Enabling works is a generic description for site preparation works that might take place prior to work under the main
Site layout plan.
construction contract.
Site waste management plan.
This could include:

Demolition.
Site clearance.
Tree protection. Featured articles and news
Diversion and/or disconnection of existing site services.
Geotechnical and exploratory ground investigation. Art of Building 2023, vote a winner
Decoupling from existing buildings.
Decontamination.
Ground improvement and/or compaction.
Excavation of known below-ground obstructions.
Survey work.
Creation of access routes.
Perimeter fencing and security provisions.
Work to neighbouring buildings.
Discharging planning conditions that must be satisfied prior to construction commencing.
Historical architectural investigation fieldwork.
Access ramps.
Signage provisions.
Provision of statutory utilities to the site.

Enabling works might be preceded by 'mobilisation' activities, carried out after the client has selected the contractor, but
before works commence on site. These are preparatory activities, such as; preparing method statements, arranging road
closures, placing necessary sub-contracts, and so on. See Mobilisation for more information.
Public voting closes on 5 January 2024.
NB: NRM1: Order of cost estimating and cost planning for capital building work, defines enabling works as:

'...works executed ahead of the main building contract. Enabling works are employer and/or project team specified works, Have a bit of spare time in the holidays?
which might include a mixture of facilitating works and new building works (e.g. site preparatory works such as major
demolition, removal of contaminated materials, reptile mitigation measures, and soil stabilisation; together with new sewers,
new access road, new drainage, new retaining walls, and minor new building works).'

This is as opposed to facilitating works, which NRM1 defines as:

‘…all components measured and incorporated in group element 0 (i.e. Facilitating works). Includes specialist works which,
normally, need to be completed before any building works can commence (e.g. major demolition works, soil stabilisation
works and or temporary diversion of mains drainage).’

Advantages of having an enabling works contract:


Write that article you have always meant to. It's
On site sooner. easier than you think.
Can saves time and money.
Could have a specialist contractor for carrying out that particular type of works eg. demolition.
UK towns receive £5m for historic building
Disadvantages:
restoration
The cost and time to make up two separate contracts
Process complexity involved in making up two separate contracts
If there are two different contractors; liability and hand-over issues.