c) Perform the role and responsibility envisaged for the GC in these TOR and Contract agreement
as a whole.
f) Distribute the role and responsibility of each of the personnel working under him in consultation
with the Employer to complete
ii. The qualifications and experience of personnel required are indicated in Clause 6 for respective positions.
i. The General Consultant will set up an Office at CAO/Construction/NER led by the Team Leader
supported by personnel to perform the Services specified in ToR.
Authority will provide office space free of cost at [CAO/C] for [84] persons workstations and access
to a meeting room free of charges. Cost of furniture shall be included in the financial bid as
reimbursable cost as per Appendix-II. Authority will not provide stationary, computers, printers,
copiers, LAN, and Internet connection and same shall be included in the Financial Bid as
reimbursable cost. All assets and facilities provided by the Authority shall remain vested with the
Authority at all times, and GC shall have no claim over it. The Authority will give its authorized
personnel access, facilities, for carrying out their obligations under this Agreement.
6. Manpower Deployment
6.1 The General Consultant shall form a multi-disciplinary team (the “Consultancy Team”) for undertaking this
assignment. The Consultancy Team shall consist of experts who have the requisite experience. Team Leader
shall be the leader of this Consultancy Team. The manpower listed below is indicative required to be deployed
by the GC., The Bidder shall propose a team which shall consists of the following Key/Support personnel
(the “Key/Support Personnel”) who shall discharge their respective responsibilities as specified below:
or combined.