Professional Documents
Culture Documents
Calibrare TCS B2
Calibrare TCS B2
Calibrare TCS B2
CHAPTER 4. Calibration
When you calibrate the indicator, the load cell's shield cable must connected with GND,
otherwise the indicator reads will have errors. (Figure 3-3)
Calibration should be operated by measure technician is as follows:
1. Weight calibration
--"-'-""""'~-' -"~''" '
Power on, press "calibration" and " Enter" together when self-checking, loosen when hear
1
buzzer.
"-I. '1
[pass) It will display [pass) after Self checking and ask to
2
input calibration password ~rl /~
Input calibration [ ------1) Press [ to input data, press [Enter) to confirm;
password "01 0201" press [Tare) to modify last bit of password or exit
3
Press [Enter l [d= xxl calibration. Password right to enter division setting,
otherwise exit calibration
[d= xx) Division setting
.rivr-J 4 press [ t l [d= yy) (1, 2, 5, 10, 20, 50, 100, 200); Press [Enter) to confirm
press [Enter) [dot= x) Confirm the division and enter point setting
-"----------
press [ t l [Zeroyy) Press [ tl to modify the zero range, the most zero
6
tracing range will be 3d ;Press [Enter) to confirm
press [Enter) [ Full l onfirm the setting and enter capacity setting
[ Full l
7 Press [ t l [ xxxx l
Press [Enter l [ LoAd)
[LoAd)
[LoAdl
8
L_.