Download as pdf
Download as pdf
You are on page 1of 13
ee ree )RECEIVING DMCI copy | | D.M. CONSUNII, INC. i Passion to uild. Commitment to Serve October 13, 2020 DMCI-NSCS1-OL-20-187 NLEX CORPORATION NLEX Compound, Balintawak, Caloocan City, Philippines 1400 Attention : Mr. Nemesio G. Castillo Project Manager Subject: — TREVI Foundation Philippines Summary of Stand-by Time NNLEX-SLEX Connector Road Project- Section 1 Dear Mr. Castillo, Please find attached letter with reference no, TFPI/LAG/20-055 and TFPI/LAG/20-062 Pertaining to the Summary of Stand-by time from June to July and August 1 to 31, 2020. Yours faithfully, D.M gon: peoenve OCT 1 5 2020 BY: 4 DMC! Plaza Building, 2281 Chino Roces Avenue Extension 123] Makat Philippines | (+63 2)888-3624, www. dmcinetcom | dmei@dmeinetcom ‘TREWI: Y Date: 5 September 2020 Reference No FPI/LAG/20-062 D.M. CONSUNSI, INC, 2281 DMCI Plaza Bldg. Don Chino Roces Ave., Makati City Attn: Mr. Jerry D. Sicat Project Manager Project: NLEX-SLEX CONNECTOR ROAD Bored Piling Works ‘Subject: Summary of Stand-by Time Dear Sir, Please find attached Summary of Stand-by Time from August 1-31, 2020 for your immediate attention. Rig# 1 257.0 2 31. Total 688.0 hours This total standby hour will be charged as cost to you and extension time. We hope that this matter will be addressed immediately in order to avoid further standby In the future. Yours faithfully, for TREVI FOUNDATIONS ‘LIPPINES, INC, Received by: ‘Sarah mayan 9515-9020 —— ~ FREWIGroup ————— "E59. ASH19 9 Og, 722 AY [eA 99 «fa KN "Ta FOUNDATON HLM = 22a 8 Cpt Cc Vr Sedat yee ngs, aly Paes ‘Me ed RATE THD tat eegConcoe she meme ma respec» Vek amen com -eseaMCTAT SEEN UE RRR " TREVIFOUNDATIONS PHILIPPINES NLEX-SLEX CONNECTOR ROAD PROJECT + SECTION 1 BORED PILING WORKS ae ‘Summary of Standby for the Month of AUGUST 3-31, 2020 = (R-930 / RIGei) at iat pee PILE STANDBY STAN seRvices oor a ena mana | terme, | A80R numoer me Hours | {| aaciatoe ower) reomrcor | no ws |W so - ‘STANDBY OF RIG; Ous to area not yat samig20] ons repent OOhrs occ +—}—__] mes romweraue | 210 we | Ww 0 rewwaroon | x0 ws | to 0 1800" FR, Do eset. 44ug20] cass |p yo henner net] — sears rowmraam | 20 we | 40 Wo E EEE ‘STANDBY OF Rig; Dua to ren not yet a sstegzo] cma | zoommreoe | 220 |orpandoy ticresnsttoncne] ts | wo 1s as, | ss0020 sunoay wo} wo No “STANDBY OF RIG; Due te aaa yet EEE vraugaa] eras | reewwsacare | 20 [pwartbyon.owecencton vee] vis | no no 2005 220 oreraionat wo | wo to ua to wag foe DCH 39-20) 97 | ronaeezonam | 220 | totmshthopreparatenfornacets | YES 10 10 antes tnt yet tare at P STANDBY OF Rs; Ous ro waling fac OMG Yomn2a| p7 | roommranm | 220 | tatnehthepeapastontortrnecephe | Yes No 0 od tat pen yetrtedet 7 STANDBY OF iG; Dus to wat or MCL aeave20} mT | rommeroonm | 22.0 | totnknthepreparstontorthemectene | YES 10 No and tat pt nyt started STANDBY OF RG: Preparatory works hither stand of 7. Gia sil ‘bsiructlon the reperatry work 8-7, Production wll go down eis tothe cys eras | nocamrioarm | 12.0. feausedtythepepatatonor aorkawen xi] YES No no the pls are oratad an alin mar reo] edoag pte, DIAC ve ae to vert the ranage at fore rtng 9 prepa ‘te work lator, (200MM), 'STANOBY OF mc; Dua towing fo MC Se | Poorman |e | the mne Oe sunpay No wo érwe20} crag | rommronam | 220 Peete es ves STAND OF Rij buat area ToT 250m20/ crea | Tommzauan | 2200 — {precared Nentorenovedthesetecng] yes inal {nthe cola nd alg For the te! ‘OPERATIONAL, No No. STANDBY OF mic Duet nent cea not yet ae oer 110 ardweto| R | reomneonnt | a repre, G-ing preparation by MC. vs No STANDBY OF NG: Dee ot sea nave sesese) rr | rooms | ano | toner ce wracarn we | ne STAY OF eset wat 0] ra son pence] A | mmmromm | 0 el orgterecannerane| . soug20 sunony w | ne sma creurow, none eat - Com f reGlewchalbee- on sda owen VRE ViFOUNDATIONS PHILIPPINES: NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 1 BORED PILING WORKS ‘Summary of Standby for the Month of AUGUST 1-31, 2020 - (R-930 / RIG-2) me | sanosr | srawoey SERVES Ton ot eas oman | cerane, | OR ower ours ae Bacioicey | _(msnrower) no ws No 0 STANDEY OF 86; Dux to wating frat obseg20] pap — ‘een at 28 obe prepared. Remora | sharon dnc roomerooa | 20 ws No 80 oxaup20 sunoay 0 io so TomM20M | 72 latingbecnactne eaten tinplate] ia 7 rsvaaan ete ‘hema aust he cclpent ea STANDBY OF RG Dante wating to DE serve | 60 tothsh raking cstucton. 7 i bed | othas20 cptraioNaL No Wo 0 roow-r00m | 140 ve 0 © STANDBY OF HG; Wasting for sen ‘ a reparation of DMC, bresingand eang Hee ofboxaivercbaucion rows | 1.09 coun ‘5 0 wo reow-7o0m | ane fs 0 0 stmoBYoFRGWoitnforares | estuga0] croso Preparaton of 1G, beng Gearog of box aversion, ecem-veon | s300 res xo to eal : sto | STANDAYOERIG; wating for wea i orwup20} ons | rooww-recem | PY OF alin co No STANDBY OF i; Doe tanec aren not yt eae prae 40 | repre. OMG rend reat te ple peer eee locaton. Tock therelzanobtcion| no %o wea8A 8ug20 sony No n 0 roome7oorm | sto ves 10 ante [srawowy cf i: Wot eae any Mad soaup20} pias ——| st toa preparation son os yee | —— tush eo rommroom | 19 vs no 0 rexaueroir | 310 lerwonrorme: Ne plererotraayty] YS 0 © ge ae “i ue tC propane a ee ‘s ‘ish. Box exdvert need to damolist to the rowmrean | i20 Hetosiatesn vs | wo so 10 wes No wo STANDBY oF; unto wate orOMEL tasigzo| ser | tints thc obirutonat aah rocrmercow | 130 ws | no i ‘STANDBY GF RIG; Cum to waiting to finish taasto] pass | roomerosmm | a5 |rivmmangnerenmesmesanen| YE so % in reowarcor | 110 ws no so tee ‘AN00¥ Fm: Detar aya ee ‘prepared by DMC at P-17 R. rawwronn | ato vs © 0 2 . STHNOBYOE RG Oto weet : steno) eae | zammzonut | 220 NOB Fn re wo |x 10 | seo sunny No wo xo aoa saxo oF mo, waking te we srg20] mura | rommacom | PY iy Wang tt w | wo so : | steo0rcr mo. wee tco- ee resupa| ome | aacranocnm | Ltbtensnahe secret es so SAVORY ost wang ro e120] crs | rewmzcom | 220 frofasiepenmetontertherepest| yes | no © ANOBY OF; Outs alg rina zoaeio| ce | raomroom | 220 |fotuntieprtaniortesneses| EE no so cre Sraoay OF mova TFTA atavea0| crs | rammroom | 220 |iottaneserevonertcnneres| ves | wes to oe i SNOT OF Reco wating tfch ahug2o) chee 720 | eobox cube obstruction and tho ees. = No bau Aug sunoar no mo Ps pee pas fas | 00" OF Re Ov teas ay = iz freee ees re Prepared. On-going preparstion by ORAC, bial zsaug20] ema | rowmnracan | mo |S™8OWVOFRG Deter wee tre] ay wo no aewvere| case | rommezaun | cap |PMON¥ CTR Dione ome nn ined fat _Bropared. On-going preparation by OCI. on = ls! sae ae savonvoFRt:ouetonetnee mtv] rrau0| na | roms azo |TANDEYOF RG Dustontt wetter] yay "0 © STANDBY OF, Ove to wating for he Prepcalin af cones by DMC STANDBY OF is: avo nec aes nat ye resupro| case | roommaasam | 19.2 rs1ug20| tneaz Mer 5 eio| cuz | aeonwrome | xo /MOnormeoronec went] ves Ne no 3040920 suwoey No No No stawpan) cxtz | ronantrooam | 229 |STANOBYOFRIG:OVetonestaresnetyst| yas No No raped n-glng preperation by DML _| ee an co tc -PIc JREVIFOUNDATIONS PHILIPPINES Date: 13 August 2020 Reference No.: TFPI/LAG/20-055 D.M. CONSUN3I, INC. 2281 DMCI Plaza Bldg. Don Chino Roces Ave., Makati City Attn: Mr. Jerry D, Sicat Project Manager Project: NLEX-SLEX CONNECTOR ROAD Bored Piling Works Subject: Summary of Stand-by Time Dear Sir, Please find attached Summary of Stand-by Time from June 25 to July 2020, for your immediate attention, Rigt1 143.0 Rig #2 Total 339,5hours: This total standby hour will be charged as cost to you and extension time. We hope that this matter will be addressed immediately in order to avoid further ‘Standby in the future. Yours faithfully, for TREVI FOUNDATIONS PHILIPPINES, INC. Sind Wy vf FREVIGroup ‘Wen. 559tH ming £502 ae) A+ Te 2905 1981 Fa 9 GABE «Ema veepsus Yee screw cam "THEMFOUNDATONS Pipes Ne» Ut 201 2d fon al rer Sea set Sl ages Gy 227 PES “62S t= Fo] 8179 ewig cengh Webi wantocee ot FREVIFOUNDATIONS PHILIPPINES NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 1 BORED PILING WORKS ‘Summary of Standby for June 25 to July 17, 2020 (Rig 1; R-930) i” PILE Pen DeLay OBSERVATION fe w Ne | HOURS . STANDBY OF RIG; It was later decided that the fastast time for the ig to ie) ue ‘resume crtingis to dell at PAT Cinsteed of (CRé-a) P28. (74 26:un-20 OPERATIONAL 2Jun-20 u ‘STANDBY OF RIG; Due to no avaliable ares to dll, (7:00PM.7:00AN) 2dtun-20 OPERATIONAL 284un20 OPERATIONAL Osun20 OPERATIONAL ‘STANDBY OF RIG: Due to waiting for next ple tobe rl DMI! stil preparing oa asad 7 the area tobe dll at CRS. (7:0am-7:00pen) STANDBY OF RIG: DIL advisad next pile to be cried wl be -20 L. Platform ata ae = ‘and access is boing prepored at P-201. (7:009m-41:00pm) 3.420 OPERATIONAL, ov.u20 OPERATIONAL, 95ah20 OPERATIONAL 06.44120 OPERATIONAL, ae Er i ‘STANDBY OF RIG; Due to CR4-6, DM stl preparing the area. (7:00PN- 7.0080). STANDBY OF RIG; Due to wating forthe surveyor Of NLEX to check the eee a . eccentric ofthe casing at CR4-6 (2:00AM-7:00AR) eae ie = ‘STANDBY OF RIG; Due to area Stl prepared by OMAG| at GRD [OORT 00a), Sia ae i STAN OF Deo ests ENG a RP STANDBY OF RUG; DMC stl preparing the area, ned to wider the area forthe | 5 | rigto swing and no casing available, We didnt stat the preboring sine the Ansuta0 crea are0 Is know tobe colapsabie at CR4-2 (7:00AM-10:30AM), (5:00PM7.00PN0) Ey STANDAY OF RIG; No avaeble casing for CR4-2 (7:0000N-7:00AN4) 12deh20 crea 2 STANDBY OF RIG; No available casing for CR4-2 (7:00AM.7: 008M) “saauia0 8 STANDBY OF RG; No avaible casing for CRA-2 (7:00AM 3000) cra esta0 u STANDBY OF RG; No aval casing for CRA? (:00R-7.004M) ss1ula0 ‘OPERATIONAL 164uh20 (OPERATIONAL a0 ‘OPERATIONAL seni Transfered to CAL site 199820 Tansfered to CAL ste 20.20 Tansferred oleate Zk TansferedtoLcALsite ret ‘Teansfered to UAL te Bk20 Tnsfereto \caLsite 2esk20 Transferred to LAL ste nha0 Trasferedto LcALste aee20 Transferred to LcALate iu20 “Transfered to LcaLste 2e20 “asteroid to LcALste 2510020 Transferred 0 LAL ste sou Transferred io Leite ‘a20 Transferred o Leste TOTAL STANDBY 1.0 Prepared by: REGINALD 8, HERNANDEZ Checked ad Reviowad by TREVI FOUNDATIONS PHILIPPINES INC ‘Bm, CONSUN, INE. i T I ‘TREVIFOUNDATIONS PHILIPPINES, NLEX-SLEX CONNECTOR ROAD PROJECT - SECTION 1 BORED PILING WORKS Summary of Standby for June 25 to July 31, 2020 (Rig 2; R-930) Pie ‘SVIANDBY | STANDET] 7 are (O3SERVATION w TIME HOURS asinao | past TAN-TEM 2 ‘STANDBY OF RIG Waiting for DMCI to prepare the area at P24. 26-4029 OPERATIONAL z-p20 7aM7eM rn STANDBY OF RIG: Wating for DMCIto prepare the area st P24. | pean - STANDBY OF RIG; Waiting forthe availabilty ofthe area, No bakchoe operator| aac + ‘of DMC to prepare the area a P24 28.20 (PeRaTioNaL ‘STANDBY OF RIG; Unable to postion and dit at P24 Ubacause 30m da zonm20 | paar aaa-reNd 41 | permanent casing not avallable. OMCI proposing t dill ether P20 or P20) Re P20 TAME n STANDBY OF RIG: Due to ea preparation of DMC! at P-20R 301-20 | P20R zamza0m | 75 STANDBY OF RUG; Due te area preparation of DMCI at -20.R : “STANDBY OF RIG: Waking forthe approval of NLEX surveyor before fing the ontu20 | e208 2AW7AM 6 eee ban o2su-20 OPERATIONAL } ossu-20 ‘OPERATIONAL STANDBY OF RIG: Due toro evallble area to cil, Next area to be eilled wll, of-Juk20 7eNTAM at eae 05-420 ‘OPERATIONAL 7 STANDBY OF RIG; Due to ongoing clearing of area and adding of akional ee i ‘ackfil materials to sable the platform at P25 8. osiutz0 | pase 7AM re [STANDBY OF RUG; No casing available at P25 R. ‘STANDBY OF RIG; Oue to verify the actual design of TOC, according to DAC Tu P2 (1 hei! oe fee § | saver nees put doun the 0c lower han the NGLat sem. 39 a ' STANDBY OF RIG; Due to stoning incident tthe area, Incident report caui20 | pase saws ‘ rbbrbieaieh Sa 2] STNDEY OF NG Wat forte unr hc te Balaton GL STANDBY OF RIG; Due to stoning indent at the area, incident ceport. foe i? submited OMI ‘STANDBY OF FUG; Ove to complaints by resents about the noise ereated by towiz0 | paar AMSA 5 | the actities and several stoning incidents, works stopped fern 12:00am- 5:00am, with approval of nighishit superior at P-26 Abl20 OPERATIONAL snwi20 ‘OPERATIONAL 334h20 sau.20 25120 sswiz0 | cras SPMTAM 4 STANDBY OF RIG; Access golng to CRE-S stl being prepared. 740420 7AM-LLAM: 4 | Stanoey oF tg; bue to waiting forthe acass to fnish from P-22 to P24 s8:ub20 ‘OPERATIONAL 18.020 OPERATIONAL zowtao | crea TAN 0AM 3 | stawpavOF Ric: Due to concrte obstruction at CRE-3(7:00am-10:006m) 21420 OPERATIONAL | eee eee cae zz] STMOBYOF Reb to wig Dre hte preparation at ch ae ry a | StaNDBY OF Ri; Due to ‘omar tg ounaton 3 ropote werk 24420 ‘OPERATIONAL 2siuiao | cRe7 vame7aN 2 STANDBY OF RIG; Ou to next area stil praparing by DMC at CRA7 | sem cream 27420 OPERATIONAL zent20 | CREB RAMAN 7 STANDBY OF RIG; Due to waiting of casing at CREB 29.5020 (OPERATIONAL 304uL20 OPERATIONAL 318129 r OPERATIONAL TOTAL STANDBY 19650 Prepared by: Re {REVI FOUNDATIONS PHILIPPINES INC. WD BH AnD Checked and Revisved bye ‘DAM, CONSUNIT, NC.

You might also like