FILE NO : KSPCB/PL/ICE/10065049/2024

Date of issue : 06-05-2024

KERALA STATE POLLUTION CONTROL BOARD

CONSENT TO ESTABLISH

ISSUED UNDER

The Water (Prevention & Control of Pollution) Act, 1974

The Air (Prevention & Control of Pollution) Act, 1981

and

The Environment (Protection) Act, 1986

As per Application No. : 10065049


Dated : 02-04-2024

To

Dasaradha Thulasi Meadows


Near Marutharoad KSEB Office, Kallepully Road, Puthur, Palakkad

Consent No. : KSPCB/PL/ICE/10065049/2024


Valid Upto : 04-10-2029
1. GENERAL
1.1. This integrated consent is granted subject to the power of the Board to withdraw consent, review and
make variation in or revoke all or any of the conditions as the Board deems fit

1 VALIDITY 04-10-2029

2 Name and Address of the establishment Dasaradha Thulasi Meadows


Near Marutharoad KSEB Office, Kallepully Road,
Puthur, Palakkad
E-Mail : baburajpnair50@gmail.com
Contact Number : 9447155941

3 Occupier Details Rajesh P


S/o Vasudevan, Vaikundam, Friends Colony, P A Kutty
Road, Olavakkode, Palakkad.
E-Mail : baburajpnair50@gmail.com
Contact Number :

4 Local Body Palakkad municipality

5 Survey Number 815/2

6 Village Palakkad -2

7 Taluk Palakkad

8 District PALAKKAD

9 Capital Investment(Rs in Lakhs) 645.0894499999999

10 Scale Medium

11 Category ORANGE

12 Annual fee(Rs) 39000.0

Total Fee remitted(Rs) 195000.0

13 Activity RESIDENTIAL APARTMENT HAVING (G+4 )


FLOORS & 16 NUMBER OF 2 BHK FLAT HAVING
BUILT UP AREA

14 Machinery details DG set - 60 KVA


2.CONDITIONS AS PER
The Water(Prevention and Control of Pollution)Act, 1974
2.1 In case of generation of trade effluent from the industry, effluent treatment system consisting oftreatment units having
adequate capacity established as per the proposal submitted along with theapplication shall be made functional before
commissioning. Additional facilities required, if any, to achieve the standards laid down by the Board u/s 17(1) (g) of the
Water Act shall also be made alongwith.

2.2 Water Consumption : 10000 Litres per Day

2.3 Effluent Generation : 8000 Litres per Day

2.4 The characteristics of effluent after treatment shall confirm to the following tolerance limits:
SI.NO. Characteristics Unit Tolerance Limit
Sewage Trade Effluent
1. pH 6.5 - 9
2. BOD mg/l 10
3. COD mg/l 50
4. TSS mg/l 10
5. NH4 - N mg/l 5
6. N - total mg/l 10
7. Fecal Coliform MPN/100ml < 230

2.5 Mode of disposal of treated effluent : Soak pit

3.CONDITIONS AS PER
The Air(Prevention and Control of Pollution)Act, 1981
3.1 Adequate air pollution control measures shall be provided before commissioning of the industry.Additional facilities
required, if any, to achieve the standards laid down by the Board shall also be madealong with.
Stack Emission
Sources of Emission Stack Height above Control Equipment
No. Rate(Nm3/Hr)
Ground
Roof Level
Level
PROPOSED D.G
Above the terrace ACOUSTIC
1. SET
level ENCLOSURE
(60 kVA)

3.2 Emission characteristics shall not exceed the following:


SI.No. Parameter Limiting Standards (mg/Nm3)

4. CONDITIONS AS PER
The Environment (Protection) Act, 1986

4.1 Plastic Waste Management Rules, 2016 and amendments shall be followed for the management of plastic waste. Single
use plastic ban as per notifications and orders for Kerala shall be strictly be followed.

4.2 Waste batteries shall be disposed of as per the Battery Waste Management Rules, 2022.

4.3 E-wastes shall be disposed of as per the provisions of E-waste management Rules, 2022 and amendments.

4.4 The provisions of the Noise Pollution (Regulation and Control) Rules, 2000 shall be followed with.

4.5 Hazardous waste generated if any, shall be disposed of in compliance with the provisions of the Hazardous and other
Wastes (Management and Trans boundary Movement) Rules, 2016.
4.6 Solid Waste Management Rules, 2016 shall be followed for the management of solid wastes. Biodegradable waste shall
be segregated from non biodegradable waste at source. Facilities namely biobins/aerobins/biogas plant shall be provided for
the biodegradable waste. Facility shall be provided for the disposal of non biodegradable wastes to authorised collectors
namely Haritha Karma Sena for the disposal of wastes for authorised treatment.

5.SPECIFIC CONDITIONS
5.1 This consent, unless withdrawn earlier shall be valid for 5 years from the date of issue. At the end of the validity period,
if the construction is not completed, the same shall be got renewed. For renewal/operate of the consent, application in the
prescribed form shall be submitted through the web portal of the Board for ONLINE CONSENT/AUTHORIZATION
MANAGEMENT, MONITORING & ENFORCEMENT SYSTEM (keralapcbonline.com) 2 months prior to the date of
validity. Late application will be accepted only with a fine of 10% of annual fee if applied within 2 months of validity date
and 50% of annual fee if applied after validity date.

5.2 This consent is granted subject to the power of the Board to review and make variation in or revoke any of the
conditions as the Board deems fit as per the relevant Acts/Rules.

5.3 Consent to Operate shall be obtained before commissioning the building under the Water (Prevention and Control of
Pollution) Act, the Air (Prevention and Control of Pollution) Act and the relevant Rules under Environment (Protection)
Act .The application for ‘consent to operate’ shall be accompanied by the following.
i. Undertaking of the builder on Rs.100 stamp paper that all facilities to comply with the conditions of the ‘consent to
establish’ have been duly provided.
ii. Certifications by the consultant to that effect.
iii. Operation & Maintenance contract (copy).
iv. Performance guarantee (copy).
v. Copy of Consent to establish
vi. Outlet location drawing.

5.4 No change or alteration of the establishment is to be made without the prior written permission of the Board. Any
change in the particulars furnished and/or in the identity of the occupier/authorized agent shall be intimated to the Board
forthwith.

5.5 A minimum set back as per Kerala Municipality Building Rules shall be provided between the boundary and the
building and the set back can be utilized for the development of green belt.

5.6 Arrangements for segregation, collection, treatment and disposal of bio degradable and non degradable/recyclable
garbage shall be provided.

5.7 Any of the following facility of adequate capacity shall be provided for the treatment of biodegradable solid waste.
1. Biogas plant/High rate reactor
2. Biobins/portable biobins
3. Centralized masonry bio tanks
4. Aerobic ferro –cement bins
5. Organic waste converting machine (mechanical composting method.)

5.8 Excavation and piling operation shall be done without causing damage to the nearby buildings and without causing
nuisance to the neighbors.

5.9 The construction debris and mud discharges etc from the construction site shall be disposed safely and the same shall be
intimated to the Board’s office in advance.

5.10 Proper precautionary measures shall be provided during construction phase to minimize disturbance due to excavation,
piling, transportation of materials etc.

5.11 Sanitary facilities shall be provided for the construction workers and effluent shall be disposed off safely.

5.12 The STP units as given in the project proposal shall be installed and made operational before commissioning of the
unit.

5.13 Sewage treatment plant (STP) shall be set up maintaining a minimum distance of 10 log Q(where Q is the discharge of
waste water in m3 /day) from the nearest residence./education institution/public office/hospital/place of worship/community
hall/ scimitar establishments

5.14 Proper facilities shall be provided for reusing treated water, 40 % of the treated water shall be reused for flushing, 30
% of treated water used for irrigation and gardening, 10 % for floor washings and other uses balance disposed through soak
pit after achieving the standards prescribed above.

5.15 Overflow from soak pit (outlet) may be connected to public drain leading to canal/river/surface water. The occupier
shall ascertain that the public drain has no block upto the water body.

5.16 Separate water meters shall be provided for measuring the quantity of treated water and the quantity of reused treated
water.

5.17 Log books shall be provided to register the daily energy consumption in STP and quantity of waste water treated and
treated water recycled.

5.18 TOD type energy meter shall be installed exclusively for the effluent treatment system and shall be maintained
properly.

5.19 Lighting arrangements shall be provided in the effluent treatment and recycling area.

5.20 The D. G. sets shall be provided with a minimum chimney height 0.2व0;&RJYJWXFGT[JWTTKQJ[JQTKYMJMNLMJXY
SJFWG^ GZNQINSL <MJWJ 0;& NX YMJ HFUFHNYNJX TK FQQ ), XJYX 9MJ ) , XJYX XMFQQ GJ UQFHJI FY F RNSNRZR
INXYFSHJTKव 0;&RJYJWXKWTRYMJSJNLMGTZWNSLWJXNIJSHJX\TWXMNUUQFHJXNSXYNYZYNTSX \MJWJ0;&NXYMJ
HFUFHNY^TK),XJYX

5.21 Non-biodegradable wastes such as plastic and other recyclables shall be collected with due segregation and disposed
off safely to genuine recyclers.

5.22 The details of the residents association to which the project is handed over by the builder shall be informed to the
Board. Also a clause stating that, the renewal of Board's consent shall be the sole responsibility of the association so formed
thereafter; this may be included in the agreement while handing over to the residents association.

5.23 The STP shall be constructed above ground level. Preliminary treatment units (collection tank, screening, oil & grease
trap, and grit chamber) need not be constructed above ground level, but there is no bypass lines provided in these units. The
other units from equalization on wards are to be constructed above ground level.

5.24 Rainwater harvesting system and arrangements for the utilization of the harvested water shall be provided before
commissioning of the project.

Signature valid
Digitally signed by DINESH K S
Date: 2024.05.06 13:25:36 IST
signaturerectangle

SIGNATURE OF ISSUING AUTHORITY

ENVIRONMENTAL ENGINEER

To
M/s Dasaradha Thulasi Meadows
Near Marutharoad KSEB Office, Kallepully Road, Puthur, Palakkad
E-Mail : baburajpnair50@gmail.com
Contact Number : 9447155941

1.This digitally signed document is legally valid as per the Information Technology Act 2000

2. For verifying this document please go to www.keralapcbonline.com and search using Certificate
Number/name of the unit/Application Number in “Certificate Verification” link in the home page of the
Board’s Phoenix website.
12 m 14.5m

13 m
10 m

APPROVED SITE PLAN


Digitally signed by DINESH K S
DINESH K S Date: 2024.05.06 13:20:26
+05'30'

ENVIRONMENTAL ENGINEER,
DISTRICT OFFICE, PALAKKAD