UT/RO/23-24/506 Unitech Technocrats

11/09/2023

M/S Sunmarc Paper Industry Pvt. Ltd.

Nagpur

Kind Attention : Respected Shri TP Singh ji.

Subject: Offer for water treatment plant to purify river water/bore well suitable to feed in
High pressure Boiler & Cooling towers.

Dear Sir,

With reference to your enquiry & on the basis of your raw water analysis report, we are pleased to submit
our techno commercial o er for Water treatment plant as per your enquiry.
We thank you very much for the above enquiry and pleased to submit our o er herewith for your kind
considera on.
The following Annexure form the part of our o er

ANNEXURE – I Design Basis, Design Scheme & Output parameter.

ANNEXURE – II Process Descrip on.

ANNEXURE – III Technical Data & Scope of Supply.


ANNEXURE – IV List of Sub Vendor.

ANNEXURE – V Schedule of exclusions & Termina on Point.

ANNEXURE – VI Price & Commercial Terms & Condi on.

We hope our o er is in line with your requirement and look forward for your valuable order regarding the
same. Please feel free to contact us for any further clari ca on in details.

Thanking you once again and assuring you of our best services at all mes.

Yours faithfully,

For Unitech Technocrats

Arun Garg

+91-9355575276

Village-Meerpur Gurudwara, Kala-Amb(Sirmour) H.P-173030

unitechtechnocrats@yahoo.com

ti
ff
ti
ff
ti
ti
ff
fi
ti
ti
ff
UT/RO/23-24/506 Unitech Technocrats
11/09/2023

ANNEXURE- I

Design Basis, Design Scheme & Output parameter.

Design Basis

Raw Water Analysis provided by client Source: - River / bore well


Parameters Unit River water Bore Well
General Appearance Not Provided. Not Provided.

Color Hz Not Provided. Not Provided.


Smell Odourless Odourless

Turbidity NTU 0.2 0.3


pH ---- 7.1 7.21

Total Suspended solids ppm 62.23 22.01


Electrical Conduc vity µs/ cm Not Provided. Not Provided.

Total Dissolved solids Mg/ltr. 469 958


Total Hardness as CaCO3 (mg/ltr.) 162.24 443.04

Total Alkalinity as CaCO3 (mg/ltr.) 230.40 326.40


Potassium ppm as K Not Provided. Not Provided.

Chloride as Cl (mg/ltr.) 35.98 142.89


P. Alkalinity as CaCO3 ppm as CaCO3 Nil Nil

Dissolved Iron ppm as Fe 0.04 0.04


BOD Ppm Not Provided. Not Provided.

COD ppm Not Provided. Not Provided.


Calcium as Ca mg/l 47.42 118.14

Sulphate as So4 mg/l 28.78 39.80


Reac ve Silica as SiO2 mg/l 1.58 Absent

Colloidal Silica mg/l 14.72 21.80


Nitrate(as No3) mg/l 6.68 3.5

Magnesium(as Mg) mg/l 10.63 35.96

BDL – Below Detec on Limit


Village-Meerpur Gurudwara, Kala-Amb(Sirmour) H.P-173030

unitechtechnocrats@yahoo.com

ti
ti
ti
UT/RO/23-24/506 Unitech Technocrats
11/09/2023

Please note that any change in raw water characteris cs will a ect treated water quality / quan ty. Please
note that the feed water to the RO Plant shall be ltered water and shall be within the speci ed norms with
respect to these parameters.

In case of any change in raw water quality, there will be corresponding change in treated water quality &
quan ty.

Design Scheme

Design Output/Flow rate

A.
Descrip on Unit Value

MGF Inlet Flow m3/hr. 75.0


Mode of opera on for MGF Manual

Ultra Filtera on Inlet m3/hr. 70

Mode of opera on for UF Fully Automa c

Weak Acid Ca on Inlet Flow m3/hr. 70.0


Mode of opera on for WAC Manual

DGT Unit ow m3/hr. 70.0

RO inlet ow (Feed) m3/hr. 60.0

RO outlet ow (Permeate) m3/hr. 45.0


RO reject Flow m3/hr. 15.0

RO Plant recovery % 75.0

Mode of opera on for RO Semi Automa c

MB unit outlet Flow m3/hr. 45.0


Mode of opera on for MB Manual.

Village-Meerpur Gurudwara, Kala-Amb(Sirmour) H.P-173030

unitechtechnocrats@yahoo.com

ti
ti
fl
fl
fl
ti
ti
ti
ti
ti
ti
ti
ti
ti
fi
ti
ff
fi
ti
UT/RO/23-24/506 Unitech Technocrats
11/09/2023

Treated water quality


Note : Please note that client must provide us clari ed water quality <25 ppm TSS.

At the outlet of MGF unit :

a) TSS : <5 ppm

At the outlet of Weak Acid Ca on unit :

a) Total Hardness : <5 ppm

b) TDS : <200 ppm

c) Total Alkalinity : <20 ppm

d) pH : 5.8 - 6.7

At the outlet of Mix-Bed unit :

a) Total Hardness : Commercially Zero

b) Electrical conduc vity : < 1.0 micro siemens/cm

c) Reac ve silica : <0.02 ppm

d) pH : 6.5

Village-Meerpur Gurudwara, Kala-Amb(Sirmour) H.P-173030

unitechtechnocrats@yahoo.com

ti
ti
ti
fi
UT/RO/23-24/506 Unitech Technocrats
11/09/2023

ANNEXURE- II

Process Descrip on

Mul Grade Filter:-

The raw water is pumped through the Mul Grade Filter for reduc on of suspended solids. Mul grade

lter consists of a sand of various grades as a lter media. When the pressure drop across the lter

exceeds the preset limit, the lter is backwashed to remove dust and dirt.

Ultra Filtera on System :-

Ultra ltra on system will helps to remove Colloidal silica by Filtera on method.

Weak Acid Ca on:

In weak and ca on alkalinity/TDS/Total Hardness will be removed by ion exchange method.

Degasi ca on System:-

Treated water from the WAC unit is fed to the degasser tower to reduce carbon dioxide content. The
degasser tower is a packed column (Pall Rings) where water, sprayed from top of the packing, breaks into
ne droplets, thereby increasing the surface area for contact. These droplets come in contact with a
countercurrent ow of air supplied by degasser fans. In the scrubbing ac on, therefore, the unstable
carbonic acid is broken into water and carbon dioxide. The air containing liberated carbon dioxide is vented
and degassed water (Free from alkalinity or carbonic acids) is collected in the degassed water tank.

Fine Filtra on:- A micron cartridge lter of 5 micron is incorporated prior to RO Plant for removal of the
par culate ma er, which will otherwise clog the RO membranes.

pH booster & An Scalant Dosing :-


The ltered water is dosed with acid to maintain pH. It is further dosed with An scalant for reduc on of LSI

and avoids scaling on the membranes.

Village-Meerpur Gurudwara, Kala-Amb(Sirmour) H.P-173030

unitechtechnocrats@yahoo.com

fi
fi
ti
ti
fi
fi
fi
ti
ti
ti
ti
ti
ti
tt
ti
fl
ti
fi
fi
ti
fi
ti
ti
ti
ti
fi
ti
ti
UT/RO/23-24/506 Unitech Technocrats
11/09/2023

Reverse Osmosis System:-

Reverse Osmosis process is a membrane process in which a synthe c semi-permeable membrane is used to

separate water from dissolved impuri es. When a semi-permeable membrane separates a dilute and

concentrates solu on of salts, due to osmosis, the water from the dilute solu on side passes through the

membrane to the concentrated side ll osmo c equilibrium is a ained. Now, if the pressure is applied and

increased gradually on the concentrated side, the ow of water con nues to reduce ll the applied pressure

reverse the direc on of ow of water and water from the concentrated side enters the dilute side. This

process is called the Reverse Osmosis.

It is very essen al to ensure that the water feed to reverse osmosis membranes is free from par culate

ma er to prevent membrane fouling. Also, the water should be free from organic ma er, heavy metals and

oxidizing agents like free chlorine.

LIMITING CONDITION OF FEED WATER TO RO PLANT


Turbidity : < 1 NTU

SDI :<5

Bacteria and organics : Nil

Temperature : 45 0C (max.)

Free chlorine : less than 0.1 ppm

Oil and grease : Nil

BOD & COD : Nil

Heavy metals : 0.1 ppm (max.)

All limi ng condi ons must be observed/ recorded in log sheets during plant opera on for
sa sfactory performance.

Village-Meerpur Gurudwara, Kala-Amb(Sirmour) H.P-173030

unitechtechnocrats@yahoo.com

ti
tt
ti
ti
ti
ti
ti
fl
ti
ti
ti
fl
tt
ti
ti
ti
ti
ti
tt
ti
UT/RO/23-24/506 Unitech Technocrats
11/09/2023

Turbidity:-
Turbidity of fed water to RO shall be less than 1 NTU. Experience has shown that prolonged opera on in

feed water turbidi es greater than 1 NTU generally results in prohibi vely frequent cleaning

requirements. Unitech strongly recommends that the performance of the pre-treatment equipment be

monitored once a shi and correc ve ac on is taken.

Silt Density Index:-


The SDI of feed water to RO shall be kept below 4 for a con nuous opera on of the RO plant. The SDI is a

measure of colloidal par cles in the feed water and hence SDI value of 4 indicates that the feed water has

very low content of colloidal par cles. This ensures minimal colloidal fouling of RO membranes. This test

shall be carried out once in a week and its value recorded.

Bacteria Contamina on:-


The feed water to RO shall be free from bacteria contamina on. The check for bacterial content (CFU per

ml) shall be carried out once a day and ac on ini ated to minimize membrane fouling.

Organic Contamina on:-


To minimize organic fouling of membranes, it is necessary to monitor this parameter once a day and

cleaning of membranes as per recommended procedure should be followed. The frequency of cleaning

will have to be determined by RO plant opera ng condi ons.

Free Residual Chlorine (FRC):-

FRC at inlet to RO shall be monitored at least once a shi and recorded, as presence of FRC is determined

to the performance of membrane.

Oil & Grease:-


The Oil & Grease should be NIL and removed completely in the pre-treatment. The presence of it in the

feed water to RO, severely a ects the membrane performance. The presence of Oil and Grease physically

fouls the membrane and make it ine ec ve, which is then very di cult to remove even by cleaning.

Village-Meerpur Gurudwara, Kala-Amb(Sirmour) H.P-173030

unitechtechnocrats@yahoo.com

ti
ti
ti
ft
ti
ff
ti
ti
ff
ti
ti
ti
ti
ti
ft
ti
ti
ti
ffi
ti
ti
ti
UT/RO/23-24/506 Unitech Technocrats
11/09/2023

Temperature:-
The opera ng temperature of feed water shall not be exceeding 45oCelcius. We understand that the RO
system will be treated only pre-treated surface water at ambient temperature and hence we do not
an cipate any problem on this account.

pH Range:-
The allowable opera ng pH range is 2 to 11 during normal opera on of RO Plant. The pH of feed water

shall be monitored once in a shi in a lab.

Cleaning system:-
We have provided you with a cleaning system to clean the membranes in the R.O. pressure tubes. This

consists of a SS pump, set of cartridge & CIP tank.

Mixed Bed Exchanger Unit:-

The water from the RO Plant is further passed through the mixed bed unit wherein the total dissolved solids
are further removed with Ca on and Anion resin in the mixed form. This treated water will be used as boiler
feed as well as the breweries use.

Village-Meerpur Gurudwara, Kala-Amb(Sirmour) H.P-173030

unitechtechnocrats@yahoo.com

ti
ti
ti
ti
ft
ti
UT/RO/23-24/506 Unitech Technocrats
11/09/2023

ANNEXURE- III

Scope of Supply

S. No. Description Unit Data/Make

Pretreatment Section
1.00 MGF Feed Pump By Unitech
1.01 Quantity nos. 02[1W + 1SB]
1.02 Make Kirloskar/Equivallant
1.03 Type Centrifugal Monobloc
1.04 Flow m3/hr. 80 - 85
1.05 Head Mtr. 25-30
1.06 MOC CI

2.00 Multigrade Filter Already exist(2200 mm dia)


2.01 Under bed Material Lot 1(By Unitech)
2.02 Types of Under bed material Different types of Pebbles &
gravels
2.03 Type of valves Butterfly
2.04 Quantity of valves lot 1
2.05 Frontal Pipe Line MOC MSRL
2.06 Rubber-lining of vessel & line By Unitech

Ultra Filteration Section


3.00 UF Feed Pump By Unitech
3.01 Quantity nos. 02[1W + 1SB]
3.02 Make Johnson/Equivallant
3.03 Type Centrifugal Monobloc
3.04 Flow m3/hr. 70
3.05 Head Mtr. 25-30
3.06 MOC SS

Village-Meerpur Gurudwara, Kala-Amb(Sirmour) H.P-173030

unitechtechnocrats@yahoo.com

UT/RO/23-24/506 Unitech Technocrats
11/09/2023

4.00 Azude filter Assembly By Unitech


4.01 Quantity Nos. 4
4.02 Capacity m3/hr. 30 each
4.03 Filteration capacity Micron 100

5.00 Ultra filteration System By Unitech


5.01 Quantity no. 1
5.02 Inlet Flow rate m3/hr. 70
5.03 Working Pressure kg/cm2 1.0 - 2.0
5.04 Membrane Type Hollow Fiber
5.05 Membrane make Veolia(Suez) / Equivalent
5.06 Membrane quantity Lot 1
5.07 Membrane housing Inbuilt
5.08 Type Side port
5.09 MOC of housing UPVC
5.10 Inter connected pipe line lot 1
5.11 MOC of pipe line UPVC/SS
5.12 Feed Header nos. 1
5.13 Permeat Header nos. 1
5.14 Backwash header nos. 1
5.15 Air Scour Header nos. 1
5.16 Valves quantity lot 1
5.17 Types of Valves Pneumatic Butterfly type
5.18 Skid nos. 1
5.19 MOC of skid SS

6.00 Backwash System By Unitech


6.01 Quantity no. 1
6.02 Backwash water tank Nos. 1
6.03 Capacity of tank KL 5

Village-Meerpur Gurudwara, Kala-Amb(Sirmour) H.P-173030

unitechtechnocrats@yahoo.com

UT/RO/23-24/506 Unitech Technocrats
11/09/2023

6.04 MOC of tank MSRL


6.05 Backwash pump nos. 2 [1W + 1 SB]
6.06 Type of pump Centrifugal
6.07 Make of pump Johnson / Equivalent
6.08 Flow m3/hr. 70 - 75
6.09 Head Mtr. 20 -25
6.10 MOC of pump SS

7.00 Chemical Dosing System By Unitech


7.01 Quantity Set 2
7.02 Make of dosing pumps Edose/Equivallant
7.03 Maximum working pressure kg/cm2 3.5

8.00 UF Membrane CIP System By Unitech


8.01 Quantity Set 1
8.02 CIP Pump nos. 1
8.03 Type of pump Centrifugal
8.04 Flow m3/hr. 45 - 55
8.05 Head Mtr. 20 - 25
8.06 MOC of pump SS
8.07 Make of pump Lubi / Equivalent
8.08 CIP tank nos. 1
8.09 Capacity of tank KL 2
8.10 MOC of tank MSRL

9.00 Twin Lobe Blower for Air Scouring By Unitech


9.01 Quantity Nos. 1
9.02 Type Twin Lobe
9.03 Capacity As per design

Village-Meerpur Gurudwara, Kala-Amb(Sirmour) H.P-173030

unitechtechnocrats@yahoo.com

UT/RO/23-24/506 Unitech Technocrats
11/09/2023

10.00 Weak Acid Cation Unit By Unitech

10.01 Quantity nos. 1


10.02 Operating Flow m3/hr 75.0
10.03 Operating Pressure kg/cm2 3.0 - 3.5
10.04 MOC MSRL
10.05 Type As per design
10.06 OBR m3 1500
10.07 Diameter mm 2000
10.08 Height mm 2500
10.09 Resin Type Weak acid cation
10.10 Resin Quantity Ltr. 3700
10.11 Type of regenerant HCL
10.12 Consumption of regenerate kg. 185 kg.(100% concentration)
10.13 Acid Measuring tank nos. 1
10.14 MOC MSRL
10.15 Frontal Pipe Line lot 1
10.16 MOC of frontal pipe line MSRL
10.17 Type of valves CI diaphragm type
10.18 Quantity of valves lot 1
10.19 Enjector nos. 1
10.20 Pressure Gauges lot 1

!!.00 Degassification System By Unitech


11.01 Degasser Tower nos. 1
11.02 Operating Flow m3/hr 75.0
11.03 Diameter of DG Tower mm 1800
11.04 Height mm 2800
11.05 MOC MSRL
11.06 Air blower nos. 2
11.07 MOC of blower MS

Village-Meerpur Gurudwara, Kala-Amb(Sirmour) H.P-173030

unitechtechnocrats@yahoo.com

UT/RO/23-24/506 Unitech Technocrats
11/09/2023

11.08 Blower Capacity As per design


11.09 Rashing rings 1 lot(50mm x 50 mm)

12.00 Degassed water storage tank Unitech


12.01 Suggested Capacity M3 10
12.02 MOC MSRL

Reverse Osmosis with Mix Bed Section


13.00 RO feed Pump By Unitech
13.01 Quantity nos. 02[1W + 1SB]
13.02 Make Kirloskar/Equivallant
13.03 Type Centrifugal Monobloc
13.04 Flow m3/hr. 65 - 70
13.05 Head Mar. 25-30
13.06 MOC SS

14.00 Antiscalant & pH booster dosing system By Unitech


14.01 Quantity nos. 04[2W + 2 SB]
14.02 Pump make Milton Roy / E Dose
14.03 Type of pump Electronic diaphragm type
14.04 Capacity of pump lph 0-4
14.05 Dosing Tank quantity nos. 2
14.06 Dosing Tank Capacity Ltr. 100
14.07 MOC of dosing tank LLDPE

15.00 Micron Filteration System By Unitech

15.01 Quantity nos. 1


15.02 Flow m3/hr 60
15.03 MOC of Housing Stainless Steel

Village-Meerpur Gurudwara, Kala-Amb(Sirmour) H.P-173030

unitechtechnocrats@yahoo.com

UT/RO/23-24/506 Unitech Technocrats
11/09/2023

15.04 MOC of cartridge PP


15.05 Filteration rating micron 5

16.00 High Pressure Pump By Unitech


16.01 Quantity nos. 02[1W + 1SB]
16.02 Flow m3/hr 60 - 65
16.03 Head Meter As per design
16.04 Make Grundfoss
16.05 MOC Stainless Steel
16.06 Power KW 45 (Approx.)

17.00 R.O.Section By Unitech


17.01 Feed Flow m3/hr 60.0
17.02 Permeated flow m3/hr 45.0
17.03 Rejected Flow m3/hr 15.0
17.04 Quantity of pressure tubes Lot 1
17.05 MOC of Pressure Tubes FRP
17.06 Make of Pressure Tubes KaiTube /UKL
17.07 Quantity of Membranes Lot 1
17.08 Size of membrane 8040
17.09 Make of Membranes Dow / Ovay /Hydronautics

18.00 CIP System By Unitech


18.01 Quantity Set 1
18.02 Pump ~ SS centrifugal type

18.03 Flow & Head ~ 50 kl/hr @20 m head

18.04 Make ~ Lubi / Equivallant

18.05 Micron Cartridge Assembly nos. 1

18.06 Tank 1 no. 500 ltr. HDPE

Village-Meerpur Gurudwara, Kala-Amb(Sirmour) H.P-173030

unitechtechnocrats@yahoo.com

UT/RO/23-24/506 Unitech Technocrats
11/09/2023

19.00 Buffer tank R.O.permeated By Unitech


19.01 Quantity nos. 1
19.02 MOC MSRL
19.03 Capacity KL 8 - 10
19.04 Level Gauge assembly 1

20.00 MB Feed Pump By Unitech


20.01 Quantity nos. 02[1W + 1SB]
20.02 Make Lubi/Equillant
20.03 MOC Stainless Steel-316
20.04 Flow lph 45000
20.05 Head meter 30

21.00 Mix Bed Unit By Unitech


21.01 Quantity nos. 1
21.02 Operating Flow m3/hr 40.0
21.03 Operating Pressure kg/cm2 3.0 - 3.5
21.04 MOC MSRL
21.05 Type Down flow
21.06 OBR m3 1400
21.07 Diameter mm 1200
21.08 Height mm 2500
21.09 Resin Type Cation & Anion
21.1 Quantity of resin Ltr. 2600
21.11 Type of regenerant HCL & Caustic(NaOH)
21.12 Acid measuring tank nos. 1
21.13 Caustic dilution tank nos. 1
21.14 MOC HDPE
21.15 Frontal Pipe Line lot 1

Village-Meerpur Gurudwara, Kala-Amb(Sirmour) H.P-173030

unitechtechnocrats@yahoo.com

UT/RO/23-24/506 Unitech Technocrats
11/09/2023

21.16 MOC of frontal pipe line MSRL


21.17 Type of valves CI diaphragm type
21.18 Quantity of valves lot 1
21.19 Twin lobe blower for Mix-bed 1
21.20 Capacity as per design

22.00 Instruments By Unitech


22.01 On Line Digital Conductivity nos. 3(Aster / Equivalent)
meter
22.02 On Lint Digital pH meter nos. 3 (Aster / Equivalent)
22.03 On Lint Digital Flow meter Nos. 3 (Aster / Equivalent)
22.04 Pressur gauges (0-7) kg/cm2) lot 1(Hguru/Equivallant)
22.05 Pressur gauges (0-21) kg/cm2) lot 1(H-guru/Equivallant)
22.06 Rotameters lot 1(Aster / Equivalent)
22.07 Low pressure switch(LPS) Lot 1(Denfos make)
22.08 High pressure switch(HPS) Lot 1(Denfos make)

23.00 Electrical panels By Unitech


23.01 Fully Automatic PLC panel for nos. 1
Ultra Filteration section.
23.02 Semi Automatic relay panel for nos. 1
Weak acid cation,Reverse Osmosis
section & Mix Bed Plant.

Village-Meerpur Gurudwara, Kala-Amb(Sirmour) H.P-173030

unitechtechnocrats@yahoo.com

UT/RO/23-24/506 Unitech Technocrats
11/09/2023

ANNEXURE IV

List of Sub Vendors:-

Descrip on of Item Approved Vendors


High Pressure Pumps Grundfoss / Equivallant

RO Membrane Dow/Ovay/Hydronautics
Dosing Pump Milton roy / E-Dose

Monobloc Pumps Kirloskar / SPX Johnson/Lubi


Bu er y Valves LP / Equivalent

Diaphragm valves Sun/Equiv.


Pressure Gauge H-Guru / Equiv.

pH/Conduc vity Meter Aster / Equiv.


Rota meter and ow elements Aster/ Equiv.

Motors As per Pump Supplier


UF Membranes Veolia/Equivallent

Note: Our commercial bid is considering the above men oned vendor. In case of any devia ons on the
above men oned vendor, price implica ons shall be extra at actual.

Village-Meerpur Gurudwara, Kala-Amb(Sirmour) H.P-173030

unitechtechnocrats@yahoo.com

tt
fl
ti
ti
ti
fl
ti
ti
ti
UT/RO/23-24/506 Unitech Technocrats
11/09/2023

ANNEXURE V

Schedule of exclusion & Termina on point:-

Termina on Point –

A Inlet of MGF Feed pump.


B Outlet of Mixed Bed Unit.

C Drain line of all the unit.


D All chemical Dosing tank & Regenera on Tank Inlet.

E Reject water from R.O.Plant

Client u lity required from clients end for the plant opera on:-

1. Power Supply - 3 ph. along with neutral & proper earthing.


2. Service water - Feed water to feed @ 75.0 m3/hr. ow as per design considera on.
3. Chemicals -All chemicals required for plant Commissioning, trial run and opera on
including rst charge.
4. Lab tes ng facility - For analysis of treated water.

Schedule of exclusion

1. Civil works like design and construc ons of founda ons, drains, drain sumps, supports of all types,
pla orms, drain channels and mass concre ng of units (if required).
2. All electrical work like cabling & earthing to pumps & Panel are excluded from our scope of supply &
works.
3. Earthing of motors & electrical Panel.
4. Cable tray will be in your scope.
5. Raw water Storage Tank, & DM Water St. Tank are not in our scope of supply.
6. All consumable (Like NaOCl, SMBS, An Scalant, Acid, Caus c and other cleaning chemicals, oil,
Greece, lubricants) will not be in our scope of supply even in commissioning stage including the rst
charge also.
7. Client has to arrange the material nearer to the site at the me of erec on & commissioning.
8. Site security will be provided by you at your own cost.
9. Ligh ng arrangements, ligh ng xtures, lamps, poles, and cables required for ligh ng or any ligh ng
distribu on boards.
10. Interconnec ng pipeline to be arranged by you in case of devia on of Equipment layout at site.
11. Tes ng and inspec on of the equipment at site should be in client scope.
12. Laboratory facili es including necessary instruments, chemicals and sta if required will be not be
in our scope.

Village-Meerpur Gurudwara, Kala-Amb(Sirmour) H.P-173030

unitechtechnocrats@yahoo.com

tf
ti
ti
ti
ti
ti
ti
fi
ti
ti
ti
ti
fi
ti
ti
ti
ti
ti
ti
ti
ti
ti
fl
ti
ti
ff
ti
ti
fi
ti
ti
UT/RO/23-24/506 Unitech Technocrats
11/09/2023

13. Transit Insurance ma ers shall be in our scope and any claims for loss, damage shall be lodged by
the client with the Insurance Company even when the transit Insurance has been arranged by us on
behalf of the clients for their convenience. Repairs, replacement for the damage, loss shall be made
good at extra cost and not lined to receipt of claim by client from Insurance. Erec on,
Commissioning and handing over of the plant shall be considered to have been completed as
described below:
a. The plant shall be considered erected once the equipment, media, interconnec ng piping,
instruments and accessories essen al to the plant opera on are in place. Minor job
comple on, not a ec ng commissioning, shall not be reason to consider it not completed.
b. The plant shall be considered as commissioned on a aining the required water output and
quality for maximum 1 runs or cycle have been jointly witnessed / demonstrated. Minor
correc ons, modi ca ons like leakage, component rec ca on, etc. not a ec ng
commissioning shall be completed later.
c. The plant shall be considered as handed over to client once the commissioning runs/ cycle has
been completed as referred above.
14. All statutory clearance and sanc ons required for the implementa on of the project.
15. Anything especially not men oned in this o er is not in our scope of work or supply.

Village-Meerpur Gurudwara, Kala-Amb(Sirmour) H.P-173030

unitechtechnocrats@yahoo.com

ti
ti
ff
fi
tt
ti
ti
ti
ti
ti
ff
tt
ti
ti
fi
ti
ti
ti
ff
ti
ti
UT/RO/23-24/506 Unitech Technocrats
11/09/2023

PURCHASER'S OBLIGATIONS

1. Timely completion of foundations & other civil works such as structures, buildings, internal
roads etc. according to a mutually agreed time schedule.

2. Completion of all works not falling within the scope of the seller so as to ensure timely
completion of the project.

3. Provision of raw materials, utilities, chemicals, catalysts etc. in sufficient quantities for pre-
commissioning and commissioning activities.

4. Free power and water in required quantities for erection, testing and commissioning.

5. Lighting as required shall be provided so that work can be carried out during night hours.

6. Receiving, unloading, storing and making available the equipment at plant site for erection
as and when required, free of cost.

7. Protected Covered & secured storage space for machinery and equipments shall be
provided, free of cost.

8. Make available adequate open leveled and graded storage space near the plant site for
storage of heavy components, free of cost.

9. Providing effective security for all equipments at site, free of cost.

10. Free lodging and boarding facilities for our erection engineers, staff and workmen.
If you are unable to provide the lodging and boarding facilities and in case we have to
arrange for the same then following rates will be applied per day per person which will be
paid by you every week in advance over and above the Contract Price.
a) Engineer — Rs.3000/- per day
b) Site Supervisor — Rs.1500/- per day
c) Worker — Rs. 850/- per day

11. Conveyance to the extent possible.

12. Communication facilities such as STD Phone, Fax etc. free of cost.

13. Workshop facilities and other auxiliary equipments required for minor modifications.

14. Furnished site office with communication facilities for our site in charge/engineer.

Village-Meerpur Gurudwara, Kala-Amb(Sirmour) H.P-173030

unitechtechnocrats@yahoo.com



UT/RO/23-24/506 Unitech Technocrats
11/09/2023

15. Chemicals, lubricants, fuels etc. as necessary during various stages of erection and
commissioning shall be made available, free of cost.

16. Experienced and skilled operators should be made available to man various stations during
pre-commissioning and commissioning operation.

17. Fitter,Welder,Electrician, skilled labour & unskilled labour will be provided by you at your
own cost.

Village-Meerpur Gurudwara, Kala-Amb(Sirmour) H.P-173030

unitechtechnocrats@yahoo.com

UT/RO/23-24/506 Unitech Technocrats
11/09/2023

ANNEXURE VII

Price and Commercial Terms & Condi ons

Price:-
A. Our price towards supply of the MGF Feed Pumps,Filter media for exis ng MGF vessel,
Rubber lining & MSRL frontal pipe line will be Rs. 6,50,000/-(Rs. Six Lac Fi y thousand only).

B. Our price towards supply of the Ultra Filtera on System will be Rs. 68,00,000/-(Rs. Sixty Eight
Lac only).

C. Our price towards supply of the Weak Acid Ca on & Degassi ca on Unit will be
Rs. 40,00,000/-(Rs. Forty Lac only).

D. Our price towards supply of the Reverse Osmosis Plant & Mix bed Unit will Rs. 70,00,000/-
(Rs. Seventy ve Lac only).

Grand total (A+B+C+D) : Rs.1,84,50,000/- (Rs. One Crore Eighty Four Lac Fi y
Thousand Only)

Price Basis:-

The above price quoted is ex-works Kala-Amb (HP) basis exclusive of , Excise Duty, Sales Tax, freight,
insurance and any other applicable taxes and du es.

Terms of payment:-

a) 60% advance along with the commercial clear Purchase Order.


b) 35% including all taxes and du es will be payable against performa invoice prior to despatch.
c) Balanced 5% against installa on & successful tes ng.

Erec on & commissioning Supervision Charges:-

Rs.5,00,000/- (Rs.Five Lac Only) extra.

lodging & boarding to our engineers will be provided by you at your own cost.

Please note that we will provide Engineer for Supervision only. Skilled & un skilled labour will be

provided by you at your own cost.

Village-Meerpur Gurudwara, Kala-Amb(Sirmour) H.P-173030

unitechtechnocrats@yahoo.com

ti
fi
ti
ti
ti
ti
ti
ti
ti
fi
ft
ti
ti
ft
UT/RO/23-24/506 Unitech Technocrats
11/09/2023

Delivery Period:-

14 to 18 weeks from the date of receipt of your technically and commercially clear purchase order
along with advance payment for the supply of the material.

Warranty:-

Equipment o ered are warranted against manufacturing defect for a period 12 months from the
invoicing date.

Way Bill Required:-


Way bill will be required from clients end during despatch of the material. Number of way Bill will
be men on later.

Validity:-

The quota on is valid for your acceptance up to 30 days from the date of this o er.

Statutory Varia ons:

Any change in Govt. policies which will a ect directly our quoted price will be charged at extra to
purchaser’s account for which necessary documents will be submi ed on request.

Force Majeure:

We shall be under no liability for delay in delivery/Comple on of work if we or our sub-contractors/


suppliers are prevented from discharging our respec ve obliga ons under the contract for causes beyond
our reasonable control including but not limited towards (whether declare or not), invasion, acts of
enemies, hos li es, riots, civil commo on, labour disturbance, strikes, lockout, layo s, mu ny, insurrec on,
rebellion, revolu on, epidemics, accidents, sabotage, re, earthquake, oods, government orders and
restric ons, legal enactment, delay or inability to obtain materials due to change in Import policy or other
statutory restric ons, lack of transport facili es, interrup ons/restric ons in power supply, damage to or
breakdown of plant, machinery and equipment etc.

Consequen al Damages:

Neither party shall at any me be liable to the other for any loss or pro ts or any similar indirect
damages. However, described, incurred or su ered by either party in respect of the project.

Village-Meerpur Gurudwara, Kala-Amb(Sirmour) H.P-173030

unitechtechnocrats@yahoo.com

ti
ti
ti
ti
ff
ti
ti
ti
ti
ti
ti
ti
ff
ti
ff
ti
fi
ti
ti
ti
tt
ti
fi
fl
ff
ff
ti
ti
UT/RO/23-24/506 Unitech Technocrats
11/09/2023

General:

Any condi ons or other ma ers pertaining to this o er not expressly s pulated will be a ma er of
mutual discussions and agreement at the me of accep ng the order.

Note:-

Unitech Technocrats reserves the right to change or modify the equipment speci ca ons.

The scope of supply is restricted to supply of equipment as speci ed in the proposal. Any subsequent
addi ons or altera ons will be acceptable to us provided it is convenient to do so and the prices and
delivery period are suitably revised.

Separate Purchase Order will be required for Supply of the material & Supervision of Erec on &
commissioning.

For Unitech Technocrats

Arun Garg

+91-9355575276

“Computer generated, hence signature not required.”

Village-Meerpur Gurudwara, Kala-Amb(Sirmour) H.P-173030

unitechtechnocrats@yahoo.com

ti
ti
ti
tt
ti
ff
ti
fi
ti
fi
ti
tt
ti

You might also like