Material Schedule

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

AUGUST SEPTEMBER

ITEM NO. DESCRIPTION 30 C.D. 30 C.D.


UNIT QUANTITY MATERIALS UNIT QUANTITY MATERIALS
PART A. FACILITIES FOR THE ENGINEER

A.1.1(3) Construction of Field Office for the Engineer

A.1.1(16) Operation and Maintenance of Field Office for the Engineer

PART B. OTHER GENERAL REQUIREMENTS

B.4(1) Construction Survey and Staking

B.5 Project Billboard / Signboard

B.7(2) Occupational Safety and Health Program liter 64.26 Diesel liters 64.26 Diesel

B.8(2) Traffic Management

B.9 Mobilization / Demobilization

PART C. EARTHWORKS

100(1) Clearing and Grubbing

100(3)a3 Individual Removal of Trees, 301-500mm dia. (small)

101(2) Removal of actual Structures/ Obstruction

101(3)b2 Removal of actual Structure/ Obstruction, 0.20m thick PCCP (unreinforced)

101(4)a3 Removal of Actual structure/ Obstruction, 910mm dia. RCPC

102(2) Surplus Common Excavation liter 16585.02 Diesel liters 16585.02 Diesel

102(3)a Surplus Rock Excavation, Soft liter 7464.73 Diesel liters 7464.73 Diesel

102(3)b Surplus Rock Excavation, hard liter 1281.29 Diesel liters 1281.29 Diesel

103(1)a Structure Excavation, Common Soil

103(3) Foundation Fill

103(6)a Pipe Culverts and Drain Excavation, Common Soil liter 2197.70 Diesel liters 2197.70 Diesel

104(1)a Embankment from Roadway Excavation, Common Soil liter 860.46 Diesel liters 860.46 Diesel

105(1)a Subgrade Preparation, Common Material liter 1013.53 Diesel liters 1013.53 Diesel

PART D. SUBBASE AND BASE COURSE

liter 3069.65 Diesel liters 3069.65 Diesel


200(1) Aggregate Subbase Course
cu.m. 2141.58 River mixed / Item 200 / Binakbak (On stocks) cu.m. 2086.13 River mixed / Item 200 / Binakbak (On stocks)

PART E. SURFACE COURSES

300(1) Gravel Surface Course cu.m. 288.26 River mixed / Item 300 / Binakbak (On stocks) cu.m. 288.26 River mixed / Item 300 / Binakbak (On stocks)

liter 3602.30 Diesel liter 3602.30 Diesel

bag 400.00 Portland Cement (Solido) bag 400.00 Portland Cement (Solido)

bag 6.00 Hard Asphalt bag 6.00 Hard Asphalt

length 250.00 16mm dia. RSB length 250.00 16mm dia. RSB
311(1)e1 Portland Cement Concrete Pavement (unreinforced), 0.28m thick, 14 days
length 10.00 28mm dia. Plain Round Bar length 10.00 28mm dia. Plain Round Bar

drum 5.00 Curing Compound drum 5.00 Curing Compound

cu.m. 840.00 Gravel (On stocks) cu.m. 840.00 Gravel (On stocks)

cu.m. 600.00 Sand (On stocks) cu.m. 600.00 Sand (On stocks)

PART F. DRAINAGE CONSTRUCTION

407(8) Lean Concrete, 16.5Mpa, Class "B"

PART G. DRAINAGE & SLOPE PROTECTION STRUCTURES

500(1)b3 Pipe Culverts, 910mm dia Class IV RCPC

500(1)b5 Pipe Culverts, 1220mm dia. Class IV RCPC

500(1)b7 Pipe Culverts, 1830mm dia. Class IV RCPC

liter 778.00 Diesel liter 778.00 Diesel

bag 1248.00 Portland Cement (Excel) bag 1248.00 Portland Cement (Excel)
505(2)a Grouted Riprap, Class A
cu.m. 220.00 Sand (On stocks) cu.m. 220.00 Sand (On stocks)

cu.m. 420.00 Boulders / Binakbak (On stocks) cu.m. 420.00 Boulders / Binakbak (On stocks)

liter 80.52 Diesel liter 80.52 Diesel

bag 125.68 Portland Cement (Excel) bag 61.77 Portland Cement (Excel)
506(1) Stone Masonry
cu.m. 12.00 Sand (On stocks) cu.m. 5.90 Sand (On stocks)

cu.m. 22.85 Boulders / Binakbak (On stocks) cu.m. 11.23 Boulders / Binakbak (On stocks)

508(1) Hand-laid Rock Embankment

PART H. MISCELLANEOUS STRUCTURE

603(3)a1 Metal Guardrail (Metal Beam) Including Post, Single, W-Beam

603(4)b Metal Beam End Piece (Bull Nose)

605(1)aa2 Warning Signs, 750mm, (W5-4C), Road Obstacle signs Steep Descent

650(1)ab3 Warning Signs, 750mm, (W5-5C), Road Obstacle signs Steep climb

605(6)e1 Hazard Markers, 450x600mm, Chevron Signs

611(1) Trees Furnishing and Transplanting

612(1) Reflectorized Thermoplastic Pavement Markings White

612(2) Reflectorized Thermoplastic Pavement Markings Yellow