Department of Education
Region IX, Zamboanga Peninsula
SCHOOLS DIVISION OF ZAMBOANGA DEL SUR
This school level Comprehensive School Safety Monitoring Tool is aligned with the
Sendai Framework for DRR (SFDRR), and the global Comprehensive School Safety Framework
(CSSF) developed by the UN International Strategy for Disaster Reduction (UNISDR). As a
signatory to the SFDRR, the Philippine Government is expected to report to the UNISDR its
accomplishment in implementing the SFDRR. In line with this, the Department of Education is
required to report its accomplishment in implementing Disaster Risk Reduction and
Management (DRRM)/School Safety to the National DRRM Council (NDRRMC) as a member of
the said council, and in accordance with RA 10121 (Philippine DRRM Act of 2010) which
reflects the country's commitment to the SFDRR.
Not Action
No. Activities Evident MOV/s
Evident Plan/Remarks
I. CSS ENABLING ENVIRONMENT
Adopted/localized existing /
1. policies relating to DRRM in
education/school safety
Designated School DRRM Focal /
2.
Person
Formed School DRRM Team, /
consisting of personnel from
3. different offices; with defined
membership and roles and
responsibilities/functions
Has a comprehensive School /
DRRM Plan, which includes
CCA and EiE measures,
4.
covering risk assessment,
risk reduction, and
rehabilitation and recovery
Students participated in the /
5.
planning process
Integrated DRRM into the /
6. School Improvement Plan
(SIP)
100% completion of DRR related /
7.
questions in the EMIS/EBEIS
Regular DRRM activities are /
8.
supported by school budget
Evident Plan/Remarks
Funding sources for /
interventions in the aftermath
9. of a disaster or emergency
exist and can easily be
tapped.
School has partnerships that /
could be tapped to support its
10.
DRRM programs and activities,
including those after a disaster
Conducted Student Led- /
11. Watching and hazard mapping
(DO. No. 23, s. 2015)
Incorporated results of /
student-led watching and
12.
hazard mapping in the DRRM
Plan and SIP
Linked student-led school
watching and hazard mapping
13. with the community hazard /
maps of LGUs provided by
DOST
School Planning Team have /
linked the community hazard
14. maps with education data to
better understand the school’s
risk
School submitted Rapid /
Assessment of Damage Report
(RADAR) to the DRRMS Central
15.
Office, within 72 hours after
the onslaught of a hazard in
the area
Data collection and /
consolidation of programs and
16. activities on DRRM, covering
the 3 Pillars, to monitor results
and impact exist
II. PILLAR 1: SAFE LEARNING FACILITIES
No. of school buildings that
1. 5
has been inventoried
Not Action
No. Activities Evident MOV/s
Evident Plan/Remarks
c. resilient construction /
Not Action
No. Activities Evident MOV/s
Evident Plan/Remarks
Not
No Action
Activities Evident Eviden MOV/s Plan/Remarks
.
t
Not
No Action
Activities Evident Eviden MOV/s Plan/Remarks
.
t
Other remarks: