B.7(2) Occupational Safety and Health Program liter 64.26 Diesel liters 64.26 Diesel
PART C. EARTHWORKS
102(2) Surplus Common Excavation liter 16585.02 Diesel liters 16585.02 Diesel
102(3)a Surplus Rock Excavation, Soft liter 7464.73 Diesel liters 7464.73 Diesel
102(3)b Surplus Rock Excavation, hard liter 1281.29 Diesel liters 1281.29 Diesel
103(6)a Pipe Culverts and Drain Excavation, Common Soil liter 2197.70 Diesel liters 2197.70 Diesel
104(1)a Embankment from Roadway Excavation, Common Soil liter 860.46 Diesel liters 860.46 Diesel
105(1)a Subgrade Preparation, Common Material liter 1013.53 Diesel liters 1013.53 Diesel
300(1) Gravel Surface Course cu.m. 288.26 River mixed / Item 300 / Binakbak (On stocks) cu.m. 288.26 River mixed / Item 300 / Binakbak (On stocks)
bag 400.00 Portland Cement (Solido) bag 400.00 Portland Cement (Solido)
length 250.00 16mm dia. RSB length 250.00 16mm dia. RSB
311(1)e1 Portland Cement Concrete Pavement (unreinforced), 0.28m thick, 14 days
length 10.00 28mm dia. Plain Round Bar length 10.00 28mm dia. Plain Round Bar
cu.m. 840.00 Gravel (On stocks) cu.m. 840.00 Gravel (On stocks)
cu.m. 600.00 Sand (On stocks) cu.m. 600.00 Sand (On stocks)
bag 1248.00 Portland Cement (Excel) bag 1248.00 Portland Cement (Excel)
505(2)a Grouted Riprap, Class A
cu.m. 220.00 Sand (On stocks) cu.m. 220.00 Sand (On stocks)
cu.m. 420.00 Boulders / Binakbak (On stocks) cu.m. 420.00 Boulders / Binakbak (On stocks)
bag 125.68 Portland Cement (Excel) bag 61.77 Portland Cement (Excel)
506(1) Stone Masonry
cu.m. 12.00 Sand (On stocks) cu.m. 5.90 Sand (On stocks)
cu.m. 22.85 Boulders / Binakbak (On stocks) cu.m. 11.23 Boulders / Binakbak (On stocks)
605(1)aa2 Warning Signs, 750mm, (W5-4C), Road Obstacle signs Steep Descent
650(1)ab3 Warning Signs, 750mm, (W5-5C), Road Obstacle signs Steep climb