Project Charter Template
The Project Charter will serve as an internal document that captures high level planning
information (scope, deliverables, assumptions, etc.) about the Project.
The Project Manager creates the Project Charter in the Initiation Phase of the Project, in
consultation with the Business Manager. Its purpose is to recognize the existence of the project
and to begin the planning process required to accomplish the Project goals. It is not intended to
be shared with the customer as a formal contract or legal document.
The Project Charter is an input to the Definition Phase of the Project where much of the
information contained herein forms the basis for detailed project planning.
PROJECT CHARTER
Project Name: Project Number: 14-MAY-0001
Innovative Office Design and
Office Move at UW-Madison
Date: Revision Number: Revision 1.1
13th May, 2023
1. PROJECT GOALS
The objective of this project is to relocate 78 staff members into a new workplace so as to
enable staff integration in time for the kick-off of the $5 million innovation grant research
scheduled to begin in 6 months.
This was necessitated because before now staff members were located in two separate
buildings on campus.
The new workplace is intended to be a high-quality, environmentally friendly, and energy-
efficient building, and it must be ready within 5 months of project approval so movement can
take place in the 6th month. The workplace will be built from sustainably sourced materials
and include features that will be energy conserving thus reducing the greenhouse effect in
accordance with global organizational standards. The initial top-down estimates provided
for is a budget not to exceed $450,000 and we will work according to this budget to deliver
on our key deliverables.
2. DELIVERABLES
This study source was downloaded by 100000799041135 from CourseHero.com on 05-16-2024 00:54:56 GMT -05:00
https://www.coursehero.com/file/207749770/Project-Charter-Templatedocx/
-A 6,500 square-foot finished workspace with a board room on the upper deck.
-Exterior finish according to organizational standards.
-Modular types of furniture and other office equipment like computers, printers, and fax machines.
-Energy independence systems with renewable energy.
-Well-finished interior with modular furniture.
-Deliver on the demolition mandate in the third month and ensure construction work begins in the
fourth month without fail.
-Ensure modular office installation in the fifth month so that the workplace will be ready for use in the
sixth month earmarked for the innovation research commencement.
-Integrated, intelligent control systems for lighting, heating, ventilation, and air
conditioning (HVAC), high-speed internet
-Finalize and complete the move in the sixth month.
3. SCOPE DEFINITION
4. PROJECT MILESTONES
This study source was downloaded by 100000799041135 from CourseHero.com on 05-16-2024 00:54:56 GMT -05:00
https://www.coursehero.com/file/207749770/Project-Charter-Templatedocx/
9. Foundation complete……………………………………..………...15 Aug 23
10. Framing complete…………………………………………..………19 Aug 23
11. Roofing complete……………………………………………….......21 Aug 23
12. HVAC system installed……………………………………..……..22 Aug 23
13. Plumbing, electrical, and mechanical installed ……………...……...23 Aug 23
14. Plumbing, mechanical, and electrical inspections passed …………..…...25 Aug 23
15. Exterior Finish………………………………………………………..27 Aug 23
16. Landscaping complete………………………………………………28 Aug 23
17. Interior finish………………………………………………...……..29 Aug 23
18. Final inspection and acceptance by management ………………….30 Aug 23
Providing electricity, sewage, natural gas, mobile network, and water services to the
proposed workplace.
Development of driveways for road accessibility.
Maintenance contracts and inspection.
Environmental agency approval.
6. RELATED DOCUMENTS
Identify the key stakeholders and team members by function, name, and role.
This study source was downloaded by 100000799041135 from CourseHero.com on 05-16-2024 00:54:56 GMT -05:00
https://www.coursehero.com/file/207749770/Project-Charter-Templatedocx/
construct new
workplace according
to specification. Staples 3rd Party Contractor
Office Supplies
8. PROJECT AUTHORIZATION
Adeniji 12 May
Rotimi 23
Approved by: Project Manager Date
13 May
Ron Madison 23
This study source was downloaded by 100000799041135 from CourseHero.com on 05-16-2024 00:54:56 GMT -05:00
https://www.coursehero.com/file/207749770/Project-Charter-Templatedocx/
Powered by TCPDF (www.tcpdf.org)