Revision history
Table of contents
4 SHORT-CIRCUIT CALCULATIONS............................................................................................................... 16
REFERENCES ...................................................................................................................................................... 93
Page 2/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
General
▪ The protection setting of feeders and transformers were properly calculated and
coordinated both with the generator’s one and among them.
▪ In order to assure the correctness of the selectivity it is necessary to install in total 6
zig-zag earthing transformers as indicated in Figure 2 and Figure 3. Four of them
installed on the 33 kV system and remaining two, on the 11 kV system.
▪ The settings proposed here are valid for the scenarios described in § 2.3. In case it is
foreseen to modify them, it is highly recommended to carry out a verification of the
settings.
▪ The proposed (by MERUS) settings for the STATCOM filter banks should be modified
as indicated in § 5.8. This because most of short-circuits on the 33 kV could cause their
tripping, with the subsequent STATCOM tripping, and consequently the stop of the
entire Dirty loads.
Generators
▪ The generators protection settings were calculated for both the scenarios indicated in
the § 2.3
▪ In particular, as far as the voltage and frequency thresholds are concerned, their
settings were calculated with the aim to preserve the generator itself.
▪ In addition, for the islanded operation, the Power Swing (78) protection function shall
be turned off.
33 kV System
▪ Additionally to the already installed 33 kV zig-zag earthing transformers, other two units
shall be installed at their final locations (see Figure 2), otherwise the zero-sequence
protection on the 33 kV system will take place with delay.
▪ In case of a single-phase fault between the SYN01 substation and the Step-up
transformers, the fault will be anyhow feed by the relative generator. This because, on
one hand, the relays installed in the SYN01 substation will send the trip signal, but on
the other hand, no protection devices installed at generator busbar are able to see the
fault. Therefore, it is essential to send an alarm to the generator unit to stop it.
▪ In case of relay trip at one end of the links between the SYN01 and the Clean/Dirty, the
other end should also open (inter-tripping).
▪ In the final configuration, in case of single-phase internal faults to the SYN01, the fault
will be finally cleared by the zero-sequence overvoltage (59N). This, due to the
following main reasons:
o The zero-sequence current will be only seen by the relay of the incomings from
Clean/Dirty busbars. This due to the location of the 33 kV zig-zag earthing
transformer.
o The relays installed at SYN01 substation have no Busbar differential protection
functions available.
Page 3/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
▪ There is not differential protection available for the Transformer T11 (33/11 kV)
connected to the Clean BB and 11 kV Metal Clad switchgear. The protection of the
transformer is done by the overcurrent functions.
Page 4/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
However, considering the review of the Single Line Diagram made by CEA, a general review
of all main protection system including the dirty busbar in its final configuration (network+2
GTs, or only network) has been performed too.
This was done on the one side to improve the overall reliability and safety of the plant, and on
the other side to have sufficient information for the design of the earthing transformer and the
relevant Neutral Earthing Resistor for the 11 kV system and the 33 kV system (please check
the paragraph 0, Conclusions and Recommendations).
Page 5/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
The present relay coordination study, concerning the 33 kV and 11 kV systems, is carried out
considering that the LV relays are correctly set. That is, it is assumed that the coordination of
the low voltage loads is correct and it is configured in the corresponding relays. It is therefore
excluded from the present analysis, the study of protection coordination of the secondary side
of the MV/LV transformers.
Despite of what above, the so called “time-overcurrent plots” had been added to the present
report with the aim of show selectivity results.
The transformers mechanical and thermal damage curve, in accordance with ANSI / IEEE
standard C57.109 – 1993, cables damage curves and motor starting curves have been added
(dashed lines) in the time-overcurrent plots.
Page 6/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
The selectivity is obtained by grading the clearing instant of the relays (discrimination in time
or chronometric selectivity) or, when possible, by considering the intervention threshold
(current discrimination or amperometric selectivity) so that the relay closest to the fault first
operated to the most distant ones.
Regarding the grading time, it must be taken into account the characteristics of the equipment
present in the plant (numerical relays), in the specific case:
▪ Typical basic timing error: 5%
▪ Overshoot time: 20 ms
▪ Safety margin: 30 ms
▪ Typical overall grading margin: 150 ÷ 250 ms
Scenario Description
Page 7/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Following tables show the main data used in the model. In particular the Substations, the zig-
zag earthing transformer, cables, transformers, asynchronous motors and static loads are
indicated.
It is important to point out that some data was hypothesized and therefore it is of main
importance to make an accurate review of it.
Page 8/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Page 9/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Page 10/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Table 1: switchgears
Name Nom.L-L Volt. Name Nom.L-L Volt.
kV kV
Term132_1 132 LF Switchboard 33
T-GT1 11 STATCOM SWB 33
T-GT2 11 11kV Metal Clad 11
T-GT4 11 SWG1 11
T-GT5 11 SWG2 11
SYN01-a 33 ASP 11
SYN01-b 33 Estate 11
SYN01-c 33 IF BB 11
SYN01-d 33 IF Cabin Supply 11
DIRTY 33 RM 11
CLEAN 33 MSS6.6kV 6.6
EAF Switchboard 33
Page 11/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Table 3: cables
Page 12/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Table 4: transformers
Name HV-Side LV-Side rtd.Pow. Shc Volt. HV- LV- Name LV Re, LV Tap
rtd.Volt. Rtd.Volt. Star Point Position
MVA % kV kV Ohm
EAF Dd EAF Switchboard TermEAF_D 18.94 21.6 33 0.44 Dd0 0 -2
EAF_Dy EAF Switchboard TermEAF_Y 18.94 21.6 33 0.44 Dy11 0 -2
S11 IF BB TermAuxIF 1.00 6.0 11 0.40 Dyn11 Connected 0 0
SUT GT-1 Tr-GT1 33kV Tr-GT1 11kV 20.00 6.0 33 11.00 Yd11 0 1
SUT GT-2 Tr-GT2 33kV Tr-GT2 11kV 20.00 6.0 33 11.00 Yd11 0 1
SUT GT-4 Tr-GT4 33kV Tr-GT4 11kV 20.00 6.0 33 11.00 Yd11 0 1
SUT GT-5 Tr-GT5 33kV Tr-GT5 11kV 20.00 6.0 33 11.00 Yd11 0 1
T1 ASP TermASP1 0.80 6.0 11 0.40 Dyn11 Connected 0 0
T11 tT11 TermT11 20.00 8.0 33 11.00 Yd11 0 -2
T12 CLEAN TermT12 0.25 4.5 33 0.40 Dyn11 Connected 0 0
T13 TermIF IF Cabin Supply 20.00 8.0 33 11.00 YNd11 0 -1
T2 ASP TermASP2 0.80 6.0 11 0.40 Dyn11 Connected 0 0
Page 13/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Name HV-Side LV-Side rtd.Pow. Shc Volt. HV- LV- Name LV Re, LV Tap
rtd.Volt. Rtd.Volt. Star Point Position
MVA % kV kV Ohm
T21 TermT21 MSS6.6kV 5.00 7.0 11 6.90 Dyn11 Connected 40 0
T22 TermT22 TermFTP2 1.25 6.0 11 0.40 Dyn11 Connected 0 -1
T23 TermT23 TermCCM 1.25 6.0 11 0.40 Dyn11 Connected 0 -1
T24 TermT24 TermEAFP1 1.60 6.5 11 0.40 Dyn11 Connected 0 -1
T25 TermT25 TermEAFP2 1.00 6.0 11 0.40 Dyn11 Connected 0 -1
T26 TermT26 TermWTP 2.50 6.5 11 0.40 Dyn11 Connected 0 -1
TR 3125 TermTR3125 TermTRaux 3.13 8.0 11 0.40 Dyn0 Connected 0 0
TR BOYS TermESTATE TermBoys 0.20 4.0 10 0.40 Dyn11 Connected 0 0
TR CONF Estate TermConf 0.20 4.0 10 0.40 Dyn11 Connected 0 0
TR ESTATE TermLEst TermLE 1.00 6.0 11 0.40 Dyn11 Connected 0 0
TR NEW B TermESTATE TermNewB 0.50 4.0 10 0.40 Dyn11 Connected 0 0
TR1 RM BM 2.20 6.5 11 3.30 Dd0 0 0
TR2 RM TermIS_1 4.00 8.0 11 0.60 Dd0 0 0
TR3 RM TermIS_2 4.00 8.0 11 0.60 Dy0 0 0
TR4 RM TermIS_3 4.00 8.0 11 0.60 Dd0 0 0
TR5 RM TermIS_4 4.00 8.0 11 0.60 Dy0 0 0
TR6 RM TermL 3.50 8.0 11 0.40 Dyn0 Connected 0 0
Tr LF TermTrLF TermLF 8.40 12.0 33 0.22 Yd11 0 10
Tr1 Term132_1 Feeder_Dirty 63.00 12.0 132 37.00 YNd11 0 6
Tr2 Term132_1 Feeder_Clean 63.00 12.0 132 35.00 YNd0 0 3
Trf STATCOM SWB TermShunt 24.00 5.0 33 0.69 Dyn0 Connected 0 0
Page 14/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Table 5: MV motors
Moment of Total Use Motor
Proportional Moment of Inertia from Moment of Starting
Name Grid Type Factor Exponent Inertia Gear ratio Type Inertia Tag(total) Method
p.u. kgm^2 kgm^2 kgm^2 s
Air C. Grid 1600 kW 0.3 2 40 1 52.68172 92.68172 1.42 Autotransformer
Fan 1 Grid 1000 kW 0.375 1.5 762.5 1 70 832.5 9.06 Direct
Fan 2 Grid 1000 kW 0.375 1.5 762.5 1 70 832.5 9.06 Direct
Nitrogen Grid 400 kW 1 2 20 1 19.8614 39.8614 1.08 Direct
Oxigen 1 Grid 400 kW 1 2 20 1 19.8614 39.8614 1.08 Direct
Oxigen 2 Grid 400 kW 1 2 20 1 19.8614 39.8614 1.08 Direct
Table 7: loads
Name Act.Pow. React.Pow. App.Pow. I Pow.Fact. cos(phi)
MW Mvar MVA kA (ind,cap)
ASP 1 0.32 0.24 0.40 0.61 0.80 ind.
ASP 2 0.32 0.24 0.40 0.61 0.80 ind.
CCM Plant 0.42 0.28 0.50 0.76 0.83 ind.
EAF Plant 1 0.64 0.48 0.80 1.22 0.80 ind.
EAF Plant 2 0.42 0.28 0.50 0.76 0.83 ind.
FTP 2 Plant 0.42 0.28 0.50 0.76 0.83 ind.
WTP Plant 1.00 0.75 1.25 1.90 0.80 ind.
Page 15/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
4 SHORT-CIRCUIT CALCULATIONS
The following tables show the results of the short-circuit calculations.
-----------------------------------------------------------------------------------------------------------------------------------
| Fault Locations |
| Short-Circuit Calculation / Method : IEC 60909 3-Phase Short-Circuit / Min. Short-Circuit Currents |
-----------------------------------------------------------------------------------------------------------------------------------
| Asynchronous Motors | Grid Identification | Short-Circuit Duration |
| Always Considered | Automatic | Break Time 0.10 s |
| | | Fault Clearing Time (Ith) 1.00 s |
| Decaying Aperiodic Component (idc) | Conductor Temperature | Voltage factor c |
| Using Method B | User Defined No | Standard defined table |
| | | |
-----------------------------------------------------------------------------------------------------------------------------------
| rtd. V Voltage c- Sk" Ik" ip Ib Sb Ik Ith |
| [kV] [kV] [deg] Factor [MVA] [kA] [deg] [kA] [kA] [MVA] [kA] [kA] |
-----------------------------------------------------------------------------------------------------------------------------------
| |
|11kV Metal C 11.00 0.00 0.00 1.00 88.14 4.63 -88.61 12.15 4.47 85.18 4.63 4.77 |
| |
|ASP 11.00 0.00 0.00 1.00 82.78 4.34 -83.13 10.14 4.24 80.83 4.34 4.40 |
| |
|CLEAN 33.00 0.00 0.00 1.00 136.81 2.39 -88.41 6.13 2.05 117.21 2.39 2.45 |
| |
|DIRTY 33.00 0.00 0.00 1.00 392.45 6.87 -87.44 17.86 6.53 373.09 6.87 7.06 |
| |
|DIRTY-dummy 33.00 0.00 0.00 1.00 392.45 6.87 -87.44 17.86 6.53 373.09 6.87 7.06 |
| |
|EAF Switchbo 33.00 0.00 0.00 1.00 389.81 6.82 -87.09 17.60 6.49 370.89 6.82 6.99 |
| |
|Estate 11.00 0.00 0.00 1.00 84.27 4.42 -83.41 10.38 4.31 82.06 4.42 4.48 |
| |
|Feeder_Dirty 33.00 0.00 0.00 1.00 392.51 6.87 -87.45 17.87 6.53 373.16 6.87 7.06 |
| |
|IF BB 11.00 0.00 0.00 1.00 140.35 7.37 -85.39 18.51 7.37 140.35 7.37 7.51 |
| |
|IF Cabin Sup 11.00 0.00 0.00 1.00 152.47 8.00 -88.63 21.69 8.00 152.47 8.00 8.45 |
| |
|LF Switchboa 33.00 0.00 0.00 1.00 40.21 0.70 -89.30 1.95 0.70 40.21 0.70 0.79 |
| |
|MSS6.6kV 6.60 0.00 0.00 1.00 35.49 3.10 -86.61 7.95 3.10 35.49 3.10 3.18 |
| |
|RM 11.00 0.00 0.00 1.00 86.73 4.55 -87.86 11.76 4.41 84.05 4.55 4.67 |
| |
|STATCOM SWB 33.00 0.00 0.00 1.00 391.92 6.86 -87.40 17.82 6.52 372.65 6.86 7.05 |
-----------------------------------------------------------------------------------------------------------------------------------
Page 16/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
-----------------------------------------------------------------------------------------------------------------------------------
| rtd. V Voltage c- Sk" Ik" ip Ib Sb Ik Ith |
| [kV] [kV] [deg] Factor [MVA] [kA] [deg] [kA] [kA] [MVA] [kA] [kA] |
-----------------------------------------------------------------------------------------------------------------------------------
| |
|SWG1 11.00 0.00 0.00 1.00 87.81 4.61 -88.36 12.04 4.46 84.92 4.61 4.75 |
| |
|SWG2 11.00 0.00 0.00 1.00 87.87 4.61 -88.31 12.03 4.46 84.97 4.61 4.75 |
| |
|SYN01-a 33.00 0.00 0.00 1.00 136.97 2.40 -88.44 6.14 2.05 117.29 2.40 2.45 |
| |
|SYN01-b 33.00 0.00 0.00 1.00 136.97 2.40 -88.44 6.14 2.05 117.29 2.40 2.45 |
| |
|SYN01-c 33.00 0.00 0.00 1.00 136.97 2.40 -88.44 6.14 2.05 117.29 2.40 2.45 |
| |
|SYN01-d 33.00 0.00 0.00 1.00 392.02 6.86 -87.42 17.83 6.52 372.57 6.86 7.05 |
| |
|T-GT1 11.00 0.00 0.00 1.00 246.51 12.94 -86.75 32.81 11.85 225.86 12.94 13.21 |
| |
|T-GT2 11.00 0.00 0.00 1.00 249.33 13.09 -87.41 33.70 12.00 228.64 13.09 13.41 |
| |
|T-GT4 11.00 0.00 0.00 1.00 143.19 7.52 -88.68 19.27 6.17 117.63 7.52 7.69 |
| |
|T-GT5 11.00 0.00 0.00 1.00 143.19 7.52 -88.68 19.27 6.17 117.63 7.52 7.69 |
| |
|Term132_1 132.00 0.00 0.00 1.00 929.70 4.07 -84.86 10.11 4.02 918.97 4.07 4.14 |
| |
|TermESTATE 11.00 0.00 0.00 1.00 81.16 4.26 -79.63 9.30 4.17 79.49 4.26 4.29 |
| |
|TermIF 33.00 0.00 0.00 1.00 388.82 6.80 -87.06 17.54 6.47 370.07 6.80 6.98 |
| |
|TermShunt 0.69 0.00 0.00 0.95 207.97 174.02 -88.55 469.01 173.61 207.49 174.02 182.60 |
| |
|TermTrLF 33.00 0.00 0.00 1.00 40.13 0.70 -89.18 1.94 0.70 40.13 0.70 0.77 |
-----------------------------------------------------------------------------------------------------------------------------------
Page 17/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
-----------------------------------------------------------------------------------------------------------------------------------
| Fault Locations |
| Short-Circuit Calculation / Method : IEC 60909 3-Phase Short-Circuit / Max. Short-Circuit Currents |
-----------------------------------------------------------------------------------------------------------------------------------
| Asynchronous Motors | Grid Identification | Short-Circuit Duration |
| Always Considered | Automatic | Break Time 0.10 s |
| | | Fault Clearing Time (Ith) 1.00 s |
| Decaying Aperiodic Component (idc) | Conductor Temperature | Voltage factor c |
| Using Method B | User Defined No | Standard defined table |
| | | |
-----------------------------------------------------------------------------------------------------------------------------------
| rtd. V Voltage c- Sk" Ik" ip Ib Sb Ik Ith |
| [kV] [kV] [deg] Factor [MVA] [kA] [deg] [kA] [kA] [MVA] [kA] [kA] |
-----------------------------------------------------------------------------------------------------------------------------------
| |
|11kV Metal C 11.00 0.00 0.00 1.10 132.17 6.94 -85.08 17.24 5.71 108.77 5.09 6.36 |
| |
|ASP 11.00 0.00 0.00 1.10 125.28 6.58 -81.90 15.25 5.44 103.58 4.75 5.95 |
| |
|CLEAN 33.00 0.00 0.00 1.10 181.81 3.18 -86.41 7.92 2.49 142.43 2.63 3.24 |
| |
|DIRTY 33.00 0.00 0.00 1.10 487.86 8.54 -87.82 22.46 8.11 463.72 8.54 8.81 |
| |
|DIRTY-dummy 33.00 0.00 0.00 1.10 487.86 8.54 -87.82 22.46 8.11 463.72 8.54 8.81 |
| |
|EAF Switchbo 33.00 0.00 0.00 1.10 484.23 8.47 -87.56 22.16 8.06 460.67 8.47 8.73 |
| |
|Estate 11.00 0.00 0.00 1.10 124.41 6.53 -80.96 14.93 5.52 105.21 4.79 5.93 |
| |
|Feeder_Dirty 33.00 0.00 0.00 1.10 487.97 8.54 -87.83 22.46 8.12 463.84 8.54 8.82 |
| |
|IF BB 11.00 0.00 0.00 1.10 161.27 8.46 -86.67 21.93 8.46 161.27 8.46 8.69 |
| |
|IF Cabin Sup 11.00 0.00 0.00 1.10 175.56 9.21 -88.88 25.16 9.21 175.56 9.21 9.84 |
| |
|LF Switchboa 33.00 0.00 0.00 1.10 44.76 0.78 -89.36 2.18 0.78 44.76 0.78 0.88 |
| |
|MSS6.6kV 6.60 0.00 0.00 1.10 50.55 4.42 -83.89 10.90 3.95 45.17 2.94 3.93 |
| |
|RM 11.00 0.00 0.00 1.10 129.61 6.80 -84.57 16.72 5.64 107.39 4.98 6.22 |
| |
|STATCOM SWB 33.00 0.00 0.00 1.10 487.13 8.52 -87.79 22.41 8.10 463.11 8.52 8.80 |
-----------------------------------------------------------------------------------------------------------------------------------
Page 18/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
-----------------------------------------------------------------------------------------------------------------------------------
| rtd. V Voltage c- Sk" Ik" ip Ib Sb Ik Ith |
| [kV] [kV] [deg] Factor [MVA] [kA] [deg] [kA] [kA] [MVA] [kA] [kA] |
-----------------------------------------------------------------------------------------------------------------------------------
| |
|SWG1 11.00 0.00 0.00 1.10 131.56 6.91 -84.92 17.10 5.69 108.46 5.06 6.32 |
| |
|SWG2 11.00 0.00 0.00 1.10 131.88 6.92 -84.93 17.14 5.70 108.51 5.07 6.34 |
| |
|SYN01-a 33.00 0.00 0.00 1.10 181.97 3.18 -86.43 7.92 2.49 142.52 2.64 3.24 |
| |
|SYN01-b 33.00 0.00 0.00 1.10 181.97 3.18 -86.43 7.92 2.49 142.52 2.64 3.24 |
| |
|SYN01-c 33.00 0.00 0.00 1.10 181.97 3.18 -86.43 7.92 2.49 142.52 2.64 3.24 |
| |
|SYN01-d 33.00 0.00 0.00 1.10 487.11 8.52 -87.80 22.41 8.10 462.87 8.52 8.80 |
| |
|T-GT1 11.00 0.00 0.00 1.10 283.98 14.91 -87.08 38.15 13.60 259.19 14.91 15.25 |
| |
|T-GT2 11.00 0.00 0.00 1.10 287.43 15.09 -87.53 39.03 13.78 262.59 15.09 15.48 |
| |
|T-GT4 11.00 0.00 0.00 1.10 177.44 9.31 -87.31 23.45 7.31 139.25 8.05 9.50 |
| |
|T-GT5 11.00 0.00 0.00 1.10 177.44 9.31 -87.31 23.45 7.31 139.25 8.05 9.50 |
| |
|Term132_1 132.00 0.00 0.00 1.10 1642.64 7.18 -84.65 17.82 7.12 1628.71 7.18 7.31 |
| |
|TermESTATE 11.00 0.00 0.00 1.10 118.70 6.23 -78.02 13.50 5.37 102.31 4.57 5.64 |
| |
|TermIF 33.00 0.00 0.00 1.10 482.85 8.45 -87.54 22.09 8.04 459.51 8.45 8.70 |
| |
|TermShunt 0.69 0.00 0.00 1.05 245.62 205.52 -88.83 558.88 204.83 244.80 205.52 217.95 |
| |
|TermTrLF 33.00 0.00 0.00 1.10 44.67 0.78 -89.28 2.17 0.78 44.67 0.78 0.87 |
-----------------------------------------------------------------------------------------------------------------------------------
Page 19/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
-----------------------------------------------------------------------------------------------------------------------------------
| Fault Locations |
| Short-Circuit Calculation / Method : IEC 60909 2-Phase Short-Circuit / Min. Short-Circuit Currents |
-----------------------------------------------------------------------------------------------------------------------------------
| Asynchronous Motors | Grid Identification | Short-Circuit Duration |
| Always Considered | Automatic | Break Time 0.10 s |
| | | Fault Clearing Time (Ith) 1.00 s |
| | Conductor Temperature | Voltage factor c |
| | User Defined No | Standard defined table |
| | | |
-----------------------------------------------------------------------------------------------------------------------------------
| rtd. V Voltage c- Sk" Ik" ip Ib Sb |
| [kV] Phase [kV] [p.u.] [deg] Factor [MVA] [kA] [deg] [kA] [kA] [MVA] |
-----------------------------------------------------------------------------------------------------------------------------------
|11kV Metal Clad 11.00 A 6.49 1.02 -2.72 1.0 0.00 0.00 0.00 0.00 0.00 0.00 |
| B 3.25 0.51 177.28 24.94 3.93 -175.77 10.32 3.93 24.94 |
| C 3.25 0.51 177.28 24.94 3.93 4.23 10.32 3.93 24.94 |
| |
|ASP 11.00 A 6.51 1.02 -2.43 1.0 0.00 0.00 0.00 0.00 0.00 0.00 |
| B 3.25 0.51 177.57 23.35 3.68 -170.59 8.58 3.68 23.35 |
| C 3.25 0.51 177.57 23.35 3.68 9.41 8.58 3.68 23.35 |
| |
|CLEAN 33.00 A 19.76 1.04 -4.06 1.0 0.00 0.00 0.00 0.00 0.00 0.00 |
| B 9.88 0.52 175.94 38.24 2.01 -174.07 5.14 2.01 38.24 |
| C 9.88 0.52 175.94 38.24 2.01 5.93 5.14 2.01 38.24 |
| |
|DIRTY 33.00 A 19.30 1.01 -1.38 1.0 0.00 0.00 0.00 0.00 0.00 0.00 |
| B 9.65 0.51 178.62 111.90 5.87 -176.03 15.28 5.87 111.90 |
| C 9.65 0.51 178.62 111.90 5.87 3.97 15.28 5.87 111.90 |
| |
|DIRTY-dummy 33.00 A 19.30 1.01 -1.38 1.0 0.00 0.00 0.00 0.00 0.00 0.00 |
| B 9.65 0.51 178.62 111.90 5.87 -176.03 15.28 5.87 111.90 |
| C 9.65 0.51 178.62 111.90 5.87 3.97 15.28 5.87 111.90 |
| |
|EAF Switchboard 33.00 A 19.30 1.01 -1.36 1.0 0.00 0.00 0.00 0.00 0.00 0.00 |
| B 9.65 0.51 178.64 111.14 5.83 -175.69 15.05 5.83 111.14 |
| C 9.65 0.51 178.64 111.14 5.83 4.31 15.05 5.83 111.14 |
| |
|Estate 11.00 A 6.51 1.02 -2.48 1.0 0.00 0.00 0.00 0.00 0.00 0.00 |
| B 3.25 0.51 177.52 23.77 3.74 -170.81 8.78 3.74 23.77 |
| C 3.25 0.51 177.52 23.77 3.74 9.19 8.78 3.74 23.77 |
| |
-----------------------------------------------------------------------------------------------------------------------------------
Page 20/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
-----------------------------------------------------------------------------------------------------------------------------------
| rtd. V Voltage c- Sk" Ik" ip Ib Sb |
| [kV] Phase [kV] [p.u.] [deg] Factor [MVA] [kA] [deg] [kA] [kA] [MVA] |
-----------------------------------------------------------------------------------------------------------------------------------
|Feeder_Dirty 33.00 A 19.30 1.01 -1.38 1.0 0.00 0.00 0.00 0.00 0.00 0.00 |
| B 9.65 0.51 178.62 111.91 5.87 -176.04 15.28 5.87 111.91 |
| C 9.65 0.51 178.62 111.91 5.87 3.96 15.28 5.87 111.91 |
| |
|IF BB 11.00 A 6.38 1.00 -0.49 1.0 0.00 0.00 0.00 0.00 0.00 0.00 |
| B 3.19 0.50 179.51 40.33 6.35 -174.89 15.96 6.35 40.33 |
| C 3.19 0.50 179.51 40.33 6.35 5.11 15.96 6.35 40.33 |
| |
|IF Cabin Supply 11.00 A 6.38 1.00 -0.55 1.0 0.00 0.00 0.00 0.00 0.00 0.00 |
| B 3.19 0.50 179.45 43.81 6.90 -178.07 18.70 6.90 43.81 |
| C 3.19 0.50 179.45 43.81 6.90 1.93 18.70 6.90 43.81 |
| |
|LF Switchboard 33.00 A 19.07 1.00 -0.15 1.0 0.00 0.00 0.00 0.00 0.00 0.00 |
| B 9.54 0.50 179.85 11.60 0.61 -179.15 1.69 0.61 11.60 |
| C 9.54 0.50 179.85 11.60 0.61 0.85 1.69 0.61 11.60 |
| |
|MSS6.6kV 6.60 A 3.85 1.01 -1.22 1.0 0.00 0.00 0.00 0.00 0.00 0.00 |
| B 1.92 0.50 178.78 10.15 2.66 -175.36 6.82 2.66 10.15 |
| C 1.92 0.50 178.78 10.15 2.66 4.64 6.82 2.66 10.15 |
| |
|RM 11.00 A 6.49 1.02 -2.66 1.0 0.00 0.00 0.00 0.00 0.00 0.00 |
| B 3.25 0.51 177.34 24.53 3.86 -175.08 9.98 3.86 24.53 |
| C 3.25 0.51 177.34 24.53 3.86 4.92 9.98 3.86 24.53 |
| |
|STATCOM SWB 33.00 A 19.30 1.01 -1.37 1.0 0.00 0.00 0.00 0.00 0.00 0.00 |
| B 9.65 0.51 178.63 111.75 5.87 -175.99 15.24 5.87 111.75 |
| C 9.65 0.51 178.63 111.75 5.87 4.01 15.24 5.87 111.75 |
| |
|SWG1 11.00 A 6.49 1.02 -2.70 1.0 0.00 0.00 0.00 0.00 0.00 0.00 |
| B 3.25 0.51 177.30 24.84 3.91 -175.54 10.22 3.91 24.84 |
| C 3.25 0.51 177.30 24.84 3.91 4.46 10.22 3.91 24.84 |
| |
|SWG2 11.00 A 6.49 1.02 -2.70 1.0 0.00 0.00 0.00 0.00 0.00 0.00 |
| B 3.25 0.51 177.30 24.86 3.91 -175.49 10.21 3.91 24.86 |
| C 3.25 0.51 177.30 24.86 3.91 4.51 10.21 3.91 24.86 |
| |
|SYN01-a 33.00 A 19.76 1.04 -4.06 1.0 0.00 0.00 0.00 0.00 0.00 0.00 |
| B 9.88 0.52 175.94 38.28 2.01 -174.09 5.15 2.01 38.28 |
| C 9.88 0.52 175.94 38.28 2.01 5.91 5.15 2.01 38.28 |
| |
|SYN01-b 33.00 A 19.76 1.04 -4.06 1.0 0.00 0.00 0.00 0.00 0.00 0.00 |
| B 9.88 0.52 175.94 38.28 2.01 -174.09 5.15 2.01 38.28 |
| C 9.88 0.52 175.94 38.28 2.01 5.91 5.15 2.01 38.28 |
| |
-----------------------------------------------------------------------------------------------------------------------------------
Page 21/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
-----------------------------------------------------------------------------------------------------------------------------------
| rtd. V Voltage c- Sk" Ik" ip Ib Sb |
| [kV] Phase [kV] [p.u.] [deg] Factor [MVA] [kA] [deg] [kA] [kA] [MVA] |
-----------------------------------------------------------------------------------------------------------------------------------
|SYN01-c 33.00 A 19.76 1.04 -4.06 1.0 0.00 0.00 0.00 0.00 0.00 0.00 |
| B 9.88 0.52 175.94 38.28 2.01 -174.09 5.15 2.01 38.28 |
| C 9.88 0.52 175.94 38.28 2.01 5.91 5.15 2.01 38.28 |
| |
|SYN01-d 33.00 A 19.30 1.01 -1.38 1.0 0.00 0.00 0.00 0.00 0.00 0.00 |
| B 9.65 0.51 178.62 111.77 5.87 -176.00 15.25 5.87 111.77 |
| C 9.65 0.51 178.62 111.77 5.87 4.00 15.25 5.87 111.77 |
| |
|T-GT1 11.00 A 6.47 1.02 -2.02 1.0 0.00 0.00 0.00 0.00 0.00 0.00 |
| B 3.23 0.51 177.98 69.93 11.01 -174.65 27.92 11.01 69.93 |
| C 3.23 0.51 177.98 69.93 11.01 5.35 27.92 11.01 69.93 |
| |
|T-GT2 11.00 A 6.47 1.02 -2.00 1.0 0.00 0.00 0.00 0.00 0.00 0.00 |
| B 3.23 0.51 178.00 70.72 11.14 -175.34 28.68 11.14 70.72 |
| C 3.23 0.51 178.00 70.72 11.14 4.66 28.68 11.14 70.72 |
| |
|T-GT4 11.00 A 6.61 1.04 -4.38 1.0 0.00 0.00 0.00 0.00 0.00 0.00 |
| B 3.31 0.52 175.62 39.91 6.28 -173.96 16.11 6.28 39.91 |
| C 3.31 0.52 175.62 39.91 6.28 6.04 16.11 6.28 39.91 |
| |
|T-GT5 11.00 A 6.61 1.04 -4.38 1.0 0.00 0.00 0.00 0.00 0.00 0.00 |
| B 3.31 0.52 175.62 39.91 6.28 -173.96 16.11 6.28 39.91 |
| C 3.31 0.52 175.62 39.91 6.28 6.04 16.11 6.28 39.91 |
| |
|Term132_1 132.00 A 76.47 1.00 -0.44 1.0 0.00 0.00 0.00 0.00 0.00 0.00 |
| B 38.23 0.50 179.56 267.49 3.51 -174.41 8.73 3.51 267.49 |
| C 38.23 0.50 179.56 267.49 3.51 5.59 8.73 3.51 267.49 |
| |
|TermESTATE 11.00 A 6.52 1.03 -2.29 1.0 0.00 0.00 0.00 0.00 0.00 0.00 |
| B 3.26 0.51 177.71 22.85 3.60 -167.22 7.85 3.60 22.85 |
| C 3.26 0.51 177.71 22.85 3.60 12.78 7.85 3.60 22.85 |
| |
|TermIF 33.00 A 19.30 1.01 -1.36 1.0 0.00 0.00 0.00 0.00 0.00 0.00 |
| B 9.65 0.51 178.64 110.86 5.82 -175.67 15.01 5.82 110.86 |
| C 9.65 0.51 178.64 110.86 5.82 4.33 15.01 5.82 110.86 |
| |
|TermShunt 0.69 A 0.38 0.96 -0.79 0.9 0.00 0.00 0.00 0.00 0.00 0.00 |
| B 0.19 0.48 179.21 59.64 149.71 -177.75 403.51 149.71 59.64 |
| C 0.19 0.48 179.21 59.64 149.71 2.25 403.51 149.71 59.64 |
| |
|TermTrLF 33.00 A 19.07 1.00 -0.15 1.0 0.00 0.00 0.00 0.00 0.00 0.00 |
| B 9.54 0.50 179.85 11.57 0.61 -179.04 1.68 0.61 11.57 |
| C 9.54 0.50 179.85 11.57 0.61 0.96 1.68 0.61 11.57 |
| |
| |
-----------------------------------------------------------------------------------------------------------------------------------
Page 22/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
-----------------------------------------------------------------------------------------------------------------------------------
| Fault Locations |
| Short-Circuit Calculation / Method : IEC 60909 2-Phase Short-Circuit / Max. Short-Circuit Currents |
-----------------------------------------------------------------------------------------------------------------------------------
| Asynchronous Motors | Grid Identification | Short-Circuit Duration |
| Always Considered | Automatic | Break Time 0.10 s |
| | | Fault Clearing Time (Ith) 1.00 s |
| | Conductor Temperature | Voltage factor c |
| | User Defined No | Standard defined table |
| | | |
-----------------------------------------------------------------------------------------------------------------------------------
| rtd. V Voltage c- Sk" Ik" ip Ib Sb |
| [kV] Phase [kV] [p.u.] [deg] Factor [MVA] [kA] [deg] [kA] [kA] [MVA] |
-----------------------------------------------------------------------------------------------------------------------------------
|11kV Metal Clad 11.00 A 7.08 1.12 -2.04 1.1 0.00 0.00 0.00 0.00 0.00 0.00 |
| B 3.54 0.56 177.96 37.67 5.93 -172.99 14.74 5.93 37.67 |
| C 3.54 0.56 177.96 37.67 5.93 7.01 14.74 5.93 37.67 |
| |
|ASP 11.00 A 7.09 1.12 -1.81 1.1 0.00 0.00 0.00 0.00 0.00 0.00 |
| B 3.55 0.56 178.19 35.66 5.61 -170.03 13.02 5.61 35.66 |
| C 3.55 0.56 178.19 35.66 5.61 9.97 13.02 5.61 35.66 |
| |
|CLEAN 33.00 A 21.56 1.13 -3.39 1.1 0.00 0.00 0.00 0.00 0.00 0.00 |
| B 10.78 0.57 176.61 51.17 2.69 -172.83 6.68 2.69 51.17 |
| C 10.78 0.57 176.61 51.17 2.69 7.17 6.68 2.69 51.17 |
| |
|DIRTY 33.00 A 21.20 1.11 -1.22 1.1 0.00 0.00 0.00 0.00 0.00 0.00 |
| B 10.60 0.56 178.78 139.28 7.31 -176.58 19.24 7.31 139.28 |
| C 10.60 0.56 178.78 139.28 7.31 3.42 19.24 7.31 139.28 |
| |
|DIRTY-dummy 33.00 A 21.20 1.11 -1.22 1.1 0.00 0.00 0.00 0.00 0.00 0.00 |
| B 10.60 0.56 178.78 139.28 7.31 -176.58 19.24 7.31 139.28 |
| C 10.60 0.56 178.78 139.28 7.31 3.42 19.24 7.31 139.28 |
| |
|EAF Switchboard 33.00 A 21.20 1.11 -1.20 1.1 0.00 0.00 0.00 0.00 0.00 0.00 |
| B 10.60 0.56 178.80 138.24 7.26 -176.33 18.98 7.26 138.24 |
| C 10.60 0.56 178.80 138.24 7.26 3.67 18.98 7.26 138.24 |
| |
|Estate 11.00 A 7.09 1.12 -1.86 1.1 0.00 0.00 0.00 0.00 0.00 0.00 |
| B 3.55 0.56 178.14 35.40 5.57 -169.05 12.74 5.57 35.40 |
| C 3.55 0.56 178.14 35.40 5.57 10.95 12.74 5.57 35.40 |
| |
-----------------------------------------------------------------------------------------------------------------------------------
Page 23/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
-----------------------------------------------------------------------------------------------------------------------------------
| rtd. V Voltage c- Sk" Ik" ip Ib Sb |
| [kV] Phase [kV] [p.u.] [deg] Factor [MVA] [kA] [deg] [kA] [kA] [MVA] |
-----------------------------------------------------------------------------------------------------------------------------------
|Feeder_Dirty 33.00 A 21.20 1.11 -1.21 1.1 0.00 0.00 0.00 0.00 0.00 0.00 |
| B 10.60 0.56 178.79 139.31 7.31 -176.59 19.24 7.31 139.31 |
| C 10.60 0.56 178.79 139.31 7.31 3.41 19.24 7.31 139.31 |
| |
|IF BB 11.00 A 7.01 1.10 -0.41 1.1 0.00 0.00 0.00 0.00 0.00 0.00 |
| B 3.51 0.55 179.59 46.38 7.30 -176.26 18.92 7.30 46.38 |
| C 3.51 0.55 179.59 46.38 7.30 3.74 18.92 7.30 46.38 |
| |
|IF Cabin Supply 11.00 A 7.01 1.10 -0.45 1.1 0.00 0.00 0.00 0.00 0.00 0.00 |
| B 3.51 0.55 179.55 50.49 7.95 -178.42 21.71 7.95 50.49 |
| C 3.51 0.55 179.55 50.49 7.95 1.58 21.71 7.95 50.49 |
| |
|LF Switchboard 33.00 A 20.98 1.10 -0.12 1.1 0.00 0.00 0.00 0.00 0.00 0.00 |
| B 10.49 0.55 179.88 12.91 0.68 -179.25 1.88 0.68 12.91 |
| C 10.49 0.55 179.88 12.91 0.68 0.75 1.88 0.68 12.91 |
| |
|MSS6.6kV 6.60 A 4.21 1.10 -0.73 1.1 0.00 0.00 0.00 0.00 0.00 0.00 |
| B 2.10 0.55 179.27 14.53 3.81 -173.16 9.40 3.81 14.53 |
| C 2.10 0.55 179.27 14.53 3.81 6.84 9.40 3.81 14.53 |
| |
|RM 11.00 A 7.08 1.12 -1.99 1.1 0.00 0.00 0.00 0.00 0.00 0.00 |
| B 3.54 0.56 178.01 36.94 5.82 -172.52 14.29 5.82 36.94 |
| C 3.54 0.56 178.01 36.94 5.82 7.48 14.29 5.82 36.94 |
| |
|STATCOM SWB 33.00 A 21.20 1.11 -1.21 1.1 0.00 0.00 0.00 0.00 0.00 0.00 |
| B 10.60 0.56 178.79 139.07 7.30 -176.55 19.19 7.30 139.07 |
| C 10.60 0.56 178.79 139.07 7.30 3.45 19.19 7.30 139.07 |
| |
|SWG1 11.00 A 7.08 1.12 -2.03 1.1 0.00 0.00 0.00 0.00 0.00 0.00 |
| B 3.54 0.56 177.97 37.49 5.90 -172.83 14.62 5.90 37.49 |
| C 3.54 0.56 177.97 37.49 5.90 7.17 14.62 5.90 37.49 |
| |
|SWG2 11.00 A 7.08 1.12 -2.03 1.1 0.00 0.00 0.00 0.00 0.00 0.00 |
| B 3.54 0.56 177.97 37.58 5.92 -172.84 14.65 5.92 37.58 |
| C 3.54 0.56 177.97 37.58 5.92 7.16 14.65 5.92 37.58 |
| |
|SYN01-a 33.00 A 21.56 1.13 -3.40 1.1 0.00 0.00 0.00 0.00 0.00 0.00 |
| B 10.78 0.57 176.60 51.22 2.69 -172.84 6.69 2.69 51.22 |
| C 10.78 0.57 176.60 51.22 2.69 7.16 6.69 2.69 51.22 |
| |
|SYN01-b 33.00 A 21.56 1.13 -3.40 1.1 0.00 0.00 0.00 0.00 0.00 0.00 |
| B 10.78 0.57 176.60 51.22 2.69 -172.84 6.69 2.69 51.22 |
| C 10.78 0.57 176.60 51.22 2.69 7.16 6.69 2.69 51.22 |
| |
-----------------------------------------------------------------------------------------------------------------------------------
Page 24/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
-----------------------------------------------------------------------------------------------------------------------------------
| rtd. V Voltage c- Sk" Ik" ip Ib Sb |
| [kV] Phase [kV] [p.u.] [deg] Factor [MVA] [kA] [deg] [kA] [kA] [MVA] |
-----------------------------------------------------------------------------------------------------------------------------------
|SYN01-c 33.00 A 21.56 1.13 -3.40 1.1 0.00 0.00 0.00 0.00 0.00 0.00 |
| B 10.78 0.57 176.60 51.22 2.69 -172.84 6.69 2.69 51.22 |
| C 10.78 0.57 176.60 51.22 2.69 7.16 6.69 2.69 51.22 |
| |
|SYN01-d 33.00 A 21.20 1.11 -1.22 1.1 0.00 0.00 0.00 0.00 0.00 0.00 |
| B 10.60 0.56 178.78 139.06 7.30 -176.55 19.19 7.30 139.06 |
| C 10.60 0.56 178.78 139.06 7.30 3.45 19.19 7.30 139.06 |
| |
|T-GT1 11.00 A 7.11 1.12 -1.89 1.1 0.00 0.00 0.00 0.00 0.00 0.00 |
| B 3.55 0.56 178.11 80.63 12.70 -175.13 32.50 12.70 80.63 |
| C 3.55 0.56 178.11 80.63 12.70 4.87 32.50 12.70 80.63 |
| |
|T-GT2 11.00 A 7.11 1.12 -1.86 1.1 0.00 0.00 0.00 0.00 0.00 0.00 |
| B 3.55 0.56 178.14 81.60 12.85 -175.60 33.24 12.85 81.60 |
| C 3.55 0.56 178.14 81.60 12.85 4.40 33.24 12.85 81.60 |
| |
|T-GT4 11.00 A 7.22 1.14 -3.76 1.1 0.00 0.00 0.00 0.00 0.00 0.00 |
| B 3.61 0.57 176.24 49.77 7.84 -173.31 19.73 7.84 49.77 |
| C 3.61 0.57 176.24 49.77 7.84 6.69 19.73 7.84 49.77 |
| |
|T-GT5 11.00 A 7.22 1.14 -3.76 1.1 0.00 0.00 0.00 0.00 0.00 0.00 |
| B 3.61 0.57 176.24 49.77 7.84 -173.31 19.73 7.84 49.77 |
| C 3.61 0.57 176.24 49.77 7.84 6.69 19.73 7.84 49.77 |
| |
|Term132_1 132.00 A 84.01 1.10 -0.28 1.1 0.00 0.00 0.00 0.00 0.00 0.00 |
| B 42.00 0.55 179.72 473.21 6.21 -174.37 15.40 6.21 473.21 |
| C 42.00 0.55 179.72 473.21 6.21 5.63 15.40 6.21 473.21 |
| |
|TermESTATE 11.00 A 7.10 1.12 -1.73 1.1 0.00 0.00 0.00 0.00 0.00 0.00 |
| B 3.55 0.56 178.27 33.74 5.31 -166.24 11.51 5.31 33.74 |
| C 3.55 0.56 178.27 33.74 5.31 13.76 11.51 5.31 33.74 |
| |
|TermIF 33.00 A 21.20 1.11 -1.20 1.1 0.00 0.00 0.00 0.00 0.00 0.00 |
| B 10.60 0.56 178.80 137.85 7.24 -176.32 18.92 7.24 137.85 |
| C 10.60 0.56 178.80 137.85 7.24 3.68 18.92 7.24 137.85 |
| |
|TermShunt 0.69 A 0.42 1.06 -0.66 1.0 0.00 0.00 0.00 0.00 0.00 0.00 |
| B 0.21 0.53 179.34 70.51 176.99 -178.17 481.30 176.99 70.51 |
| C 0.21 0.53 179.34 70.51 176.99 1.83 481.30 176.99 70.51 |
| |
|TermTrLF 33.00 A 20.98 1.10 -0.12 1.1 0.00 0.00 0.00 0.00 0.00 0.00 |
| B 10.49 0.55 179.88 12.88 0.68 -179.17 1.87 0.68 12.88 |
| C 10.49 0.55 179.88 12.88 0.68 0.83 1.87 0.68 12.88 |
| |
| |
-----------------------------------------------------------------------------------------------------------------------------------
Page 25/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
-----------------------------------------------------------------------------------------------------------------------------------
| Fault Locations |
| Short-Circuit Calculation / Method : IEC 60909 Single Phase to Ground / Min. Short-Circuit Currents |
-----------------------------------------------------------------------------------------------------------------------------------
| Asynchronous Motors | Grid Identification | Short-Circuit Duration |
| Always Considered | Automatic | Break Time 0.10 s |
| | | Fault Clearing Time (Ith) 1.00 s |
| | Conductor Temperature | Voltage factor c |
| | User Defined No | Standard defined table |
| | | |
-----------------------------------------------------------------------------------------------------------------------------------
| rtd. V Voltage c- Sk" Ik" ip Ib Sb |
| [kV] Phase [kV] [p.u.] [deg] Factor [MVA] [kA] [deg] [kA] [kA] [MVA] |
-----------------------------------------------------------------------------------------------------------------------------------
|11kV Metal Clad 11.00 A 0.00 0.00 0.00 1.0 1.84 0.29 -12.28 0.76 0.29 1.84 |
| B 10.71 1.69 -151.44 0.00 0.00 0.00 0.00 0.00 0.00 |
| C 11.11 1.75 147.91 0.00 0.00 0.00 0.00 0.00 0.00 |
| |
|ASP 11.00 A 0.00 0.00 0.00 1.0 1.82 0.29 -12.52 0.67 0.29 1.82 |
| B 10.67 1.68 -151.36 0.00 0.00 0.00 0.00 0.00 0.00 |
| C 11.08 1.74 147.76 0.00 0.00 0.00 0.00 0.00 0.00 |
| |
|CLEAN 33.00 A 0.00 0.00 0.00 1.0 3.14 0.16 -21.61 0.42 0.16 3.14 |
| B 31.90 1.67 -151.21 0.00 0.00 0.00 0.00 0.00 0.00 |
| C 33.12 1.74 147.56 0.00 0.00 0.00 0.00 0.00 0.00 |
| |
|DIRTY 33.00 A 0.00 0.00 0.00 1.0 6.35 0.33 -21.67 0.87 0.33 6.35 |
| B 32.24 1.69 -150.92 0.00 0.00 0.00 0.00 0.00 0.00 |
| C 33.09 1.74 148.36 0.00 0.00 0.00 0.00 0.00 0.00 |
| |
|DIRTY-dummy 33.00 A 0.00 0.00 0.00 1.0 6.35 0.33 -21.67 0.87 0.33 6.35 |
| B 32.24 1.69 -150.92 0.00 0.00 0.00 0.00 0.00 0.00 |
| C 33.09 1.74 148.36 0.00 0.00 0.00 0.00 0.00 0.00 |
| |
|EAF Switchboard 33.00 A 0.00 0.00 0.00 1.0 6.34 0.33 -21.75 0.86 0.33 6.34 |
| B 32.23 1.69 -150.91 0.00 0.00 0.00 0.00 0.00 0.00 |
| C 33.09 1.74 148.35 0.00 0.00 0.00 0.00 0.00 0.00 |
| |
|Estate 11.00 A 0.00 0.00 0.00 1.0 1.82 0.29 -12.41 0.67 0.29 1.82 |
| B 10.68 1.68 -151.34 0.00 0.00 0.00 0.00 0.00 0.00 |
| C 11.08 1.74 147.79 0.00 0.00 0.00 0.00 0.00 0.00 |
| |
-----------------------------------------------------------------------------------------------------------------------------------
Page 26/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
-----------------------------------------------------------------------------------------------------------------------------------
| rtd. V Voltage c- Sk" Ik" ip Ib Sb |
| [kV] Phase [kV] [p.u.] [deg] Factor [MVA] [kA] [deg] [kA] [kA] [MVA] |
-----------------------------------------------------------------------------------------------------------------------------------
|Feeder_Dirty 33.00 A 0.00 0.00 0.00 1.0 6.35 0.33 -21.67 0.87 0.33 6.35 |
| B 32.24 1.69 -150.92 0.00 0.00 0.00 0.00 0.00 0.00 |
| C 33.09 1.74 148.36 0.00 0.00 0.00 0.00 0.00 0.00 |
| |
|IF BB 11.00 A 0.00 0.00 0.00 1.0 1.85 0.29 -14.19 0.73 0.29 1.85 |
| B 10.81 1.70 -150.86 0.00 0.00 0.00 0.00 0.00 0.00 |
| C 11.05 1.74 148.71 0.00 0.00 0.00 0.00 0.00 0.00 |
| |
|IF Cabin Supply 11.00 A 0.00 0.00 0.00 1.0 1.87 0.29 -13.03 0.80 0.29 1.87 |
| B 10.84 1.71 -150.87 0.00 0.00 0.00 0.00 0.00 0.00 |
| C 11.06 1.74 148.82 0.00 0.00 0.00 0.00 0.00 0.00 |
| |
|LF Switchboard 33.00 A 0.00 0.00 0.00 1.0 5.17 0.27 -40.40 0.75 0.27 5.17 |
| B 26.14 1.37 -155.18 0.00 0.00 0.00 0.00 0.00 0.00 |
| C 32.38 1.70 137.10 0.00 0.00 0.00 0.00 0.00 0.00 |
| |
|MSS6.6kV 6.60 A 0.00 0.00 0.00 1.0 0.36 0.10 -1.50 0.24 0.10 0.36 |
| B 6.53 1.71 -150.82 0.00 0.00 0.00 0.00 0.00 0.00 |
| C 6.65 1.75 149.06 0.00 0.00 0.00 0.00 0.00 0.00 |
| |
|RM 11.00 A 0.00 0.00 0.00 1.0 1.84 0.29 -12.59 0.75 0.29 1.84 |
| B 10.70 1.69 -151.43 0.00 0.00 0.00 0.00 0.00 0.00 |
| C 11.10 1.75 147.87 0.00 0.00 0.00 0.00 0.00 0.00 |
| |
|STATCOM SWB 33.00 A 0.00 0.00 0.00 1.0 6.35 0.33 -21.68 0.87 0.33 6.35 |
| B 32.24 1.69 -150.92 0.00 0.00 0.00 0.00 0.00 0.00 |
| C 33.09 1.74 148.36 0.00 0.00 0.00 0.00 0.00 0.00 |
| |
|SWG1 11.00 A 0.00 0.00 0.00 1.0 1.84 0.29 -12.30 0.76 0.29 1.84 |
| B 10.71 1.69 -151.43 0.00 0.00 0.00 0.00 0.00 0.00 |
| C 11.11 1.75 147.90 0.00 0.00 0.00 0.00 0.00 0.00 |
| |
|SWG2 11.00 A 0.00 0.00 0.00 1.0 1.84 0.29 -12.29 0.76 0.29 1.84 |
| B 10.71 1.69 -151.43 0.00 0.00 0.00 0.00 0.00 0.00 |
| C 11.11 1.75 147.90 0.00 0.00 0.00 0.00 0.00 0.00 |
| |
|SYN01-a 33.00 A 0.00 0.00 0.00 1.0 3.14 0.16 -21.58 0.42 0.16 3.14 |
| B 31.90 1.67 -151.21 0.00 0.00 0.00 0.00 0.00 0.00 |
| C 33.12 1.74 147.57 0.00 0.00 0.00 0.00 0.00 0.00 |
| |
|SYN01-b 33.00 A 0.00 0.00 0.00 1.0 3.14 0.16 -21.58 0.42 0.16 3.14 |
| B 31.90 1.67 -151.21 0.00 0.00 0.00 0.00 0.00 0.00 |
| C 33.12 1.74 147.57 0.00 0.00 0.00 0.00 0.00 0.00 |
| |
-----------------------------------------------------------------------------------------------------------------------------------
Page 27/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
-----------------------------------------------------------------------------------------------------------------------------------
| rtd. V Voltage c- Sk" Ik" ip Ib Sb |
| [kV] Phase [kV] [p.u.] [deg] Factor [MVA] [kA] [deg] [kA] [kA] [MVA] |
-----------------------------------------------------------------------------------------------------------------------------------
|SYN01-c 33.00 A 0.00 0.00 0.00 1.0 3.14 0.16 -21.58 0.42 0.16 3.14 |
| B 31.90 1.67 -151.21 0.00 0.00 0.00 0.00 0.00 0.00 |
| C 33.12 1.74 147.57 0.00 0.00 0.00 0.00 0.00 0.00 |
| |
|SYN01-d 33.00 A 0.00 0.00 0.00 1.0 6.35 0.33 -21.67 0.87 0.33 6.35 |
| B 32.24 1.69 -150.92 0.00 0.00 0.00 0.00 0.00 0.00 |
| C 33.09 1.74 148.36 0.00 0.00 0.00 0.00 0.00 0.00 |
| |
|T-GT1 11.00 A 0.00 0.00 0.00 1.0 0.01 0.00 89.35 0.00 0.00 0.01 |
| B 11.00 1.73 -150.00 0.00 0.00 0.00 0.00 0.00 0.00 |
| C 11.00 1.73 150.00 0.00 0.00 0.00 0.00 0.00 0.00 |
| |
|T-GT2 11.00 A 0.00 0.00 0.00 1.0 0.00 0.00 85.50 0.00 0.00 0.00 |
| B 11.00 1.73 -150.00 0.00 0.00 0.00 0.00 0.00 0.00 |
| C 11.00 1.73 150.00 0.00 0.00 0.00 0.00 0.00 0.00 |
| |
|T-GT4 11.00 A 0.00 0.00 0.00 1.0 0.00 0.00 85.50 0.00 0.00 0.00 |
| B 11.00 1.73 -150.00 0.00 0.00 0.00 0.00 0.00 0.00 |
| C 11.00 1.73 150.00 0.00 0.00 0.00 0.00 0.00 0.00 |
| |
|T-GT5 11.00 A 0.00 0.00 0.00 1.0 0.00 0.00 85.50 0.00 0.00 0.00 |
| B 11.00 1.73 -150.00 0.00 0.00 0.00 0.00 0.00 0.00 |
| C 11.00 1.73 150.00 0.00 0.00 0.00 0.00 0.00 0.00 |
| |
|Term132_1 132.00 A 0.00 0.00 0.00 1.0 344.17 4.52 -84.48 11.23 4.52 344.17 |
| B 72.64 0.95 -114.20 0.00 0.00 0.00 0.00 0.00 0.00 |
| C 72.16 0.95 113.71 0.00 0.00 0.00 0.00 0.00 0.00 |
| |
|TermESTATE 11.00 A 0.00 0.00 0.00 1.0 1.80 0.28 -12.50 0.62 0.28 1.80 |
| B 10.65 1.68 -151.27 0.00 0.00 0.00 0.00 0.00 0.00 |
| C 11.05 1.74 147.71 0.00 0.00 0.00 0.00 0.00 0.00 |
| |
|TermIF 33.00 A 0.00 0.00 0.00 1.0 6.34 0.33 -21.79 0.86 0.33 6.34 |
| B 32.23 1.69 -150.91 0.00 0.00 0.00 0.00 0.00 0.00 |
| C 33.09 1.74 148.35 0.00 0.00 0.00 0.00 0.00 0.00 |
| |
|TermShunt 0.69 A 0.00 0.00 0.00 0.9 91.29 229.17 -88.01 617.65 229.17 91.29 |
| B 0.34 0.85 -101.91 0.00 0.00 0.00 0.00 0.00 0.00 |
| C 0.33 0.84 100.72 0.00 0.00 0.00 0.00 0.00 0.00 |
| |
|TermTrLF 33.00 A 0.00 0.00 0.00 1.0 5.15 0.27 -40.56 0.75 0.27 5.15 |
| B 26.14 1.37 -155.09 0.00 0.00 0.00 0.00 0.00 0.00 |
| C 32.35 1.70 137.12 0.00 0.00 0.00 0.00 0.00 0.00 |
| |
| |
-----------------------------------------------------------------------------------------------------------------------------------
Page 28/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
-----------------------------------------------------------------------------------------------------------------------------------
| Fault Locations |
| Short-Circuit Calculation / Method : IEC 60909 Single Phase to Ground / Max. Short-Circuit Currents |
-----------------------------------------------------------------------------------------------------------------------------------
| Asynchronous Motors | Grid Identification | Short-Circuit Duration |
| Always Considered | Automatic | Break Time 0.10 s |
| | | Fault Clearing Time (Ith) 1.00 s |
| | Conductor Temperature | Voltage factor c |
| | User Defined No | Standard defined table |
| | | |
-----------------------------------------------------------------------------------------------------------------------------------
| rtd. V Voltage c- Sk" Ik" ip Ib Sb |
| [kV] Phase [kV] [p.u.] [deg] Factor [MVA] [kA] [deg] [kA] [kA] [MVA] |
-----------------------------------------------------------------------------------------------------------------------------------
|11kV Metal Clad 11.00 A 0.00 0.00 0.00 1.1 2.03 0.32 -11.62 0.79 0.32 2.03 |
| B 11.86 1.87 -151.01 0.00 0.00 0.00 0.00 0.00 0.00 |
| C 12.17 1.92 148.46 0.00 0.00 0.00 0.00 0.00 0.00 |
| |
|ASP 11.00 A 0.00 0.00 0.00 1.1 2.01 0.32 -11.88 0.74 0.32 2.01 |
| B 11.84 1.86 -150.99 0.00 0.00 0.00 0.00 0.00 0.00 |
| C 12.16 1.91 148.38 0.00 0.00 0.00 0.00 0.00 0.00 |
| |
|CLEAN 33.00 A 0.00 0.00 0.00 1.1 3.46 0.18 -21.15 0.45 0.18 3.46 |
| B 35.29 1.85 -150.98 0.00 0.00 0.00 0.00 0.00 0.00 |
| C 36.38 1.91 148.00 0.00 0.00 0.00 0.00 0.00 0.00 |
| |
|DIRTY 33.00 A 0.00 0.00 0.00 1.1 7.00 0.37 -21.48 0.97 0.37 7.00 |
| B 35.56 1.87 -150.83 0.00 0.00 0.00 0.00 0.00 0.00 |
| C 36.40 1.91 148.55 0.00 0.00 0.00 0.00 0.00 0.00 |
| |
|DIRTY-dummy 33.00 A 0.00 0.00 0.00 1.1 7.00 0.37 -21.48 0.97 0.37 7.00 |
| B 35.56 1.87 -150.83 0.00 0.00 0.00 0.00 0.00 0.00 |
| C 36.40 1.91 148.55 0.00 0.00 0.00 0.00 0.00 0.00 |
| |
|EAF Switchboard 33.00 A 0.00 0.00 0.00 1.1 6.99 0.37 -21.57 0.96 0.37 6.99 |
| B 35.56 1.87 -150.82 0.00 0.00 0.00 0.00 0.00 0.00 |
| C 36.39 1.91 148.54 0.00 0.00 0.00 0.00 0.00 0.00 |
| |
|Estate 11.00 A 0.00 0.00 0.00 1.1 2.01 0.32 -11.81 0.73 0.32 2.01 |
| B 11.83 1.86 -150.98 0.00 0.00 0.00 0.00 0.00 0.00 |
| C 12.15 1.91 148.36 0.00 0.00 0.00 0.00 0.00 0.00 |
| |
-----------------------------------------------------------------------------------------------------------------------------------
Page 29/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
-----------------------------------------------------------------------------------------------------------------------------------
| rtd. V Voltage c- Sk" Ik" ip Ib Sb |
| [kV] Phase [kV] [p.u.] [deg] Factor [MVA] [kA] [deg] [kA] [kA] [MVA] |
-----------------------------------------------------------------------------------------------------------------------------------
|Feeder_Dirty 33.00 A 0.00 0.00 0.00 1.1 7.00 0.37 -21.48 0.97 0.37 7.00 |
| B 35.56 1.87 -150.83 0.00 0.00 0.00 0.00 0.00 0.00 |
| C 36.40 1.91 148.55 0.00 0.00 0.00 0.00 0.00 0.00 |
| |
|IF BB 11.00 A 0.00 0.00 0.00 1.1 2.04 0.32 -14.15 0.83 0.32 2.04 |
| B 11.90 1.87 -150.85 0.00 0.00 0.00 0.00 0.00 0.00 |
| C 12.16 1.91 148.77 0.00 0.00 0.00 0.00 0.00 0.00 |
| |
|IF Cabin Supply 11.00 A 0.00 0.00 0.00 1.1 2.05 0.32 -12.98 0.88 0.32 2.05 |
| B 11.93 1.88 -150.84 0.00 0.00 0.00 0.00 0.00 0.00 |
| C 12.17 1.92 148.88 0.00 0.00 0.00 0.00 0.00 0.00 |
| |
|LF Switchboard 33.00 A 0.00 0.00 0.00 1.1 5.70 0.30 -40.29 0.83 0.30 5.70 |
| B 28.84 1.51 -155.17 0.00 0.00 0.00 0.00 0.00 0.00 |
| C 35.65 1.87 137.23 0.00 0.00 0.00 0.00 0.00 0.00 |
| |
|MSS6.6kV 6.60 A 0.00 0.00 0.00 1.1 0.40 0.10 -1.22 0.26 0.10 0.40 |
| B 7.20 1.89 -150.62 0.00 0.00 0.00 0.00 0.00 0.00 |
| C 7.30 1.92 149.27 0.00 0.00 0.00 0.00 0.00 0.00 |
| |
|RM 11.00 A 0.00 0.00 0.00 1.1 2.03 0.32 -11.94 0.78 0.32 2.03 |
| B 11.85 1.87 -151.01 0.00 0.00 0.00 0.00 0.00 0.00 |
| C 12.17 1.92 148.43 0.00 0.00 0.00 0.00 0.00 0.00 |
| |
|STATCOM SWB 33.00 A 0.00 0.00 0.00 1.1 6.99 0.37 -21.50 0.97 0.37 6.99 |
| B 35.56 1.87 -150.83 0.00 0.00 0.00 0.00 0.00 0.00 |
| C 36.40 1.91 148.55 0.00 0.00 0.00 0.00 0.00 0.00 |
| |
|SWG1 11.00 A 0.00 0.00 0.00 1.1 2.03 0.32 -11.64 0.79 0.32 2.03 |
| B 11.86 1.87 -151.01 0.00 0.00 0.00 0.00 0.00 0.00 |
| C 12.17 1.92 148.46 0.00 0.00 0.00 0.00 0.00 0.00 |
| |
|SWG2 11.00 A 0.00 0.00 0.00 1.1 2.03 0.32 -11.63 0.79 0.32 2.03 |
| B 11.86 1.87 -151.01 0.00 0.00 0.00 0.00 0.00 0.00 |
| C 12.17 1.92 148.46 0.00 0.00 0.00 0.00 0.00 0.00 |
| |
|SYN01-a 33.00 A 0.00 0.00 0.00 1.1 3.46 0.18 -21.13 0.45 0.18 3.46 |
| B 35.29 1.85 -150.98 0.00 0.00 0.00 0.00 0.00 0.00 |
| C 36.38 1.91 148.00 0.00 0.00 0.00 0.00 0.00 0.00 |
| |
|SYN01-b 33.00 A 0.00 0.00 0.00 1.1 3.46 0.18 -21.13 0.45 0.18 3.46 |
| B 35.29 1.85 -150.98 0.00 0.00 0.00 0.00 0.00 0.00 |
| C 36.38 1.91 148.00 0.00 0.00 0.00 0.00 0.00 0.00 |
| |
-----------------------------------------------------------------------------------------------------------------------------------
Page 30/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
-----------------------------------------------------------------------------------------------------------------------------------
| rtd. V Voltage c- Sk" Ik" ip Ib Sb |
| [kV] Phase [kV] [p.u.] [deg] Factor [MVA] [kA] [deg] [kA] [kA] [MVA] |
-----------------------------------------------------------------------------------------------------------------------------------
|SYN01-c 33.00 A 0.00 0.00 0.00 1.1 3.46 0.18 -21.13 0.45 0.18 3.46 |
| B 35.29 1.85 -150.98 0.00 0.00 0.00 0.00 0.00 0.00 |
| C 36.38 1.91 148.00 0.00 0.00 0.00 0.00 0.00 0.00 |
| |
|SYN01-d 33.00 A 0.00 0.00 0.00 1.1 7.00 0.37 -21.48 0.97 0.37 7.00 |
| B 35.56 1.87 -150.83 0.00 0.00 0.00 0.00 0.00 0.00 |
| C 36.40 1.91 148.55 0.00 0.00 0.00 0.00 0.00 0.00 |
| |
|T-GT1 11.00 A 0.00 0.00 0.00 1.1 0.01 0.00 89.35 0.00 0.00 0.01 |
| B 12.10 1.91 -150.00 0.00 0.00 0.00 0.00 0.00 0.00 |
| C 12.10 1.91 150.00 0.00 0.00 0.00 0.00 0.00 0.00 |
| |
|T-GT2 11.00 A 0.00 0.00 0.00 1.1 0.00 0.00 85.50 0.00 0.00 0.00 |
| B 12.10 1.91 -150.00 0.00 0.00 0.00 0.00 0.00 0.00 |
| C 12.10 1.91 150.00 0.00 0.00 0.00 0.00 0.00 0.00 |
| |
|T-GT4 11.00 A 0.00 0.00 0.00 1.1 0.00 0.00 85.50 0.00 0.00 0.00 |
| B 12.10 1.91 -150.00 0.00 0.00 0.00 0.00 0.00 0.00 |
| C 12.10 1.91 150.00 0.00 0.00 0.00 0.00 0.00 0.00 |
| |
|T-GT5 11.00 A 0.00 0.00 0.00 1.1 0.00 0.00 85.50 0.00 0.00 0.00 |
| B 12.10 1.91 -150.00 0.00 0.00 0.00 0.00 0.00 0.00 |
| C 12.10 1.91 150.00 0.00 0.00 0.00 0.00 0.00 0.00 |
| |
|Term132_1 132.00 A 0.00 0.00 0.00 1.1 588.93 7.73 -84.42 19.17 7.73 588.93 |
| B 81.05 1.06 -116.09 0.00 0.00 0.00 0.00 0.00 0.00 |
| C 80.68 1.06 115.82 0.00 0.00 0.00 0.00 0.00 0.00 |
| |
|TermESTATE 11.00 A 0.00 0.00 0.00 1.1 2.00 0.32 -11.95 0.68 0.32 2.00 |
| B 11.81 1.86 -150.95 0.00 0.00 0.00 0.00 0.00 0.00 |
| C 12.14 1.91 148.28 0.00 0.00 0.00 0.00 0.00 0.00 |
| |
|TermIF 33.00 A 0.00 0.00 0.00 1.1 6.99 0.37 -21.61 0.96 0.37 6.99 |
| B 35.55 1.87 -150.83 0.00 0.00 0.00 0.00 0.00 0.00 |
| C 36.39 1.91 148.54 0.00 0.00 0.00 0.00 0.00 0.00 |
| |
|TermShunt 0.69 A 0.00 0.00 0.00 1.0 107.06 268.74 -88.39 730.79 268.74 107.06 |
| B 0.38 0.94 -102.48 0.00 0.00 0.00 0.00 0.00 0.00 |
| C 0.37 0.93 101.52 0.00 0.00 0.00 0.00 0.00 0.00 |
| |
|TermTrLF 33.00 A 0.00 0.00 0.00 1.1 5.68 0.30 -40.46 0.83 0.30 5.68 |
| B 28.84 1.51 -155.10 0.00 0.00 0.00 0.00 0.00 0.00 |
| C 35.61 1.87 137.25 0.00 0.00 0.00 0.00 0.00 0.00 |
| |
| |
-----------------------------------------------------------------------------------------------------------------------------------
Page 31/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Page 32/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Branch GT-1/2/4/5
Instrument Transformer
Main Settings
Code Ratio
IEC / ANSI / Manufacturers’ Voltage Voltage Voltage
CT VT Time Characteristic
[pri.V] [sec.V] [p.u.]
U< [27] - 11000V/110V 8250 82.50 0.75 1.50 Definite
U< [27] - 11000V/110V 13200 132.00 1.20 1.50 Definite
U> [59] - 11000V/110V 9350 93.50 0.85 3.00 Definite
U> [59] - 11000V/110V 12320 123.20 1.12 3.00 Definite
U0> [59N] - 11000V/110V 1100 11.00 0.10 3.00 Definite
The undervoltage and overvoltage protections are strongly dependent by the generators characteristics and by the Grid Code of the Nigerian
TSO when the plant is interconnected to the synchronous system. The above settings are proposed only for the islanded operation.
Page 33/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Branch GT-1/2/4/5
Instrument Transformer
Main Settings
Code Ratio
IEC / ANSI / Manufacturers’ Frequency Frequency
CT VT Time Characteristic
[Hz] [p.u.]
f<2 [81] - 11000V/110V 46.50 46.50 1.00 Definite
f<1 [81] - 11000V/110V 47.50 47.50 4.00 Definite
f>1 [81] - 11000V/110V 51.50 51.50 4.00 Definite
The underfrequency and overfrequency protections are strongly dependent by the generators characteristics and by the Grid Code of the Nigerian
TSO when the plant is interconnected to the synchronous system. The above settings are proposed only for the islanded operation. In addition
ROCOF (rate of frequency protection) shall be enabled.
Branch GT-1
Instrument Transformer
Main Settings
Code Ratio
IEC / ANSI / Manufacturers’ Current Current Current
CT VT Time Characteristic Directional
[pri.A] [sec.A] [p.u.]
I2> [46] 1000A/5A - 40 0.20 0.04 60.00 IEC Class C (Extremely Inverse) None
I2>> [46] 1000A/5A 0 - 530 2.65 0.53 1.50 Definite None
I>t [51] 1000A/5A - 850 4.25 0.85 0.33 IEC 255-3 extremely inverse None
I> [50] 1000A/5A 0 - 1400 7.00 1.40 0.80 Definite None
Page 34/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Branch GT-1
Instrument Transformer
Main Settings
Code Ratio
IEC / ANSI / Manufacturers’ K1 [40] K2 [40] Qo1 [40] Qo2 [40]
CT VT Time Characteristic U<
P1 [32] P2 [32] Q1 [32] Q2 [32]
Loss of excitation [40] 1000A/5A 11000V/110V 0 - 0.22 - 3.00 Definite 0.7
Antimotoring (reverse power) [32] 1000A/5A 11000V/110V < 0.02 - - - 2.00 Definite 0.7
If available, the generator C.B. failure protection settings are reported in the following table:
Branch GT-1
Instrument Transformer
Main Settings
Code Ratio
IEC / ANSI / Manufacturers’ Current Current
CT VT Time Characteristic
[pri.A] [p.u.]
Generator C.B. failure protection 50BF 1000A/5A - 120.0 0.12 0.5 Definite
Page 35/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Current Transformer CT 1 Ratio 400/5 Winding 2 adapter Current transformer ratio 2.5
DIgSILENT
2500.0
Release Threshold [pu] 0.20
[-]
5th Harmonic Blocking [%] 35 11.00 kV 0.0000 3600.0 7200.0 10800. 14400. 18000.
T-GT4\Cub_2\GT-4 - 87
Page 36/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Branch GT-2/4/5
Instrument Transformer
Main Settings
Code Ratio
IEC / ANSI / Manufacturers’ Current Current Current
CT VT Time Characteristic Directional
[pri.A] [sec.A] [p.u.]
I2> [46] 1250A/5A - 50 0.20 0.04 60.00 IEC Class C (Extremely Inverse) None
I2>> [46] 1250A/5A - 537 2.15 0.43 1.50 Definite None
I>t [51] 1250A/5A - 900 3.60 0.72 0.33 IEC 255-3 very inverse None
I> [50] 1250A/5A 0 - 1637 6.55 1.31 0.80 Definite None
Instrument Transformer
Main Settings
Code Ratio
Branch
IEC / ANSI / Manufacturers’ K1 [40] K2 [40] Qo1 [40] Qo2 [40]
CT VT Time Caracteristic U<
P1 [32] P2 [32] Q1 [32] Q2 [32]
Loss of excitation [40] GT-2/4/5 1250A/5A 11000V/110V 0 - 0.22 - 3.00 Definite 0.7
Antimotoring (reverse power) [32] GT-2/4/5 1250A/5A 11000V/110V < 0.02 - - - 2.00 Definite 0.7
If available, the generator C.B. failure protection settings are reported in the following table:
Page 37/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Branch GT-2/4/5
Instrument Transformer
Main Settings
Code Ratio
IEC / ANSI / Manufacturers’ Current Current
CT VT Time Characteristic
[pri.A] [p.u.]
Generator C.B. failure protection 50BF 1250A/5A - 125.0 0.1 0.5 Definite
Page 38/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Current Transformer CT 1 Ratio 400/5 Winding 2 adapter Current transformer ratio 3.1
DIgSILENT
2500.0
Release Threshold [pu] 0.20
[-]
5th Harmonic Blocking [%] 35 11.00 kV 0.0000 3600.0 7200.0 10800. 14400. 18000.
T-GT4\Cub_2\GT-4 - 87
Page 39/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Branch GT-2
Branch GT-2
Page 40/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Relay Model -
Page 41/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
TR2 132/33kV
Branch Nominal voltage [kV] 132
QTR2
DIgSILENT
2500.00
Release Threshold [pu] 0.20
[-]
5th Harmonic Blocking [%] 35 11.00 kV 0.0000 3600.0 7200.0 10800. 14400. 18000.
Internal BB\Cub_1\Feeder GT4 - 87
Page 42/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
The Three-phase current inrush detection INRPHAR function shall be set “on” due to harmonic generated while transformers.
Start value: 15%
Operate delay time: 10 s
Page 43/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Page 44/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Current Transformer CT 1 Ratio 400/5 Winding 2 adapter Current transformer ratio 3.1
DIgSILENT
2500.00
Release Threshold [pu] 0.20
[-]
5th Harmonic Blocking [%] 35 11.00 kV 0.0000 3600.0 7200.0 10800. 14400. 18000.
Internal BB\Cub_1\Feeder GT4 - 87
Page 45/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Page 46/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Page 47/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Page 48/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Branch EAF-AH1
Cubicle QD1
Branch LF-AH1
Cubicle QD2
Page 49/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Branch DBT-W60001/2/3
Cubicle QD3
Branch F-L-4.2
Cubicle QD4
Page 50/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Branch DTB-6014/15/16
Cubicle QD5
Page 51/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Page 52/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Page 53/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Page 54/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Page 55/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Page 56/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Page 57/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Branch F-L-1
Cubicle QC1
Branch CLB-6001/2/3/4/5/6
Cubicle QC2
Page 58/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Branch F-L-4.1
Cubicle QC3
Page 59/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Page 60/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Page 61/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Page 62/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Branch EAF-AH1
Cubicle MSP
Page 63/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Page 64/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Page 65/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
5.7 LF SWITCHBOARD
Page 66/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Page 67/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Branch DBT-W60001/2/3
Cubicle Q0
Page 68/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Branch STATCOM Tr
Cubicle Q0
Page 69/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Page 70/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Relay Model -
Branches NER-11kV_IF
Cubicles -
A suitable relay should be installed with a appropriate differential function [87] in order
to detect any internal fault to the zig-zag transformers. The output signal should send a
general tripping signal to the complete 11 kV portion and/or a warning signal to the
operator.
Branch I.F.-W6001
Cubicle A02
Page 71/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
5.10 IF SWG
Relay Model -
Relay Model -
Branch IF Transformer
Cubicle -
Page 72/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Page 73/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Relay Model -
Branches NER-11kV_C
Cubicles -
A suitable relay should be installed with a appropriate differential function [87] in order
to detect any internal fault to the zig-zag transformers. The output signal should send a
general tripping signal to the complete 11 kV portion and/or a warning signal to the
operator.
Page 74/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Branch NC-SWG1
Cubicle A02
Branch NC-SWG2
Cubicle A03
Page 75/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Page 76/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Branch NC-SWG1
Cubicle 63006
Relay Model -
Page 77/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Relay Model -
Relay Model -
Page 78/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Branch NC-SWG2
Cubicle C62001
Branch DC-11AH1-0
Cubicle C62004
Page 79/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Branch SB-11AH1-0
Cubicle C62005
Branch KZF-11AH1
Cubicle C62006
Page 80/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Branch LG-11AH1-0
Cubicle C62007
Branch LZ-11AH1-0
Cubicle C62008
Page 81/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Branch CCFJ-11AH1
Cubicle C62009
Branch CC-11AH1-0
Cubicle C62012
Page 82/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Branch KZF-11AH1
Cubicle 05
Branch T27
Cubicle 01
Page 83/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Relay Model -
Relay Model -
Page 84/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Relay Model -
Relay Model -
Page 85/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Branch T28
Cubicle 11
Page 86/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Branch T21-MSS6.6kV
Cubicle A01
Page 87/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Branch FAN1
Cubicle A02
Page 88/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Branch FAN2
Cubicle A03
Page 89/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Page 90/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Page 91/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
Page 92/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission
Project: SMC - Protection Relay Coordination Study Issue date: 16.05.2018
Our Ref: SMC004 Rev.: 00
REFERENCES
[1] Network Protection & Automation Guide, Protective Relays, Measurement & Control,
ALSTOM, Edition May 2011
[2] SEB UAR4N Digital Under- And Overvoltage Multifunction Relay, User Manual
[3] ING4N Digital Multifunction Generator Protection Relay, User Manual
[4] HAR1N Frequency And Overfluxing Digital Multifunction Relay, User Manual
[5] IDT8N Digital Percentage Biased Transformer Differential Protection Relay, User
Manual
[6] PQR4N Digital Multifunction Generator Protection Relay For Loss Of Excitation,
Antimotoring And Rotor Earth Fault, User Manual
[7] ZFP8N Generator Out-Of-Step Protection Relay, User Manual
[8] ABB REC650 Relay, Technical Manual
[9] ABB REF630 Relay, Technical Manual
[10] ABB RET630 Relay, Technical Manual
[11] SNP-3313, Instructions
[12] SNP-3316, Instructions
[13] DPL-100EC2(C3) type microprocessor based line protection and monitoring device,
User Manual
Page 93/93 2018 © WEIDMANN Electrical Technology AG. Cannot be distributed without permission