EPSCC1 Contractor WPS N°: 098CR

Job nr. LY010 APPLICABLE PQR: N.A.

GREAT MABRUK DEVELOPMENT PROJECT

WELDING PROCEDURE SPECIFICATION FOR


CAP REPAIR ON BUTT WELD
PIPE TO FITTINGS

C. V. M.
1 07/10/2004 Approved for construction Cantarelli Bîrlan Mazzi
C. V. M.
0 20/09/2004 Issued for comments
Cantarelli Bîrlan Mazzi
REV DATE DESIGNATION BY CHECK APPR

STATUS CODE : A = Issued for comments - B = Issued for approval - C = Approved – I = Information only

TOTAL OR PARTIAL REPRODUCTION AND/OR UTILIZATION OF THIS DOCUMENT ARE FORBIDDEN


WITHOUT PRIOR WRITTEN AUTHORIZATION OF THE OWNER

COMPAGNIE DES PETROLES TOTAL LIBYE


GREAT MABRUK DEVELOPMENT PROJECT
EPSCC1 Contract N° : GMD/84/2002/MA
WELDING PROCEDURE SPECIFICATION FOR CAP REPAIR ON BUTT WELD
Doc. Title: PIPE TO FITTINGS
REVISION STATUS
Doc. N°: TEC-GRL-WEL-250-10007
C.P.T.L. 1 C

Doc. Title : TEC-GRL-WEL-250-10007 – Rev. 1


File: LY010_WPS_098CR_Rev1_App..doc Page: 1 / 3
EPSCC1 Contractor WPS N°: 098CR

Job nr. LY010 APPLICABLE PQR: N.A.

THIS PROCEDURE IS IN ACCORDING WITH SPEC. GS PLR 421 AND API STD 1104
PROCEDURE TO BE USED FOR: CAP REPAIR ON BUTT WELD PIPE TO FITTINGS
WELDING PROCESS(ES): SMAW
BASE MATERIAL: API 5L Gr.B TO ASTM A105 / ASTM A234 WPB OR SIMILARS
OUTSIDE DIAMETER RANGE: FROM 168,3 mm (6”) TO 273,0 mm (10”)
WALL THICKNESS RANGE: FROM 8,2 mm UP TO 11,1 mm
PROJECT O.D. AND W.T.: O.D. 168,3 mm (6”) W.T. 9,5 AND 11,0 mm
O.D. 219,1 mm (8”) W.T. 8,2 mm
O.D. 273,0 mm (10”) W.T. 11,1 mm
JOINT DESIGN AND WELDING SEQUENCE

D
D = 2 mm MAX

FILLER METAL
AWS AWS TUNGSTEN
BEAD TRADE NAME MANIFACTURER SIZE Ø mm
SPECIFICATION CLASSIFICATION SIZE Ø mm
CAP FOX EV 50 BÖHLER THYSSEN A5.1 E7018-1 3,2 N.A.
// // // // // // //

NUMBER OF BEADS : ONE


WELD POSITION : 5G
DIRECTION OF WELDING : VERTICAL-UP
SHIELDING GAS : N.A. FLOW RATE : N.A.
PURGING GAS : N.A. FLOW RATE : N.A.
WELDING PARAMETERS
HEAT INPUT
CURRENT TRAVEL SPEED WIRE SPEED
BEAD POLARITY AMPERE VOLTS ( kJ / mm )
AC or DC ( cm / min ) ( m / min )
Aver. Of PQR
CAP DC + 90 to 120 22 to 26 6 to 9 N.A.
// // // // // // // //

NUMBER OF WELDERS : ONE


TIME LAPSE BETWEEN END OF ROOT BEAD AND START OF HOT BEAD : N.A.
TIME LAPSE BETWEEN END OF HOT BEAD AND START OF SUBSEQUENT BEADS : N.A.
MINIMUM NUMBER OF BEADS BEFORE JOINT ALLOWED TO COOL : THE REPAIR SHALL BE COMPLETED WITHOUT INTERRUPTION
TYPE OF LINE-UP CLAMP : N.A.
REMOVAL OF LINE-UP CLAMP : N.A.
PIPE MOVE-UP AFTER : N.A.
CLEANING : BY GRINDING AND/OR BRUSCHING WHEN NECESSARY
PREHEATING MIN. TEMP. : 100° C CONTROLLED BY THERMAL CRAYON AND/OR DIGITAL THERMOMETER
TYPE OF HEATER TO BE USED : MANUAL BURNERS WITH PROPANE GAS
INTERPASS TEMP. MIN. : 100°C MAX. °C 250°C POSTHEATING N.A.
REMARKS: THE LOW HYDROGEN CONSUMABLES (FOX EV 50) SHALL BE SUPPLIED IN VACUUM SEALED CONDITION

COMPAGNIE DES PETROLES TOTAL LIBYE


GREAT MABRUK DEVELOPMENT PROJECT
Doc. Title : TEC-GRL-WEL-250-10007 – Rev. 1
File: LY010_WPS_098CR_Rev1_App..doc Page: 2 / 3
EPSCC1 Contractor WPS N°: 098CR

Job nr. LY010 APPLICABLE PQR: N.A.

METHOD OF REMOVAL OF THE DEFECT

• THE REMOVAL OF ALL DEFECTS SHALL BE MADE BY GRINDING. THE GRINDING OPERATION SHALL BE CARRIED OUT
UP TO THE COMPLETE REMOVAL OF WELD DEFECT AND IN ANY CASE UP TO SOUND METAL.
• THE REMOVED PORTION SHALL BE SUFFICIENTLY DEEP AND LONG TO REMOVE THE DEFECT.
• AT THE END AND SIDE OF THE CAVITY THERE SHALL BE GRADUALLY TAPERED FORM THE BOTTOM OF THE GROVE
TO THE SURFACE OF THE WELD METAL.
• AFTER DEFECT REMOVAL, THE REPAIR EXCAVATION SHALL BE CHECKED BY MAGNETIC PARTICLE INSPECTION TO
ENSURE THE COMPLETE REMOVAL OF THE DEFECT.
• IF DEFECTS HAVE NOT BEEN REMOVED, OR NEW DEFECT HAVE BEEN ADDED AS A RESULT OF REPAIR ATTEMPT, A
FURTHER REPAIR ONLY IS ADMITTED IN ACCORDANCE WITH A PRE-QUALIFIED WELDING PROCEDURE.
• IN CASE OF DEFECTS ON FILLING OR CAP WELD BEADS, THE LENGTH OF THE CAVITY SHALL BE 100mm AS MINIMUM.
• THE WELDS REPAIRED SHALL BE INSPECTED BY THE SAME NON-DESTRUCTIVE TESTING PREVIOUSLY USED FOR
DEFECT DETECTION. (VISUAL AND RADIOGRAPHIC TESTING)

COMPAGNIE DES PETROLES TOTAL LIBYE


GREAT MABRUK DEVELOPMENT PROJECT
Doc. Title : TEC-GRL-WEL-250-10007 – Rev. 1
File: LY010_WPS_098CR_Rev1_App..doc Page: 3 / 3