Professional Documents
Culture Documents
Basketball Stadium Final Project
Basketball Stadium Final Project
FARHAN M FADZILAH
1222000017
PEMBERI TUGAS
DOSEN
Refranisa, ST, MT
NAMA PROYEK
PROJECT NAME
TANGERANG BASKETBALL
STADION
KETERANGAN KETERANGAN
1 1 A00-01 DAFTAR GAMBAR NTS 1 1 A00-01 DAFTAR GAMBAR NTS
DIGAMBAR
NIM
TANGGAL
SKALA
Refranisa, ST, MT
NAMA PROYEK
PROJECT NAME
TANGERANG BASKETBALL
STADION
CATATAN
NOTE
SHOP DRAWING
PAKET PEKERJAAN
WORK PACKAGE
INSTANSI
UNIV
PERSETUJUAN
APPROVAL
NAMA GAMBAR
DRAWING TITLE
DIGAMBAR
NIM
TANGGAL
01 SITUASI SKALA
SKALA 1 : 2500 KODE PROYEK KODE GAMBAR NO. LEMBAR TOTAL LEMBAR
PEMBERI TUGAS
DOSEN
Refranisa, ST, MT
NAMA PROYEK
PROJECT NAME
TANGERANG BASKETBALL
STADION
CATATAN
NOTE
SHOP DRAWING
PAKET PEKERJAAN
WORK PACKAGE
INSTANSI
UNIV
PERSETUJUAN
APPROVAL
NAMA GAMBAR
DRAWING TITLE
DIGAMBAR
TANGGAL
SKALA 1 : 500
SKALA
Refranisa, ST, MT
NAMA PROYEK
PROJECT NAME
LIFT
LIFT
TANGERANG BASKETBALL
STADION
GATE MASUK B
GATE MASUK A
GATE MASUK C
ESKALATOR
CATATAN
NOTE
LIFT
ESKALATOR
PAKET PEKERJAAN
AREA LOADING UNLOADING WORK PACKAGE
WC PEMAIN AWAY
ARCHITECTURE AND FINISHING WORK
WC STAFF
AWAY KETERANGAN
WC PEMAIN AWAY
INFORMATION
WC STAFF HOME
KM/WC PRIA KM/WC WANITA WC PEMAIN
HOME
WC STAFF HOME
WC PEMAIN
HOME WC STAFF HOME
INSTANSI
AREA LOADING UNLOADING UNIV
KM/WC WANITA
KM/WC PRIA
PERSETUJUAN
KM/WC WANITA
APPROVAL
NAMA GAMBAR
DRAWING TITLE
DENAH
01 LANTAI DASAR DIGAMBAR
SKALA 1 : 250
NIM
TANGGAL
SKALA
Refranisa, ST, MT
1
2
32 NAMA PROYEK
3 PROJECT NAME
TANGERANG BASKETBALL
31
STADION
4 AREA LOBBY PENONTON
LIFT LIFT
CATATAN
NOTE
LIFT LIFT
30
5
ESKALATOR ESKALATOR
LIFT LIFT
LOUNGE LOUNGE
29
RUANG OPERASIONAL RUANG OPERASIONAL
6
AREA KITCHEN AREA KITCHEN
ESKALATOR ESKALATOR
GAT
GATE UTARA A5
GATE UTARA A6
RUANG IBADAH RUANG IBADAH
E UT
A7
ARA
ARA
28
E UT
A 4
GAT
GA
TE
U TRIBUN UTARA AA
8
7
27
GATE UTARA
GATE UTARA
A9
SHOP DRAWING
8
A2
PAKET PEKERJAAN
WORK PACKAGE
TRIBUN UTARA
TRIBUN UTARA
WC PRIA WC PRIA
26
KETERANGAN
A
A
GATE UTARA A1 GATE UTARA A10 INFORMATION
9
25
GATE UTAMA A GATE UTAMA B
10
WC WANITA WC WANITA
INSTANSI
UNIV
24
11
TRIBUN BARAT
TRIBUN TIMUR
GATE BARAT A2 GATE TIMUR A2
A
A
WC WANITA WC WANITA
PERSETUJUAN
23
APPROVAL
12
22
TANGGA TANGGA
13
NAMA GAMBAR
DRAWING TITLE
AREA SERVICE AREA SERVICE
21
RUANG GUDANG RUANG GUDANG
14
15
19 DIGAMBAR
16 NIM
18
17
TANGGAL
DENAH
01 LANTAI 1 SKALA
SKALA 1 : 250
KODE PROYEK KODE GAMBAR NO. LEMBAR TOTAL LEMBAR
PEMBERI TUGAS
DOSEN
Refranisa, ST, MT
1
2
32 NAMA PROYEK
3 PROJECT NAME
TANGERANG BASKETBALL
31
STADION
4 AREA LOBBY
LIFT LIFT
CATATAN
NOTE
LIFT LIFT
30
5
ESKALATOR ESKALATOR
GAT
A B4
LIFT
TRIBUN UTARA LIFT
EU
TAR
R. MEP R. MEP
TAR
29
EU
A
GAT
B3
R. PENGELOLA STADION R. PENGELOLA STADION
6
ESKALATOR ESKALATOR
GA 5
TE AB
UT AR
A RA UT
B TE
2 GA
28
R. PERSONALIA R. PERSONALIA
7
R. STAFF R. STAFF
27
R. MANAGER R. MANAGER
SHOP DRAWING
8
TRIBUN UTARA
TRIBUN UTARA
WORK PACKAGE
R. WA DIREKTUR R. WA DIREKTUR
ARCHITECTURE AND FINISHING WORK
26
KETERANGAN
B
B
R. RAPAT R. RAPAT
25
R. KEPALA STADION R. KEPALA STADION
R. RAPAT R. RAPAT
INSTANSI
UNIV
24
R. WA KEPALA STADION R. WA KEPALA STADION
11
TRIBUN BARAT
TRIBUN TIMUR
GATE BARAT B1 GATE TIMUR B1
KM/WC KM/WC
B
B
PERSETUJUAN
23
KM/WC KM/WC APPROVAL
12
22
TANGGA TANGGA
13
NAMA GAMBAR
DRAWING TITLE
AREA SERVICE AREA SERVICE
21
RUANG GUDANG RUANG GUDANG
14
15
19 DIGAMBAR
16
NIM
18
17
TANGGAL
DENAH
01 LANTAI 2 SKALA
SKALA 1 : 250
KODE PROYEK KODE GAMBAR NO. LEMBAR TOTAL LEMBAR
PEMBERI TUGAS
DOSEN
Refranisa, ST, MT
1
2
32 NAMA PROYEK
3 PROJECT NAME
TANGERANG BASKETBALL
31
STADION
4
LIFT LIFT
CATATAN
NOTE
LIFT LIFT
30
R. MEP R. MEP
TRIBUN UTARA
5
POST SECURITY
ESKALATOR
C POST SECURITY
GA
5
TC
29
TE
RA
BA
BA
RA
TE
TC
GA
POST OPERASIONAL POST OPERASIONAL
5
6
ESKALATOR
28
GAT C4
7
E BA RAT
RAT E BA
C4 GAT
27
GATE BA RAT C3
RAT C3 GATE BA
SHOP DRAWING
8
PAKET PEKERJAAN
TRIBUN UTARA
TRIBUN UTARA
WORK PACKAGE
26
KETERANGAN
C
C
INFORMATION
9
25
10
INSTANSI
GATE BARAT C1 GATE BARAT C1 UNIV
24
11
TRIBUN BARAT
TRIBUN TIMUR
C
C
PERSETUJUAN
23
APPROVAL
12
22
TANGGA TANGGA
13
NAMA GAMBAR
DRAWING TITLE
AREA SERVICE AREA SERVICE
21
RUANG GUDANG RUANG GUDANG
14
15
19 DIGAMBAR
16
NIM
18
17
TANGGAL
DENAH
01 LANTAI 3 SKALA
SKALA 1 : 250
KODE PROYEK KODE GAMBAR NO. LEMBAR TOTAL LEMBAR
PEMBERI TUGAS
DOSEN
Refranisa, ST, MT
NAMA PROYEK
PROJECT NAME
TANGERANG BASKETBALL
STADION
CATATAN
NOTE
TOP
+23.500
SHOP DRAWING
8500
PAKET PEKERJAAN
WORK PACKAGE
LANTAI 2
+10.000
5000
INSTANSI
UNIV
LANTAI 1
+5.000
5000
LANTAI DASAR
±0.000 PERSETUJUAN
APPROVAL
NAMA GAMBAR
DRAWING TITLE
DIGAMBAR
NIM
TANGGAL
SKALA
Refranisa, ST, MT
NAMA PROYEK
PROJECT NAME
TANGERANG BASKETBALL
STADION
CATATAN
NOTE
KETERANGAN
INFORMATION
LANTAI 3
+15.000
5000
23500
LANTAI 2
+10.000 INSTANSI
UNIV
5000
LANTAI 1
+5.000
5000
PERSETUJUAN
APPROVAL
LANTAI DASAR
±0.000
NAMA GAMBAR
DRAWING TITLE
DIGAMBAR
NIM
TANGGAL
SKALA
Refranisa, ST, MT
NAMA PROYEK
PROJECT NAME
TANGERANG BASKETBALL
STADION
CATATAN
NOTE
SHOP DRAWING
PAKET PEKERJAAN
TOP WORK PACKAGE
+23.500
ARCHITECTURE AND FINISHING WORK
KETERANGAN
INFORMATION
8500
LANTAI 3
+15.000
5000
23500
LANTAI 2 INSTANSI
+10.000 UNIV
5000
LANTAI 1
+5.000
5000
PERSETUJUAN
APPROVAL
LANTAI DASAR
±0.000
NAMA GAMBAR
DRAWING TITLE
DIGAMBAR
NIM
TANGGAL
SKALA
Refranisa, ST, MT
NAMA PROYEK
PROJECT NAME
TANGERANG BASKETBALL
STADION
CATATAN
NOTE
SHOP DRAWING
PAKET PEKERJAAN
WORK PACKAGE
TOP ARCHITECTURE AND FINISHING WORK
+23.500
KETERANGAN
INFORMATION
8500
LANTAI 3
+15.000
5000
23500
INSTANSI
LANTAI 2 UNIV
+10.000
5000
LANTAI 1
+5.000
PERSETUJUAN
5000
APPROVAL
LANTAI DASAR
±0.000
01 TAMPAK BELAKANG STADION
SKALA 1 : 200
NAMA GAMBAR
DRAWING TITLE
DIGAMBAR
NIM
TANGGAL
SKALA
Refranisa, ST, MT
NAMA PROYEK
PROJECT NAME
TANGERANG BASKETBALL
STADION
CATATAN
NOTE
TOP
+23.500
SHOP DRAWING
8500
PAKET PEKERJAAN
WORK PACKAGE
LANTAI 2
+10.000
5000
INSTANSI
UNIV
LANTAI 1
+5.000
5000
LANTAI DASAR
±0.000 PERSETUJUAN
APPROVAL
01 POTONGAN A
SKALA 1 : 200
NAMA GAMBAR
DRAWING TITLE
DIGAMBAR
NIM
TANGGAL
SKALA
Refranisa, ST, MT
NAMA PROYEK
PROJECT NAME
TANGERANG BASKETBALL
STADION
CATATAN
NOTE
TOP
+23.500
8500
SHOP DRAWING
PAKET PEKERJAAN
LANTAI 3 WORK PACKAGE
+15.000 ARCHITECTURE AND FINISHING WORK
5000
KETERANGAN
23500
INFORMATION
LANTAI 2
+10.000
5000
LANTAI 1
+5.000
5000
INSTANSI
UNIV
LANTAI DASAR
±0.000
01 POTONGAN B
SKALA 1 : 200 PERSETUJUAN
APPROVAL
NAMA GAMBAR
DRAWING TITLE
DIGAMBAR
NIM
TANGGAL
SKALA
Refranisa, ST, MT
NAMA PROYEK
PROJECT NAME
TANGERANG BASKETBALL
STADION
CATATAN
NOTE
SHOP DRAWING
PAKET PEKERJAAN
WORK PACKAGE
INSTANSI
UNIV
PERSETUJUAN
APPROVAL
NAMA GAMBAR
DRAWING TITLE
01 VISUALISASI 3D
SKALA NTS DIGAMBAR
NIM
TANGGAL
SKALA
Refranisa, ST, MT
NAMA PROYEK
PROJECT NAME
TANGERANG BASKETBALL
STADION
CATATAN
NOTE
RB KP
SHOP DRAWING
RB KP
PAKET PEKERJAAN
WORK PACKAGE
RB ARCHITECTURE AND FINISHING WORK
RB
RB KETERANGAN
KP KP KP RB KP INFORMATION
RB
KP KP KP RB KP KP KP
RB RB
RB RB RB
KP KP
KP KP KP RB RB
RB RB
KP
RB
RB RB RB KP
KP
RB RB RB
KP KP KP RB
KP KP RB KP INSTANSI
RB RB RB
UNIV
KP KP KP RB
RB
RB
KP RB RB
RB KP
RB
KP
KP
KP
KP
PERSETUJUAN
APPROVAL
RB KP
RB
RB RB
KP
RB
RB
NAMA GAMBAR
KP DRAWING TITLE
KP KP
RB
DIGAMBAR
NIM
TANGGAL
Refranisa, ST, MT
KS
KS
KS
KS
NAMA PROYEK
PROJECT NAME
KS TANGERANG BASKETBALL
KS STADION
CATATAN
KS
NOTE
KS
RB RB
RB RB
KP KP
RB RB
KP KP KP KP
RB RB
RB RB
KP RB RB KP
KS
KP KP
RB RB
RB RB
RB RB
KS
KP KP KP KP
KP RB RB KP
RB RB
KP KP
RB RB
KP KP
KP RB KP KP RB KP
RB RB
RB KP RB RB KP RB
RB RB
KP KP
KS
RB RB
KP KP KP KP
KP KP
KS RB KP KP RB
KP KP
RB RB
RB RB RB RB
KP KP
KP KP
RB RB RB RB
KS
KP RB RB KP
KP KP KP KP
RB RB
KS
KP KP
RB KP KP RB
RB KP KP RB
RB RB
SHOP DRAWING
RB RB
KP RB KP RB KP KP RB KP RB KP
KP KP
RB KP KP RB
KP KP
PAKET PEKERJAAN
KS
RB RB RB RB
RB RB
KP
KP KP KP KP
KP
WORK PACKAGE
KP KP KP KP KP KP
RB RB
RB RB KETERANGAN
RB RB
RB RB
KP KP KP KP
INFORMATION
RB RB
KP KP
RB RB
KS
KP KP KP KP
RB KP KP RB
RB KP KP RB
RB RB
KP KP KP KP KP KP KP KP
RB RB
KS
KP KP KP KP KP KP
RB RB RB RB RB RB
RB RB RB RB RB RB
KS
RB RB
KP KP KP KP KP KP
KP KP
KP RB KP KP KP KP RB KP
RB RB
INSTANSI
KS
KP KP KP KP
RB RB RB RB UNIV
KP KP
KP KP
KP KP
RB RB
RB RB
KP KP
KP KP KP KP
KS
RB RB RB RB
RB RB
RB RB
KP KP KP KP
RB RB
KP KP KP KP
KP KP
KS
RB KP KP RB
KP KP KP KP KP KP
RB RB RB RB
KP KP KP KP PERSETUJUAN
APPROVAL
KP RB KP KP RB KP
KS
RB RB
RB RB
KS
KP KP
KP KP
KS
KP KP
KP KP
KP KP
RB RB
RB RB
KS
KP KP
RB RB
NAMA GAMBAR
KP KP
KP RB RB KP DRAWING TITLE
RB RB
KS
KP KP KP KP
KP RB RB KP
KS RB RB
KS
KS
KS
KS
DIGAMBAR
NIM
DENAH KOLOM & BALOK TANGGAL
01 LANTAI 1
SKALA 1 : 250 SKALA
Refranisa, ST, MT
KS
KS
KS
KS
NAMA PROYEK
PROJECT NAME
KS TANGERANG BASKETBALL
KS STADION
CATATAN
KS
NOTE
KS
RB RB
RB
RB RB RB RB
RB RB
RB RB
RB RB
KS
RB RB
KS
RB RB
RB RB
RB RB
RB RB
KS
RB RB
RB RB
KS
RB RB
RB RB
RB RB
KS
RB RB
RB RB
KS
RB RB
RB RB
RB RB
SHOP DRAWING
RB RB RB RB PAKET PEKERJAAN
KS
RB RB
WORK PACKAGE
RB RB
KETERANGAN
RB RB
INFORMATION
RB RB
KS
RB RB RB RB
RB RB
KS
RB RB
RB RB
RB RB
KS
RB RB
RB
RB RB
RB INSTANSI
KS
RB RB
UNIV
RB RB
RB RB RB RB
KS
RB RB
RB RB
RB RB
KS
RB RB
PERSETUJUAN
RB RB
APPROVAL
KS
KS
RB RB
RB RB
KS
RB RB
KS
RB RB
RB RB
NAMA GAMBAR
RB RB RB RB
DRAWING TITLE
RB RB
KS
RB RB
RB RB
KS RB RB
KS
RB
KS RB RB
RB RB
KS
KS
DIGAMBAR
NIM
DENAH KOLOM & BALOK TANGGAL
01 LANTAI 2
SKALA 1 : 250 SKALA
KS Refranisa, ST, MT
KS
KS
KS
NAMA PROYEK
PROJECT NAME
KS
TANGERANG BASKETBALL
KS
STADION
CATATAN
KS
NOTE
KS
KS
KS
KS
KS
KS
KS
SHOP DRAWING
KS
PAKET PEKERJAAN
WORK PACKAGE
KETERANGAN
INFORMATION
KS
KS
KS
KS
INSTANSI
UNIV
KS
KS
PERSETUJUAN
APPROVAL
KS
KS
KS
KS
NAMA GAMBAR
KS
DRAWING TITLE
KS
KS
KS
KS
KS
DIGAMBAR
NIM
DENAH KOLOM & BALOK
01 LANTAI 3 TANGGAL
SKALA 1 : 250
SKALA
Refranisa, ST, MT
NAMA PROYEK
PROJECT NAME
TANGERANG BASKETBALL
STADION
CATATAN
NOTE
SHOP DRAWING
PAKET PEKERJAAN
WORK PACKAGE
WC
WC WC WC WC WC WC WC WC WC WC WC WC JW
JW
PAB Ø1"
PAB Ø1"
PAB Ø1"
WC WC WC WC
WC WC WC WC WC WC WC
PAB Ø1"
WC JW
WC WC WC WC WC WC WC
WC WC WC WC
PAB Ø1"
PAB Ø1"
INSTANSI
PAB Ø1"
WC WC WC WC
WC WC WC WC WC WC WC
PAB Ø1"
WC JW
JW WC
PAB Ø1"
UNIV
WC WC WC WC WC WC WC
WC WC WC WC
PAB Ø1"
PAB Ø1"
WC WC WC WC
WC WC WC WC WC WC WC
WC WC WC WC WC WC WC
PAB Ø1"
WC WC WC WC
PAB Ø1"
PAB Ø1"
WC WC WC WC WC WC WC
WC WC WC WC WC WC WC
PERSETUJUAN
APPROVAL
PAB Ø1"
TITIK SUMBER AIR
NAMA GAMBAR
DRAWING TITLE
TANGGAL
SKALA
Refranisa, ST, MT
NAMA PROYEK
PROJECT NAME
TANGERANG BASKETBALL
STADION
CATATAN
NOTE
SHOP DRAWING
PAKET PEKERJAAN
WORK PACKAGE
PAB Ø1"
ARCHITECTURE AND FINISHING WORK
PAB Ø1"
KETERANGAN
PAB Ø1"
PAB Ø1"
INFORMATION
PAB Ø1"
PAB Ø1"
PAB Ø1"
PAB Ø1"
PAB Ø1"
PAB Ø1"
INSTANSI
UNIV
PAB Ø1"
PAB Ø1"
PERSETUJUAN
PAB Ø1"
PAB Ø1"
APPROVAL
PAB Ø1"
PAB Ø1"
NAMA GAMBAR
DRAWING TITLE
DIGAMBAR
NIM
Refranisa, ST, MT
NAMA PROYEK
PROJECT NAME
TANGERANG BASKETBALL
STADION
CATATAN
NOTE
SHOP DRAWING
PAB Ø1"
PAB Ø1"
PAKET PEKERJAAN
WORK PACKAGE
PAB Ø1"
INFORMATION
PAB Ø1"
PAB Ø1"
INSTANSI
UNIV
PAB Ø1"
PAB Ø1"
PERSETUJUAN
APPROVAL
PAB Ø1"
PAB Ø1"
PAB "
Ø1 Ø1
" PAB
PAB "
Ø1 Ø1
" PAB
PAB "
Ø1 Ø1
" PAB
NAMA GAMBAR
DRAWING TITLE
DIGAMBAR
NIM
Refranisa, ST, MT
NAMA PROYEK
PROJECT NAME
TANGERANG BASKETBALL
STADION
CATATAN
NOTE
SHOP DRAWING
PAKET PEKERJAAN
WORK PACKAGE
INSTANSI
UNIV
PERSETUJUAN
APPROVAL
PAB "
Ø1 Ø1
" PAB
NAMA GAMBAR
DRAWING TITLE
DIGAMBAR
INSTALASI AIR BERSIH NIM
01 LANTAI 3
SKALA 1 : 250 TANGGAL
SKALA
Refranisa, ST, MT
NAMA PROYEK
PROJECT NAME
TANGERANG BASKETBALL
STADION
CATATAN
NOTE
SHOP DRAWING
PAKET PEKERJAAN
WORK PACKAGE
INSTANSI
UNIV
PERSETUJUAN
APPROVAL
NAMA GAMBAR
DRAWING TITLE
TANGGAL
SKALA
Refranisa, ST, MT
NAMA PROYEK
PROJECT NAME
TANGERANG BASKETBALL
STADION
CATATAN
NOTE
SHOP DRAWING
PAKET PEKERJAAN
WORK PACKAGE
PABS Ø3"
PABS Ø3"
ARCHITECTURE AND FINISHING WORK
KETERANGAN
INFORMATION
PABS Ø3"
PABS Ø3"
PABS Ø3"
PABS Ø3"
PABS Ø3"
PABS Ø3"
INSTANSI
UNIV
PABS Ø3"
PABS Ø3"
PABS Ø3"
PABS Ø3"
PERSETUJUAN
APPROVAL
PABS Ø3"
PABS Ø3"
NAMA GAMBAR
DRAWING TITLE
DIGAMBAR
NIM
INSTALASI AIR KOTOR TANGGAL
01 LANTAI 1
SKALA 1 : 250 SKALA
Refranisa, ST, MT
NAMA PROYEK
PROJECT NAME
TANGERANG BASKETBALL
STADION
CATATAN
NOTE
SHOP DRAWING
PABS Ø3"
PABS Ø3"
PAKET PEKERJAAN
WORK PACKAGE
PABS Ø3"
PABS Ø3"
ARCHITECTURE AND FINISHING WORK
KETERANGAN
INFORMATION
PABS Ø3"
PABS Ø3"
PABS Ø3"
PABS Ø3"
INSTANSI
UNIV
PABS Ø3"
PABS Ø3"
PERSETUJUAN
PABS Ø3"
PABS Ø3"
APPROVAL
NAMA GAMBAR
DRAWING TITLE
DIGAMBAR
Refranisa, ST, MT
NAMA PROYEK
PROJECT NAME
TANGERANG BASKETBALL
STADION
CATATAN
NOTE
SHOP DRAWING
PAKET PEKERJAAN
WORK PACKAGE
INSTANSI
UNIV
PERSETUJUAN
APPROVAL
NAMA GAMBAR
DRAWING TITLE
DIGAMBAR
Refranisa, ST, MT
NAMA PROYEK
PROJECT NAME
TANGERANG BASKETBALL
STADION
CATATAN
NOTE
SHOP DRAWING
PAKET PEKERJAAN
WORK PACKAGE
INSTANSI
UNIV
PERSETUJUAN
APPROVAL
NAMA GAMBAR
DRAWING TITLE
DIGAMBAR
NIM
TANGGAL
01 INSTALASI AIR HUJAN
SKALA 1 : 250
SKALA
Refranisa, ST, MT
NAMA PROYEK
PROJECT NAME
TANGERANG BASKETBALL
STADION
CATATAN
NOTE
SHOP DRAWING
PAKET PEKERJAAN
WORK PACKAGE
INSTANSI
UNIV
PERSETUJUAN
APPROVAL
NAMA GAMBAR
DRAWING TITLE
SKALA
Refranisa, ST, MT
NAMA PROYEK
PROJECT NAME
TANGERANG BASKETBALL
STADION
CATATAN
NOTE
SHOP DRAWING
PAKET PEKERJAAN
WORK PACKAGE
INSTANSI
UNIV
PERSETUJUAN
APPROVAL
NAMA GAMBAR
DRAWING TITLE
DIGAMBAR
INSTALASI TITIK LAMPU
01 LANTAI 1 NIM
SKALA
Refranisa, ST, MT
NAMA PROYEK
PROJECT NAME
TANGERANG BASKETBALL
STADION
CATATAN
NOTE
SHOP DRAWING
PAKET PEKERJAAN
WORK PACKAGE
INSTANSI
UNIV
PERSETUJUAN
APPROVAL
NAMA GAMBAR
DRAWING TITLE
TANGGAL
SKALA
Refranisa, ST, MT
NAMA PROYEK
PROJECT NAME
TANGERANG BASKETBALL
STADION
CATATAN
NOTE
SHOP DRAWING
PAKET PEKERJAAN
WORK PACKAGE
INSTANSI
UNIV
PERSETUJUAN
APPROVAL
NAMA GAMBAR
DRAWING TITLE
SKALA
Refranisa, ST, MT
NAMA PROYEK
PROJECT NAME
TANGERANG BASKETBALL
STADION
CATATAN
NOTE
SHOP DRAWING
PAKET PEKERJAAN
WORK PACKAGE
INSTANSI
UNIV
PERSETUJUAN
APPROVAL
NAMA GAMBAR
DRAWING TITLE
TANGGAL
SKALA
Refranisa, ST, MT
NAMA PROYEK
PROJECT NAME
TANGERANG BASKETBALL
STADION
CATATAN
NOTE
SHOP DRAWING
PAKET PEKERJAAN
WORK PACKAGE
INSTANSI
UNIV
PERSETUJUAN
APPROVAL
NAMA GAMBAR
DRAWING TITLE
01 LANTAI 1 NIM
SKALA 1 : 250
TANGGAL
SKALA
Refranisa, ST, MT
NAMA PROYEK
PROJECT NAME
TANGERANG BASKETBALL
STADION
CATATAN
NOTE
SHOP DRAWING
PAKET PEKERJAAN
WORK PACKAGE
INSTANSI
UNIV
PERSETUJUAN
APPROVAL
NAMA GAMBAR
DRAWING TITLE
DIGAMBAR
INSTALASI TITIK CCTV
01 LANTAI 2 NIM
SKALA
Refranisa, ST, MT
NAMA PROYEK
PROJECT NAME
TANGERANG BASKETBALL
STADION
CATATAN
NOTE
SHOP DRAWING
PAKET PEKERJAAN
WORK PACKAGE
INSTANSI
UNIV
PERSETUJUAN
APPROVAL
NAMA GAMBAR
DRAWING TITLE
TANGGAL
SKALA
Refranisa, ST, MT
NAMA PROYEK
PROJECT NAME
TANGERANG BASKETBALL
STADION
CATATAN
NOTE
SHOP DRAWING
PAKET PEKERJAAN
WORK PACKAGE
INSTANSI
UNIV
PERSETUJUAN
APPROVAL
NAMA GAMBAR
DRAWING TITLE
JALUR EVAKUASI
01 LANTAI DASAR DIGAMBAR
SKALA 1 : 250 NIM
TANGGAL
SKALA
Refranisa, ST, MT
NAMA PROYEK
PROJECT NAME
TANGERANG BASKETBALL
STADION
CATATAN
NOTE
SHOP DRAWING
PAKET PEKERJAAN
WORK PACKAGE
INSTANSI
UNIV
PERSETUJUAN
APPROVAL
NAMA GAMBAR
DRAWING TITLE
DIGAMBAR
JALUR EVAKUASI NIM
01 LANTAI 1
SKALA 1 : 250 TANGGAL
SKALA
Refranisa, ST, MT
NAMA PROYEK
PROJECT NAME
TANGERANG BASKETBALL
STADION
CATATAN
NOTE
SHOP DRAWING
PAKET PEKERJAAN
WORK PACKAGE
INSTANSI
UNIV
PERSETUJUAN
APPROVAL
NAMA GAMBAR
DRAWING TITLE
TANGGAL
SKALA
Refranisa, ST, MT
NAMA PROYEK
PROJECT NAME
TANGERANG BASKETBALL
STADION
CATATAN
NOTE
SHOP DRAWING
PAKET PEKERJAAN
WORK PACKAGE
INSTANSI
UNIV
PERSETUJUAN
APPROVAL
NAMA GAMBAR
DRAWING TITLE
JALUR EVAKUASI
01 LANTAI 3 DIGAMBAR
SKALA 1 : 250
NIM
TANGGAL
SKALA