Professional Documents
Culture Documents
Ta Widia Fitri Novita Sari
Ta Widia Fitri Novita Sari
Ta Widia Fitri Novita Sari
Water Tank Air Compressor Mixing Point Pump Cooler Condenser Reboiler Packed Bed Reactor Absorben Tower Distilation Column Flash Vessel Flash Vessel Maleic Anhydride Tank
FIC FY
LAL LAH
A/D
D/A
LI Waste Treatment
D/A LT
FT
60
8 170
Waste Treatment
FE
PC FC
LE
7
ST-101
45
170
Water P-101 14
97,1 E-103
120 101
11
101
15
PI TI 40 PI A/D
TI
PT FY
I/P 101
LIC
D/A TT
A/D A/D A/D A/D
PIC FY V-102
3 D/A LT TD
PT
20
101
PT TT T-102 LIC PT TT
LIC
FRC I/P
Butane FIC
BG TCK
M-101 4 TT LCV
PE TE LT A/D PE TE
FFC 279
147,9
Air 1 V-101
Waste Treatment
20 LIC
I/P T-101 BG TCK
101
R-101
LC
TIC TT
M C-101
I/P E-104 FC
2
PE TE 147,9
5 I/P LI
TY 275
410
BG TCK
275
TT 9 12 16
95 160 LC 162
PIC TT ST-102
D/A A/D PT 170 101 101
TIC
E-102 P-103
A/D 10
R-102
40
PT 170
TIC
TT D/A
13
KETERANGAN: E-101 162
Nomor Arus TIC 101
I/P
Suhu Operasi
Tekanan Operasi
6
96
170 P-102
JUDUL
FT-UNRI A3 1
Temp (C) 20 147,9 20 279 410 96 45 60 95 40 120 160 162 97,1 40 162
DATE
Pressure 101 275 101 147,9 275 170 170 170 170 170 101 101 101 101 101 101 06/12/2022 SHEET 1 OF 2