditioning Est. Project Engineer Mechanical UAE 12/2015 – 01/2018
Since December 2015 I had been employed by Atlas Air Conditioning (Sharjah), who is an Electro
Mechanical Contractor for MEP Works. I was responsible for coordination and implementation of various
projects in these facilities in the magnitude of up to 15 million PKR per year. Besides the mechanical
engineering I was involved in the profit improvement projects, labor reduction, production cost reduction,
development and commissioning of new products.
Résumé Page 2 of 2

 Up gradation of complete Hilton Hotel Halls Project. Installation of HVAC system including 35
No’s Package Air Conditioning Units of 68ton each capacity with G.I ducting, air devices, HWR/
CWS piping and cladding work.
 Fire Suppression System with pump set (Jockey, Electric and Diesel) of 750gpms and Fire
suppression clean agent FM200, Plumbing works including sump pumps.
Space Electro mechanical Works LLC Asst. Engineer UAE 10/2013 – 10/2015
From Aug 2013 I was employed by the Space Electromechanical Works. (Dubai), who was the electro-
mechanical contractor in UAE, as an Assistant Engineer.
Mirdif Villas Project was a PKR 45 million MEP works and Burjaman Center Car Parking HVAC and
Ventilation System Project was a PKR 85 million including HVAC, Fire Fighting and Plumbing Works.
I was member a team of engineers and other specialists who were responsible for development and
implementation of project procedures and systems to plan, manage and control project resources like cost,
time, equipment, labor, and documents. I have been employing several project management platforms for
project collaboration and communication during all project phases from master planning to construction.

Skills set Knowledge & Competencies


 Lead the project to make the “Purification of Water through Solar Energy” in my BSc ME.
 Lead the project to make the “Sheet Bending & Straightening Machine” in my D.A.E.
 Communication Skills from Career Counsel (Pvt.) Ltd.
 PEC 73rd Annual Proceedings held on 24 & 25, DEC 2015 at P.C Hotel Lahore
 World Environment Day on the Theme of “7 Billion Dreams. 1 Planet. Consume with Care”
 World Water Day on the Theme of “Water & Sustainable Development”
 Symposium on the Theme of “Means of Transportation – Present & Future”
 Secrets to Build the Brand Promotion from RAKIZAR
 Modern Selling Skills from ADVANCE ELECTTRONICS INTERNATIONAL
Licenses
 LTV / HTV
 PAKISTAN ENGINEERING COUNCIL MECH/26625
 PAKISTAN ENGINEERING CONGRESS MECH/5300
 INSTITUTE OF ENGINEERING PAKISTAN M18984
 INSTITUTE OF RRSEARCH ENGINEERS AM1010004143
 INTERNATIONAL ASSOCIATION OF ENGINEERS 154545
 PROFESSIONAL EXCELLENCE GROUP PEG001491
 PROJECT MANAGEMENT INSTITUTE 4959096
Personal Data
S / O: SHAHID SALEH
DOB: July 28, 1986
CNIC No. 35200-7615974-5
Nationality: Pakistan
Residence: Lahore, Punjab
Religion: Islam - Sunni
Passport No. LE5149742
Status: Married
No of Child: Two (M Taha, Houria)

You might also like