AXVENTURE SDN BHD

JOB SAFETY ANALYSIS


JSA NO: JSA/AXV/HSE/002 SCOPE: BUILDING WORKS DATE: 02/05/2019

PROJECT: The Vyne-Phase 3 JOB ACTIVITY: Lifting works with cranes LEGAL REQUIREMENT: FM (BOWEC) (Safety) Reg. 1986, FM (Notification, Cert of
Fitness & Insp.) Reg. 1970, Sect 15, OSHA 1994.
No Job Sequence Hazard Identification Risk Assessment Hierarchy of Recommended
Potential Hazard Potential Current Probability Consequences Risk Control Control Measures
Risk Control * ** Ranking***

1 Inspection of crane -Trip, slip & fall Minor injury House 1 5 5 6, 4 - To wear anti-slip safety shoe.
components at height. keeping - Crane surface shall be free oil & other
slippery condition.
- Recommended to provide guard rail.

2 Crane set- up and - Uneven & soft - Major injuries Ground 1 25 25 4, 5 - Ground to be inspected prior to set up
positioning (except for ground- toppling of / fatality inspection crane and use steel plate as base for crane.
tower crane) crane - Proper padding shall be placed for mobile
- Struck by crane crane.
- Banskman or signal man shall guide crane
operator while sting- up of crane.
- Out rigger for mobile crane to be fully
extended and pad shall be placed.

3 Inspection for lifting - Struck by lifting - Body & hand -PPE 1 10 10 6,5 - To wear all necessary PPE
gears. chain injuries - Inspection of lifting gears shall be carried
- manual handling out by experienced personnel only.
-
4 Operation of crane near Falling of objects - Body injuries Non 1 25 25 3,5 - Crane operational area to be studied before
power line and near - Electrocution or fatality proceeds work.
road side. - Public road shall be closed or cordon off if
lifting works affect road user.
- Flagman shall be placed on road side or
lifting area shall be isolated prior to lifting
activity.

5 Operation of crane in - Topple of crane - Major injuries Non 1 25 25 1 - Tower crane operation shall be ceased
poor weather condition - Electrocution - Fatality when strong wind is likely to cause stability
such as strong wind or of crane.
lightening. - Falling of objects
- Mobile crane operator shall cease
operation when found not safe for
operation.
AXVENTURE SDN BHD
JOB SAFETY ANALYSIS
6 Hoisting of load. - Snapping of lifting - Major injuries 2 25 50 3,4,5 - Visual inspection for lifting gears and
gears - Fatality crane shall be carried out.
- Struck by load - Worn or damaged lifting gears shall be
- Falling of materials. removed from site.
- Crane failure - Lifting gear shall be used as per SWL.
- Miscommunication
between crane - All lifting load shall be provided tag line
operator and signal to control swing.
man.
- Crane operator and rigger shall to
competent person.
- Materials shall be secured or fasten
properly.
- Lifting area shall be isolated.
- Supervisor or lifting superintendent shall
be supervising all critical lifting.
- PTW shall be raised for lifting more than
5 ton.
- Only experienced or trained person shall
act as signalman.
- Walkie-talkie shall be used to
communicate with crane operator and
signalman for operation.
- Signal man shall be visible from operator
cabin for mobile crane operation.
- Loading platform shall be in place with
SWL.
- Toolbox briefing to be conducted prior to
start work.
- Tower crane operator shall not be allowed
to work more than 12 hours in a day to
prevent fatigue and lead to unwanted
incident.
- Frequent inspection and maintenance for
all cranes to be carried out as per
manufacturer recommendation.
AXVENTURE SDN BHD
JOB SAFETY ANALYSIS

* Choose (Probability) ** Choose (Consequences) ***Choose (Urgency of Action) Hierarchy of Control

1 – Once in 2 years 5 – First 101 ~ 125 – Immediate 6 – PPE


Aid

2 – Once a year 10 – Minor Injury 76 ~ 100 – Within 1 day 5 – Administration


Control

3 – Once in 6 months 15 – Diseases 51 ~ 75 – Within 4 days 4– Engineering Control

4 – Once a month 20 – Major Injury / 26 ~ 50 – Within 1 week 3 – Isolation


Fracture

5 – Once a week 25 – Fatality 0 ~ 25 – Within 2 weeks 2 – Substitution

1 - Elimination
AXVENTURE SDN BHD
JOB SAFETY ANALYSIS
REVIEW BY SHE COMMITTEE MEMBER
NO NAME POSITION COMPANY SIGNATURE
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

PREPARED BY: ……...........…………………….. APPROVED BY: …………………………………………….

THEEBAN RAJ PONNURENGAM (SHO) FONG CHIN CHAI (PM)