2019 IEEE PES Innovative Smart Grid Technologies Asia

Analysis of Coordinated Control Strategy for Large-scale Renewable Energy VSC-


HVDC Integration

Li Yan, Wang Zhibin, Chi Yongning, Wei Chunxia, Liu Hongzhi, Tang Haiyan
China Electric Power Research Institute
China State Key Laboratory of Operation and Control of Renewable Energy & Storage Systems
Beijing, China
E-mail: liyan@epri.sgcc.com.cn

Abstract— When a large-scale renewable energy source is transmission projects with high voltage and large capacity,
connected to a VSC-HVDC grid and the VSC-HVDC system is Zhangjiakou renewable energy can be accommodation in a
used for long-distance transmission, the operational wider range. At the same time, it utilizes the fast power
characteristics of the renewable energy and the VSC-HVDC regulation capability of VSC-HVDC to solve the problem of
grid will affect each other. The adaptability of the renewable weak of renewable energy generation. After the completion
energy to the VSC-HVDC grid will become an important of the project, two VSC-HVDC converter stations in
factor affecting the operation of the grid. China has built the Zhangjiakou Kangbao and Zhangbei will be used to collect
Nanao three-terminal VSC-HVDC project, the Zhoushan five- the abundant wind power and photovoltaic power generation
terminal VSC-HVDC project, and the two- terminal of the
in Zhangjiakou.
Xiamen VSC-HVDC project. Breakthroughs have been made
When a large-scale renewable energy source is
in the impact of AC/DC system interconnection and key
equipment technologies for VSC-HVDC transmission systems, connected to a VSC-HVDC grid and the VSC-HVDC
especially VSC-HVDC converters and control protection system is used for long-distance transmission, the
technology. This paper focuses on the two main problems with operational characteristics of the renewable energy and the
renewable energy island integration. The first problem is how VSC-HVDC grid will affect each other. The adaptability of
the VSC-HVDC grid provides a stable AC voltage to the the renewable energy to the VSC-HVDC grid will become
renewable energy source without AC grid support. The second an important factor affecting the operation of the grid.
issue is how to maintain the energy balance of the VSC-HVDC According to the pre-engineering design, in the Zhangbei
system in the event of a fault. When the receiving end fails, the VSC-HVDC power grid project, Kangbao Station and
power energy cannot be sent out. When the sending end fails, Zhangbei Station will be in the island operation mode for a
the energy will accumulate in the VSC-HVDC grid. The long time. According to the engineering design
resulting overvoltage and overcurrent problems require new requirements, the Zhangbei four-terminal VSC-HVDC grid
control protection technology to will be introduced in this adopts the ring structure of the true bipolar half-bridge metal
paper. return line grounding. The specific structure is shown in
Figure 1. The capacity of Zhangbei single-pole converter
Keywords Coordinated Control Strategy, Large-scale station is 1500 MW, the capacity of single-pole converter of
Renewable Energy, VSC-HVDC Integration Kangbao station is 750 MW, the capacity of single-pole
converter of Beijing station is 1500 MW, the capacity of
I. INTRODUCTION single-pole converter of Fengning station is 750 MW, DC
In recent years, VSC-HVDC transmission technology The overhead line has a rated current of 3000 A. In the
has developed rapidly. China has built the Nanao three- normal mode, Zhangbei and Kangbao are the renewable
terminal VSC-HVDC project, the Zhoushan five-terminal energy sending terminals, the Beijing station is the receive
VSC-HVDC project, and the two- terminal of the Xiamen end, and Fengning is the regulation terminal, which is
VSC-HVDC project. Breakthroughs have been made in the responsible for balancing the power of the VSC-HVDC grid.
impact of AC/DC system interconnection and key Positive electrode Overhead Line

equipment technologies for VSC-HVDC transmission Kang


Bao
Feng
Ning
systems, especially DC converters and control protection Negative electrode
technology. Aiming at the problem of power transmission
from the 10 million-kilowatt wind power base in Northern
Hebei, comprehensive analysis of the AC grid structure in
the Beijing-Tianjin-Tangshan region, Zhangbei renewable
energy Power has become one of the options for the
adoption of the VSC-HVDC grid. Zhangbei Renewable Zhang
bei Beijing

Energy VSC-HVDC sending and discharging


Demonstration Project is a major demonstration project of
the State Grid Corporation to solve the problem of Figure 1. Zhangbei four-terminal flexible grid structure
Zhangjiakou renewable energy transmission and
consumption. Through the construction of VSC-HVDC

978-1-7281-3520-5/19/$31.00 ©2019 IEEE 234


This paper focuses on the two main problems with engineering, the six bridge arms will be locked at the same
renewable energy island integration. The first problem is time, which will cause a large voltage and current impact on
how the VSC-HVDC grid provides a stable AC voltage to the DC transient and AC transients of the system. In order to
the renewable energy source without AC grid support. The reduce this impact, Zhangbei VSC-HVDC grid recommends
second issue is how to maintain the energy balance of the the use of split arm locking technology.
VSC-HVDC system in the event of a fault. When the
receiving end fails, the power energy cannot be sent out. C. DC voltage coordinated control strategy
When the sending end fails, the energy will accumulate in Zhangbei VSC-HVDC grid has two characteristics:
the VSC-HVDC grid. The resulting overvoltage and First, the long-distance overhead line is used. When the
overcurrent problems require new control protection line runs from closed-loop to open-loop, it may cause a
technology to will be introduced in this paper. large voltage drop on the overhead line. For example,
II. COORDINATED CONTROL STRATEGY FOR VSC-HVDC Zhangbei to Beijing line open-loop operation, The power
GRID AFTER RENEWABLE ENERGY INTEGRATION
from Zhangbei will turn to Kangbao and Fengning to flow
into Beijing. At this time, the DC voltage of the line will
A. VSC-HVDC line fault fast recovery technology increase due to the increased line impedance.
The second is to ensure that the DC circuit breaker on the
The VSC-HVDC grid operates in a flexible and versatile
line can operate normally, and the control line voltage
manner, and can operate in ring, open loop or de-run. The
cannot be raised too high. At present, the mainstream
faulty fast recovery control of the DC line allows the VSC-
scheme proposed by several well-known domestic control
HVDC grid to flexibly switch between these operating
equipment manufacturers mainly controls the DC voltage
modes. In order to prevent the short circuit from causing the
from the way of controlling the additional deviation slope
ring power grid to collapse, the Zhangbei VSC-HVDC grid
control.
needs to use DC circuit breaker and DC line fault fast
The control mode of the VSC-HVDC grid converter
recovery technology. The purpose is to identify the fault
station may be one of a constant power control mode, a
within a few ms, locate the fault, determine the action
constant DC voltage control mode or a constant AC voltage
breaker, and finally exit the trip. And coincide with certain
control mode. Under the premise of inter-station
conditions.
communication, the control mode can be switched by
There are two advantages to the fast recovery operation:
master-slave control. When there is no station
First, to ensure the transient stability of the AC grid to the
communication, the converter station detects the DC voltage
greatest extent. Second, the impact of voltage, current and
of the port of the station, and controls the takeover of the
power on the equipment during the rapid recovery process is
DC voltage control through the deviation slope control after
smaller, which helps to improve the safety and friendliness
the DC voltage exceeds the limit.
of the control of the VSC-HVDC grid equipment.
Taking Zhangbei VSC-HVDC grid as an example, for
When a fault occurs on the line, the circuit breaker at both
Kangbao converter station and Zhangbei converter station,
ends of the line must be disconnected first. A key
the DC voltage can not be controlled in the island mode, and
technology is that the circuit breaker that needs to be opened
can only be coordinated within the pole; in the networked
does not need to be reclosed. This involves the problem of
mode, there is the voltage support of the AC grid to the DC
permanent and transient fault judgment. If it is permanent,
grid. These two stations can be configured to coordinate
the faulty circuit breaker is not suitable. If it is a transient
control of DC voltage. As a power regulating terminal
fault, it is necessary to pass the two circuit breakers in the
connected to the AC grid, Fengning Station can be used as a
ring VSC-HVDC grid. The identification of transient faults
backup DC voltage control station. As the DC voltage
and permanent faults is mainly achieved by the function of
control main station connected to the AC grid, Beijing
the branch branch of the hybrid DC breaker. The basic
Station realizes the deviation slope control of DC voltage.
principle is: after the fault, the sub-module of the branch
When the power redundancy occurs in the Beijing station,
branch is gradually combined under the premise that the DC
the Fengning station will take over the DC voltage control
breaker is successfully disconnected. If the branch branch is
when the upper limit of the deviation is reached. Zhangbei
gradually closed, no sub-module overvoltage and over-
and Kangbao stand in the island mode and do not participate
transfer branch overcurrent are generated. In the case, it is
in the DC voltage coordination control between the stations.
considered that this fault is a transient fault; if an
overcurrent or submodule overvoltage of the branch branch D. Coordinated control of power transfer after unipolar
occurs during the gradual closing of the branch branch, then blocking
the fault is considered to be a permanent fault and cannot be The single-pole blocking of the VSC-HVDC grid
closed. converter station is a serious type of fault in operation. In
B. Branch arm locking technology order to ensure the safe and stable operation of the VSC-
HVDC grid equipment after locking, it needs to be
According to the past engineering experience, once the
completed by inter-pole or inter-station power transfer. The
fault occurs in the Xiamen and Zhoushan VSC-HVDC

235
relevant control strategy is mainly determined by the control fully transferred. When the power is consumed, the upper-
mode of the single-pole blocking fault converter station, and level coordination control system is notified to orderly cut
it needs to be determined according to the specific situation: the machine, while consuming excessive power, The control
1) For a converter station with a constant power control system won the time for the order control of the wind farm.
mode, in one case, the total input power of the two poles is The converter station of the energy-consuming device
smaller than the capacity of the single pole converter, and at transmits the operating state and power information. When
this time, all the belts can be transferred. In another case, the the energy-consuming device is put into operation, the input
total power of the two poles is greater than the capacity of signal needs to be transmitted to the inter-station
the single-pole inverter. At this time, only part of the power coordination control layer, and the renewable energy field
transfer can be realized. This process needs to be carried out station is controlled by the coordination control layer for
by transmitting the inter-electrode coordination of the orderly cutting. When the cutting machine is completed, the
operating state and the power information, and the energy-consuming device will be exits. According to the
communication delay cannot exceed 2ms. simulation result, the whole process needs to leave 500ms,
2) For the inter-pole transfer belt of the island control that is, the input time of the energy-consuming device is
station, the constant AC voltage control mode is adopted. designed in 500ms. The impact and advantages and
For the Zhangbei VSC-HVDC grid, the power transmission disadvantages of the energy-consuming devices in different
is determined by the renewable energy sending end, and its locations in the VSC-HVDC grid are different. One is added
transfer mode is also divided into two cases: to the AC side and the other is added to the DC side. The
The total power of the two poles is less than the capacity advantage added to the AC side is that the cost is low and
of the single pole converter. Once the unipolar loses voltage, the footprint is small; the addition on the DC side is
the power is sent from the other pole. equivalent to a resistor, and one switch must be connected,
In the other case, when the total power of the two poles is and the IGBT must be connected in series, and the technical
greater than the single pole commutation capacity, if all the difficulty will be relatively large.
belts are not taken, the unipolar overcurrent will be caused. 3) For the converter station with the DC voltage control
The Zhangbei VSC-HVDC pole bipolar capacity power mode, since its power is determined by the DC voltage, the
upper limit is 3000MW, and the fault single pole lock power transfer cannot be realized by the inter-pole transfer
occurs in 1 second. Because it is an island control, the between the stations, and can only be realized by the inter-
power of the fault pole will be automatically transferred to station power coordinated control. Each converter station
the other pole, and the bridge arm current will increase transmits information such as the working state and power
rapidly. The current can rise to the overcurrent protection of each station's bipolar through the cooperative control
action value of the inverter within milliseconds. If no system. Because the inertia of the DC voltage is relatively
measures are taken, the inverter overcurrent protection large, the communication delay can meet the requirements
action will trip. The problem can not be solved by reducing within 3ms. The power transfer between stations is realized
the wind field output or cutting the wind power. On the one by the inter-station coordinated control between the
hand, the response speed of the wind power control converter stations. Taking Fengning pumping as an example,
protection system cannot meet the requirements of the VSC- it can cooperate with the renewable energy to eliminate the
HVDC grid characteristics, and on the other hand, the peaks and fill the valleys, so as to achieve the fluctuation of
characteristics of the VSC-HVDC converter and wind the renewable energy. The purpose of suppression is to
turbine of each manufacturer. It is also different, so it is make the Beijing station get a smooth power sending as
difficult to achieve the interconnection of the control system. much as possible. The Zhangbei four-end VSC-HVDC grid
In addition, it is not feasible to control the frequency of consists of a positive ring grid, a metal grounding grid, and
the AC connect point by the inverter or reduce the voltage a negative ring grid. When a ground fault occurs in the
of the port to reduce the power through the converter. First, negative line of Zhangbei to Beijing, the circuit breaker at
because the power of the regulation is limited, it is not both ends of the line trips this line, and the negative ring
enough to reduce all of the power. Second, because the grid line from Zhangbei to Beijing is open-loop, thus
power of the rising frequency regulation is limited, it is not automatically generating power transfer, which may result
enough to reduce so much power, and the voltage drop will in an overload from the negative line of Kangbao to
also cause the converter to over-current. Therefore, to meet Fengning. At this time, it is necessary to limit the output of
the control requirements of the inverter in the island mode, Zhangbei renewable energy on the one hand, and to reduce
only the method of installing the energy consumption device the overload of the negative electrode by transferring a part
in the primary circuit can be adopted to effectively suppress of the power of the negative electrode to the positive
the overcurrent condition in which the power of the two electrode while the positive electrode capacity is allowed.
poles is greater than the capacity of the single pole 4) When the renewable energy island is connected to the
commutation. grid, the inverter can be operated under the VSC-HVDC
The main function of the energy-consuming device is to power control mode. If there is a line trip at this time, the
absorb the excess power when the single pole cannot be non-fault pole will go to the faulty pole power, if the

236
transfer capacity is insufficient. It will be automatically disconnected. The presence of the short-circuit current will
diverted from the AC grid. directly affect the magnitude of the AC voltage on the
renewable energy side. The quality of the waveform forces
III. NEW TECHNOLOGY REQUIREMENTS FOR RENEWABLE the renewable energy into a fault crossing state.
ENERGY VSC-HVDC GRID INTEGRATION The locking fault of the VSC-HVDC converter is
Since the operation mode of the island is the normal controlled by the terminal converter station. When there are
operation mode of Zhangbei Station and Kangbao Station of multiple converter stations at the receiving end, and the sum
Zhangbei VSC-HVDC Grid Project, in terms of access of the output capacity of the normal working converter
system regulations, the converter station operates in the station is greater than the output power of the renewable
fixed AC voltage V/F mode under normal operating energy, the system works normally. In the normal working
conditions, and its output voltage quality can basically meet converter station outputs, when the sum of the capacities is
the requirements of the national power quality standard. The less than the output power of the renewable energy, the
existing renewable energy (mainly wind power and renewable energy DC grid-connected system will have a
photovoltaic) connect system regulations can fully meet the power surplus phenomenon, the most direct manifestation is
requirements of renewable energy VSC-HVDC grid- the over-voltage on the DC side of the DC system, which
connected operation, but under special conditions, requires an emergency start-up system to prevent the system
renewable energy and the electrical parameters between the from being over-voltage.
grids still interact. Therefore, the blocking of the VSC-HVDC converter
station will affect the power transmission of renewable
A. Design of renewable energy fault ride though transient
energy and affect the stability of the renewable energy side
current affecting converter station protection design
AC collection system. If the renewable energy field group is
When a low voltage event occurs in the renewable energy still expected to be in operation during the lock-in of the
side AC system, that is, the voltage is lower than 0.9p.u., the VSC-HVDC converter station, the renewable energy power
wind turbine will perform a low voltage ride through mode, generation unit will be required to have a passive operation
and the wind turbine will timely block the safety chain mode to actively support the AC system voltage stability
information related to the grid and converter. Due to the and frequency stability.
delay in the transmission of information during the low- In addition, since it is not expected that the renewable
break start-up transient process (generally about 20ms), the energy field group will stop running during the lock-up of
wind turbine is still in a constant power and large-state state, the converter station, when the fault is eliminated, the
and the current rises due to the voltage drop. system will still have a recovery process, which will need to
It can be seen from the low voltage ride-through test consider the synchronization problem between the output
curve of the doubly-fed wind turbine that the wind turbine exchange of the converter station and the communication
has a current spike within 3~5ms of the low-through mode, system of the aggregation network, so new requirements are
and the amplitude will reach about 3 times of the reference placed on the control of the converter station.
amplitude. This current will affect the operating
characteristics of the VSC-HVDC converter station, which C. The coupling between the renewable energy power
may cause overcurrent blocking at the converter station. generation unit and the converter station affects the
Therefore, when designing the overcurrent threshold of the stability of the system.
converter station, it is necessary to fully consider the Since the renewable energy side AC system is supported
operating characteristics of the renewable energy unit, by the VSC-HVDC grid converter station, the DC converter
leaving a certain margin to ensure that the overcurrent station belongs to the power electronics equipment.
protection of the converter station does not malfunction, and Compared with the large system, the AC collection system
the renewable energy and compliance system can be controlled by the converter station is equivalent to the weak
realized coordination reliability. AC system. There are many power electronic equipments in
the weak AC system. There are problems such as switching
B. The blocking of the VSC-HVDC converter station
harmonic coupling, electrical parameter coupling, control
affects the power transmission of renewable energy
parameter coupling and response speed matching among
The blocking fault of the converter station of the HVDC power electronic equipment, especially under low wind
line power is equivalent to the disconnection fault of the AC speed and low light conditions. The mutual influence is
system. That is, the renewable energy side AC collection especially obvious.
system loses the support of the converter station, and the Therefore, before designing a large-scale renewable
renewable energy power instantaneously loses the outflow energy DC grid-connected system, it is necessary to perform
path, resulting in a power surplus phenomenon. If the system-specific DC access analysis, clarify the impact and
converter station is blocked due to the HVDC-side fault, the formulate a system response strategy, that is, evaluate and
renewable energy source will also provide a short-circuit analyze the renewable energy field group.
current to the HVDC fault point before the AC breaker is

237
IV. CONCLUSION
When the renewable energy adopts the AC-DC parallel REFERENCES
transmission mode, the DC fault has little influence on the
[1] TANG Guangfu, LUO Xiang, WEI Xiaoguang. Multi-terminal
renewable energy, and only the AC-side circuit breaker can HVDC and DC-grid technology[J]. Proceedings of the CSEE, 2013,
be cut off to realize the fault current cut-off. When the 33(10): 8-17
renewable energy adopts the DC sending mode, due to the [2] Wang G. Q, Wang Z. X, Li S. Simulation study of a modular
DC fault, the current design control mode is that the whole multilevel high-voltage direct current based on voltage source
converter system for an offshore wind farm[J]. European
grid is out of service when the DC fault occurs, and the fault Transactions on Electrical Power, 2012, 22(8): 1161-1175
is isolated and then restarted. Therefore, during the VSC- [3] S.M. Muyeen, Rion Takahashi, Junji Tamura. Operation and control
HVDC converter station blocking, the renewable energy of HVDC-connected offshore wind farm[J]. IEEE Transactions on
side AC system will be loss of voltage support seriously Sustainable Energy, 2010, 1(1): 30-37
affects the stability of the AC system on the renewable [4] Gomis-Bellmunt O, Junyent-Ferré A, Sumper A, et al. Control of a
energy side. At the same time, since the renewable energy wind farm based on synchronous generators with a central HVDC-
VSC converter [J]. IEEE Transactions on Power Systems, 2011, 26(3):
power has no output path, the renewable energy power 1632-1640
generation unit will start the shift control, Chopper control [5] Eduardo Prrieto-Aragjo, Fernando D. Bianchi, Adrià Junyent-Ferré,
and crowbar control to realize the power self-consumption et al. Methodology for droop control dynamic analysis of
and fault traversal of the renewable energy power multiterminal VSC-HVDC grids for offshore wind farms [J]. IEEE
Transactions on Power Delivery, 2011, 26(4): 2476-2485
generation unit. In addition, considering the need to
synchronize with the renewable energy-side AC system [6] Gomis-Bellmunt Oriol, Liang Jun, Ekanayake Janaka, et al. Voltage-
current characteristics of multiterminal HVDC-VSC for offshore
during the restart of the VSC-HVDC grid, it is necessary to wind farms[J]. Electric Power systems Research, 2011, 81(2): 440-
consider the cooperative operation technology with the AC 450
system in the renewable energy power generation base [7] Pinto, R.T, Bauer P, Rodrigues S.F, et al. A novel distributed direct-
during the restart of the VSC-HVDC grid. voltage control strategy for grid integration of offshore wind energy
systems through MTDC network [J]. IEEE Transactions on Industrial
Electronics, 2013, 60(6): 2429-2441
ACKNOWLEDGMENT
[8] Xia Chen, Haishun Sun, Jinyu Wen, et al. Integrating wind farm to
This work is supported by SGCC technology project the grid using hybrid multiterminal HVDC technology[J]. IEEE
<Research on Key Technologies of Multi-infeed Cascaded Transactions on Industry Applications, 2011, 47(2): 965-972
Hybrid HVDC Transmission System >.