No. Item Description Quantity Unit Measure Unit Cost Amount 1 Banana 1 kilo 20 20 2 Oil 1/5 Kilo 68 13.6 3 Cheese pack 29.5 14.75 Total 48.35
Schedule 2: Direct Labor Cost
Number of Manpower required 1 Number of hours required per manpower 3 Total number of hours required 3 Labor rate (₱350/8) 43.75 Direct labor cost 43.75
Schedule 2.2: Direct Labor Cost
Number of Manpower required 1 Number of hours required per manpower 1 Total number of hours required 1 Labor rate (₱350/8) 43.75 Direct labor cost 43.75
Schedule 3: Factory Overhead Cost
Water 0.228 Electricity 0.6944444444 Fuel 1.4125 Others 0 Total overhead cost 2.334944444
Schedule 3.2: Factory Overhead Cost
Water 0.114 Electricity 0.6944444444 Fuel 0.70625 Others 0 Total overhead cost 1.514694444 Schedule 4: unit selling price a. total manufacturing cost direct materials cost 109.45 direct labor cost 43.75 factory overhead cost 2.33 total 155.53 b. yield 10 c. unit cost (a/b) 15.553 d. mark up (cx%) 9.4468922 (60.74%) e. unit selling price (c+d) 24.9998922 or 25
Schedule 4.2: unit selling price
a. total manufacturing cost direct materials cost 48.35 direct labor cost 43.75 factory overhead cost 1.51 total 93.58 b. yield 6 c. unit cost (a/b) 15.59666667 d. mark up (cx%) 4.679000001 (30%) e. unit selling price (c+d) 20.27566667 or 20