Sunmarc Paper Industry (P) Ltd. (Water Treatment Plant)
Sunmarc Paper Industry (P) Ltd. (Water Treatment Plant)
Sunmarc Paper Industry (P) Ltd. (Water Treatment Plant)
11/09/2023
Nagpur
Subject: Offer for water treatment plant to purify river water/bore well suitable to feed in
High pressure Boiler & Cooling towers.
Dear Sir,
With reference to your enquiry & on the basis of your raw water analysis report, we are pleased to submit
our techno commercial o er for Water treatment plant as per your enquiry.
We thank you very much for the above enquiry and pleased to submit our o er herewith for your kind
considera on.
The following Annexure form the part of our o er
We hope our o er is in line with your requirement and look forward for your valuable order regarding the
same. Please feel free to contact us for any further clari ca on in details.
Thanking you once again and assuring you of our best services at all mes.
Yours faithfully,
Arun Garg
+91-9355575276
unitechtechnocrats@yahoo.com

ti
ff
ti
ff
ti
ti
ff
fi
ti
ti
ff
UT/RO/23-24/506 Unitech Technocrats
11/09/2023
ANNEXURE- I
Design Basis
unitechtechnocrats@yahoo.com

ti
ti
ti
UT/RO/23-24/506 Unitech Technocrats
11/09/2023
Please note that any change in raw water characteris cs will a ect treated water quality / quan ty. Please
note that the feed water to the RO Plant shall be ltered water and shall be within the speci ed norms with
respect to these parameters.
In case of any change in raw water quality, there will be corresponding change in treated water quality &
quan ty.
Design Scheme
A.
Descrip on Unit Value
unitechtechnocrats@yahoo.com

ti
ti
fl
fl
fl
ti
ti
ti
ti
ti
ti
ti
ti
ti
fi
ti
ff
fi
ti
UT/RO/23-24/506 Unitech Technocrats
11/09/2023
d) pH : 5.8 - 6.7
d) pH : 6.5
unitechtechnocrats@yahoo.com

ti
ti
ti
fi
UT/RO/23-24/506 Unitech Technocrats
11/09/2023
ANNEXURE- II
Process Descrip on
The raw water is pumped through the Mul Grade Filter for reduc on of suspended solids. Mul grade
lter consists of a sand of various grades as a lter media. When the pressure drop across the lter
exceeds the preset limit, the lter is backwashed to remove dust and dirt.
Ultra ltra on system will helps to remove Colloidal silica by Filtera on method.
Degasi ca on System:-
Treated water from the WAC unit is fed to the degasser tower to reduce carbon dioxide content. The
degasser tower is a packed column (Pall Rings) where water, sprayed from top of the packing, breaks into
ne droplets, thereby increasing the surface area for contact. These droplets come in contact with a
countercurrent ow of air supplied by degasser fans. In the scrubbing ac on, therefore, the unstable
carbonic acid is broken into water and carbon dioxide. The air containing liberated carbon dioxide is vented
and degassed water (Free from alkalinity or carbonic acids) is collected in the degassed water tank.
Fine Filtra on:- A micron cartridge lter of 5 micron is incorporated prior to RO Plant for removal of the
par culate ma er, which will otherwise clog the RO membranes.
unitechtechnocrats@yahoo.com

fi
fi
ti
ti
fi
fi
fi
ti
ti
ti
ti
ti
ti
tt
ti
fl
ti
fi
fi
ti
fi
ti
ti
ti
ti
fi
ti
ti
UT/RO/23-24/506 Unitech Technocrats
11/09/2023
Reverse Osmosis process is a membrane process in which a synthe c semi-permeable membrane is used to
separate water from dissolved impuri es. When a semi-permeable membrane separates a dilute and
concentrates solu on of salts, due to osmosis, the water from the dilute solu on side passes through the
membrane to the concentrated side ll osmo c equilibrium is a ained. Now, if the pressure is applied and
increased gradually on the concentrated side, the ow of water con nues to reduce ll the applied pressure
reverse the direc on of ow of water and water from the concentrated side enters the dilute side. This
It is very essen al to ensure that the water feed to reverse osmosis membranes is free from par culate
ma er to prevent membrane fouling. Also, the water should be free from organic ma er, heavy metals and
SDI :<5
Temperature : 45 0C (max.)
All limi ng condi ons must be observed/ recorded in log sheets during plant opera on for
sa sfactory performance.
unitechtechnocrats@yahoo.com

ti
tt
ti
ti
ti
ti
ti
fl
ti
ti
ti
fl
tt
ti
ti
ti
ti
ti
tt
ti
UT/RO/23-24/506 Unitech Technocrats
11/09/2023
Turbidity:-
Turbidity of fed water to RO shall be less than 1 NTU. Experience has shown that prolonged opera on in
feed water turbidi es greater than 1 NTU generally results in prohibi vely frequent cleaning
requirements. Unitech strongly recommends that the performance of the pre-treatment equipment be
measure of colloidal par cles in the feed water and hence SDI value of 4 indicates that the feed water has
very low content of colloidal par cles. This ensures minimal colloidal fouling of RO membranes. This test
ml) shall be carried out once a day and ac on ini ated to minimize membrane fouling.
cleaning of membranes as per recommended procedure should be followed. The frequency of cleaning
FRC at inlet to RO shall be monitored at least once a shi and recorded, as presence of FRC is determined
feed water to RO, severely a ects the membrane performance. The presence of Oil and Grease physically
fouls the membrane and make it ine ec ve, which is then very di cult to remove even by cleaning.
unitechtechnocrats@yahoo.com

ti
ti
ti
ft
ti
ff
ti
ti
ff
ti
ti
ti
ti
ti
ft
ti
ti
ti
ffi
ti
ti
ti
UT/RO/23-24/506 Unitech Technocrats
11/09/2023
Temperature:-
The opera ng temperature of feed water shall not be exceeding 45oCelcius. We understand that the RO
system will be treated only pre-treated surface water at ambient temperature and hence we do not
an cipate any problem on this account.
pH Range:-
The allowable opera ng pH range is 2 to 11 during normal opera on of RO Plant. The pH of feed water
Cleaning system:-
We have provided you with a cleaning system to clean the membranes in the R.O. pressure tubes. This
The water from the RO Plant is further passed through the mixed bed unit wherein the total dissolved solids
are further removed with Ca on and Anion resin in the mixed form. This treated water will be used as boiler
feed as well as the breweries use.
unitechtechnocrats@yahoo.com

ti
ti
ti
ti
ft
ti
UT/RO/23-24/506 Unitech Technocrats
11/09/2023
ANNEXURE- III
Scope of Supply
Pretreatment Section
1.00 MGF Feed Pump By Unitech
1.01 Quantity nos. 02[1W + 1SB]
1.02 Make Kirloskar/Equivallant
1.03 Type Centrifugal Monobloc
1.04 Flow m3/hr. 80 - 85
1.05 Head Mtr. 25-30
1.06 MOC CI
unitechtechnocrats@yahoo.com

UT/RO/23-24/506 Unitech Technocrats
11/09/2023
unitechtechnocrats@yahoo.com

UT/RO/23-24/506 Unitech Technocrats
11/09/2023
unitechtechnocrats@yahoo.com

UT/RO/23-24/506 Unitech Technocrats
11/09/2023
unitechtechnocrats@yahoo.com

UT/RO/23-24/506 Unitech Technocrats
11/09/2023
unitechtechnocrats@yahoo.com

UT/RO/23-24/506 Unitech Technocrats
11/09/2023
unitechtechnocrats@yahoo.com

UT/RO/23-24/506 Unitech Technocrats
11/09/2023
unitechtechnocrats@yahoo.com

UT/RO/23-24/506 Unitech Technocrats
11/09/2023
unitechtechnocrats@yahoo.com

UT/RO/23-24/506 Unitech Technocrats
11/09/2023
ANNEXURE IV
RO Membrane Dow/Ovay/Hydronautics
Dosing Pump Milton roy / E-Dose
Note: Our commercial bid is considering the above men oned vendor. In case of any devia ons on the
above men oned vendor, price implica ons shall be extra at actual.
unitechtechnocrats@yahoo.com

tt
fl
ti
ti
ti
fl
ti
ti
ti
UT/RO/23-24/506 Unitech Technocrats
11/09/2023
ANNEXURE V
Termina on Point –
Client u lity required from clients end for the plant opera on:-
Schedule of exclusion
1. Civil works like design and construc ons of founda ons, drains, drain sumps, supports of all types,
pla orms, drain channels and mass concre ng of units (if required).
2. All electrical work like cabling & earthing to pumps & Panel are excluded from our scope of supply &
works.
3. Earthing of motors & electrical Panel.
4. Cable tray will be in your scope.
5. Raw water Storage Tank, & DM Water St. Tank are not in our scope of supply.
6. All consumable (Like NaOCl, SMBS, An Scalant, Acid, Caus c and other cleaning chemicals, oil,
Greece, lubricants) will not be in our scope of supply even in commissioning stage including the rst
charge also.
7. Client has to arrange the material nearer to the site at the me of erec on & commissioning.
8. Site security will be provided by you at your own cost.
9. Ligh ng arrangements, ligh ng xtures, lamps, poles, and cables required for ligh ng or any ligh ng
distribu on boards.
10. Interconnec ng pipeline to be arranged by you in case of devia on of Equipment layout at site.
11. Tes ng and inspec on of the equipment at site should be in client scope.
12. Laboratory facili es including necessary instruments, chemicals and sta if required will be not be
in our scope.
unitechtechnocrats@yahoo.com

tf
ti
ti
ti
ti
ti
ti
fi
ti
ti
ti
ti
fi
ti
ti
ti
ti
ti
ti
ti
ti
ti
fl
ti
ti
ff
ti
ti
fi
ti
ti
UT/RO/23-24/506 Unitech Technocrats
11/09/2023
13. Transit Insurance ma ers shall be in our scope and any claims for loss, damage shall be lodged by
the client with the Insurance Company even when the transit Insurance has been arranged by us on
behalf of the clients for their convenience. Repairs, replacement for the damage, loss shall be made
good at extra cost and not lined to receipt of claim by client from Insurance. Erec on,
Commissioning and handing over of the plant shall be considered to have been completed as
described below:
a. The plant shall be considered erected once the equipment, media, interconnec ng piping,
instruments and accessories essen al to the plant opera on are in place. Minor job
comple on, not a ec ng commissioning, shall not be reason to consider it not completed.
b. The plant shall be considered as commissioned on a aining the required water output and
quality for maximum 1 runs or cycle have been jointly witnessed / demonstrated. Minor
correc ons, modi ca ons like leakage, component rec ca on, etc. not a ec ng
commissioning shall be completed later.
c. The plant shall be considered as handed over to client once the commissioning runs/ cycle has
been completed as referred above.
14. All statutory clearance and sanc ons required for the implementa on of the project.
15. Anything especially not men oned in this o er is not in our scope of work or supply.
unitechtechnocrats@yahoo.com

ti
ti
ff
fi
tt
ti
ti
ti
ti
ti
ff
tt
ti
ti
fi
ti
ti
ti
ff
ti
ti
UT/RO/23-24/506 Unitech Technocrats
11/09/2023
PURCHASER'S OBLIGATIONS
1. Timely completion of foundations & other civil works such as structures, buildings, internal
roads etc. according to a mutually agreed time schedule.
2. Completion of all works not falling within the scope of the seller so as to ensure timely
completion of the project.
3. Provision of raw materials, utilities, chemicals, catalysts etc. in sufficient quantities for pre-
commissioning and commissioning activities.
4. Free power and water in required quantities for erection, testing and commissioning.
5. Lighting as required shall be provided so that work can be carried out during night hours.
6. Receiving, unloading, storing and making available the equipment at plant site for erection
as and when required, free of cost.
7. Protected Covered & secured storage space for machinery and equipments shall be
provided, free of cost.
8. Make available adequate open leveled and graded storage space near the plant site for
storage of heavy components, free of cost.
10. Free lodging and boarding facilities for our erection engineers, staff and workmen.
If you are unable to provide the lodging and boarding facilities and in case we have to
arrange for the same then following rates will be applied per day per person which will be
paid by you every week in advance over and above the Contract Price.
a) Engineer — Rs.3000/- per day
b) Site Supervisor — Rs.1500/- per day
c) Worker — Rs. 850/- per day
12. Communication facilities such as STD Phone, Fax etc. free of cost.
13. Workshop facilities and other auxiliary equipments required for minor modifications.
14. Furnished site office with communication facilities for our site in charge/engineer.
unitechtechnocrats@yahoo.com



UT/RO/23-24/506 Unitech Technocrats
11/09/2023
15. Chemicals, lubricants, fuels etc. as necessary during various stages of erection and
commissioning shall be made available, free of cost.
16. Experienced and skilled operators should be made available to man various stations during
pre-commissioning and commissioning operation.
17. Fitter,Welder,Electrician, skilled labour & unskilled labour will be provided by you at your
own cost.
unitechtechnocrats@yahoo.com

UT/RO/23-24/506 Unitech Technocrats
11/09/2023
ANNEXURE VII
Price:-
A. Our price towards supply of the MGF Feed Pumps,Filter media for exis ng MGF vessel,
Rubber lining & MSRL frontal pipe line will be Rs. 6,50,000/-(Rs. Six Lac Fi y thousand only).
B. Our price towards supply of the Ultra Filtera on System will be Rs. 68,00,000/-(Rs. Sixty Eight
Lac only).
C. Our price towards supply of the Weak Acid Ca on & Degassi ca on Unit will be
Rs. 40,00,000/-(Rs. Forty Lac only).
D. Our price towards supply of the Reverse Osmosis Plant & Mix bed Unit will Rs. 70,00,000/-
(Rs. Seventy ve Lac only).
Grand total (A+B+C+D) : Rs.1,84,50,000/- (Rs. One Crore Eighty Four Lac Fi y
Thousand Only)
Price Basis:-
The above price quoted is ex-works Kala-Amb (HP) basis exclusive of , Excise Duty, Sales Tax, freight,
insurance and any other applicable taxes and du es.
Terms of payment:-
lodging & boarding to our engineers will be provided by you at your own cost.
Please note that we will provide Engineer for Supervision only. Skilled & un skilled labour will be
unitechtechnocrats@yahoo.com

ti
fi
ti
ti
ti
ti
ti
ti
ti
fi
ft
ti
ti
ft
UT/RO/23-24/506 Unitech Technocrats
11/09/2023
Delivery Period:-
14 to 18 weeks from the date of receipt of your technically and commercially clear purchase order
along with advance payment for the supply of the material.
Warranty:-
Equipment o ered are warranted against manufacturing defect for a period 12 months from the
invoicing date.
Validity:-
The quota on is valid for your acceptance up to 30 days from the date of this o er.
Any change in Govt. policies which will a ect directly our quoted price will be charged at extra to
purchaser’s account for which necessary documents will be submi ed on request.
Force Majeure:
Consequen al Damages:
Neither party shall at any me be liable to the other for any loss or pro ts or any similar indirect
damages. However, described, incurred or su ered by either party in respect of the project.
unitechtechnocrats@yahoo.com

ti
ti
ti
ti
ff
ti
ti
ti
ti
ti
ti
ti
ff
ti
ff
ti
fi
ti
ti
ti
tt
ti
fi
fl
ff
ff
ti
ti
UT/RO/23-24/506 Unitech Technocrats
11/09/2023
General:
Any condi ons or other ma ers pertaining to this o er not expressly s pulated will be a ma er of
mutual discussions and agreement at the me of accep ng the order.
Note:-
Unitech Technocrats reserves the right to change or modify the equipment speci ca ons.
The scope of supply is restricted to supply of equipment as speci ed in the proposal. Any subsequent
addi ons or altera ons will be acceptable to us provided it is convenient to do so and the prices and
delivery period are suitably revised.
Separate Purchase Order will be required for Supply of the material & Supervision of Erec on &
commissioning.
Arun Garg
+91-9355575276
unitechtechnocrats@yahoo.com