DOCUMENT TITLE
BLASTING & PAINTING APPLICATION FOR
STORAGE TANK AT SABTANK
JOB NO : XXXXXXX-MS
1
METHOD STATEMENT FOR BLASTING & PAINTING WORKS AT SABTANK
DOCUMENT TITLE
BLASTING & PAINTING APPLICATION FOR
STORAGE TANK AT SABTANK
INDEX
1.0 Purpose 3
2.0 References 3
3.0 Scope 3
4.0 Responsibility 5
9.0 Attachments 11
2
METHOD STATEMENT FOR BLASTING & PAINTING WORKS AT SABTANK
DOCUMENT TITLE
BLASTING & PAINTING APPLICATION FOR
STORAGE TANK AT SABTANK
1.0 PURPOSE
This method statement covers the requirements for material and application of coating
activities to PYGAS TF1-T-1301 storage tank Roof, Structure, handrails and external
shall at SABTANK-Yanbu.
1.1 PRIORITY
1.1.1 Any conflict exists between the requirements of the listed standards, specifications
and this method statement should immediately be brought to the attention of
SABTANK, and an acceptable solution must be reached.
1.1.2 Wherever a difference exists between the method statement & specification, the
specification shall govern. However, no deviations shall be made from the
specification without written authorization from SABTANK.
1.1.3 All the applicable procedures of this method statement required to be understood by
the operatives must be explained by their respective supervisor / foreman and record
of explanation and operative’s understanding shall be maintained on Toolbox talk
form.
2.0 REFERENCES
PAINTING SPECIFICATION
Document No. Document Title Rev No Rev Date
SES T01-S01 Sabic Coating Standards 03 Dec 2021
3.0 SCOPE
3.1 MATERIALS
3.1.1 Alyami shall deliver all painting equipment / accessories to site used for this project and
shall ensure that all equipment / accessories are suitable for the purpose to be used.
3.1.2 All painting materials to be used in this project shall be in accordance with the project
specification SES T01-S01.
3.1.3 The materials for primer coat and finish (final) coat shall be from one manufacturer only.
Mixing components or coats from different systems of the same manufacturer or other
manufacturer shall be avoided.
3
METHOD STATEMENT FOR BLASTING & PAINTING WORKS AT SABTANK
DOCUMENT TITLE
BLASTING & PAINTING APPLICATION FOR
STORAGE TANK AT SABTANK
3.2.2 ELECTRICAL
Junction Boxes and Electrical Lead.
3.3.2 The temperature reading of the storage area shall be recorded twice and logged on daily
basis.
3.3.3 All painting materials shall be handled in accordance with the manufacturer's written
recommendations and shall be brought to the point of application in original sealed
cans, supplied and delivered in labeled containers.
The labels shall be legible at the time of application and if possible, shall include:
Brand Name/Name of Manufacturer
Formula or Specification Number
Color
Manufacturer's Application Instruction
Validity date
4
METHOD STATEMENT FOR BLASTING & PAINTING WORKS AT SABTANK
DOCUMENT TITLE
BLASTING & PAINTING APPLICATION FOR
STORAGE TANK AT SABTANK
3.3.4 All other accessories of painting equipments shall be stored in a way that it is protected
from exposure to weather e.g. heat, rain, dirt, etc.
3.3.5 Only the materials that shall be used in each workday shall be stored in the immediate
work area. All materials shall be stored at locations designated and allotted by
SABTANK.
4.0 RESPONSIBILITY
4.4 LABORS
All labors shall carry out their assigned task in accordance with the site in charge
instructions.
5.1.2 Prior to start of abrasive blasting, Alyami shall ensure that any visible surface
discontinuities such as welding spatters, slag, flux deposits, dents, laminations,
undercuts, porosities, etc. are removed by SABTANK.
5.1.4 Blow the entire area with clean, dry compressed air to remove all dust.
5.1.5 Clean, dry, oil free air shall be used to remove dust from the surfaces after
preparation. It may be necessary to clean by brushing.
5
METHOD STATEMENT FOR BLASTING & PAINTING WORKS AT SABTANK
DOCUMENT TITLE
BLASTING & PAINTING APPLICATION FOR
STORAGE TANK AT SABTANK
5.2.2 Coated Surfaces shall be prepared by full blasting using recycled abrasive to remove
old, contaminated paint and its particles from surface, prior to coating surface shall be
sweep blasting using new abrasive to achieve as per Sa2.5 equivalent to SSPC-SP10.
5.2.3 Abrasive blast cleaning and painting shall not be carried out together in the same area
nor shall abrasive cleaning be carried out in proximity of recently applied paint.
5.2.6 Particular attention shall be paid to joints, angles, pits and weld areas to ensure that
their surfaces are brought to the required standard. After blasting, all dust and grits
shall be removed from pockets and corners using clean and dry compressed air.
Between cleaning and priming, the substrate shall not allow to be contaminated. All
surfaces shall be prime coated before discoloration occurs and all cases within four
hours of blast cleaning.
5.2.7 Surfaces not prime coated within prescribed time after blast cleaning for any reason
shall be cleaned again with care before primer is applied.
6.1.1 Coatings shall be applied in accordance with the specification SES T01-S01 and the
manufacturer’s instructions.
6.1.2 All Painting activities to be carried out within 04 hours after completion of Blasting.
6.1.3 Stripe coat to be done for Weld Joints, Edges, Corners etc.
6.1.5 Spray Tip range should be range as per manufacturer data sheet
6
METHOD STATEMENT FOR BLASTING & PAINTING WORKS AT SABTANK
DOCUMENT TITLE
BLASTING & PAINTING APPLICATION FOR
STORAGE TANK AT SABTANK
6.1.7 The Alyami painting inspector shall verify that the coating has been applied to provide
a uniform film of the specified thickness is well bonded to the metal or previously
applied coating is free of laps, streaks, sags, or other visually evident defects and
was applied within the manufacturer’s specified pot life.
6.1.8 The information related to ambient conditions surface cleanliness, mixing, application,
and cure shall be recorded with minimum and maximum allowable tolerances as per
manufacturer’s product data sheet in line with inspection frequency requirements.
6.1.9 The method of application shall be as specified in the painting system schedules and
data sheets.
6.1.10 Prior to starting of paint works, ensure all the areas to be painted are pre-cleaned and
surface is properly prepared.
6.1.11 Only qualified personnel, thoroughly familiar and experienced with painting application,
shall be employed for this work.
6.1.12 The thinners provided by the manufacturer to thin the paint shall be mixed in
proportions recommended by the paint manufacturer.
6.1.13 Apply coating to clean and dry surfaces. The temperature of the air, paint, or metal
shall be as per the manufacturer’s technical data sheet.
6.1.14 Paint shall be applied so that an even film of uniform thickness, tint and consistency
covers the entire surface, and is free of pin holes, blisters, dry spray, detrimental runs
and sags, excessive or inadequate film build, foreign inclusions etc.
6.1.15 The application of coating shall be avoided in case the air is misty and when the
surfaces are damp or frosted.
6.1.16 Painters shall be issued with proper wet film thickness gauges and shall use it for
frequent checks on applied wet film.
6.1.17 Dry film thickness - DFT shall be tested by gauges which are periodically calibrated for
accurate measurement.
Paint System
SES PCS-03
6.1.18 Multiple coat application - each coating of multiple coat system shall be tinted
7
METHOD STATEMENT FOR BLASTING & PAINTING WORKS AT SABTANK
DOCUMENT TITLE
BLASTING & PAINTING APPLICATION FOR
STORAGE TANK AT SABTANK
differently from the others so that MISSED areas will be visually apparent.
6.1.19 Preparation of surfaces between coats - Immediately before each coating after the first
(except those prescribed by the manufacturer as wet-on-wet), the surface shall be
examined to determine its need for cleaning and preparation to accept subsequent
coats. If grease or oil is present, it shall be removed by a suitable of non - ionic
detergent and then pressure - hosed. The same treatment shall be given to areas
from which grease or oil has been removed.
6.1.20 Timing of coatings - Except for coatings designated by the manufacturers as wet on
wet, coatings shall be applied only under the following conditions: -
The surface has been cleaned and dried.
The manufacturer's specified minimum time for recoat has elapsed.
The manufacturer's specified maximum time for recoat has not elapsed.
6.2.2 The operator of spray equipment shall be experienced in its use and shall be
responsible for maintaining it in good working order.
6.2.3 Material hoses and container shall be thoroughly cleaned before different materials
are introduced.
6.2.4 At regular intervals of application, the applicator is to conduct wet film checks to
ensure that the desired coating thickness is being achieved.
6.2.5 When excessive coating has been applied, excess materials shall be brushed out
immediately.
6.2.8 During application of inorganic zinc, equip paint containers with a mechanical agitator
so that the mixture is in motion at regular intervals during the application period.
8
METHOD STATEMENT FOR BLASTING & PAINTING WORKS AT SABTANK
DOCUMENT TITLE
BLASTING & PAINTING APPLICATION FOR
STORAGE TANK AT SABTANK
6.4.2 Primer shall only be applied to the surface which has been prepared and cleaned in
accordance with the specification.
6.4.3 Paint shall be applied by conventional spray or airless spray as per the specification
and manufacturer’s data sheets.
6.4.4 Paint shall not be applied during rain, fog, mist or in a dust laden atmosphere unless
suitably and effectively protected.
6.4.5 Wet film thickness gauges shall be used where practicable to ensure that specified
film thickness is being achieved.
6.5.2 The prepared surface shall be inspected by the Alyami Painting Inspector.
6.5.3 Paint shall be applied by airless spray as per the specification and manufacturer’s
data sheets.
6.5.4 Paint shall not be applied during rain, fog, mist or in a dust laden atmosphere unless
suitable and effectively protected.
9
METHOD STATEMENT FOR BLASTING & PAINTING WORKS AT SABTANK
DOCUMENT TITLE
BLASTING & PAINTING APPLICATION FOR
STORAGE TANK AT SABTANK
6.5.5 Wet film thickness gauges shall be used where practicable to ensure that specified
film thickness is being achieved.
6.5.6 Each coat of paint shall be generally free from surface defects, particularly pinholes,
runs, sags, blister, dry spray and over spray. The finished coat shall have an even
and uniform appearance with due allowance being made for the change in the film at
the edge of stripe coating.
6.5.7 However, if localized repair work has been carried out, appearance will lack
uniformity.
6.6 CURING
6.6.1 Tanks shall not be placed in service unless the final coating is fully cured, the curing
time for the paint shall be as recommended in the Manufacturer data sheet.
7.1.2 All inspection shall be carried out in accordance with SES T01-S01, manufacturer’s
printed recommendations and this method statement.
7.1.3 Alyami representative shall be present during all phases of inspection of major lining
painting.
10
METHOD STATEMENT FOR BLASTING & PAINTING WORKS AT SABTANK
DOCUMENT TITLE
BLASTING & PAINTING APPLICATION FOR
STORAGE TANK AT SABTANK
8.1.2 All materials used on site shall be provided for with the material safety data sheets,
which will indicate the manufacturer’s recommendation for the safe use of materials.
8.1.3 All painting material must be labeled to identify appropriate PPE requirement.
8.2.1.7 Hand Gloves (leather palmed gloves/cotton gloves with rubber palm)
8.2.2 The personnel directly involved in carrying out the spray paint application shall be
provided with filter type mask.
8.2.3 The personnel directly involved in carrying out the blasting operation shall be
provided with Nova 2000 blast helmet duly certified by NIOSH, CE.
9.0 ATTACHMENTS
9.1 Attachment -01: Technical Data Sheet
- END –