PERMIT TO WORK

Section A (to be completed by Contractor carrying out the Works)


Contact Person Company Name, Address & Company Stamp:
Ryan Boey

Contact Mobile Event name: PULSE


91912214 Company Name: Rizen PTD LTD
Address: 30 Ceylon Road #03-04, Singapore 429623
Vehicle No. Ceylon crest
SLN9718M

Schedule of
26 April 2024 8:30pm
Work Time From: To: 04:30am
Location of Por Vida Skateboarding (B1-11) @ GRID MALL
(Please specify)
Work
Location will be level 1 viewing gallery to the skatepark
Electrical Fire System ACMV Plumbing Building Others:
Type of Work
(please tick)

Venue will be holding a techno music event/party

Description of the level 1 will be at work


Work
will be cover up of viewing gallery with poles and black out curtains at 7:30pm onwards

Worker Name List


Document(s)
submit for Risk Assessment/ Management
approval (please Schedule of Work
tick) Others
(Please submit the Application Form to Centre Management Office at No.1 Selegie Road #05-03 GR.ID Singapore 188306 or via email to
support@gridsingapore.com)

Section B (to be completed by CMO)

Approved Reject

25/04/24
Joanne Foo
Approved By
Managing Agent
Name Signature Date

Acknowledged By Security
on Duty
Security Officer Name Signature Date

Please bring a copy of this approved Work Permit to Level 2 Fire Command Centre to exchange for Security Pass. Only workers with approved
Work Permit will be allowed to carry out the works and should you have any query, please contact our Fire Command Centre at 6339 2602.

 Contractors shall make application for commencement of works at least 3 working days in advance
 Hacking/noisy works/ works generating pungent smell (such as paintings and use of thinner, glue) are allowed from 10.30pm to 7am only)
 No hacking or noisy works are allowed (all-day) on Sunday & Public Holidays.
 For Hot Works, contractors are required to fill up Hot Work Permit and submit to Centre Management Office for approval at least 2 working days before
the work is being carried out. Contractor is required to place their fire extinguisher at the work location during the Hot Work.
 Common area protection for works between 10.30pm to 7am on the following day.
 With delivery of materials, to protect Cargo lift, lift lobby, wall and floor along corridor from lift lobby to location of work.
 Without delivery of materials, to keep floor outside hoarding clean at all times.
 Contractors who are working along the corridor or in the common area shall protect wall and floor at the location of work.

Signed By the contractor: _________________________