FREX BUILDERS LTD Client : Mr S.

Zulu
Situated :off Leonard hill road plot 48/48 Attention: by F.Kazimilo
bauleni lusaka
Contact :+260977654606/0956874838
Email :Aumandofrex@gmail.com DATE: 31/07/20

SUBSTRUCTURE MATERIALS (ONLY )

DESCRIPTION QTY UNIT PRICE AMOUNT


Blocks 8” ( 400*200*200mm) 2500 No. K 4,60 K 11,500,00
Cement 556 50 Kgs Bag K 125,00 K 69,000,00
Building sand 02 40 Tones K 2,000,00 K 4,000,00
Quarry dust 04 80 Tones K 2,500,00 K 10,000.00
Crush stones 20mm 03 60Tones K 2,500,00 K 7,500,00
Anti-Termite 02 5Liters K 605,00 K 1,210,00
Rebar Y12 (12mm) 115 Pieces 12m K 115,00 K 13,225,00
Rebar Y 16 (16 mm) 45 Pieces 12m K 180,00 K 8,100,00
Rebar Y20 ( 20mm) 06 12m K 450,00 K 2,700,00
Rebar Y 8 (8mm) 95 Pieces 6m K 60,00 K 6,175,00
Corn Force wire Heavy duty (257) 03 Roll Meters 50m K 1,600,00 K 4,800,00
Brick force wire (6”) 4 Batches Batches K 180,00 K 720,00
Wire Nails (4”) 10 1Kgs K 30,00 K 300,00
Concrete Nails (4”) 10 1Kgs K 50,00 K 500,00
Wire Nails (3”) 10 1Kgs K 30,00 K 300,00
Polythene Sheets heavy duty 03 Rolls Meters 100m K 275,00 K 825,00
Laterite/Glavel 06 20 Tones K 1,200,00 K 7,200,00
Timbers 50*50mm 30 Pieces 5 Meters K 65,00 K 1,950,00
Fascia Boards 200*25mm 30 Pieces 5 Meters K 180,00 K 5,400,00
Tying Wire 02 batches Kgs 25 K 410,00 K 820,00
Premix concrete slab {SINOMA} 40.00 /cubic meter K1,200,00 K 48.000,00

BANK NAME: FIRST NATIONAL BANK VAT 16% K


A/C NAME : FRED KAZIMILO LABOUR COST 35% K 71,478,00
A/C NUMBER: 62745941379 SUBTOTAL K 204,225,00
BRANCH CODE: 005
TOTAL K 276,210,00
Terms of payments 50 % down payment. 50% upon completion of the work. Excellence
And Quality Is Our Priority