SINOHYDRO CORPORATION (M) SDN. BHD.

Site Daily Activities Report


MAIN BUILDING WORKS FOR BLOCK B - 408 UNITS 32 STOREY COMMERCIAL SUITE 1 DATE 日期:
(PHASE 1A) FOR PROPOSED AMALGAMATION INTO MIXED COMMERCIAL DEVELOPMENT
AT JALAN HAJI SAMAN, KOTA KINABALU, SABAH. DAY 星期:
Manpower On Site Plant & Machineries
Project Director 0 Excavator Operator 0 Excavator ex200 0
Project Manager 0 Backhoe Excavator Operator 0 Backhoe Excavator 0
Technical Engineer 0 Crawler Crane Operator 0 Crawler crane 0
Technical Coordinator 0 Mobile Crane Operator 0 Mobile Crane 0
Safety & Health Officer 0 Roller Compactor Operator 0 Roller Compactor 0
Head of Contract Dpt. n Loader Operator 0 Loader 0
Purchaser 0 Piling Machine Operator 0 Piling Machine 0
Purchaser 0 Tug Boat Operator 0 Tug Boat 0
Piling Supervisor 0 Welder 0 Barge 0
Site Safety Supervisor 0 Concrete Pump Operator 0 Welding Machine 0
Supervisor 0 Concrete spreader Operator 0 Concrete Pump 0
Quantity Surveyor 0 Lorry Driver 0 Concrete spreader 0
Surveyor 0 Barbender 0 Lorry 0
QA/QC 0 Carpenter 0 Rebar Bender 0
Longarm Excavator Operator 0 Clamshell Operator 0 Rebar Cutter 0
Test Technician 0 General Worker 0 Clamshell 0
Administration 0 Traffic Controller 0 Longarm excavator 0
Electrician 0 Security 0 Gen Set 0
Scaffolding 0 Air Compressor 0
Signalman 0 Water Pump 0
0 Vibro-hammer 0

Total合计 0 Total合计 0 Total合计 0


Weather 天气情况 Site Activities / Work Progress 现场作业/工作进展

Note:

Fine :
Cloudy :
Rain :

Recorded by : Checked By: Verified by :

Sinohydro Corporation (M) Sdn. Bhd. Wang Haron & Goh Sdn Bhd Client Representive/Consultant :
Name : Name : Name :
Date : Date : Date :