Professional Documents
Culture Documents
Operation - Maintenance Manual For LG958L (N) LG959 - Version 2 in February, 2017 5th Printing
Operation - Maintenance Manual For LG958L (N) LG959 - Version 2 in February, 2017 5th Printing
CONTENTS
PREFACE ........................................................................................................................................................................... II
SAFETY INFORMATION ................................................................................................................................................IV
CHAPTER I SAFETY ......................................................................................................................................................... 1
1 SAFETY LABELS POSITIONS AND THE CONTENTS................................................................................ 1
2 SAFETY REQUIRMENTS ............................................................................................................................. 19
3 SAFETY OPERATION.................................................................................................................................... 21
4 STARTING SAFELY ....................................................................................................................................... 26
5 SAFETY DRIVING ......................................................................................................................................... 33
6 SAFETY OPERATION.................................................................................................................................... 40
7 SAFETY PARKING ........................................................................................................................................ 44
8 SAFETY EXAMINATION AND REPAIR ...................................................................................................... 46
9 SAFETY TRANSPORTATION ....................................................................................................................... 58
CHAPTER II INTRODUCTION ....................................................................................................................................... 61
1 GENERAL VIEW OF THE MACHINE & COMPONENTS’ NAME ............................................................ 61
2 GEOMETRICAL DIMENSIONS .................................................................................................................... 62
3 PRODUCT TYPE AND ITS MEANING ........................................................................................................ 65
4 NAMEPLATE .................................................................................................................................................. 65
5 USE CONDITIONS ......................................................................................................................................... 67
6 CIRCUMSTANCES REQUIREMENT ........................................................................................................... 67
7 FEATURES ...................................................................................................................................................... 68
8 TECHNICAL PERFORMANCE & PARAMETER ........................................................................................ 71
CHAPTER III OPERATION AND APPLICATION ......................................................................................................... 75
1 BE FAMILIAR WITH MACHINE .................................................................................................................. 75
2 RUN-IN PERIOD OF NEW MACHINE ........................................................................................................107
3 OPERATION AND USE OF LOADER .........................................................................................................109
CHAPTER Ⅳ OPTION ................................................................................................................................................. 163
CHAPTERⅣ MAINTENANCE .................................................................................................................................... 165
1 MAINTENANCE GUIDE ..............................................................................................................................165
2 DETAILED RULES OF MAINTENANCE ...................................................................................................168
3 CONTENTS OF MAINTENANCE................................................................................................................175
CHAPTERⅥ SYSTEM PRICIPLE DIAGRAM ........................................................................................................... 181
1 TRANMISSION SYSTEM .............................................................................................................................181
2 HYDRAULIC SYSTEM ................................................................................................................................182
3 BRAKE SYSTEM ..........................................................................................................................................183
4 ELECTRIC SYSTEM .....................................................................................................................................186
I
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
PREFACE
Thank you for purchasing the wheel loader manufactured by SDLG.
This manual provides rules and guidelines that are helpful for all relevant people to use this machine
safely and effectively. Keep this manual handy and all relevant people should read it periodically. If you
read carefully and take full advantages of this manual, the machine will always be in best condition. If
this manual has been lost or has become damaged or cannot be read, contact with us or our dealers for a
new one.
If you sell the machine, be sure to give this manual to the new owners.
Parameters, figures and information included in the manual are only suitable to basic loaders. For those
derivative products, please consult with us or refer to relative reference manuals.
When selecting working tools, please follow the user manual to assemble and disassemble, replace and
use them.
We are continually striving to improve the quality of our products, to produce more advanced and safer
engineering machine. We reserve the right to change and modify our design, but we do not promise to
inform the changes of products that have been sold. We also reserve the right to change the data and
machine, and the right to maintain. The changes of design, operation and user manual of maintenance
information in this document will not be informed in advance. Welcome feedback from customers. If you
would like to comment on any aspect of this manual or our products in general, please do not hesitate to
contact with us.
Please feed back the shortcomings during using our products in time, so that we can continue to improve
our products to satisfy your requirement.
All rights reserved. The contents of this publication may not be reproduced in any form without prior
written permission of Shandong Lingong construction machinery Co. ,Ltd.
II
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
△
! WARNING
Incorrect operations, maintenance and repair could results in hurt and death.
Operator should read this manual carefully before operation or maintenance.
Never involve in operation and maintenance and repair of the machine before
reading and understanding this manual.
The operation specifications and precautions given in the manual only apply to
the intended uses of this machine. If the machine is used for any unintended
conditions that are not specifically prohibited, be sure that operation will not
cause hurts to you and other persons.
Do not carry out the operation and actions prohibited in the manual.
III
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
SAFETY INFORMATION
The operator should know and obey the safety rules or regulations described in the national and local
laws. If there are no such rules, please follow the rules described in this manual.
Most accidents are caused by failing to follow fundamental safety regulations about the operation and
maintenance of machines. To avoid accidents, please read, understand and follow all precautions and
warning in this manual and on the machine before performing operation and maintenance.
Safety precautions are specified in Chapter I SAFETY.
Because of potential danger that is impossible to be predicted, safety information described in this
manual cannot include all of the safety precautions, and we also cannot predict every circumstance that
might involve in a potential hazard in operation and maintenance. Therefore, if the procedures or actions
that are not recommended in this manual are used, you must ensure the safety of the operator and
machine. Otherwise, consult with us or the dealers.
The safety precautions for operation and maintenance in this manual only apply to those conditions
specified by the machine. If the operation of the machine is not specified in the manual, users should take
full responsibility by themselves. We will not bear any safety responsibility for the operators or machine.
In any case, you should not engage in prohibited operations as described in this manual.
The following signal words are used:
△
! DANGER── If this is not avoided, serious damages or death may happen. This word is
also used to mean that if this is not avoided, the machine will be damaged.
△
! WARNING── Failing to avoid this hazard may also result in serious injury or death.
Failure to avoid this hazard may also result in serious damage to the machine.
△
! NOTICE── It will result in minor or moderate injury if the hazard is not avoided. This
word is used for precautions that must be taken in order to avoid actions which could shorten the life
of the machine.
IV
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
CHAPTER I SAFETY
△
! WARNING
CONTENTS
1
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
2
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
3
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
4
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
5
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
6
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
7
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
8
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
9
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
10
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
11
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
12
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
13
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
14
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
15
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
21 Antifreeze liquid
Located on the left side of operator cab door or mouse of
radiator of engine hood
16
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
17
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
18
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
2 SAFETY REQUIRMENTS
20
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
3 SAFETY OPERATION
Check all the safety items, for example, whether the safety
protective device is at the safe status. Make sure the tires are not
worn and the tire pressure is normal. Routinely check whether
there is the leakage of oil, water and air, deformation, loose
fittings and abnormal sounds or accidents. Check the safety
devices routinely.
21
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
wheels if necessary.
Make sure the loader is locked and put the key at a safe
place.
22
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
23
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
24
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
Make sure the support and the accessories are correctly set
when someone works under the machine. Do not use the
hydraulic tank as support. The accessories may go down and
result in an accident when the control system moves or the
hydraulic tubes leaks.
Never do any adjustments when the machine is operating or
the engine is working unless there is an outstanding reason, such
as an emergency.
Stay far away from any rotary and moving parts.
Make sure there is no sundry on the vane of engine. Vane
could shoot off or cut off the sundry, tools inside.
Do not try to check or maintain a working engine because it
is dangerous.
25
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
4 STARTING SAFELY
26
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
27
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
No operation! installed).
Be familiar with all the warning equipment, gauges, and
control equipment on the panel.
28
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
29
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
30
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
31
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
5 SAFETY DRIVING
33
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
34
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
35
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
△
! WARNING
36
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
Driver may feel some illusion about the height of the ground
and the distance at night, so keep the light on and drive at proper
speed.
Keep the front and rear head light and working light on
when working in dark areas.
37
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
38
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
5.9 Towing
△
! WARNING
Injury, even death may occur if the machine is towed
incorrectly or the selected steel wires are damaged.
Follow the direction in CHAPTER III – 3.5.2 (7) Towing
Operation, a dangerous condition may be caused by using the
wrong method.
Wear gloves to deal with tight wires.
Before preparation for the towing is done, confirm the
signals with other people.
Please contact with Shandong Lingong Construction
Machinery Co. Ltd. or their accredited dealers if the engine does
not start or the brake system has problems.
Please tow the machine on level ground if possible; it is
dangerous to tow on a ramp.
If the disabled machine is towed by another machine, the
tight steel wire should be strong enough to pull the weight of the
towed machine. The tight steel wire with wring or radius
reduction can not be used.
People are not allowed to go between two machines when
the machines are connected.
Do not stand on the towing steel wires or tight steel wires.
39
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
Keep the hook of the towing machine and the towing parts
in a horizontal line.
6 SAFETY OPERATION
6.1 Forming a Good Operation Habits
Always sit on the seat, and tie the safety belt during
operation. The machine in operation should always be controlled
by the operator.
Operate the control handle of the working equipment
properly to prevent misoperation.
Examine and listen to the exceptions carefully, and report
immediately when there is a problem. Do not repair it while in
operation.
The load cannot exceed rated capacity of the machine.
Operation beyond the capacity of the machine is very dangerous.
Be sure to confirm the loading and unloading weight in advance
to avoid overloading. We have no responsible for the machinery
or personnel injury caused by overloads.
41
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
Don’t use the machine for any work other than what the
machine is designed for. It may damage the parts or cause an
accident when using the head of the working equipment for
other functions, such as hook, grasp, draw, push, or tow.
42
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
43
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
7 SAFETY PARKING
△
! WARNING
44
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
45
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
47
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
△
! NOTICE
8.8 Cleaning
Wear the anti-sliding shoes to prevent sliding when cleaning
the machine. Wear protective clothes when using high pressure
water to clean the machine.
Clean routinely to prevent dirt or mud splashing into the
eyes or slippage caused by oil on the machine.
Do not use a flammable scour when cleaning the machine.
Stop the engine to clean the inner part of the machine, put
all the levers in the neutral position, draw the brake valve control
handle and keep it in the braked position.
Do not let water enter an electric part (such as sensor, wire
connectors) or operator cab. If so, the operation may be disabled
and the electric circuit may be damaged.
Wear protective clothes and glasses when using compressed
air to clean the filter mesh.
49
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
50
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
△
! NOTICE
52
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
8.14 Gasholder
Open the water drain valve on the bottom of air holder to
drain the water every day, and drain out the water radically once
every day at least. And make sure the water drain valve has
been closed before start the engine. Paste the safety signs on the
Water drain valve
air holder body. Please conform to the indications of safety
signs.
Due to the high pressure gas in the gas holder, you should
check the external part of the holder regularly and check the
safely.
53
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
When the pressure of gas holder is too high, the gas holder
before use.
Pay attention to the labels on equipment before installation
to prevent accidents.
Spread the vaseline on the poles to prevent erosion. The
wire connections should be firm and credible. Never hammer the
wire pole which may cause the leak of vitriol.
Connect the positive pole of the storage battery with the
negative pole of the machine first, and then connect the negative
pole of the storage battery with the positive pole of the machine.
Put the battery on the shaft using the upside fixing method
or downside fixing method to prevent destruction caused by
loosening.
There is an indicator on the cover of the battery. The green
light means it can be used, the black light means it should be
charged, and the white light means it should be replaced.
Replace with a new battery after the white light indicator.
Routinely recharge the battery if the battery lacks electric
power during use to prevent the capability of battery sulfate
going down.
If the battery is installed, disassemble it and put it in a dry
and well ventilated place if it is not used for long time (generally
more than 15 days). Recharge the battery every 3~6 months
(based on whether the indicator is black or not).
55
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
56
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
at least.
Please stand aside if a tire starts to fall down. Never try to
hold a tire since the tires for engineering mechanisms are
generally very heavy, and you may be seriously hurt.
8.20. Waste materials
Please conform to the following procedures in case of pollution:
9 SAFETY TRANSPORTATION
9.3 Lifting
Use the hook of the front and rear frame to transport the machine
to ship or train.
Select proper lifting equipment according to the weight of the
loader, otherwise it is dangerous to surpass the weight limit.
Notices for lifting:
Make sure the loader is in the transporting state. The
front and rear frame should be in the middle position.
Lock the machine using the lock bar to prevent rotation
of the front and rear frame during lifting.
All the control levers (or handles) should be in the
middle position.
Stop the engine, lock all the equipment using keys and
then remove.
No one is allowed to stay in the operator cab.
Never lift the machine using steel wire connecting the
two hooks on the front frame.
It is allowed to lift the machine using 4 steel wires of the
same length (no shorter than 7m).
Keep the machine horizontal during lifting.
59
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
60
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
CHAPTER II
INTRODUCTION
1 GENERAL VIEW OF THE MACHINE &
COMPONENTS’ NAME
Cab
Working
lamp
Engine
Rocker hood
Boom
Bucket
Front Rear
wheel wheel
61
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
2 GEOMETRICAL DIMENSIONS
62
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
63
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
64
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
LG 9 5 8/9 L/N
Upgrade code
Template is 8/9
Wheel loader
SDLG
4 NAMEPLATE
The nameplate is fixed on the left rear side of the front frame,
describing the model, PIN, manufacturing year and
manufacturer of the machine. The type of nameplate is shown in
Fig. 2-5. The other configurations of nameplate refer to
CHAPTER II - 8 TECHNICAL PERFORMANCE &
PARAMETERS. The nameplate of FOPS & ROPS is shown in
Fig. 2-6.
65
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
66
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
5 USE CONDITIONS
△
! WARNING
6 CIRCUMSTANCES REQUIREMENT
Requirements for this machine as follows:
1. Altitude: ≤2000m;
2. Temperature: -15℃~+40℃;
3. Water depth: ≤630mm.
The loader is a general construction machine, and can be used
for all kinds of work listed in this manual under normal
conditions. If it is used under other conditions or potentially
dangerous circumstances, such as areas with flammable
materials, explosives and asbestos dust, special safety rules need
to be observed and the machine should also equipped with
specific purpose equipment.
67
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
7 FEATURES
7.1 LG958L/LG959 Performance and Features
Equipped with national Ⅱ emission standard engine with
low speed and large torque—Strong power and high reliability.
LG958L is equipped with ZF transmission with front-four
and rear-three shifts, KD key for automatic change speed,
reliable and safe. LG959 axle applies advanced manufacture
technology with great reliability. Wet brake is reliable and safe.
Equipped with highly efficient radiator, the air inlet ducts
and the air outlet ducts of the whole cooling system are
optimized, which can reduce the temperature of water and
hydraulic system effectively and improve the efficiency.
The full hydraulic loading steering hydraulic system was
used with single pump large flow working device hydraulic
system and the efficiency of the hydraulic system can be
improved significantly. Optimized and improved seal structure
of hydraulic pipeline can ensure the reliability of the overall
hydraulic system.
Steerable dashboard used high quality instruments and
sensors to ensure the reliability of the whole electrical system.
Working device is designed optimally, the lifting force of
boom is large, fill factor of bucket is high, and it is well suited
for heavy materials. Bucket structure is designed optimally,
equipped with high strength wear resistant main blade plate to
prolong life-span. The bearings are fully sealed to prevent dust
entering and the service life of the bearings can be improved.
Widened wheel-track and extended base of machine was
designed to improve stability of the whole machine. Apply
articulated reinforced box-type frame structure, with large
steering angle and small turning radius to make the machine
strong and durable.
68
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
electrical system.
Working device is designed optimally, the lifting force of
boom is large, fill factor of bucket is high, and it is well suited
for heavy materials. Bucket structure is designed optimally,
equipped with high strength wear resistant main blade plate to
prolong life-span. The bearings are fully sealed to prevent dust
entering and the service life of the bearings can be improved.
Widened wheel-track and extended base of machine was
designed to improve stability of the whole machine. Apply
articulated reinforced box-type frame structure, with large
steering angle and small turning radius to make the machine
strong and durable.
New dampers are used to connect the engine/gearbox/cab
and the frame and the operating comfort can be upgraded
significantly.
Optimize the layout of the cab with wide vision and large
operating space; complete coverage of the cab interior, sealing
damping; front console, winding forward. Equipped with air
conditioning, security and comfort.
70
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
71
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
72
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
73
Operation & Maintenance Manual──LG958L (N)/LG959Wheel Loader
74
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
CHAPTER III
OPERATION AND
APPLICATION
1 BE FAMILIAR WITH MACHINE
1.1 Control Systems and Gauges
75
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
76
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
77
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
78
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
79
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
80
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
Working Chronometer
This gauge shows the total operation hours of the machine; its value
can be used as a reference for inspection and maintenance.
81
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
Engine tachometer
This gauge shows the rotation speed of the engine.
1.Preheating indicator lamp 2.Low fuel pressure alarm 3.Charging indicator lamp 4.Power cut off
indicator lamp 5.Emergency steering indicator lamp 6.Fuel coase filtering indicator lamp
7.Control working indicator lamp 8.High beam indicator lamp 9.Low brake air pressure alarm
10.Parking brake indicator lamp
82
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
1.Preheating indicator lamp 2.Low fuel pressure alarm 3.Charging indicator lamp 4.Power cut off
indicator lamp 5.Fuel containing water alarm lamp 6.Engine failure indicator lamp 7.Control
working indicator lamp 8.High beam indicator lamp 9.Low brake air pressure alarm 10.Parking
brake indicator lamp
83
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
84
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
Working Chronometer
This indicator shows the total operation hours of the engine;
its value can be used as a reference for inspection and
maintenance.
Fuel Level Gauge
85
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
Revolution Gauge
This gauge indicates the rotating speed of engine at present.
86
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
87
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
Alarm lamp for air filter blocking: If the air filter is blocked this
lamp will glimmer. If this circumstance happens, clean or replace
the air filter.
Central Warning Lamp: Before the engine is started, the lamps
of engine oil pressure indicator and charging indicator will be on
and this lamp will stay unlighted. When other parts of the machine
out of order, the light will be on and flash.
Power Cut Indicator Lamp: The lamp will come on if the power
is cut off, and it will go off if the power is not cut off.
Safety belt indicator lamp: If the safety belt is not tied, the
indicator lamp is on to remind the driver. In reservation.
Mute indicator lamp: Some failure happens and some sound will
alarm; Turn on the mute rocker switch and warning sound will
stop and the indicator lamp will be on.
Safety lock indicator lamp: Turn on the safety lock rocker switch
and safety solenoid valve locks the working device hydraulic
system, and then the indicator lamp will be on.
88
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
93
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
94
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
96
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
The wheel and steering gear are connected. When the machine
works normally, turn the steering wheel clockwise, the machine
turns right; turning the steering wheel anticlockwise, the
machine turns left.
The features are listed below:
The rotation angles of the steering wheel and the machine
are not equal. If the steering wheel is continuously turned;
the machine rotation angle will increase until get the
needed position.
The faster the steering wheel turns, the faster the machine
turns.
The steering wheel cannot self-return after turning, the
turning angle of the machine will be kept. After finishing
turning the machine, turn the steering wheel in the reverse
direction to keep the machine moving in a straight
direction.
1.2.6 Control Levers and Pedals
Shifting control Lever
Refer to 1.1 Operation devices and gauges Fig.3-1, Fig.3-2
and Fig.3-3 in this chapter.
This operation lever is used to control the traveling indirection
and speed.
The machine applies front 4/rear 3 gearbox. Place the shifting
control lever in proper position and control accelerator penal to
100
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
△
! WARNING
101
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
1.2.10 Fuse
△
! NOTICE
102
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
103
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
104
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
a)Cooling
Start the engine.
Turn on the wind switch. Turn on the temperature
control switch to COOL, and the cooling indicator lamp
is on and the system is in the state of cooling.
Rotate wind switch to select three modes.
When the temperature is reduced to set temperature,
rotate the cooling starting change switch
counterclockwise until the indicator light 1 goes out and
compressor stops to work, and the indoor temperature is
the set value. When the indoor temperature is above this
temperature, indicator light is on, the compressor starts
automatically and the systeem begins to cool; When the
indoor temperature is below this temperature, indicator
light goes out and the system stops to work.
b)Heating
Turn off the cooling starting change switch before using
it.
Start the engine, and open the hot water valve.
Turn on the wind switch, select the shift and adjust it to
the proper wind.
Note: Turn off the hot water vave when cooling in summer;
Turn off the temperature control switch when heating in
winter.
1.2.12 Adjustment of Seat
△
! WARNING
When adjusting the cab’s seat, park the machine in a
safe place and stop the engine.
Adjust the seat before starting operation or replacing
the operator.
Make sure that you can depress the brake pedal
completely when your back is against the seat backrest.
105
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
Weight Adjustment
The weight adjustment handle is in the middle of seat bottom.
Backrest Angle Turn the handle A anticlockwise to reduce the damping stiffness
Adjustment C and turn it clockwise to increase the damping stiffness. Rotate
C
the damping stiffness adjust handle A by hand according to the
Fore-and-Aft
Adjustment B operator’s weight until feel comfortable.
Weight Fore-and-Aft Adjustment
Adjustment
A This handle is on the left bottom side of the seat. Pull the
fore-and-aft handle B and move the seat forward or backward to
the desired position; it will lock automatically after pushing it
down.
Backrest Angle Adjustment
Put the backrest angle adjust handle C upward to pull the
backrest until the angle is comfortable. The backrest angle is
locked when loose the handle.
Height Adjustment
There are three positions for the height of seat, and the operator
can adjust according to the need. During adjusting, set the base
under the seat by two hands and draw up forcibly and stably.
When the cracking sound is sounded, please loose your hands,
then the seat will fix in this position. Adjust the position of seat
to the highest position and draw up forcibly, and then press
down, the seat will fall to the lowest position.
Headrest Height Adjustment
Set the headrest of seat by two hands, and then draw up or press
down forcibly to adjust the height of headrest.
1.2.13 Use of Safety Belt (if assembled)
If the safety belt is assembled on the seat, please tie it when
operating the machine. Before using safety belt, please check the
degree of wear and firm. Replace it if it is necessary.
Adjust the length of safety belt before using to make sure the
safety belt can be used for safety guarantee and comfort. Move
the position of lock on the safety belt to adjust the length of
safety belt. The clamper of the safety belt is at the right side of
seat, and put the lock into the opening of clamper to jam the lock.
106
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
107
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
△
! ATTENTION
Keep the engine runs in low speed, and examine the reason
114
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
115
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
△
! NOTICE
116
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
△
! WARNING
△
! WARNING
117
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
△
! WARNING
118
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
119
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
120
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
△
! NOTICE
Keep the two sides of the bucket cutting into the material
equally to prevent only a single side working. Face the
loader forward and never let an angle exist between the
front and rear frame.
(3) Carrying Operation
The loader must be used without a truck under the following
conditions:
The ground is too soft and not level, and a truck cannot be
used.
When the transportation distance is within 500 meters, it is
not economical to use a truck.
121
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
122
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
△
! NOTICE
△
! WARNING
123
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
Check whether the towing rope and towing pin are strong
enough to support the weight of the towed machine. If
machine will pass over clay ground or go up a slope, two
towing ropes and towing pins should suffer at least 1.5 times
as weight of the towed machine.
Try to decrease the towing angle of the towing rope to
ensure that the angle between the towing rope and the towed
machine is within 30°. The height of the towing points of
the two machines should be close.
The connection between the towing equipment and the
machine should be strong.
The weight of the towing machine should be heavier than
the towed one, and have enough traction power and braking
power to be able to pull or brake two vehicles going up and
down a slope.
When towing the machine down a slope, the machine
should have sufficient traction power and braking power.
Another towing machine should be used to pull at the back
side to prevent the towed machine from losing control or
turning over.
Start to tow and brake gently, at the low speed, and turn on
the warning flash lamp.
The speed for towing the loader should be within 10 km/h.
Try to tow the machine to the nearest repairing garage. If the
distance is longer than 10 km or the towing speed faster than
10 km/h, the front and rear transmission axle must be
disassembled or put the loader on towing truck for
transportation.
3.5.3 Operation in Cold Weather
Notes at low temperature
If the temperature is too low, the engine will be difficult to start;
radiator may be frozen, the followings should be done:
Use low-viscosity fuel, hydraulic oil and lubricants. The
specific use of oil refers to ChapterⅤ2.2.2 Choice of oil
table.
124
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
△
! NOTICE
125
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
△
! ATTENTION
△
! NOTICE
Oil level check must be executed 15 minutes before
engaging the engine, or after stopping the engine.
Park the machine on level ground, and put the transmission
lever in the neutral (N) position. Press the parking brake
switch to brake, and wedge the front and back tires.
126
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
“L”
Dipstick of Shang
chai engine
“Add” tick
127
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
△
! ATTENTION
△
! TTENTION
Clean up the area around oil filter installation, and use the
filter wrench to remove the filter cartridge.
Fill engine oil into the filter element, and apply a small
amount of oil on the rubber seal.
Twist on the new filter element by hand until it contacts
with gasket.
After the sealing ring contacts with the base, tighten “1/2
“circle or “3/4~1” circle.
Check the engine oil level and oil pressure.
Start the engine and check whether the gasket is sealed; if
not, remove the filter and check the seal face.
Attention! Oil filter replacement method above is only for
reference, while in fact, the instructions on the filter shall be
as the criterion.
129
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
torque 25Nm);
Attention: Gasket 2 must be positioned well!
Tighten the drain bolt 4;
Open the oil line;
After starting the engine, check the leakage.
Single-stage fuel filter drainage/ deflation (DDE engine)
Drainage:
Put the oil pan under the prefiltering;
Unscrew the drain bolt 4, noting the liquid flowing out,
when the liquid changes from the water into the fuel, tighten
the drain bolt 4;
After starting the engine, check the leakage.
Deflation:
Open the oil line;
Start the engine, and make the engine run for 2minites;
Put the oil pan under the prefiltering;
Unscrew the deflated bolt 8, deflating until bubbles
disappear and fuel flows out;
Tighten deflated bolt 8 (tightening torque 15Nm);
After starting the engine, check the leakage.
Attention: working beside the fuel equipment, it is
prohibited to open flame and smoking, and properly handle
the waste fuel!
Clean fuel filter (when optional) (SHANGCHAI)
Shut down the engine.
Cut off the oil supply valve on the fuel tank.
Unscrew the filter cover nut 1, and put down the filter shell
3.
Remove filter element 2.
Clean the shell and filter element with the clean and
uninflammable solution.
Install the filter element.
Oil filling and deflation of the fuel system (SHANGCHAI)
Move the throttle lever to “stop the oil supply (OFF)”
position.
131
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
Clean strainer
Loosen the switch 1, and take off the lid 2;
Remove dust cup from the part 4, and empty it;
Install the dust cup 3 on the part 4, and cover the lid 2, and then
tighten the switch 1;
Attention: never fill the oil into the dust cup, and the
damaged dust cup must be replaced!
Put filter element 4 into diesel fuel to clean, and drip it dry;
Clean the air filter shell;
Check the rubber ring 5&6, replacing them when in need;
Inject the engine oil into the oil cup until it reach the arrow
scale;
Put the oil cup and the filter element back to the filter shell, and
tighten the bolts.
Attention: Never use gas to wash the filter element, and
handle the old oil properly!
Clean dry-type air filter dust mouth
Press the dust mouth, as indicated by the arrows in the picture;
Clean the dust mouth regularly;
Press the top of the dust mouth together to remove the
agglomerated dust.
Install the filter element 3, put back cover 2 and tighten lid 1;
Attention: never use the gas, hot water to wash the filter
element.
Maintenance of the air filter (SHANGCHAI engine)
Clean air filter element
△
! ATTENTION
(1) Along the folds length direction, use the compressed air to blow
the internal.
(2) Along the filter folds length direction, use the compressed air to
blow the external. Along the folds length direction, use the
compressed air to blow the internal. Check the filter element.
Clean filter element with water (pressure does not exceed
280KP)
(1) Along the filter folds length direction, use the water to wash the
internal of the filter element.
134
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
(2) Along the filter folds length direction, use the water to wash the
external of the filter element. Dry it and check the filter element.
(2) Pack the sound filter, and storage it in a clean and dry place.
135
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
(4) Remove the lower cover lid and filter element on the air filter.
(12) Install the lower part on the upper part, and tighten the clamp
bolt.
Clean the cooling system
△
! ATTENTION
(1) Slowly unscrew the radiator cover to release the pressure, and
then remove the cover.
(3) Unscrew water drain valve on the engine body. If the engine is
equipped with gearing oil cooler, air compressor pump (water
cooling), you should also unscrew the oil cooler and the water
drain valve of air compressor pump. Drain out all cooling fluid
in the cooling system.
(4) Tighten the water drain valve.
(5) Fill commodity cleaning fluid, or the cleaning fluid where every
40L of water is mixed with 1kg of sodium hydrogen sulfate
(NaHSO4), into the cooling system. Starting and running the
engine for 30 minutes, stop the engine, and release cleaning fluid.
Rinse cooling system with clean water, until the discharged
water is clean.
Attention! Don't run engine when flushing.
(6) Tighten all the water drain valves. Add the neutral solution, or
the solution where 40L of water mixed with 250g crystallization
sodium carbonate (Na2CO3+10H2O), into the system.
(7) Starting and running the engine for 10 minutes, stop the engine,
and release the neutral solution.
(8) Rinse cooling system with clean water, until the discharged
water is clean.
Attention! Don't run engine when flushing.
(9) Tighten all the water drain valves.
(10) Inject clean water to the engine. Run the engine for 10 minutes,
and then drain the water. Repeat the above approach, until the
discharged water is clean.
137
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
△
! ATTENTION
(6) Coolant level is 10~15mm away from the bottom of the radiator
cover.
(7) Before the radiator cover is not covered, start the engine; after
liquid surface is stable, according to the need, fill the cooling
fluid.
(8) Stop engine, and tighten the radiator cover. Check and tighten all
water drain valves again.
Maintenance of supercharger
Turbochargers and turbo engine have a close relationship in
performance; the change of the performance of the supercharger,
will directly affect the engine performance; in order to make the
supercharged engine keep good comprehensive performance, as
the engine, supercharger must be used in a right way and has a
good maintenance in the process of using. Because the leakage
of joints in the inlet and outlet system will affect the work of the
supercharger, the user must often check the fastening of the
external joints.
139
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
△
! ATTENTION
140
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
△
! WARNING
141
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
△
! NOTICE
142
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
Drain all the oil out and clean the oil on the draining plug,
the sealing surface of shell and the gearbox, assemble them
well with new sealing ring.
Loosen the oil inlet cover of the gear box which is on the
left side of the machine. Inject the prescriptive
hydrodynamic drive oil.
Start the engine and run at idle status. Add oil until the oil
Oil draining plug of transfer case
143
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
△
! NOTICE
Don't drain oil under the cold state; when oil temperature
is around 40℃, oil discharge effect is best. During oil
draining, not only drain clean the transmission oil, but
also drain clean the oil in radiator and tubing.
Before transmission work, add appropriate amount of
specified oil; considering the oil filled volume of the
cooler, filter, tubing and torque converter, during filling
oil for the first time, the filling amount is more than the
regular amount in the future.
If the old oil is dirty, do not add new oil directly.
Disassemble the coarse oil filter which is in profile, and
clean all the parts. If there are any metal powders or
fragments please contact the maintenance man.
Assemble the parts, and add a little new hydrodynamic
drive oil. Start engine run it at idle status for 3~5 minutes.
Drain the oil in the oil pan out and add new prescribed
oil.
③Replace gearbox filter
144
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
△
! ATTENTION
Drive the loader to the flat place and move the machine at
creep speed by throttling down to guarantee that the
marking line of end face of a driving axle’s wheel edge is in
the horizontal position. While wheel drain plug shall be
Horizontal line underneath the marking line as shown in the figure.
The engine shuts off and the gear lever comes to the neutral
position. Press the parking brake switch or pull the parking
Wheel drain plug brake handle and place stoppers before and behind the tire.
Clean up the areas around the wheel drain plugs at the
driving axle’s both sides and the filling screw plug at the
Axle house center of the axle house. Disassemble the screw plug to
oil fill plug
observe to make sure the oil level inside the driving axle
shall be at the wheel edge draining port or at the lower edge
of the oil filling port of axle house. If the oil level stops
Axle house below the lower edge of the oil port, the specified gear oil
oil drain plug
shall be filled in. See “2.2 Oil Selection in Chapter V” for
selecting the gear oil, same as below.
Check the oil level of the rear driving axle as per the above
mentioned procedures.
② Replace with the new oil
△
! NOTICE
146
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
△
! WARNING
147
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
△
! WARNING
148
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
⑥Oil Temperature
The normal working temperature should not exceed 90℃.
The temperature up to 130℃ in hubs cannot be admitted. If
the temperature is exceeding 130℃, the vehicle must be
stopped and inspected for braking system or axle.
⑦Grease
Use multi-purpose grease with following properties:
Lithium soap, its drop point is 170℃, NLGI class2. The grease
must be anti-corrosive, water-resistant and walk stable.
Re-grease all pressure grease fittings weekly.
Check tightening torque of all screwed joints between axles and
frames/transmission shafts/rims. (First check after 50 operating
hours)!
149
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
△
! WARNING
△
! NOTICE
Press the braking control lever to carry out braking. Start the
engine and keep it at idle status for 10 minutes. Raise and
lower the boom several times, and tilt the bucket forward
and backward several times.
Raise the boom to the highest position; tilt the bucket
backwards to the extreme position and shut the engine.
Push the bucket control lever forward to let the bucket tilt
forward freely by its weight. Drain out the oil in the bucket
cylinder. After the bucket has tilted to the desired position,
push the working device control handle forward to let the
boom fall down by its weight freely. Drain out the oil in the
boom cylinder.
△
! WARNING
Air exchange Start engine, and raise and lower lift arm. Tilt the bucket
Ventilation cover filter
forward and backward the bucket to the extreme position
2~3 times to let the hydraulic oil fill the cylinders and pipes
sufficiently. And run the engine in the idle status for 5
minutes to release the air in the system.
151
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
Shut the engine. Check the oil level. Add oil when it is not
enough.
3.6.6 A/C
△
! WARNING
There is risk of serious bodily harm.
The rotating parts may result in serious tamping
injury or cutting injury.
Shut down the engine before check air condition
belt tension.
Regularly check the status of driving belt.
1 Driving belt
152
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
△
! ATTENTION
Do not use the high pressure flushing.
Follow these steps to regularly clean the condenser:
1. Open the condenser cover.
2. Using compressed air to blow the condenser from the
bottom.
3. Close the condenser cover.
1 Evaporator
2 Condenser △
! ATTENTION
If the system pressure becomes too high, due to the
condenser jam, the air condition will be cut off.
Before using switch to restart the system, you must
first clean the condenser.
△
! ATTENTION
Do not use the high pressure flushing.
Regularly clean the evaporator. The evaporator can be
simply cleaned under the state of installation. Use a
soft brush, rather than compressed air.
Remove the evaporator cover and air conditioner filter
element before cleaning, and then reinstall them.
If you want a more thorough cleaning, you must loosen
the evaporator from the installation seat and clean from
the rear. Therefore, this work should be done in SDLG
authorized repair shop.
153
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
△
! WARNING
156
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
1 Insufficient battery
1 Charge
7 Starting motor turns feebly charge
2 Replace
2 Faulty alternator
1 Faulty cable
Starting motor disengaged 1 Check and repair
8 2 Insufficient battery
before engine starts 2 Charge
charge
157
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
158
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
159
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
160
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
161
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
162
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
CHAPTER Ⅳ OPTION
OPTION
Item Applied machine Remark
Standard bucket 2.8 m³
Standard bucket 3.0m³ (Standard arm)
Bigger bucket 3.6 m³ ( Bucket width 3300)
The machine without
Bigger bucket 4.2 m³(Main cutting board is quick-change equipment
Export machine(LG958L,LG959)
protuberant)
Bigger bucket 4.5 m³(Bucket width 3300)
Rock bucket(2.0m³、2.7m³、3.0m³)
Side dumping bucket 2.5m³ Only applicable for 3 valve
Multifunctional bucket 3.0m³ Only applicable for LG958L standard machine
Bucket 2.8m³
Bucket
Standard bucket 2.8m³(Flat cutting board)
Only applicable for LG958N
Bigger bucket(3.6 m³,4.5m³)
Rock bucket 2.8 m³
Quick-change standard bucket 3.0m³
Quick-change standard bucket 3.0m ³
(Assembled with wearing plate)
LG959 Quick-change standard bucket 3.0m³ With quick-change equipment
Quick-change bigger bucket 4.2m³
LG959 quick-change bigger bucket 4.5m³
LG956 quick-change rock bucket 2.4m³
Only applicable for standard
LG956 Standard pallet fork (1.25m)
Without quick-change equipment machine
Fork LG959CE pallet fork (1.25m)
LG956 quick-change pallet fork
Quick-change machine
LG959 quick-change pallet fork
Grass Grass grapple (Width 2966, minimum grip
grapple diameter 1313, placket 3172)
Log grapple (skewer combine, width 2256,
Export machine(LG958L,LG959) Only applicable for 3 valve
placket 1884)
Log grapple (forfication, width 2622, placket
Log 1633)
grapple
Quick-change log grapple (forfication, width
2622, placket 1633) Only applicable for 3 valve
Combine quick-change log grapple (width quick-change machine
Only applicable for LG958L
2612, placket 1686)
Others Snow plough Without quick-change equipment Only applicable for 3 valve
163
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
SUBSTITUTION
Standard Substitution Applied machine Remark
Radial tubeless tyre Change the spoke
20 layers L5 tyre simultaneously
Tyre with inner tube Desert tyre
20 layers L5 tubeless tyre
General 20 layers tubeless tyre (L-3)
Normal counterbalance
Oversize counterbalance 1800kg
1400kg
Non-Single refrigeration air Single refrigeration air conditioner Export machine(LG958L,
conditioner module module LG956-08
LG959)
Engine hood with fixed
Engine hood with rotary window ribbing
window ribbing
Only applicable for 3 valve
Tooth wear-resisting plate
standard machine
Antifreeze ( -35 ℃ ) and
Antifreeze ( -45 ℃ ) and hydraulic oil
hydraulic oil ( L-HM46 ) Cold area
(VG46)module for cold regions
module
L-HM 46 hydraulic oil MV68 hydraulic oil High temperature area
turn signals module Light support module for India Export to India
Only applicable for 3 valve
Pilot single joystick Pilot double joystick standard machine
Only applicable for LG958L
Rear turning light hood License plate
Warmer Air conditioner
EXTRA
Item Applied machine Remark
Cold boot device
Only applicable for LG958L
LG95X wearing plate module (two-bank holes)
Differ according to the
The third hydraulic connection Export machine(LG958L,LG959)
export area
164
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
CHAPTERⅣ
MAINTENANCE
1 MAINTENANCE GUIDE
167
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
168
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
170
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
oil.
Follow the first-in-first-out rule to maintain oil quality
during long-term storage (use the oil with the longest shell
life).
2.1.7 Filters
Filters are extremely important safety components. They
can prevent impurities in the fuel from entering important
equipment and causing problems. Replace all filters
periodically. For the maintenance cycle, refer to 3
CONTENTS OF MAINTENANCE in this chapter.
Replace filters at shorter intervals when the machine works
in a severely bad environment.
Never try to clean paper filter elements and use them again.
Always replace them with a new one.
When replacing the oil filters, check whether there are some
metallic particles adhering to the old filter. If some metal
particles are found, consult the maintenance people.
Never open the packs of new filters until they are used.
Always use authorized filter parts.
171
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
172
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
173
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
174
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
3 CONTENTS OF MAINTENANCE
177
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
Carry out the periodic maintenance of every 10, 50, 100 and 250
hours with this maintenance operation at the same time.
Check and adjust the clearance of hand brake system.
Check the wear condition of brake discs and friction discs.
Replace them if necessary.
Clean the silencer of the braking electromagnetic valve.
Check if there is leakage in the hydraulic system, check and
clean the air vent of gearbox. Clean the oil pan of gearbox
and oil suction filter cartridge in the oil pan of the gearbox.
Replace the scavenge filter cartridge of the hydraulic oil
tank and the cartridge of pilot filter. Replace the gearbox oil,
at least replace it once a year. (For VRT200 gearbox)
Replace the filter of air conditioner(when it is installed):
after cleaning the filter,if the volume of output wind is not
enough,please replace the filter in advance.
Clean the oil pan of gearbox. Clean the suction filter
cartridge in the oil pan of gearbox. Replace the breathing
filter of gearbox and the filter cartridge in the oil lines of
torque converter-gearbox, replace the gearbox oil. Replace
once at least annually.
Check the parking control device.
Clean or replace fuel first filter. Replace air filter main filter
element.
178
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
180
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
CHAPTERⅥ SYSTEM
PRICIPLE DIAGRAM
1 TRANMISSION SYSTEM
1. Input gear 2. KR reversing gear 3. Intermediate shaft gear 4. Fourth speed gear 5.
K34 gear ring 6. Third speed gear 7. Output gear 8. Second speed big and small gears
assembly 9.KR2 gear ring 10. Working pump drive gear 11. Steering pump drive gear
12. First speed gear 13.KV1 gear ring 14. KV reversing gear
Fig. 6-1 Transmission System Principle Diagram
181
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
2 HYDRAULIC SYSTEM
1.Working pump 2.Hydraulic tank 3.Pressure selecting valve 4.Duplex pump 5.Priority valve
6.Diverter 7.Combination valve 8.Steering cylinder 9.Pilot valve 10.Multitandem valve
11.Boom cylinder 12. Rotary bucket cylinder
Fig. 6-2 Hydraulic System Principle Diagram of LG958L/LG959
1.Working pump 2.Hydraulic tank 3.Pilot filter 4.Pressure selecting valve 5.Flow valve
6.Duplex pump 7.On-off valve 8.Priority valve 9.Combination valve 10.Diverter 11.Steering
cylinder 12.Pilot valve 13.Multitandem valve 14.Boom cylinder 15. Rotary bucket cylinder
Fig. 6-3 Hydraulic System Principle Diagram of LG958N
3 BRAKE SYSTEM
1.Air booster pump 2. Throttle valve 3. Air brake valve 4. Gasholder 5.Oil-water separator
combination switch 6.Air compressor 7.Brake magnetic valve 8.Parking brake chamber
184
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
Step the left brake pedal during driving. Compressed air from
gasholder 3 goes through air brake valve 2 enters in gas chamber
of gas booster pump 1, pushes the piston of booster pump, the
other chamber of the pump is filled with brake fluid (the
maximum pressure of oil is about 14MPa), then high pressure
brake fluid pushes the piston of caliper disc brake to make the
friction plate touch the brake discs, which can brake the vehicle;
pneumatic signal will be output to cut off the power of gearbox
at the same time.
Step the left brake pedal during driving. The principle of braking
is the same as using the left pedal, but power of gearbox will not
be cut off.
Release the brake pedal, and gas in the booster pump will be
discharged into the atmosphere through the brake valve, the
braking state will be removed.
1.Air booster pump 2. Throttle valve 3. Air brake valve 4. Gasholder 5.Oil-water separator
combination switch 6.Air compressor 7.Brake magnetic valve 8.Parking brake chamber
and remove the brake; When parking, press the button of the
brake magnetic valve, gas in the booster pump will be
discharged into the atmosphere through the brake magnetic
valve, the braking state will be removed by pulling up the brake
device by spring force, and parking brake indicator lamp will
be on due to the output pneumatic pressure signals, and cut off
the power of gearbox.
When the pressure of the system is lower than 0.4MPa, the brake
magnetic valve will be power off automatically to discharge the
compressed air into air through manual brake valve to realize
emergency brake, and to ensure the safety of the worker and the
machine.
4 ELECTRIC SYSTEM
186
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
187
Fig.6-6 Electrical Principle Diagram for LG958L/LG959 (Equipped with Weichai engine)
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
188
Fig.6-7 Electrical Principle Diagram for LG958L/LG959 (equipped with DDE engine)
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
189
Fig.6-8 Electrical Principle Diagram for LG958L (equipped with Shangchai engine)
Operation & Maintenance Manual──LG958L (N)/LG959 Wheel Loader
190
Fig.6-9 Electrical Principle Diagram for LG958N (equipped with Weichai engine)