Spesifikasi

SEBUTHARGA PERKHIDMATAN KERJA-KERJA PENYELENGGARAAN


SISTEM PENGHAWA DINGIN BERPUSAT DAN PENGHAWA DINGIN
Tajuk Templat:
SPLIT UNIT SERTA KERJA-KERJA BERKAITAN UNTUK TEMPOH DUA
(2) TAHUN DI ILKKM KUCHING, SARAWAK
Jenis Item: Perkhidmatan
Jenis Barangan: Tempatan

Kekerapan /
Bil. Unit Bil. Unit
UOM Kuantiti
Item Ukuran Sehari Ukuran Sebulan
Unit Ukuran
Spesifikasi
Service and Months 1 24
maintenance for
Service Report/ Checklist The Contractor must prepare and sign two
24 months for
copies of approved check list for every service. The checklist must be
Mechanical
signed by the user and the appointed technical officer from the
Electrical related
Engineering Department. If requested by the user the service
works. contractor must submit an extra copy of the service report to the user
concerned.
- Contractor to submit/provide PPM Checklist - To submit Monthly
Planned Preventive Maintenance (PPM). Report with site photo and
update the status of each programmed activity in every site meeting. -
To attend and present at Monthly Validation Meeting - The PPM shall
be carry out as per schedule.
Air Cooled Split Months 1 24
Units (ACSU) at
i)Monthly Maintenance of 27 Units ACSU - General cleaning
Blok Cempaka,
(filter,condenser,evaporator) - Rectify and replace minor and small
Orkid, Surau, Bilik
parts, such as capacitor, batteries for controller and all other related
Pemandu, Busang,
maintenance.
Bario, Tian,
Asajaya, Serikin, ii) Inspection Indoor Unit -Inspect for any abnormalities. Trace the
Skrang. faults and rectify as necessary -Inspect and clean all air filters -Inspect
leakage or clogging at drain pan and drain line. Flush as necessary
-Inspect refrigerant piping, joints, fitting and insulation leaks or
damages
iii) Inspection Outdoor Unit - Inspect refrigerant leaks at joints, fittings,
piping and compressors. -Inspect all fans and motor as necessary
-Inspect condensing coil, filter dryer, compressor units and paddings
iv) Technical Staff The service contractor shall provide at least one (2)
ACMV technicians which having at least 1 years experienced in
service and maintenance of the ACMV system.
Fan Coil Units Months 1 24
(FCU) and System
i) Monthly Maintenance of 17 Units FCU - General cleaning (chilled
Blok Cempaka
water [ipe, strainer) bolt tightening(FCU and FCU Control Panel),
Orkid
record engineering data of ammeter and voltan. Inspect water

Page 1 / 4
regulation valves, refrigerant gas and all other related maintenance.
ii) Technical Staff The service contractor shall provide at least one (2)
ACMV technicians which having at least 1 years experienced in
service and maintenance of the ACMV system.
Air Handling Units Months 1 24
(AHU) and System
i) Monthly Maintenance of 31 Units AHU - General cleaning (washable
Blok Orkid Blok
air filter AHU, chilled water pipe, condenser, strainer), bolt tightening
Cempaka
(AHU and AHU Control Panel), record engineering data of ammeter
and voltan. Inspect water regulation valves, water coils, refrigerant gas,
gas filter drier and all other related maintenance.
ii) Technical Staff The service contractor shall provide at least one (2)
ACMV technicians which having at least 1 years experienced in
service and maintenance of the ACMV system.
CHILLED WATER Months 1 24
PUMP ROOM -
i) Monthly Maintenance of two (2) location Chilled Water Pump Room -
BLOK ORKID
General service of chilled water pump room (strainer chilled water
BLOK CEMPAKA
pumpset, lubricate motor). Inspections chilled water pumpset,
maintenance, services, troubleshoot and all other work related. -
Provide water jet to clean and clear away the debris algae etc from the
existing concrete plinth of chilled water pump room at Blok Orkid and
Blok Cempaka.
ii) Technical Staff The service contractor shall provide at least one (2)
ACMV technicians which having at least 1 years experienced in
service and maintenance of the ACMV system.
COOLING TOWER Months 1 24
- BLOK ORKID
i) Monthly Maintenance of 6 Unit Cooling Tower - General service of
BLOK CEMPAKA
cooling tower (water tank, filter cooling tower, lubricate motor).
Type : Nihon
Inspections motor, float valve, motorized valve, maintenance, services,
Spindle Cooling
troubleshoot and all other work related. - Provide water jet to clean and
Tower clear away the debris algae etc from the existing concrete plinth of
cooling towers cold water storage tank and firefighting water storage
tank at: 1) Blok Cempaka - 400 meter square. 2) Blok Orkid -48 meter
square - Maintain the cleanliness of the cooling towers, fans, strainers,
fins and etc.
ii) Technical Staff The service contractor shall provide at least one (2)
HVAC technicians which having at least 1 years experienced in service
and maintenance of the HVAC system.
WATER Months 1 8
TREATMENT OF
The service contractor shall apply water treatment to the cooling
COOLING TOWER
tower(s) shall be quaterly per year. The type of chemical to be used
- BLOK ORKID
must be approved by the department supervisor. The application of
BLOK CEMPAKA
treatment is to control the pH level to the control values [pH 6.8 – 8.0]
Type : Nihon and also to control algae growth in the cooling tower. All chemical used
Spindle Cooling be submitted together with the service contractor. The costs of water
Tower treatment shall be included in the quarterly rate quoted by the service
contractor and shall not be charged separately. The service contractor
shall submit the service water treatment report to the Institut Latihan
Kementerian Kuching Sarawak, Technical Officer for endorsement and

Page 2 / 4
one copy of the report shall retained by the Technical Officer. A sample
of the service water treatment report is attached for reference.
UNSCHEDULE Months 1 8
MAJOR
All unscheduled major overhaul, minor repair, as per request
OVERHAUL,
(provision) work only be able to proceed when the proposed
MINOR REPAIR
job/task/work approved by the Engineering Department, depend on the
AND PER
fund/ allocation availability. All proposed items/product catalogue are
REQUEST WORK advisable to be submitted and attached with the quoted document.
FOR WATER Please be noted that the cost of spare parts replacement and related
COOLED SYSTEM works shall be quoted based on the price listed in JKR Schedule of
AT Rate during the contract period and shall be verifiy by the Institut
ILKKM KUCHING :- Latihan Kementerian Kesihatan Malaysia (ILKKM) Technical Officer.
ii) Major Overhaul/Repair/Replace Major overhaul such as breakdown
of chilled water pump set needed works for allignment shaft, replace
mechanical seal, replace bearing, major overhaul compressor unit for
AHU needed to be dismantle on site and replace with new
piston/terminal and all other related parts with component Water
cooled package unit system and all other related major works
regarding to Water cooled system.
iii) Minor Repair/ Replace/ Rectify Minor repair/replace and rectify
including for all water cooled package which is AHU/FCU/ACSU,
control panel for water cooled system system of cooling tower, chilled
water pump set, AHU and FCU such as replacement of timer, relay,
molded case circuit breaker (MCCB), residual current circuit breaker
(RCCB), set of contactor,thermal overload relay, autotrans, condenser,
refrigerant gas , gas filter drier, drain pipe, belt drives, fan/motors
bearing,pilot light, on/off switch button, strainer thermostat switch,
thermostatic expansion valves (TXV), pressure gauge, high pressure
switch, low pressure switch and all other related works for minor repair.
iv) Consumable Materials The service contractor shall supply the
following consumable materials as and when required:- a) All oils and
grease required for lubrication of pumps, fan bearings, motor bearings,
pivot and other moving parts. b) All minor water cooled packaged unit
parts, such as belting, 230-240 VAC relay, contactor, wire, indicator,
push buttons and switches. c) All cotton wastes, soap detergent,
chemical treatment and other cleaning materials required for cleaning
purposes. The costs of consumable materials shall be included in the
fixed monthly/quarterly/half- yearly rate quoted by the service
contractor and shall not be charged separately.
v) Tools and Equipments The service contractor shall posses adequate
relevant and caliberated tools and equipment such as portable
temperature meter, surface temperature meter, relative humidity meter,
dew point meter, manifold set, air flow meter, electrical multimeter,
clamp meter, spanner set, screw driver set, players set, drills, allen key
set, gloves, and goggle. The service contractaor shall make all tools
and equipment available as and when required by the department.
vi) Respone Time The service contractor representative or technician
is required to respond immediately to the service/breakdown request to
minimize the time the system and/or equipment is not available for use.
The service contractor representative or technician shall be present
physically by authorized and competent personnel within their trades of

Page 3 / 4
competency to rectify or to investigate a fault or complaint after it was
reported by the client. The service contractor representative or
technician shall standby 24 hours to asists the department in the event
of emergency/breakdown of equipement/system.
CHILLED WATER Months 1 24
PUMP ROOM
i) Daily Schedule to start and stop ACMV system The service
(CONTROL PANEL
contractor representative or technician is required to start HVAC
SYSTEM FOR
system (morning 7:00AM) and stop system (evening 4:30PM) with
COOLING TOWER
daily schedule (30 days) for cooling tower and chilled water pump are
AND CHILLED located in Blok Orkid and Blok Cempaka, as per user agreed schedule
WATER (Monday-Friday) and as per request (Saturday/Sunday). 1) Blok
PUMPSET)- BLOK Cempaka - 4 Cooling Tower/ 4 Chilled Water Pump Set 2) Blok Orkid -
ORKID BLOK 2 Cooling Tower/ 2 Chilled Water Pump Set
CEMPAKA
ii) Technical Staff The service contractor shall provide at least one (1)
ACMV technicians which having at least 2 years experienced in
service and maintenance of the ACMV system. Job scope;- - The
cooling tower and chilled water pump set are connected at the control
panel system in Blok Orkid and Blok Cempaka. The service contractor
required to ensure the ACMV system works properly.
iii) Respone Time The service contractor representative or technician
is required to respond immediately to the service/breakdown request to
minimize the time the system and/or equipment is not available for use.
The service contractor representative or technician shall be present
physically by authorized and competent personnel within their trades of
competency to rectify or to investigate a fault or complaint after it was
reported by the client. The service contractor representative or
technician shall standby 24 hours to asists the department in the event
of emergency/breakdown of equipement/system.