Professional Documents
Culture Documents
010 Materi Kuliah 011 Pondasi Langsung Ms01
010 Materi Kuliah 011 Pondasi Langsung Ms01
1
3. Direct Foundation
2
5. Soil Pressure due to Loads
ܸ௨
=ݍ ≤ ݍ௨௧
ܤ௫ ∙ ܤ௬
3
࢞
5.2 Eccentric Load with eccentricity ࢋ ≤
ܸ௨ 6 ∙ܯ
ݍ = −
ܤ௫ ∙ ܤ௬ ܤ௫ଶ ∙ ܤ௬
ܸ௨ 6 ∙ܯ
ݍ௫ = + ଶ ≤ ݍ௨௧
ܤ௫ ∙ ܤ௬ ܤ௫ ∙ ܤ௬
࢞
5.3 Eccentric Load with eccentricity ࢋ >
4 ∙ ܸ௨
ݍ௫ = ≤ ݍ௨௧
2 ∙ ܤ௬ ሺܤ௫ − 2 ∙ ݁ሻ
6. Checking Required
4
7. Critical Section
5
b. Critical Location 2 : Two Action Shear /Punching Shear : Thickness the
Slab
6
c. Critical Location 3 : One Action Shear : Thickness of Concrete Slab
7
8.2 Tebal Minimum Pile Cap
8
9
10. Kapasitas Geser 2 Arah (Vc)
10
11. Tulangan Minimum dan Jarak maksimum tulangan Lentur
11