Professional Documents
Culture Documents
Qa10 PS D85ess-2 (3415)
Qa10 PS D85ess-2 (3415)
Engine Model Engine SN Type of Attachment Every Every Every Every Every
Information
250h 500h 1000h 2000h 4000h
Code 1 2 3 4 5
Filling Instruction : Below are the items related to the operation, maintenance and lubrication of this unit. To be serviced at periodic service and additional services
The operation & Maintenance Manual details all items to maximize machine availability
: Item to be serviced Result of Inspection : Good Condition X : Bad Condition : Correction Made
1 End bit and cutting edge Check wearness; reverse or replace if necessary
•••••
2 Lift cylinder ball joint, 2 pcs Greasing
•••••
3 Tilt brace ball joint, 2 pcs Greasing
•••••
4 Tilt brace thread, 2 pcs Greasing
•••••
5 Equalizer bar side pin, 4 pcs Greasing
•••••
6 Track tension Check tension, adjust if necessary
•••••
7 Shoe bolts Check tightness; tighten if necessary
•••••
8 Final drive oil Check level, add if necessary and take oil sample for PAP
•••••
9 Final drive oil, 27 ltr each side Change oil
•••
10 Idler clearance Check clearance; adjust if necessary
•••
11 Idler oil level Check level; Add oil
••••
12 Universal Joint (Drive Shaft), 2 pcs Greasing
•••
13 Power train oil, 48 ltr Change power train oil
•••
14 Power train strainers Clean strainers
•••
15 Power train case breather, 1 pcs Clean from dust with diesel oil
•••
16 Hydraulic oil Change hydraulic oil
••
17 Vibration damper Check for crack or peeling in the outside surface of the rubber
••
18 Fuel strainer Clean from dirt and sediment
•••••
19 Towing winch oil (if equiped ) Check oil level
•••••
20 Towing winch oil, 75 ltr (if equiped ) Change oil and clean the oil strainer
•••
21 Towing winch oil filter and screen (if equiped ) Replace filter, clean oil suction screen and magnets
••••
Mechanic Leader Supervisor
( ) ( ) ( )