Contents
1. PURPOSE................................................................................................................................2
2. SCOPE.....................................................................................................................................2
3. RESPONSIBILITIES..................................................................................................................4
4. WORK GROUPS DISTRIBUTION.............................................................................................4
5. TOOLS & EQUIPMENT...........................................................................................................5
6. REFERENCES AND ATTACHMENTS……………………………………………….5
Repair, Formwork and Casting | WQ CS6 New vent line form TEG unit to the new cold flare
CS7 Still Column Vent Line Re-routing
1. PURPOSE
The main purpose of this method statement is to fabricated, erected, and removed as
specified herein and shall be of a type, size, shape, quality and strength to produce
hardened concrete having the shape, lines and dimensions indicated on the drawings. The
forms shall be true to line and grade in accordance with the tolerances as specified in
"Cast-In-Place Concrete" and shall be mortar tight and sufficiently rigid to resist deflection
during concrete placement. The surfaces of forms shall be smooth and free from
irregularities, dents, sags, and holes that would deface the finished surfaces.
2. SCOPE
Method statement covers all activities as follows below :
2.1 Formwork and casting:
2.1.3 Reinforcement:
The reinforcing bars, ties, links, stirrups and all other reinforcing shall be positioned and rigidly
fixed exactly as shown on the drawings such that the minimum cover requirements are achieved
and the true alignment of the reinforcement is the maintained. Splices in reinforcements shall
be made at design locations shown on the drawing. All reinforcing bars shall be stored on the
site on supports suitably spaced and at sufficient height to keep the steel clear of the ground.
Long term storage shall be minimized on site.
Repair, Formwork and Casting | WQ CS6 New vent line form TEG unit to the new cold flare
CS7 Still Column Vent Line Re-routing
2.1.6 Repair:
Touching up of concrete surfaces after the removal of form work is not permitted until they
have been inspected and released in accordance with the quality procedures. The repair
method including materials and the extent of the repair works to remedy the imperfections of
the concrete shall be specified and approved For each repair case and comply with the design
requirements of the structure concerned. This is the good way for the building concrete work.
2.2.1 Supervision
2.2.1.1 Internal / External Control
Quality Control Engineers and Company’s engineers shall have the right to access to all quality
records at any time and witness all tests for compaction.
Repair, Formwork and Casting | WQ CS6 New vent line form TEG unit to the new cold flare
CS7 Still Column Vent Line Re-routing
2.2.2.2 Responsibility
All the persons involved in the works.
2.2.2.3 Records
Each non acceptance recorded during the works has to be pointed out straight away to the
construction manager of subcontractor, quality control engineer of ALbilal and Company’s
duty engineer.
Non Conformance will be filled up and signed by the COMPANY.
If a non-conformance is corrected and accepted, the solution will be described in the record
form.
2.2.2.4 Corrections
After the non-acceptance is examined, the solution will be shown and agreed by COMPANY.
3. RESPONSIBILITIES
It is overall responsibility of PM/CM to organize resources to perform construction activities as per
project / SD specification, in compliance with quality, schedule & safety requirements.
It is the responsibility of CM that construction activities are executed according to the relevant BGC
specifications, in compliance with quality, schedule & safety requirements.
Site team will ensure that all the works are performed professionally as per latest approved for
construction (AFC) drawings & specifications.
The relevant supervisors will ensure that all activities are conducted in accordance with this method
statement and BGC specifications.
The QC team will ensure that all work is executed according to international specifications and that
requirements all activities of project dossier are full completed.
The relevant supervisors will ensure that all activities are conducted in accordance with HSE rules
Repair, Formwork and Casting | WQ CS6 New vent line form TEG unit to the new cold flare
CS7 Still Column Vent Line Re-routing
• Safety
o FR coverall
o Helmet
o Glass
o Gloves
o Safety shoes
o Ear Plugs (if required)
o Fire extinguisher
o Mask
o Harness
Repair, Formwork and Casting | WQ CS6 New vent line form TEG unit to the new cold flare
CS7 Still Column Vent Line Re-routing
Repair, Formwork and Casting | WQ CS6 New vent line form TEG unit to the new cold flare