Professional Documents
Culture Documents
Record of Main Building (Daily, Weekly, Monthly, Quarterly)
Record of Main Building (Daily, Weekly, Monthly, Quarterly)
Record of Main Building (Daily, Weekly, Monthly, Quarterly)
Forman
# Area Cleaning PPM Task Main Building Remarks
Signature
Lift Lobbies & Corridors' low wall (including ledges, sills and skirting boards are free of dust and
1 ………………………………………………………………………………………………………………………………………….
cobwebs) level Dusting
2 Elevators' low wall level Dusting ………………………………………………………………………………………………………………………………………….
3 Terrace's low wall level Dusting ………………………………………………………………………………………………………………………………………….
4 Exit Doors Dusting ………………………………………………………………………………………………………………………………………….
5 Lift Lobbies & Corridors' low glass level Dusting ………………………………………………………………………………………………………………………………………….
6 All lab in side cleaning and dusting (Garbage, Floor, Tables, Glasses) ………………………………………………………………………………………………………………………………………….
7 Reception's & Lobby area’s low glass level Dusting ………………………………………………………………………………………………………………………………………….
8 Reception's & Lobby area’s low wall level Dusting ………………………………………………………………………………………………………………………………………….
Reception Floor cleaning Dusting / Moping
9 ………………………………………………………………………………………………………………………………………….
10 All Offices Desks, Benches, Furniture, Fixtures, Fittings Dusting ………………………………………………………………………………………………………………………………………….
11 Building Elevators Doors Dusting ………………………………………………………………………………………………………………………………………….
12 Corridors Floors Dusting / Mopping ………………………………………………………………………………………………………………………………………….
13 Elevators Floors Dusting / Mopping …………….
14 Terrace area Floor cleaning ………………………………………………………………………………………………………………………………………….
15 Retail Area / Floor Cleaning ………………………………………………………………………………………………………………………………………….
16 Floor Mat Cleaning
17 Kitchen Dusting ………………………………………………………………………………………………………………………………………….
18 Toilets (Floors, Walls, Fittings, sinks ) Dusting / Mopping / Sanitizing ………………………………………………………………………………………………………………………………………….
19 Janitor room Dusting / Mopping ………………………………………………………………………………………………………………………………………….
20 Collect garbage From Garbage Rooms ………………………………………………………………………………………………………………………………………….
21 Empty clean waste 20 L bins using appropriate coded trash bags
22 Empty clean waste 05 L bins using appropriate coded trash bags ………………………………………………………………………………………………………………………………………….
23 Parking area Wall & Floor cleaning Dusting ………………………………………………………………………………………………………………………………………….
Parking Entry & exit barrier Dusting
24 ………………………………………………………………………………………………………………………………………….
25 Pavement sweeping ………………………………………………………………………………………………………………………………………….
26 External Area External Ground Sweeping ………………………………………………………………………………………………………………………………………….
27 External staircase sweeping ………………………………………………………………………………………………………………………………………….
Forman
# Cleaning PPM Task Main Building Remarks
Signature
9 All under roof external walls, eaves and vents Dusting …………………………………………………………………………………………………………………………………………
All floor surfaces of the undercover/internal car parks are visibly clean, free of grease stains, general residue and
13 …………………………………………………………………………………………………………………………………………
other foreign matter
14 Inspection pits and surrounding areas are clean of all oil and grease. Waste water and all debris is removed …………………………………………………………………………………………………………………………………………
All accessible electrical cupboards, service risers and storerooms are clean and free of rubbish or any other
15 …………………………………………………………………………………………………………………………………………
foreign matter;
Forman
# Cleaning PPM Task In-Outside Building Remarks
Signature
4 All fire hose cabinets are to be cleaned and dusted inside & out ………………………………………………………………………………………………………………………………………….…………………………………………………………………………………………
Forman
# Cleaning PPM Task Main Building Remarks Signature
1 Wash all walls (Entrance & Lift Lobbies) throughout main area including all horizontal surfaces and ledges ………………………………………………………………………………………………………………………………………….…………………………………………………………………………………………
2 Wash all parking area low wall (including fixed) fittings, signage's ………………………………………………………………………………………………………………………………………….…………………………………………………………………………………………
3 Door frames, window frames and any other steel/metal wooden elements are to be thoroughly cleaned. ………………………………………………………………………………………………………………………………………….…………………………………………………………………………………………
7 Wash all Basement area low wall (including fixed) fittings, signage's ………………………………………………………………………………………………………………………………………….…………………………………………………………………………………………
8 Door frames, window frames and any other steel & glass elements are to be thoroughly cleaned. (Mosque) ………………………………………………………………………………………………………………………………………….…………………………………………………………………………………………
9 Door frames, window frames and any other wooden elements are to be thoroughly cleaned. (Mosque) ………………………………………………………………………………………………………………………………………….…………………………………………………………………………………………
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
9 All under roof external walls, eaves and vents Dusting Weekly
All floor surfaces of the undercover/internal car parks are visibly clean, free
13 of grease stains, general residue and other foreign matter Weekly
Inspection pits and surrounding areas are clean of all oil and grease. Waste
14 water and all debris is removed Weekly
All accessible electrical cupboards, service risers and storerooms are clean
1 and free of rubbish or any other foreign matter; Weekly
All fire hose cabinets are to be cleaned and dusted inside &
Monthly
out
Door frames, window frames and any other steel & glass
8 Quarterly
elements are to be thoroughly cleaned. (Mosque)
Page 5