1 PROPOSED "HILTON FOOD AUSTRALIA" TEMPERATURE CONTROLLED


Project: PROCESSING AND DISTRIBUTION FACILITY
2 Location: 30 SEEANA PLACE HEATHWOOD, QLD. 4110
3
4 Subject: Quantity Takeoff Plumbing
5
6 Item No Description Quantity Unit Rate Total
7 I DWG NO H01 REV T1
8 H01_100 DWV_DRAIN,WASTE,VENT PIPEWORK 65.00 M 0.00
9 H01_150 DWV_DRAIN,WASTE,VENT PIPEWORK 52.00 M 0.00
10 H01_225 DWV_DRAIN,WASTE,VENT PIPEWORK 21.00 M 0.00
11 H01_300 DWV_DRAIN,WASTE,VENT PIPEWORK 3.33 M 0.00
12 H01_63 PN12.5_PUMP OUTLINE 719.00 M 0.00
13 H01_100 PN12.5_PUMP OUTLINE 72.70 M 0.00
14 H01_20 HPCW_HIGH PRESSURE COLD WATER 62.36 M 0.00
15 H01_25 HPCW_HIGH PRESSURE COLD WATER 51.21 M 0.00
16 H01_32 HPCW_HIGH PRESSURE COLD WATER 113.63 M 0.00
17 H01_40 HPCW_HIGH PRESSURE COLD WATER 34.38 M 0.00
18 H01_50 HPCW_HIGH PRESSURE COLD WATER 144.87 M 0.00
19 H01_100 HPCW_HIGH PRESSURE COLD WATER 272.55 M 0.00
20 H01_NEW GAS SERVICE 138.11 M 0.00
21 H01_NEW CIVIL WATER SERVICE 552.82 M 0.00
22 H01_160 PE_NEW COUNCIL SEWER 96.52 M 0.00
23 H01_COS_CLEAROUT TO SURFACE 12.00 EA 0.00
24 H01_1200MM SEWER INSPECTION CHAMBER 1.00 EA 0.00
25 H01_SEWER PROPERTY CONNECTION POINT (BY OTHERS) 1.00 EA 0.00
26 H01_DN150 AUTOMATIC BACKWASH FILTER' JUDO JPF SERIES 1.00 EA 0.00
27 H01_AF4-150 FINE PARTICLE FILTER 1.00 EA 0.00
28 H01_A.P.A GAS METER IN VENTILATED ENCLOSURE 1.00 EA 0.00
29 H01_FIRE SERVICES CAPPED FOR FUTURE CONNECTION 2.00 EA 0.00
30 H01_150MM TESTABLE SINGLE CHECK VALVE ABOVE GROUND (FIRE SPRINKLER SERVICE) 1.00 EA 0.00
31 H01_150MM TESTABLE DOUBLE CHECK CHECK VALVE 1.00 EA 0.00
32 H01_150MM MAG FLO WATER METER FOR HIRE SERVICES (ALLOW ALL COSTS) 2.00 EA 0.00
33 H01_150MM WATER METER ASSEMBLY 1.00 EA 0.00
34 H01_LOCATE AND CONNECT TO CIVIL WATER SERVICE 1.00 EA 0.00
35 H01_450MM X450MM SWIP WITH 225MM OUTLET 1.00 EA 0.00

Prepared by: Philip C. Page 1 of 35


engr_philipncesar@yahoo.com
A B C D E F

1 PROPOSED "HILTON FOOD AUSTRALIA" TEMPERATURE CONTROLLED


Project: PROCESSING AND DISTRIBUTION FACILITY
2 Location: 30 SEEANA PLACE HEATHWOOD, QLD. 4110
3
4 Subject: Quantity Takeoff Plumbing
5
6 Item No Description Quantity Unit Rate Total
36 H01_32MM IRRIGATION CONNECTION POINT WITH 32MM RPZD COMPLETE WITH CV'S AND STRAINER 1.00 EA 0.00
37 H01_CV_CONTROL VALVE 2.00 EA 0.00
38 H01_32MM COLD WATER METER WITH CV'S (AMR TO BMS) 1.00 EA 0.00
39 H01_CONNECTION TO CIVIL STORMWATER DRAINAGE 1.00 EA 0.00
40 H01_150MM RPZD COMPLETE WITH CV'S AND STRAINER 1.00 EA 0.00
41 H01_150MM FULL FLOW BYPASS WITH ISOLATION VALVE LOCKED IN CLOSED POSITION 1.00 EA 0.00
42 H01_HC (NON POTABLE)_FOR GIT WASHDOWN WITH 15MM RPZD COMPLETE WITH CV'S IN VANDAL PR 2.00 EA 0.00
43 H01_CV & CHV IN H/D PATHBOX 5.00 EA 0.00
44 H01_HC ON POST OVER ORG 1.00 EA 0.00
45 H01_150DIA ORG (WITH HC COVER) TO BE RECESSED IN KERB AND SHALL BE 150MM BELOW FFL(MIN) 1.00 EA 0.00
46 II DWG NO H02 REV T1 0.00
47 H02_TW_NEW TRADE WASTE DRAINAGE_110MM DIA HDPE 1,728.96 M 0.00
48 H02_TW_NEW TRADE WASTE DRAINAGE_160MM DIA HDPE 104.31 M 0.00
49 H02_TW_NEW TRADE WASTE DRAINAGE_200MM DIA HDPE 108.92 M 0.00
50 H02_NEW STORM WATER SERVICE_100 75.51 M 0.00
51 H02_NEW STORM WATER SERVICE_150 142.01 M 0.00
52 H02_NEW STORM WATER SERVICE_225 592.77 M 0.00
53 H02_NEW STORM WATER SERVICE_300 52.31 M 0.00
54 H02_NEW STORM WATER SERVICE_375 1.23 M 0.00
55 H02_NEW STORM WATER SERVICE_600 11.97 M 0.00
56 H02_SPS S/S TRENCH DRAIN & GRATE 413.49 M 0.00
57 H02_TRENCH DRAIN & GRATE 18.22 M 0.00
58 H02_NEW VENT PIPE 303.61 M 0.00
59 H02_63 PN12.5_PUMP OUTLINE 26.16 M 0.00
60 H02_DP_100_DOWN PIPE 15.00 EA 0.00
61 H02_O/F_100_OVER FLOW 2.00 EA 0.00
62 H02_900MMX900MM_SWIP 3.00 EA 0.00
63 H02_DP_225_DOWN PIPE 43.00 EA 0.00
64 H02_DP_150_DOWN PIPE 10.00 EA 0.00

Prepared by: Philip C. Page 2 of 35


engr_philipncesar@yahoo.com
A B C D E F

1 PROPOSED "HILTON FOOD AUSTRALIA" TEMPERATURE CONTROLLED


Project: PROCESSING AND DISTRIBUTION FACILITY
2 Location: 30 SEEANA PLACE HEATHWOOD, QLD. 4110
3
4 Subject: Quantity Takeoff Plumbing
5
6 Item No Description Quantity Unit Rate Total
65 H02_GVP_50_GREASE VENT PIPE 1.00 EA 0.00
66 H02_GVP_100_GREASE VENT PIPE 8.00 EA 0.00
67 H02_VP_100_VENT PIPE 5.00 EA 0.00
68 H02_DD_100_DRAINAGE DROPPER 2.00 EA 0.00
69 H02_IFWD_50_INDEPENDANT FLOOR WASTE DROPPER 3.00 EA 0.00
70 H02_GTV_100_GREASE TRAP VENT 6.00 EA 0.00
71 H02_DP_300_DOWN PIPE 3.00 EA 0.00
72 H02_DP_375_DOWN PIPE 1.00 EA 0.00
73 H02_TWDD_110_TRADE WASTE DRAINAGE DROPPER 7.00 EA 0.00
74 H02_CONNECTION TO CIVIL STORMWATER DRAINAGE 9.00 EA 0.00
75 H02_450MMX450MM SWIP 1.00 EA 0.00
76 H02_150 DIA DRAINERS GRATE 1.00 EA 0.00
77 H02_5000L GIT FOR KITCHEN 1.00 EA 0.00
78 H02_8000L GIT FOR PRODUCTION AREA WITH H/D GAS TIGHT COVER AND FRAME 3.00 EA 0.00
79 H02_GRATED DT 5.00 EA 0.00
80 H02_FWG_FLOOR WASTE GULLY 79.00 EA 0.00
81 H02_B/T_BUCKET TRAP 66.00 EA 0.00
82 H02_T/TD FOR AUTOMATIC TRAP PRIMER IN WALL W/ VIEWING PANEL 19.00 EA 0.00
83 H02_HANDWASH TROUGH 7.00 EA 0.00
84 H02_DF_DRINKING FOUNTAIN 6.00 EA 0.00
85 H02_AC/TD_AIRCONDITIONING TUNDISH_INWALL W/ ACCESS PANEL 15.00 EA 0.00
86 H02_100MM TRAPPED DRAINAGE POINT FOR ELPRESS EDW-20 1.00 EA 0.00
87 H02_160MM TRAPPED DRAINAGE POINT FOR DOLAV WASHER 1.00 EA 0.00
88 H02_T/TD_TRAPPED TUNDISH FOR RPZD 2.00 EA 0.00
89 H02_SAFETY SHOWER/EW 4.00 EA 0.00
90 H02_B_BASIN 7.00 EA 0.00
91 H02_2000L GIT FOR PRODUCTION AREA WITH H/D GAS TIGHT COVER AND FRAME 1.00 EA 0.00
92 H02_100MM TRAPPED DRAINAGE POINTS FOR CENTRAL CLEANING UNIT, HIGH PRESSURE UNIT AND FO 3.00 EA 0.00
93 H02_T/TD_TRAPPED TUNDISH_ FOR BOOTWASH 3.00 EA 0.00

Prepared by: Philip C. Page 3 of 35


engr_philipncesar@yahoo.com
A B C D E F

1 PROPOSED "HILTON FOOD AUSTRALIA" TEMPERATURE CONTROLLED


Project: PROCESSING AND DISTRIBUTION FACILITY
2 Location: 30 SEEANA PLACE HEATHWOOD, QLD. 4110
3
4 Subject: Quantity Takeoff Plumbing
5
6 Item No Description Quantity Unit Rate Total
94 H02_HW/TD_HOT WATER TUNDISH 4.00 EA 0.00
95 H02_SK_SINK 9.00 EA 0.00
96 H02_12000L GIT FOR CRATE WASHDOWN WITH H/D COVERS & FRAME 1.00 EA 0.00
97 H02_450MMX450MM BUNDED TEST DRAIN WITH 225MM OUTLET 1.00 EA 0.00
98 H02_200MM TRAPPED DRAINAGE POINT FOR CRATE WASH 4.00 EA 0.00
99 H02_AC/TD_AIR CON TUNDISH 3.00 EA 0.00
100 H02_PUMP CONTROL PANEL TO BMS 2.00 EA 0.00
101 H02_PUMP STATION-1 1.00 EA 0.00
102 H02_PUMP STATION-2 1.00 EA 0.00
103 H02_COS_CLEAROUT TO SURFACE 38.00 EA 0.00
104 III DWG NO H03 REV T1 0.00
105 H03_NEW STROM WATER SERVICE_50 157.37 M 0.00
106 H03_NEW STROM WATER SERVICE_225 47.41 M 0.00
107 H03_NEW STROM WATER SERVICE_300 11.66 M 0.00
108 H03_NEW HOUSE DRAINAGE 125.34 M 0.00
109 H03_NEW VENT PIPE 6.17 M 0.00
110 H03_DP_225_DOWN PIPE 49.00 EA 0.00
111 H03_DP_100_DOWN PIPE 10.00 EA 0.00
112 H03_DP_150_DOWN PIPE 12.00 EA 0.00
113 H03_DP_300_DOWN PIPE 4.00 EA 0.00
114 H03_DP_375_DOWN PIPE 1.00 EA 0.00
115 H03_GVP_100_GREASE VENT PIPE 10.00 EA 0.00
116 H03_GVP_110_GREASE VENT PIPE 1.00 EA 0.00
117 H03_GVP_50_GREASE VENT PIPE 1.00 EA 0.00
118 H03_VP_100_VENT PIPE 7.00 EA 0.00
119 H03_TWDD_110_TRADE WASTE DRAINAGE DROPPER 7.00 EA 0.00
120 H03_GTV_100_GREASE TRAP VENT 6.00 EA 0.00
121 H03_DD_100_DRAINAGE DROPPER 3.00 EA 0.00
122 H03_VP_65_VENT PIPE 6.00 EA 0.00

Prepared by: Philip C. Page 4 of 35


engr_philipncesar@yahoo.com
A B C D E F

1 PROPOSED "HILTON FOOD AUSTRALIA" TEMPERATURE CONTROLLED


Project: PROCESSING AND DISTRIBUTION FACILITY
2 Location: 30 SEEANA PLACE HEATHWOOD, QLD. 4110
3
4 Subject: Quantity Takeoff Plumbing
5
6 Item No Description Quantity Unit Rate Total
123 H03_VP_50_VENT PIPE 3.00 EA 0.00
124 H03_IFWD_50_INDEPENDENT FLOOR WASTE DROPPER 3.00 EA 0.00
125 H03_O/F_225_OVERFLOW 9.00 EA 0.00
126 H03_O/F_100_OVERFLOW 3.00 EA 0.00
127 H03_O/F_150_OVERFLOW 2.00 EA 0.00
128 H03_GVP_65_GREASE VENT PIPE 1.00 EA 0.00
129 H03_AC/TD_AIRCONDITIONER TRAPPED TUNDISH 23.00 EA 0.00
130 H03_SK_SINK 2.00 EA 0.00
131 H03_FWG_FLOOR WASTE GULLY 6.00 EA 0.00
132 H03_T/TD FOR AUTOMATIC TRAP PRIMER 6.00 EA 0.00
133 IV DWG NO H04 REV T1 0.00
134 H04_NEW STROM WATER_225 31.92 M 0.00
135 H04_NEW STROM WATER_300 84.94 M 0.00
136 H04_NEW STROM WATER_375 23.38 M 0.00
137 H04_NEW TRADE WASTE DRAINAGE 43.07 M 0.00
138 H04_NEW VENT PIPE 37.51 M 0.00
139 H04_NEW HOUSE DRAINAGE 303.36 M 0.00
140 H04_CONDENSATE LAGGED PIPEWORK 79.64 M 0.00
141 H04_DP_150_DOWN PIPE 10.00 EA 0.00
142 H04_VP_100_VENT PIPE 6.00 EA 0.00
143 H04_GVP_100_GREASE VENT PIPE 6.00 EA 0.00
144 H04_IFWD_50_INDEPENDANT FLOOR WASTE DROPPER 4.00 EA 0.00
145 H04_GVP_50_GREASE VENT PIPE 3.00 EA 0.00
146 H04_TWDD_110_TRADE WASTE DRAINAGE DROPPER 6.00 EA 0.00
147 H04_GVP_100_GREASE VENT PIPE 12.00 EA 0.00
148 H04_VP_50_VENT PIPE 3.00 EA 0.00
149 H04_DP_225_DOWN PIPE 45.00 EA 0.00
150 H04_GVP_110_GREASE VENT PIPE 1.00 EA 0.00
151 H04_VP_65_VENT PIPE 1.00 EA 0.00

Prepared by: Philip C. Page 5 of 35


engr_philipncesar@yahoo.com
A B C D E F

1 PROPOSED "HILTON FOOD AUSTRALIA" TEMPERATURE CONTROLLED


Project: PROCESSING AND DISTRIBUTION FACILITY
2 Location: 30 SEEANA PLACE HEATHWOOD, QLD. 4110
3
4 Subject: Quantity Takeoff Plumbing
5
6 Item No Description Quantity Unit Rate Total
152 H04_DD_100_DRAINAGE DROPPER 2.00 EA 0.00
153 H04_DP_300_DOWN PIPE 1.00 EA 0.00
154 H04_DP_375_DOWN PIPE 1.00 EA 0.00
155 H04_B/T_BUCKET TRAP 8.00 EA 0.00
156 H04_AC/TD_AIRCONDITIONER TUNDISH 8.00 EA 0.00
157 H04_DF_DRINGKING FOUNTAIN 1.00 EA 0.00
158 H04_SPS S/S TRENCH DRAIN & GRATE 1.00 EA 0.00
159 H04_AC/TD IN WALL WITH ACCESS PANEL 7.00 EA 0.00
160 H04_110MM TRAPPE DRAINAGE POINT FOR CONDENSE DRAIN COMPRESSED 26.00 EA 0.00
161 H04_100MM TRAPPED DRAINAGE POINT FOR CHILLED PROCESS TANKER TANK 1.00 EA 0.00
162 H04_SK_SINK 3.00 EA 0.00
163 H04_T/TD FOR AUTOMATIC TRAP PRIMER IN WALL WITH VIEWING PANEL 1.00 EA 0.00
164 H04_FWG_FLOOR WASTE GULLY 1.00 EA 0.00
165 V DWG NO H05 REV T1 0.00
166 H05_VP_100_VENT PIPE 6.00 EA 0.00
167 H05_DP_150_DOWN PIPE 13.00 EA 0.00
168 H05_GTV_100_GREASE TRAP VENT 6.00 EA 0.00
169 H05_GVP_50_GREASE VENT PIPE 2.00 EA 0.00
170 H05_O/F_150_OVERFLOW 3.00 EA 0.00
171 H05_VP_50_VENT PIPE 3.00 EA 0.00
172 H05_GVP_100_GREASE VENT PIPE 12.00 EA 0.00
173 H05_DP_225_DOWN PIPE 45.00 EA 0.00
174 H05_GVP_50_GREASE VENT PIPE 1.00 EA 0.00
175 H05_VP_65_VENT PIPE 1.00 EA 0.00
176 VI DWG NO H06 REV T1 0.00
177 H06_VP_100_VENTPIPE 7.67 M 0.00
178 H06_NEW STROM WATER SERVICE_100 6.87 M 0.00
179 H06_NEW STROM WATER SERVICE_150 2.22 M 0.00
180 H06_NEW STORM WATER SERVICE_225 9.89 M 0.00

Prepared by: Philip C. Page 6 of 35


engr_philipncesar@yahoo.com
A B C D E F

1 PROPOSED "HILTON FOOD AUSTRALIA" TEMPERATURE CONTROLLED


Project: PROCESSING AND DISTRIBUTION FACILITY
2 Location: 30 SEEANA PLACE HEATHWOOD, QLD. 4110
3
4 Subject: Quantity Takeoff Plumbing
5
6 Item No Description Quantity Unit Rate Total
181 H06_100 DWV_DRAIN,WASTE,VENT PIPEWORK 59.47 M 0.00
182 H06_150 DWV_DRAIN,WASTE,VENT PIPEWORK 322.57 M 0.00
183 H06_TW_NEW TRADE WASTE DRAINAGE_110MM DIA HDPE 229.35 M 0.00
184 H06_SPS S/S TRENCH GRATE & DRAIN 7.87 M 0.00
185 H06_VP_65_VENTPIPE 2.76 M 0.00
186 H06_VP_50_VENT PIPE 0.75 M 0.00
187 H06_B_BASIN 17.00 EA 0.00
188 H06_SHR_SHOWER 7.00 EA 0.00
189 H06_SK_SINK 12.00 EA 0.00
190 H06_SAFETY SHOWER/EW 1.00 EA 0.00
191 H06_UR_URINAL 12.00 EA 0.00
192 H06_WC_WATER CLOSET 35.00 EA 0.00
193 H06_DP_100_DOWN PIPE 2.00 EA 0.00
194 H06_CONNECTION TO CIVIL STORMWATER DRAINAGE 1.00 EA 0.00
195 H06_AC/TD_BELOW BENCH TO DISCHARGE ABOVE SINK TRAP 1.00 EA 0.00
196 H06_VP_50_VENT PIPE 1.00 EA 0.00
197 H06_150 MM OVERFLOW 4.00 EA 0.00
198 H06_600MM X 600MM CONCRETE SWIP 2.00 EA 0.00
199 H06_CONNECTION TO CIVIL STORMWATER DRAINAGE 1.00 EA 0.00
200 H06_25000L COLD WATER BREAK TANK 1.00 EA 0.00
201 H06_65000L STAINLESS STEEL HOT WATER STORAGE TANK 1.00 EA 0.00
202 H06_A/A/V 7.5L/S BELOW SK 2.00 EA 0.00
203 H06_D/SK_DOUBLE BOWL SINK 4.00 EA 0.00
204 H06_110MM TRAPPED DRAINAGE POINT FOR COMBI STEAMER 3.00 EA 0.00
205 H06_T/TD FOR RPZD BELOW D/SK 2.00 EA 0.00
206 H06_DW_DISHWASHER 2.00 EA 0.00
207 H06_FWG_FLOOR WASTE GULLY 38.00 EA 0.00
208 H06_B/T_BUCKET TRAP 7.00 EA 0.00
209 H06_HANDWASH TROUGH 8.00 EA 0.00

Prepared by: Philip C. Page 7 of 35


engr_philipncesar@yahoo.com
A B C D E F

1 PROPOSED "HILTON FOOD AUSTRALIA" TEMPERATURE CONTROLLED


Project: PROCESSING AND DISTRIBUTION FACILITY
2 Location: 30 SEEANA PLACE HEATHWOOD, QLD. 4110
3
4 Subject: Quantity Takeoff Plumbing
5
6 Item No Description Quantity Unit Rate Total
210 H06_T/TD FOR AUTOMATIC TRAP PRIMER IN WALL WITH VIEWING PANEL 10.00 EA 0.00
211 H06_50MM TRAPPED DRAINAGE POINT FOR WASHING MACHINE 1.00 EA 0.00
212 H06_VP_50_INWALL_VENT PIPE 4.00 EA 0.00
213 H06_VP_65_INWALL_VENT PIPE 5.00 EA 0.00
214 H06_C/SK_CLEANER SINK 1.00 EA 0.00
215 H06_GVP_100_GREASE VENT PIPE 2.00 EA 0.00
216 H06_GVP_65_GREASE VENT PIPE (INWALL) 1.00 EA 0.00
217 H06_50MM TRAPPED DRAINAGE POINTS FOR ELPRESS DISH 2.00 EA 0.00
218 H06_T/TD FOR WELLY WASHERS 1.00 EA 0.00
219 H06_T/TD 3.00 EA 0.00
220 H06_VP_100_VENT PIPE (IN WALL) 1.00 EA 0.00
221 H06_COS_CLEAROUT TO SURFACE 19.00 EA 0.00
222 H06_VP_50_VENT PIPE 1.00 EA 0.00
223 VII DWG NO H07 REV T1 0.00
224 H07_NEW COLD WATER SERVICE_25 187.79 M 0.00
225 H07_NEW COLD WATER SERVICE_32 41.02 M 0.00
226 H07_NEW COLD WATER SERVICE_40 46.39 M 0.00
227 H07_NEW COLD WATER SERVICE_50 91.87 M 0.00
228 H07_NEW COLD WATER SERVICE_65 81.90 M 0.00
229 H07_NEW COLD WATER SERVICE_80 144.88 M 0.00
230 H07_NEW COLD WATER SERVICE_100 53.11 M 0.00
231 H07_NEW HOT WATER SERVICE_25 7.77 M 0.00
232 H07_NEW HOT WATER SERVICE_25 2.12 M 0.00
233 H07_NEW HOT WATER SERVICE_32 234.06 M 0.00
234 H07_NEW HOT WATER SERVICE_50 17.95 M 0.00
235 H07_NEW HOT WATER SERVICE_65 610.74 M 0.00
236 H07_NEW HOT WATER SERVICE_80 95.72 M 0.00
237 H07_NEW HOT WATER SERVICE_100 357.90 M 0.00
238 H07_NEW HOUSE DRAINAGE_100 13.49 M 0.00

Prepared by: Philip C. Page 8 of 35


engr_philipncesar@yahoo.com
A B C D E F

1 PROPOSED "HILTON FOOD AUSTRALIA" TEMPERATURE CONTROLLED


Project: PROCESSING AND DISTRIBUTION FACILITY
2 Location: 30 SEEANA PLACE HEATHWOOD, QLD. 4110
3
4 Subject: Quantity Takeoff Plumbing
5
6 Item No Description Quantity Unit Rate Total
239 H07_N/PW_40_NON POTABLE WATER 120.71 M 0.00
240 H07_N/PW-50_NON POTABLE WATER 37.11 M 0.00
241 H07_N/PW_65_NON POTABLE WATER 212.02 M 0.00
242 H07_N/PW_100_NON POTABLE WATER 29.53 M 0.00
243 H07_CWR_25_COLD WATER RISER 4.00 EA 0.00
244 H07_CWR_32_COLD WATER RISER 2.00 EA 0.00
245 H07_CWR_100_COLD WATER RISER 1.00 EA 0.00
246 H07_HWR_25_HOT WATER RISER 2.00 EA 0.00
247 H07_HWR_32_HOT WATER RISER 1.00 EA 0.00
248 H07_NPR_40_NON-POTABLE DROPPER 1.00 EA 0.00
249 H07_NPR_50_NON-POTABLE DROPPER 1.00 EA 0.00
250 H07_NPR_100_NON-POTABLE DROPPER 1.00 EA 0.00
251 H07_CV_CONTROL VALVE 39.00 EA 0.00
252 H07_SK_SINK 9.00 EA 0.00
253 H07_SV IN H/D PATHBOX 2.00 EA 0.00
254 H07_CV AND TMV IN WALL BELOW SK 2.00 EA 0.00
255 H07_32MM HOT WATER RETURN METER FOR CREATE WASH AREA AT HIH LEVEL OVER. WATER METER TO 1.00 EA 0.00
256 H07_AUTOMATIC TRAP PRIMER IN S/S ENCLOSURE IN WALL TO DISCHARGE OVER T/TD 2.00 EA 0.00
257 H07_65MM COLD WATER CONNECTION POINT FOR WASHING MACHINE (ALLOW ALL COSTS). 15-20M3/H 1.00 EA 0.00
258 H07_65MM COLD WATER METER FOR CRATE WASH AREA COMPLETE WITH CV'S ON WALL. WATER METER 1.00 EA 0.00
259 H07_65MM COLD WATER RPZD ON WALL COMPLETE WITH CV'S AND STRAINER (ALLOW ALL COSTS) 2.00 EA 0.00
260 H07_65MM COLD WATER METER FOR CRATE WASHER ON WALL COMPLETE WITH CV'S (ALLOW ALL COST 2.00 EA 0.00
261 H07_50MM COLD WATER METER FOR MAIN OFFICE COMPLETE WITH CV'S ON WALL 1.00 EA 0.00
262 H07_65MM HOT WATER CONNECTION POINT FOR CRATE WASHING MACHINE (ALLOW ALL COSTS). 15-2 1.00 EA 0.00
263 H07_CWR_50_COLD WATER RISER 1.00 EA 0.00
264 H07_65MM HOT WATER FLOW METER FOR CREATE WASH AREA AT HIGH LEVEL OVER. WATER METER TO 1.00 EA 0.00
265 H07_SYSTEM FLUSH VALVE 1.00 EA 0.00
266 H07_CV AND TMV IN WALL BELOW B 2.00 EA 0.00
267 H07_32MM HOT WATER RETURN METER FOR PRODUCTION AREA AT HIGH LEVEL OVER (ALLOW ALL COS 1.00 EA 0.00

Prepared by: Philip C. Page 9 of 35


engr_philipncesar@yahoo.com
A B C D E F

1 PROPOSED "HILTON FOOD AUSTRALIA" TEMPERATURE CONTROLLED


Project: PROCESSING AND DISTRIBUTION FACILITY
2 Location: 30 SEEANA PLACE HEATHWOOD, QLD. 4110
3
4 Subject: Quantity Takeoff Plumbing
5
6 Item No Description Quantity Unit Rate Total
268 H07_AUTOMATIC TRAP PRIMER IN S/S ENCLOSURE IN WALL TO DISCHARGE OVER T/TD 8.00 EA 0.00
269 H07_CV AND TMV IN WALL BELOW HANDWASH TROUGH WITH ACCESS PANEL 1.00 EA 0.00
270 H07_CV AND TMV BELOW SK WITH ACCESS PANEL 4.00 EA 0.00
271 H07_CV AND TMV IN WALL BELOW B WITH ACCESS PANEL 2.00 EA 0.00
272 H07_AUTOMATIC TRAP PRIMER IN S/S ENCLOSURE IN WALL TO DISCHARGE OVER T/TD 1.00 EA 0.00
273 H07_65MM HOT WATER RPZD COMPLETE WITH CV'S IN WALL S/S ENCLOSURE (ALLOW ALL COSTS) 1.00 EA 0.00
274 H07_65MM COLD WATER METER COMPLETE WITH CV'S ON WALL (ALLOW ALL COSTS) 1.00 EA 0.00
275 H07_65MM HOT WATER CONNECTION POINT FOR DOLAV WASHER (ALLOW ALL COSTS) 15-20M3/HR-3 B 1.00 EA 0.00
276 H07_65MM COLD WATER CONNECTION POINT FOR DOLAV WASHER (ALLOW ALL COSTS) 1.00 EA 0.00
277 H07_65MM HOT WATER METER COMPLETE WITH CV'S ON WALL (ALLOW ALL COSTS) 1.00 EA 0.00
278 H07_CV AND TMV IN WALL BELOW HANDWASH TROUGH WITH ACCESS PANEL 1.00 EA 0.00
279 H07_25MM AND 25MM HOT AND COLD WATER CONNECTION POINTS FOR ELPRESS EDW-20 (ALLOW ALL 2.00 EA 0.00
280 H07_25MM COLD & HOT WATER METER COMPLETE WITH CV'S ON WALL (ALLOW ALL COSTS). WATER ME 2.00 EA 0.00
281 H07_25MM HOT WATER RPZD COMPLETE WITH CV'S IN WALL IN S/S ENCLOSURE (ALLOW ALL COSTS) 1.00 EA 0.00
282 H07_CV AND TMV IN WALL BELOW HANDWASH TROUGH WITH ACCESS PANEL 3.00 EA 0.00
283 H07_CV AND TMV IN WALL BELOW HANDWASH TOUGH WITH ACCESS PANEL 1.00 EA 0.00
284 H07_CV AND TMV BELOW SK IN WALL WITH ACCESS PANEL 1.00 EA 0.00
285 H07_20MM HOT WATER CONNECTION POINT TO MULTIVAC (ALLOW ALL COSTS) 1.00 EA 0.00
286 H07_CV AND TMV IN WALL BELOW HANDWASH TROUGH WITH ACCESS PANEL 2.00 EA 0.00
287 H07_100MM HOT WATER FLOW METER FOR PRODUCTION AREA AT HIGH LEVEL OVER. WATER METER TO 1.00 EA 0.00
288 H07_TMV BELOW B IN WALL WITH ACCESS PANEL 1.00 EA 0.00
289 H07_SAFETY SHOWER/EW 2.00 EA 0.00
290 H07_AUTOMATIC TRAP PRIMER IN S/S ENCLOSURE IN WALL TO DISCHARGE OVER T/TD 1.00 EA 0.00
291 H07_50MM CONNECTION POINT FOR REFRIGERATION CONTRACTOR (ALLOW ALL COSTS) 1.00 EA 0.00
292 H07_FOR CONNECTION TO HEX-04 (BY REFRIGERATION CONTACTOR) REFER TO DRAWING NO. H15 1.00 EA 0.00
293 H07_100MM CAPPED CONNECTION FOR MECHANICAL CONTRACTOR (ALLOW ALL COSTS) 1.00 EA 0.00
294 H07_TMV BELOW IN WALL WITH ACCESS PANEL 1.00 EA 0.00
295 H07_BOOT WASHER 3.00 EA 0.00
296 H07_HC (NON-POTABLE) 2.00 EA 0.00

Prepared by: Philip C. Page 10 of 35


engr_philipncesar@yahoo.com
A B C D E F

1 PROPOSED "HILTON FOOD AUSTRALIA" TEMPERATURE CONTROLLED


Project: PROCESSING AND DISTRIBUTION FACILITY
2 Location: 30 SEEANA PLACE HEATHWOOD, QLD. 4110
3
4 Subject: Quantity Takeoff Plumbing
5
6 Item No Description Quantity Unit Rate Total
297 H07_20MM COLD WATER RPZD IN WALL IN S/S ENCLOSURE COMPLETE WITH CV'S AND STRAINER (ALLOW 1.00 EA 0.00
298 H07_TMV BELOW SK IN WALL WITH ACCESS PANEL 1.00 EA 0.00
299 H07_40MM COLD WATER METER FOR LOGISTICS OFFICE AND CHARGING ROOM COMPLETE WITH CV'S ON 1.00 EA 0.00
300 H07_DF_DRINKING FOUNTAIN 5.00 EA 0.00
301 H07_VB_VANITY BASIN 2.00 EA 0.00
302 VIII DWG NO H08 REV T1 0.00
303 H08_NPR_40_NON POTABLE RISER 1.00 EA 0.00
304 H08_NPR_50_NON POTABLE RISER 1.00 EA 0.00
305 H08_NPR_100_NON POTABLE RISER 1.00 EA 0.00
306 H08_CWR_25_COLD WATER RISER 6.00 EA 0.00
307 H08_CWR_32_COLD WATER RISER 2.00 EA 0.00
308 H08_HWR_25_HOT WATER RISER 3.00 EA 0.00
309 H08_HWR_32 1.00 EA 0.00
310 H08_SK_SINK 2.00 EA 0.00
311 H08_TMV & CV BELOW SK 2.00 EA 0.00
312 H08_AUTOMATIC TRAP PRIMER TO DISCHARGE OVER T/TD 3.00 EA 0.00
313 H08_CV_CONTROL VALVE 3.00 EA 0.00
314 H08_HC_HOSE COCK 1.00 EA 0.00
315 IX DWG NO H09 REV T1 0.00
316 H09_NPR_40_NON POTABLE RISER 1.00 EA 0.00
317 H09_NPR_50_NON POTABLE RISER 1.00 EA 0.00
318 H09_NPR_100_NON POTABLE RISER 1.00 EA 0.00
319 H09_50MM CONNECTION POINT FOR REFRIGERATION CONTRACTOR 1.00 EA 0.00
320 H09_CV_CONTROL VALVE 4.00 EA 0.00
321 H09_100MM CONNECTION POINT FOR MECHANICAL CONTRACTOR 1.00 EA 0.00
322 H09_CWR_25_COLD WATER RISER 4.00 EA 0.00
323 H09_HWR_25_HOT WATER RISER 2.00 EA 0.00
324 H09_SK_SINK 2.00 EA 0.00
325 H09_TMV AND CV BELOW SK 2.00 EA 0.00

Prepared by: Philip C. Page 11 of 35


engr_philipncesar@yahoo.com
A B C D E F

1 PROPOSED "HILTON FOOD AUSTRALIA" TEMPERATURE CONTROLLED


Project: PROCESSING AND DISTRIBUTION FACILITY
2 Location: 30 SEEANA PLACE HEATHWOOD, QLD. 4110
3
4 Subject: Quantity Takeoff Plumbing
5
6 Item No Description Quantity Unit Rate Total
326 H09_DF_DRINKING FOUNTAIN 1.00 EA 0.00
327 H09_40MM CONNECTION POINT FOR 5000L CHILLED PROCESS WATER TANK. 1.00 EA 0.00
328 H09_AUTOMATIC TRAP PRIMER IN S/S ENCLOSURE IN WALL TO GISCHARGE OVER T/TD 1.00 EA 0.00
329 X DWG NO H10 REV T1 0.00
330 H10_HC FOR SOLAR PANELS AND GENERAL CLEANING 2.00 EA 0.00
331 H10_CWR_25_COLD WATER RISER 2.00 EA 0.00
332 XI DWG NO H11 REV T1 0.00
333 H11_HPHW_25_HIGH PRESSURE HOT WATER 524.77 M 0.00
334 H11_HPHW_50_HIGH PRESSURISED HOT WATER 65.49 M 0.00
335 H11_HPHW_65_HIGH PRESSURISED HOT WATER 117.63 M 0.00
336 H11_DF_25_DIS INFECTION 597.34 M 0.00
337 H11_DF_40_DIS INFECTION 145.47 M 0.00
338 H11_F_25_FOAM 582.66 M 0.00
339 H11_F_40_FOAM 144.68 M 0.00
340 H11_HPCW_25_HIGH PRESSURE COLD WATER 134.39 M 0.00
341 H11_HPCW_40_HIGH PRESSURE COLD WATER 96.88 M 0.00
342 H11_20MM STAINLESS STEEL WELDED PIPE FOR CHEMICAL BRUEL CRATE WASHER 66.89 M 0.00
343 H11_CV_CONTROL VALVE 115.00 EA 0.00
344 H11_HPCWR_HIGH PRESSURE COLD WATER RISER 2.00 EA 0.00
345 H11_HPHWR_HIGH PRESSURE HOT WATER RISER 2.00 EA 0.00
346 H11_DFR_DISINFECTION RISER 2.00 EA 0.00
347 H11_FR_FOAM RISER 2.00 EA 0.00
348 H11_HYGIENIC ENTRANCE 3.00 EA 0.00
349 XII DWG NO H12 REV T1 0.00
350 H12_F_25_FOAM 3.28 M 0.00
351 H12_DF_25_DIS INFECTION 3.26 M 0.00
352 H12_HPHW_25_HIGH PRESSURE HOT WATER 3.31 M 0.00
353 H12_HPCW_25_HIGH PRESSURE COLD WATER 3.32 M 0.00
354 H12_FR_FOAM RISER 2.00 EA 0.00

Prepared by: Philip C. Page 12 of 35


engr_philipncesar@yahoo.com
A B C D E F

1 PROPOSED "HILTON FOOD AUSTRALIA" TEMPERATURE CONTROLLED


Project: PROCESSING AND DISTRIBUTION FACILITY
2 Location: 30 SEEANA PLACE HEATHWOOD, QLD. 4110
3
4 Subject: Quantity Takeoff Plumbing
5
6 Item No Description Quantity Unit Rate Total
355 H12_DFR_DISINFECTION RISER 3.00 EA 0.00
356 H12_HPHWR_HIGH PRESSURE HOT WATER RISER 2.00 EA 0.00
357 H12_HPCWR_HIGH PRESSURE COLD WATER RISER 2.00 EA 0.00
358 H12_CV_CONTROL VALVE 8.00 EA 0.00
359 XIII DWG NO H13 REV T1 0.00
360 H13_DF_25_DIS INFECTION 1.82 M 0.00
361 H13_CV_CONTROL VALVE 1.00 EA 0.00
362 H13_DFR_DISINFECTION RISER 1.00 EA 0.00
363 H13_HYGIENIC ENTRANCE 1.00 EA 0.00
364 XIV DWG NO H14 REV T1 0.00
365 H14_NEW GAS SERVICES 83.26 M 0.00
366 H14_NEW COLD WATER SERVICES_20 34.33 M 0.00
367 H14_NEW COLD WATER SERVICES_25 18.62 M 0.00
368 H14_NEW COLD WATER SERVICES_32 120.87 M 0.00
369 H14_NEW COLD WATER SERVICES_40 114.29 M 0.00
370 H14_NEW COLD WATER SERVICES_50 233.28 M 0.00
371 H14_NEW COLD WATER SERVICES_80 7.78 M 0.00
372 H14_NEW COLD WATER SERVICES_100 24.30 M 0.00
373 H14_N/PW_40_NON-POTABLE WATER SERVICE 14.10 M 0.00
374 H14_N/PW_50_NON-POTABLE WATER SERVICE 16.24 M 0.00
375 H14_N/PW_100_NON-POTABLE WATER SERVICE 7.03 M 0.00
376 H14_NEW HOT WATER SERVICE_20 52.54 M 0.00
377 H14_NEW HOT WATER SERVICE_32 103.69 M 0.00
378 H14_NEW HOT WATER SERVICE_40 201.04 M 0.00
379 H14_NEW HOT WATER SERVICE_50 161.97 M 0.00
380 H14_NEW HOT WATER SERVICE_100 3.76 M 0.00
381 H14_N/PW_80_NON-POTABLE WATER SERVICE 6.88 M 0.00
382 H14_20MM COLD WATER RPZD IN S/S ENCLOSURE ON WALL COMPLETE WITH CV'S AND STRAINER 4.00 EA 0.00
383 H14_TMV IN WALL WITH ACCESS PANEL 1.00 EA 0.00

Prepared by: Philip C. Page 13 of 35


engr_philipncesar@yahoo.com
A B C D E F

1 PROPOSED "HILTON FOOD AUSTRALIA" TEMPERATURE CONTROLLED


Project: PROCESSING AND DISTRIBUTION FACILITY
2 Location: 30 SEEANA PLACE HEATHWOOD, QLD. 4110
3
4 Subject: Quantity Takeoff Plumbing
5
6 Item No Description Quantity Unit Rate Total
384 H14_GAS SOLENOID SHUT OFF VALVE ON WALL 1800MM ABOVE F.F.L. 2.00 EA 0.00
385 H14_TILTING KETTLE 1.00 EA 0.00
386 H14_20MM GAS CONNECTION POINT FOR BRAT PAN 1.00 EA 0.00
387 H14_20MM GAS CONNECTION POINT FOR SALAMANDER AND FRYER 2.00 EA 0.00
388 H14_20MM GAS CONNECTION POINT FOR BURNER AND GRIDDLE 2.00 EA 0.00
389 H14_PRESSURE REDUCING VALVE TO SUIT COMBI OVEN 2.00 EA 0.00
390 H14_DUAL CHECK VALVE 3.00 EA 0.00
391 H14_20MM HOT WATER RPZD IN S/S ENCLOSURE ON WALL COMPLETE WITH CV'S AND STRAINER 2.00 EA 0.00
392 H14_TLV IN WALL WITH ACCESS PANEL 14.00 EA 0.00
393 H14_PRESSURE REDUCING VALVE TO SUIT COFFE MACHINE 1.00 EA 0.00
394 H14_ZIP HYDROTAP 4 IN 1 UNIT BELOW BENCH 4.00 EA 0.00
395 H14_20MM COLD WATER CONNECTION POINTS WELLY WASH 2.00 EA 0.00
396 H14_20MM GAS CONNECTION POINT FOR GAS COOKTOP 1.00 EA 0.00
397 H14_20MM COLD WATER CONNECTION POINTS FOR COMBI 2.00 EA 0.00
398 H14_CWR_COLD WATER RISER 1.00 EA 0.00
399 H14_CV'S AND TLV BELOW B IN WALL WITH ACCESS PANEL 1.00 EA 0.00
400 H14_CV'S BELOW C/SK 1.00 EA 0.00
401 H14_AUTOMATIC TRAP PRIMER IN S/S ENCLOSURE IN WALL TO DISCHARGE OVER T/TD 6.00 EA 0.00
402 H14_ZIP HYDROTAP 4 IN 1 UNIT BELOW BENCH (ALLOW ALL COSTS) 1.00 EA 0.00
403 H14_20MM COLD WATER CONNECTION POINT FOR TVI SHARPENING MACHINE (ALLOW ALL COSTS) 1.00 EA 0.00
404 H14_20MM COLD WATER CONNECTION POINT FOR TRIEF SHARPENING MACHINE (ALLOW ALL COSTS) 1.00 EA 0.00
405 H14_20MM COLD WATER CONNECTION POINT FOR WASHING MACHINE (ALLOW ALL COSTS) 1.00 EA 0.00
406 H14_20MM COLD WATER CONNECTION POINT FOR ELPRESS DISH WASHER (ALLOW ALL COSTS) 1.00 EA 0.00
407 H14_50MM HOT WATER FLOW AND 32MM HOT WATER RETURN WATER METERS IN MAIN OFFICE BUILDING 2.00 EA 0.00
408 H14_20MM & 15MM COLD & HOT WATER RPZD IN S/S ENCLOSURE IN WALL COMPLETE WITH CV'S AND S 1.00 EA 0.00
409 H14_20MM COLD WATER CONNECTION POINTS FOR COMBI (ALLOW ALL COSTS) 2.00 EA 0.00
410 H14_20MM COLD WATER RPZD IN S/S ENCLOSURE IN WALL COMPLETE WITH CV'S AND STRAINER. TO BE 1.00 EA 0.00
411 H14_CV_CONTROL VALVE 84.00 EA 0.00
412 H14_B_BASIN 21.00 EA 0.00

Prepared by: Philip C. Page 14 of 35


engr_philipncesar@yahoo.com
A B C D E F

1 PROPOSED "HILTON FOOD AUSTRALIA" TEMPERATURE CONTROLLED


Project: PROCESSING AND DISTRIBUTION FACILITY
2 Location: 30 SEEANA PLACE HEATHWOOD, QLD. 4110
3
4 Subject: Quantity Takeoff Plumbing
5
6 Item No Description Quantity Unit Rate Total
413 H14_WC_WATER CLOSET 35.00 EA 0.00
414 H14_SHR_SHOWER 7.00 EA 0.00
415 H14_UR_URINAL 12.00 EA 0.00
416 H14_HC_HOSE COCK 2.00 EA 0.00
417 H14_SK_SINK 11.00 EA 0.00
418 H14_BBQ 1.00 EA 0.00
419 H14_CV BELOW SK 1.00 EA 0.00
420 H14_D/SK_DOUBLE BOWL SINK 1.00 EA 0.00
421 H14_C/SK_CLEANER'S SINK 1.00 EA 0.00
422 H14_20MM WATER CONNECTION POINT FOR DEMI EQUIPMENT (ALLOW ALL COSTS) 1.00 EA 0.00
423 H14_20MM COLD WATER RPZD COMPLETE WITH CV'S IN S/S ENCLOSURE IN WALL (ALLOW ALL COSTS) 1.00 EA 0.00
424 H14_SAFETY SHOWER/EW 0.00 EA 0.00
425 H14_TLV IN WALL WITH ACCESS PANEL 1.00 EA 0.00
426 H14_ZIP HYDROTAP 4 IN 1 UNIT BELOW BENCH (ALLOW ALL COSTS) 2.00 EA 0.00
427 H14_TLV IN WALL WITH ACCESS PANEL 1.00 EA 0.00
428 H14_40MM HOT WATER METER FOR LOGISTIC AND CHARGING ROOM AT HIGH LEVEL OVER. WATER METE 1.00 EA 0.00
429 H14_HC_HOSE COCK 2.00 EA 0.00
430 H14_5L ZIP TUDOR BELOW SK (ALLOW ALL COSTS) 1.00 EA 0.00
431 H14_INSTALL 20MM WATER METER ON WALL COMPLETE WITH CV'S (ALLOW ALL COSTS) 1.00 EA 0.00
432 H14_CWR_25_COLD WATER CLOSET 1.00 EA 0.00
433 H14_100MM COLD WATER SUB-METER AND CV'S FOR HEX-04 (BY REFRIGERATION CONTACTOR) ON WAL 1.00 EA 0.00
434 H14_50MM COLD WATER SUB-METER AND CV'S FOR REFRIGERATION PLANT IN WALL. WATER METER TO 1.00 EA 0.00
435 H14_80MM COLD WATER SUB-METER AND CV'S FOR PRODUCTION AREA ON WALL. WATER METER TO B 1.00 EA 0.00
436 H14_50MM COLD WATER SUB-METER AND CV'S FOR CENTRAL CLEANING SYSTEM. WATER METER TO BE 1.00 EA 0.00
437 H14_40MM COLD WATER SUB-METER AND CV'S FOR DISINFECTION/FOAMING SYSTEM. WATER METER T 1.00 EA 0.00
438 H14_100MM COLD WATER METER AND CV'S FOR 65.00; HOT WATER STORAGE TANK TOP-UP (ALLOW AL 1.00 EA 0.00
439 H14_40MM WATER CONNECTION POINT TO DISINFECTION/DOSING SYSTEM (ALLOW ALL COSTS) 1.00 EA 0.00
440 H14_50MM COLD WATER CONNECTION POINT FOR COLD WATER BOOSTER UNIT (ALLOW ALL COSTS) 1.00 EA 0.00
441 H14_100MM RPZD COMPLETE WITH CV'S AND STRAINER IN S/S ENCLOSURE (ALLOW ALL COSTS) 1.00 EA 0.00

Prepared by: Philip C. Page 15 of 35


engr_philipncesar@yahoo.com
A B C D E F

1 PROPOSED "HILTON FOOD AUSTRALIA" TEMPERATURE CONTROLLED


Project: PROCESSING AND DISTRIBUTION FACILITY
2 Location: 30 SEEANA PLACE HEATHWOOD, QLD. 4110
3
4 Subject: Quantity Takeoff Plumbing
5
6 Item No Description Quantity Unit Rate Total
442 H14_100MM HOT WATER SUB-METER AND CV'S FOR CENTRAL CLEANING SYSTEM ON WALL. WATER MET 1.00 EA 0.00
443 H14_100MM HOT WATER CONNECTION POINT FOR HOT WATER BOOSTER UNIT (ALLOW ALL COSTS) 1.00 EA 0.00
444 H14_TMV BELOW B IN WALL WITH ACCESS PANEL 1.00 EA 0.00
445 H14_SAFETY SHOWER/EW 2.00 EA 0.00
446 H14_40MM COLD WATER SUB-METER AND CV'S FOR REFRIGERATION PLANT ON WALL. WATER METER T 1.00 EA 0.00
447 H14_40MM COLD WATER RPZD COMPLETE WITH CV'S (ALLOW ALL COSTS) 1.00 EA 0.00
448 H14_100MM COLD WATER SUB-METER AND CV'S ON WALL FOR MECHANICAL CONTRACTOR. WATER MET 1.00 EA 0.00
449 H14_100MM COLD WATER RPZD COMPLETE WITH CV'S (ALLOW ALL COSTS) 1.00 EA 0.00
450 H14_50MM COLD WATER RPZD COMPLETE WITH CV'S (ALLOW ALL COSTS) 1.00 EA 0.00
451 H14_80MM COLD WATER RPZD COMPLETE WITH CV'S (ALLOW ALL COSTS) 1.00 EA 0.00
452 H14_50MM COLD WATER RPZD COMPLETE WITH CV'S (ALLOW ALL COSTS) 1.00 EA 0.00
453 H14_40MM COLD WATER RPZD COMPLETE WITH CV'S (ALLOW ALL COSTS) 1.00 EA 0.00
454 H14_100MM RPZD COMPLETE WITH CV'S (ALLOW ALL COSTS) 1.00 EA 0.00
455 H14_CWD_100_COLD WATER DROPPER 1.00 EA 0.00
456 XV DWG NO H15 REV T1 0.00
457 H15_NEW STORM WATER SERVICE_150 4.33 M 0.00
458 H15_NEW STORM WATER SERVICE_225 26.67 M 0.00
459 H15_225 DWV_DRAIN,WASTE,VENT PIPEWORK 19.74 M 0.00
460 H15_NEW VENT PIPE 126.63 M 0.00
461 H15_110 PN 12.5_PUMP OUTLINE 0.83 M 0.00
462 H15_NEW COLD WATER SERVICES_25 12.67 M 0.00
463 H15_NEW COLD WATER SERVICES_100 19.57 M 0.00
464 H15_NEW COLD WATER SERVICES_150 35.23 M 0.00
465 H15_NEW HOT WATER SERVICE_65 32.90 M 0.00
466 H15_NEW HOT WATER SERVICE_100 95.66 M 0.00
467 H15_NEW HOT WATER SERVICE_150 29.82 M 0.00
468 H15_COS_CLEAROUT TO SURFACE 10.00 EA 0.00
469 H15_20000 COOLING PIT WITH 2 X ACCESS RISERS AND LADDER 1.00 EA 0.00
470 H15_150 DIA DRAINERS GRATE 1.00 EA 0.00

Prepared by: Philip C. Page 16 of 35


engr_philipncesar@yahoo.com
A B C D E F

1 PROPOSED "HILTON FOOD AUSTRALIA" TEMPERATURE CONTROLLED


Project: PROCESSING AND DISTRIBUTION FACILITY
2 Location: 30 SEEANA PLACE HEATHWOOD, QLD. 4110
3
4 Subject: Quantity Takeoff Plumbing
5
6 Item No Description Quantity Unit Rate Total
471 H15_DP_100_DOWNPIPE 2.00 EA 0.00
472 H15_450MM X450MM SWIP WITH GALVANISED GRATE AND FRAME 1.00 EA 0.00
473 H15_450MM X 450MM BUNDED TEST DRAIN WITH 225MM OUTLET 1.00 EA 0.00
474 H15_VP_100_VENT PIPE 10.00 EA 0.00
475 H15_PUMP CONTROL PANEL TO BMS 1.00 EA 0.00
476 H15_8000 MIXING TANK AND CHAMBER WITH ACCESS RISER AND LADDER 1.00 EA 0.00
477 H15_ISOLATION WITH ACCESS RISER AND LADDER 1.00 EA 0.00
478 H15_FLOW METER CHAMBER WITH ACCESS RISER AND LADDER TO FINISH SURFACE 1.00 EA 0.00
479 H15_FLOW AND TEMPERATURE MONITORING SENSORS TO BE SENT BACK TO BMS 1.00 EA 0.00
480 H15_PUMP STATION 3 1.00 EA 0.00
481 H15_TANK TO BE CAST IN SITU (REINFORCED CONCRETE) 1.00 EA 0.00
482 H15_INSTALL WATER LEVEL AND 3 X TEMPERATURE SENSORS. ALL SENSORS TO BMS 1.00 EA 0.00
483 H15_100MM HOT WATER TANK FILL WITH RESERVOIR VALVE AND 4 WAY VALVE 1.00 EA 0.00
484 H15_65000L STAINLESS STEEL HOT WATER STORAGE TANK 1.00 EA 0.00
485 H15_AIR VALVE 2.00 EA 0.00
486 H15_100MM FULL FLOW BYPASS VALVE LOCKED IN CLOSED POSITION 1.00 EA 0.00
487 H15_150MM COLD WATER STORAGE TANK FILL WITH RESERVOIR VALVE AND 4 WAY FLOAT CONTROL VA 1.00 EA 0.00
488 H15_INSTALL WATER LEVEL AND TEMPERATURE SENSORS. ALL SENSORS TO BMS 1.00 EA 0.00
489 H15_25000L COLD WATER BREAK TANK 1.00 EA 0.00
490 H15_ANTI-VORTEX PLATE 1.00 EA 0.00
491 H15_DUAL HOT WATER CIRCULATION PUMPS 5.0L/S @ 10M HEAD 2.00 EA 0.00
492 H15_COLD WATER SERVICE PUMPS ON CONCRETE PLINTH 6.0L/S @ 45M HEAD 4.00 EA 0.00
493 H15_100MM FULL FLOW BYPASS VALVE LOCKED IN CLOSED POSITION 1.00 EA 0.00
494 H15_PUMP CONTROL PANEL 1.00 EA 0.00
495 H15_HEX-01 1.00 EA 0.00
496 H15_PRESSURE TANK 1.00 EA 0.00
497 H15_65MM HOT WATER RETURN SUB-METER AND CV'S ON WALL 1.00 EA 0.00
498 H15_GRUNDFOS HOT WATER CIRCULATION PUMPS WITH TIMER ON WALL MODEL NO. TPE3 WITH FLO 1.00 EA 0.00
499 H15_SYSTEM FLUSH VALVE 1.00 EA 0.00

Prepared by: Philip C. Page 17 of 35


engr_philipncesar@yahoo.com
A B C D E F

1 PROPOSED "HILTON FOOD AUSTRALIA" TEMPERATURE CONTROLLED


Project: PROCESSING AND DISTRIBUTION FACILITY
2 Location: 30 SEEANA PLACE HEATHWOOD, QLD. 4110
3
4 Subject: Quantity Takeoff Plumbing
5
6 Item No Description Quantity Unit Rate Total
500 H15_150MM FULL FLOW BYPASS 1.00 EA 0.00
501 H15_U.V. FILTER 11.5L/S TREATMENT RATE 1.00 EA 0.00
502 H15_150MM HOT WATER RETURN SUB-METER AND CV'S ON WALL 1.00 EA 0.00
503 H15_80' HOT WATER SUPPLY PUMPS ON CONCRETE PLINTH 11.5L/S @ 45M HEAD 3.00 EA 0.00
504 H15_HEX-04 1.00 EA 0.00
505 H15_HEAD PUMP (1100KW) 1.00 EA 0.00
506 H15_25MM COLD WATER SUB-METER AND CV'S FOR PH DOSING SHED.WATER METER TO BE AMR TO BM 2.00 EA 0.00
507 H15_25MM WATER CONNECTION POINT FOR PH DOSING SYSTEM 1.00 EA 0.00
508 H15_DOSING & PH CONTROL SHED 1.00 EA 0.00
509 XVI DWG NO C141 ISSUE-B 0.00
510 C141_SW_150Ø_DRAINAGE LINE 9.02 M 0.00
511 C141_SW_225Ø_DRAINAGE LINE 12.01 M 0.00
512 C141_SW_300Ø_DRAINAGE LINE 24.45 M 0.00
513 C141_SW_375Ø_DRAINAGE LINE 100.85 M 0.00
514 C141_SW_450Ø_DRAINAGE LINE 78.75 M 0.00
515 C141_SW_525Ø_DRAINAGE LINE 57.07 M 0.00
516 C141_SW_600Ø_DRAINAGE LINE 61.90 M 0.00
517 C141_SW_675Ø_DRAINAGE LINE 14.12 M 0.00
518 C141_SS_SUBSOIL LINE 247.07 M 0.00
519 C141_RW_100Ø_ROOFWATER LINE 48.73 M 0.00
520 C141_RW_225Ø_ROOFWATER LINE 40.90 M 0.00
521 C141_RW_300Ø_ROOFWATER LINE 16.68 M 0.00
522 C141_PROVIDE CONNECTION FOR PIT 1.00 EA 0.00
523 C141_PIT A6 1.00 EA 0.00
524 C141_PIT A4 1.00 EA 0.00
525 C141_PIT A2 1.00 EA 0.00
526 C141_PIT A40 1.00 EA 0.00
527 C141_PIT A1 1.00 EA 0.00
528 C141_PIT A18 1.00 EA 0.00

Prepared by: Philip C. Page 18 of 35


engr_philipncesar@yahoo.com
A B C D E F

1 PROPOSED "HILTON FOOD AUSTRALIA" TEMPERATURE CONTROLLED


Project: PROCESSING AND DISTRIBUTION FACILITY
2 Location: 30 SEEANA PLACE HEATHWOOD, QLD. 4110
3
4 Subject: Quantity Takeoff Plumbing
5
6 Item No Description Quantity Unit Rate Total
529 C141_PIT A41 1.00 EA 0.00
530 C141_PIT A20 1.00 EA 0.00
531 C141_PIT A42 1.00 EA 0.00
532 C141_PIT A19 1.00 EA 0.00
533 C141_PIT A3 1.00 EA 0.00
534 C141_DP_DWONPIPE (INDICATIVE ONLY) 5.00 EA 0.00
535 XVII DWG NO C142 ISSUE-B 0.00
536 C142_SW_150Ø_DRAINAGE LINE 30.83 M 0.00
537 C142_SW_225Ø_DRAINAGE LINE 12.37 M 0.00
538 C142_SW_375Ø_DRAINAGE LINE 39.29 M 0.00
539 C142_SW_450Ø_DRAINAGE LINE 50.08 M 0.00
540 C142_SW_600Ø_DRAINAGE LINE 21.69 M 0.00
541 C142_SW_675Ø_DRAINAGE LINE 24.02 M 0.00
542 C142_SW_750Ø_DRAINAGE LINE 174.61 M 0.00
543 C142_SW_825Ø_DRAINAGE LINE 57.70 M 0.00
544 C142_SW_900Ø_DRAINAGE LINE 64.52 M 0.00
545 C142_SS_SUBSOIL LINE 667.43 M 0.00
546 C142_RW_225Ø_ROOFWATER LINE 408.85 M 0.00
547 C142_RW_300Ø_ROOFWATER LINE 265.35 M 0.00
548 C142_RW_375Ø_ROOFWATER LINE 38.79 M 0.00
549 C142_PROVIDE PUMP-OUT PIT IN RECESSED DOCK 1.00 EA 0.00
550 C142_PIT A7 1.00 EA 0.00
551 C142_PIT A8 1.00 EA 0.00
552 C142_PIT A9 1.00 EA 0.00
553 C142_PIT A10 1.00 EA 0.00
554 C142_PIT A11 1.00 EA 0.00
555 C142_PIT A12 1.00 EA 0.00
556 C142_PIT A43 1.00 EA 0.00
557 C142_PIT A5 1.00 EA 0.00

Prepared by: Philip C. Page 19 of 35


engr_philipncesar@yahoo.com
A B C D E F

1 PROPOSED "HILTON FOOD AUSTRALIA" TEMPERATURE CONTROLLED


Project: PROCESSING AND DISTRIBUTION FACILITY
2 Location: 30 SEEANA PLACE HEATHWOOD, QLD. 4110
3
4 Subject: Quantity Takeoff Plumbing
5
6 Item No Description Quantity Unit Rate Total
558 C142_PIT A1 1.00 EA 0.00
559 C142_PIT A18 1.00 EA 0.00
560 C142_PIT A41 1.00 EA 0.00
561 C142_PIT A21 1.00 EA 0.00
562 C142_PIT A22 1.00 EA 0.00
563 C142_PIT A23 1.00 EA 0.00
564 C142_PIT A24 1.00 EA 0.00
565 C142_PIT A25 1.00 EA 0.00
566 C142_PIT A26 1.00 EA 0.00
567 C142_DP_DOWNPIPE (INDICATIVE ONLY) 42.00 EA 0.00
568 XVIII DWG NO C143 ISSUE-B 0.00
569 C143_SW_600Ø_DRAINAGE LINE 65.34 M 0.00
570 C143_SW_750Ø_DRAINAGE LINE 17.56 M 0.00
571 C143_SW_825Ø_DRAINAGE LINE 191.76 M 0.00
572 C143_SW_900Ø_DRAINAGE LINE 54.49 M 0.00
573 C143_SW_1050Ø_DRAINAGE LINE 146.15 M 0.00
574 C143_SW_1200Ø_DRAINAGE LINE 15.19 M 0.00
575 C143_RW_100Ø_ROOFWATER LINE 60.30 M 0.00
576 C143_RW_150Ø_ROOFWATER LINE 73.50 M 0.00
577 C143_RW_225Ø_ROOFWATER LINE 102.05 M 0.00
578 C143_RW_300Ø_ROOFWATER LINE 104.88 M 0.00
579 C143_SS_SUBSOIL LINE 476.97 M 0.00
580 C143_PIT A12 1.00 EA 0.00
581 C143_PIT 13 1.00 EA 0.00
582 C143_PIT 14 1.00 EA 0.00
583 C143_PIT A15 1.00 EA 0.00
584 C143_PIT A16 1.00 EA 0.00
585 C143_PIT A17 1.00 EA 0.00
586 C143_PIT A31 1.00 EA 0.00

Prepared by: Philip C. Page 20 of 35


engr_philipncesar@yahoo.com
A B C D E F

1 PROPOSED "HILTON FOOD AUSTRALIA" TEMPERATURE CONTROLLED


Project: PROCESSING AND DISTRIBUTION FACILITY
2 Location: 30 SEEANA PLACE HEATHWOOD, QLD. 4110
3
4 Subject: Quantity Takeoff Plumbing
5
6 Item No Description Quantity Unit Rate Total
587 C143_PIT A29 1.00 EA 0.00
588 C143_PIT A28 1.00 EA 0.00
589 C143_PIT A27 1.00 EA 0.00
590 C143_PIT A26 1.00 EA 0.00
591 C143_PIT A37 1.00 EA 0.00
592 C143_PIT A38 1.00 EA 0.00
593 C143_PIT A32 1.00 EA 0.00
594 C143_PIT A33 1.00 EA 0.00
595 C143_PIT A34 1.00 EA 0.00
596 C143_PIT A35 1.00 EA 0.00
597 C143_PIT A36 1.00 EA 0.00
598 C143_DP_DOWNPIPE (INDICATIVE ONLY) 22.00 EA 0.00
599 C143_STORMWATER MANAGEMENT SYSTEM 1&2 UNDERGROUND OSD TANK WITH INTERNAL SEPARATIO 1.00 EA 0.00 0.00
600 C143_PROVIDE 2X65KL ABOVE GROUND RAINWATER TANKS. PROVIDE 2X300Ø OVERFLOW FROM EACH T 2.00 EA 0.00
601 C143_CONNECT EXISTING ACCESS DRIVEWAY DRAINAGE & INTEGRATE INTO SITE DRAINAGE SYSTEM 1.00 EA 0.00
602 C143_DETENTION AND BIORETENTION SYSTEM AS APPROVED IN ASAHI FACILITY APPROVAL A004451 1.00 EA 0.00 0.00
603 C143_DISCHARGE TO EXISTING ESTATE DRAINAGE CONNECTION PIT 2.00 EA 0.00 0.00
604 0.00
605
606
607
608
609 NOTES: -Takeoff as per legend & callout
610
611
612
613

Prepared by: Philip C. Page 21 of 35


engr_philipncesar@yahoo.com
Project: PREMIER PACIFIC PARADISE
Location: LOT 5 MENZIES DRIVE, PACIFIC PARADISE QLD 4564

Subject: Quantity Takeoff

Quantity
Deduct Quantity after
Unit/Portion ion
opening

Ground
L Unit H/EA Sub-total deduction

WATER LINE,ETC.
COLD WATER LINE @ Ø65MM
WATER_SITE_ASSUMED 65 CW Cu O/C 134.33 M 134.33 134.33 1
WATER_GROUND FLOOR_65 CW Cu O/C 373.23 M 373.23 373.23 1
WATER_GROUND FLOOR_65 CW Cu O/C 229.56 M 229.56 229.56 1
WATER_GROUND FLOOR_65 CW Cu O/C 122.09 M 122.09 122.09 1
WATER_FIRST FLOOR_ASSUMED 65 CW Cu O/C 23.8 M 23.8 23.8
COLD WATER LINE @ Ø40MM
WATER_TYPICAL ACCESABLE_Ø40MM CW 3.68 M 3.68 3.68 6
WATER_TYPICAL SLUICE_Ø40MM CW 9.54 M 9.54 9.54 3
COLD WATER LINE Ø32MM
WATER_GROUND FLOOR_32 CW Cu O/C 75.64 M 75.64 75.64 1
COLD WATER LINE Ø20MM
WATER_GROUND FLOOR_TYPICAL ROOM TYPE A/B/D_Ø20MM CW 3.44 M 3.44 3.44 78
WATER_GROUND FLOOR_TYPICAL ROOM TYPE C_Ø20MM CW 6.19 M 6.19 6.19 6
HOT WATER RECIRCULATION LINE Ø40MM
WATER_GROUND FLOOR_40 HWR Cu O/C 29.44 M 29.44 29.44 1
HOT WATER RECIRCULATION LINE Ø32MM
WATER_GROUND FLOOR_32 HWR Cu O/C 87.07 M 87.07 87.07 1
WATER_GROUND FLOOR_32 HWR Cu O/C 41.82 M 41.82 41.82 1
WATER_GROUND FLOOR_32 HWR Cu O/C 36.71 M 36.71 36.71 1
HOT WATER RECIRCULATION LINE Ø25MM
WATER_GROUND FLOOR_25 HWR Cu O/C 76.48 M 76.48 76.48 1
WATER_GROUND FLOOR_25 HWR Cu O/C 84.79 M 84.79 84.79 1
WATER_GROUND FLOOR_25 HWR Cu O/C 6.87 M 6.87 6.87 1
WATER_FIRST FLOOR_ASSUMED 25 HWR Cu O/C 18.22 M 18.22 18.22
HWF LINE Ø40MM
WATER_GROUND FLOOR_40 HWF Cu O/C 126.68 M 126.68 126.68 1
WATER_GROUND FLOOR_40 HWF Cu O/C 20.65 M 20.65 20.65 1
WATER_GROUND FLOOR_40 HWF Cu O/C 121.48 M 121.48 121.48 1
WATER_GROUND FLOOR_40 HWF Cu O/C 143.42 M 143.42 143.42 1
HWF LINE Ø32MM
WATER_GROUND FLOOR_32 HWF Cu O/C 68.19 M 68.19 68.19 1
WW LINE Ø40MM
WATER_TYPICAL ACCESABLE_Ø40MM WW 3.77 M 3.77 3.77 6
WATER_TYPICAL SLUICE_Ø40MM WW 10.06 M 10.06 10.06 3
WW LINE Ø20MM
WATER_GROUND FLOOR_TYPICAL ROOM TYPE A/B/D_Ø20MM WW 3.48 M 3.48 3.48 78
WATER_TYPICAL ROOM TYPE C_Ø20MM WW 5.24 M 5.24 5.24 6

Prepared by: Philip 22 of 35


engr_philipncesar@yahoo.com
Project: PREMIER PACIFIC PARADISE
Location: LOT 5 MENZIES DRIVE, PACIFIC PARADISE QLD 4564

Subject: Quantity Takeoff

Quantity
Deduct Quantity after
Unit/Portion ion
opening

Ground
L Unit H/EA Sub-total deduction

ISOLATION VALVE IN CAST IRON BOX UNDER GROUND


WATER_GROUND FLOOR_ISOLATION VALVE IN CAST IRON BOX UNDER GROUND 18 EA 18 18 1
WATER_GROUND FLOOR_ISOLATION VALVE IN CAST IRON BOX UNDER GROUND 10 EA 10 10 1
WATER_GROUND FLOOR_ISOLATION VALVE IN CAST IRON BOX UNDER GROUND 11 EA 11 11 1
WATER_SITE_80MM COLD WATER ISOLATION VALVE WITHIN UNDERGROUND CAST IRON VALVE BOX 1 EA 1 1 1
SCREW NOSE BIBCOCK COMPLETE WITH HOSE CONNECTOR SYPHON BREAKER
WATER_SITE_SCREW NOSE BIBCOCK COMPLETE WITH HOSE CONNECTOR SYPHON BREAKER 10 EA 10 10 1
WATER_GROUND FLOOR_SCREW NOSE BIBCOCK COMPLETE WITH HOSE CONNECTOR SYPHON BREAKER 2 EA 2 2 1
WATER_GROUND FLOOR_SCREW NOSE BIBCOCK COMPLETE WITH HOSE CONNECTOR SYPHON BREAKER 8 EA 8 8 1
THERMOSTATIC MIXING VALVE
WATER_GROUND FLOOR_THERMOSTATIC MIXING VALVE 49 EA 49 49 1
WATER_GROUND FLOOR_THERMOSTATIC MIXING VALVE 43 EA 43 43 1
WATER_GROUND FLOOR_THERMOSTATIC MIXING VALVE 25 EA 25 25 1
WATER_FIRST FLOOR_THERMOSTATIC MIXING VALVE 4 EA 4 4
WATER_TYPICAL ROOM TYPE C_THERMOSTATIC MIXING VALVE 1 EA 1 1
HOT WATER POINT
WATER_GROUND FLOOR_HOT WATER POINT 16 EA 16 16 1
WATER_GROUND FLOOR_HOT WATER POINT 3 EA 3 3 1
WATER_GROUND FLOOR_HOT WATER POINT 9 EA 9 9 1
WATER_GROUND FLOOR_TYPICAL ROOM TYPE A/B/D_HOT WATER POINT 2 EA 2 2 78
WATER_TYPICAL ACCESABLE_HOT WATER POINT 1 EA 1 1 6
WATER_FIRST FLOOR_HOT WATER POINT 5 EA 5 5
WATER_TYPICAL SLUICE_HOT WATER POINT 3 EA 3 3 3
WATER_TYPICAL ROOM TYPE C_HOT WATER POINT 2 EA 2 2
COLD WATER POINT
WATER_GROUND FLOOR_COLD WATER POINT 16 EA 16 16 1
WATER_GROUND FLOOR_COLD WATER POINT 4 EA 4 4 1
WATER_GROUND FLOOR_COLD WATER POINT 13 EA 13 13 1
WATER_GROUND FLOOR_TYPICAL ROOM TYPE A/B/D_COLD WATER POINT 3 EA 3 3 78
WATER_TYPICAL ACCESABLE_COLD WATER POINT 2 EA 2 2 6
WATER_TYPICAL SLUICE_COLD WATER POINT 4 EA 4 4 3
WATER_FIRST FLOOR_COLD WATER POINT 5 EA 5 5
WATER_TYPICAL ROOM TYPE C_COLD WATER POINT 3 EA 3 3
CHECK VALVE
WATER_GROUND FLOOR_CHECK VALVE 2 EA 2 2 1
WATER_GROUND FLOOR_CHECK VALVE 4 EA 4 4 1
WATER_TYPICAL SLUICE_CHECK VALVE 4 EA 4 4 3
WATER_TYPICAL ROOM TYPE C_CHECK VALVE 4 EA 4 4
WATER METER

Prepared by: Philip 23 of 35


engr_philipncesar@yahoo.com
Project: PREMIER PACIFIC PARADISE
Location: LOT 5 MENZIES DRIVE, PACIFIC PARADISE QLD 4564

Subject: Quantity Takeoff

Quantity
Deduct Quantity after
Unit/Portion ion
opening

Ground
L Unit H/EA Sub-total deduction

WATER_SITE_NEW 100MM WATER METER ASSEMBLY WITH 100MM RPZ VALVE 1 EA 1 1 1


WATER_GROUND FLOOR_WATER METER 6 EA 6 6 1
WATER_GROUND FLOOR_ WATER METER 9 EA 9 9 1
WATER_TYPICAL SLUICE_WATER METER 2 EA 2 2 3
WATER_FIRST FLOOR_WATER METER 1 EA 1 1
WATER_FIRST FLOOR_WATER METER 1 EA 1 1
WATER_FIRST FLOOR_WATER METER 2 EA 2 2
UNDER BENCH CHILLED/BOILING UNIT WITH DRIP TRAY AND FONT EXTENSION KIT
WATER_GROUND FLOOR_UNDER BENCH CHILLED/BOILING UNIT WITH DRIP TRAY AND FONT EXTENSION KIT 1 EA 1 1 1
WATER_GROUND FLOOR_UNDER BENCH CHILLED/BOILING WATER UNIT WITH DRIP TRAY AND FONT EXTENSION KIT 2 EA 2 2
WATER_FIRST FLOOR_UNDER BENCH CHILLED/BOILING WATER UNIT WITH DRIP TRAY AND FONT EXTENSION KIT 1 EA 1 1
AUTOMATIC BACKWASH FILTER WITH BY-PASS AND TUNDISH DRAIN TO ADJACENT GULLY
WATER_SITE_AUTOMATIC BACKWASH FILTER WITH BY-PASS AND TUNDISH DRAIN TO ADJACENT GULLY 1 EA 1 1 1
80MM COLD WATER RISER WITHIN WALL CAVITY TO CEILING SPACE
WATER_SITE_80MM COLD WATER RISER WITHIN WALL CAVITY TO CEILING SPACE 10 EA 10 10 1
PIPE RISER
WATER_GROUND FLOOR_PIPE RISER 2 EA 2 2 1
COLD & TEMPERED WATER DROPPERS TO UNDERFLOOR FOR WATER SUPPLY TO HAIRDRESSER BASINS
WATER_GROUND FLOOR_COLD & TEMPERED WATER DROPPERS TO UNDERFLOOR FOR WATER SUPPLY TO HAIRDRESSER BASINS 1 EA 1 1 1
HOT WATER SERVICE PLANT
WATER_GROUND_PLANT-1 1 EA 1 1 1
WATER_GROUND_PLANT-2 1 EA 1 1 1
HOT WATER UNIT FLUES
WATER_ROOF_HOT WATER UNIT FLUES 3 EA 3 3
DRAINAGE LINE, ETC.
Ø150 MM PVC
DRAINAGE_SITE_Ø150MM PVC 60.08 M 60.08 60.08 1
DRAINAGE_GROUND FLOOR_Ø150MM PVC U/G 253.36 M 253.36 253.36 1
DRAINAGE_GROUND FLOOR_Ø150MM PVC U/G 67 M 67 67 1
DRAINAGE_GROUND FLOOR_Ø150MM PVC U/G 122.28 M 122.28 122.28 1
Ø100 MM PVC
DRAINAGE_SITE_Ø100MM PVC 25.8 M 25.8 25.8 1
DRAINAGE_SITE_Ø100MM PVC 8.84 M 8.84 8.84 1
DRAINAGE_GROUND FLOOR_Ø100MM PVC U/G 10.69 M 10.69 10.69 1
DRAINAGE_GROUND FLOOR_Ø100MM PVC U/G 135.35 M 135.35 135.35 1
DRAINAGE_GROUND FLOOR_Ø100MM PVC U/G 54.6 M 54.6 54.6 1
DRAINAGE_GROUND FLOOR_Ø100MM PVC 6.16 M 6.16 6.16 1
Ø100 MM HDPE
DRAINAGE_SITE_Ø100MM HDPE 12.34 M 12.34 12.34 1

Prepared by: Philip 24 of 35


engr_philipncesar@yahoo.com
Project: PREMIER PACIFIC PARADISE
Location: LOT 5 MENZIES DRIVE, PACIFIC PARADISE QLD 4564

Subject: Quantity Takeoff

Quantity
Deduct Quantity after
Unit/Portion ion
opening

Ground
L Unit H/EA Sub-total deduction

DRAINAGE_GROUND FLOOR_Ø100MM HDPE 97.13 M 97.13 97.13 1


DRAINAGE_FIRST FLOOR_100 HDPE 16.88 M 16.88 16.88
TRAPPED TUNDISH
DRAINAGE_SITE_TRAPPED TUNDISH 1 EA 1 1 1
DRAINAGE_GROUND FLOOR_TRAPPED TUNDISH 8 EA 8 8 1
DRAINAGE_GROUND FLOOR_TRAPPED TUNDISH 3 EA 3 3 1
DRAINAGE_TYPICAL SLUICE_TRAPPED TUNDISH 1 EA 1 1 3
DRAINAGE_FIRST FLOOR_TRAPPED TUNDISH 1 EA 1 1
IN-WALL TRAPPED TUNDISH
DRAINAGE_GROUND FLOOR_INWALL TRAP TUNDISH 2 EA 2 2 1
DRAINAGE_FIRST FLOOR_IWTD 7 EA 7 7
DRAINAGE_GROUND FLOOR_TYPICAL ROOM TYPE A/B/D_IWTD 1 EA 1 1 78
DRAINAGE_GROUND FLOOR WITH FIRST FLOOR_TYPICAL ROOM TYPE /A/B/D_IWTD 1 EA 1 1
DRAINAGE_TYPICAL ROOM TYPE C_IWTD 1 EA 1 1 6
INSPECTION OPENING TO SURFACE
DRAINAGE_SITE_INSPECTION OPENING TO SURFACE 4 EA 4 4 1
DRAINAGE_GROUND FLOOR_INSPECTION OPENING TO SURFACE 48 EA 48 48 1
DRAINAGE_GROUND FLOOR_INSPECTION OPENING TO SURFACE 43 EA 43 43 1
DRAINAGE_GROUND FLOOR_INSPECTION OPENING TO SURFACE 32 EA 32 32 1
DRAINAGE_GROUND FLOOR_INSPECTION OPENING TO SURFACE 2 EA 2 2 1
DRAINAGE_FIRST FLOOR_INSPECTION OPENING TO SURFACE 7 EA 7 7
DRAINAGE_GROUND FLOOR_TYPICAL ROOM TYPE A/B/D_INSPECTION OPENING TO SURFACE 1 EA 1 1 78
DRAINAGE_TYPICAL SLUICE_INSPECTION OPENING TO SURFACE 1 EA 1 1 3
DRAINAGE_TYPICAL ROOM TYPE C_INSPECTION OPENING TO SURFACE 1 EA 1 1 6
DRAINAGE_TYPICAL ACCESABLE_INSPECTION OPENING TO SURFACE 1 EA 1 1 6
DRAINAGE_GROUND FLOOR WITH FIRST FLOOR_TYPICAL ROOM TYPE /A/B/D_INSPECTION OPENING TO SURFACE 1 EA 1 1
DRAINAGE_TYPICAL ROMM TYPE A/B/D_FIRST FLOOR_INSPECTION OPENING TO SURFACE 1 EA 1 1
80/65 MM FLOOR TRAP WASTE
DRAINAGE_GROUND FLOOR_80/65 MM FLOOR TRAP WASTE 7 EA 7 7 1
DRAINAGE_GROUND FLOOR_80/65 MM FLOOR TRAP WASTE 2 EA 2 2 1
DRAINAGE_FIRST FLOOR_80/65 MM FLOOR TRAP WASTE 8 EA 8 8
DRAINAGE_GROUND FLOOR_TYPICAL ROOM TYPE A/B/D_80/65MM FLOOR TRAP WASTE 1 EA 1 1 78
DRAINAGE_TYPICAL ROOM TYPE C_80/65MM FLOOR TRAP WASTE 1 EA 1 1 6
DRAINAGE_TYPICAL ACCESABLE_80/65MM FLOOR TRAP WASTE 1 EA 1 1 6
DRAINAGE_TYPICAL SLUICE_80/65MM FLOOR TRAP WASTE 1 EA 1 1 3
DRAINAGE_TYPICAL ROMM TYPE A/B/D_FIRST FLOOR_80/65MM FLOOR TRAP WASTE 1 EA 1 1
DRAINAGE_GROUND FLOOR WITH FIRST FLOOR_TYPICAL ROOM TYPE /A/B/D_80/65MM FLOOR TRAP WASTE 1 EA 1 1
DRAINAGE_TYPICAL ROMM TYPE A/B/D_FIRST FLOOR_IWTD 1 EA 1 1
Ø40MM SEWER

Prepared by: Philip 25 of 35


engr_philipncesar@yahoo.com
Project: PREMIER PACIFIC PARADISE
Location: LOT 5 MENZIES DRIVE, PACIFIC PARADISE QLD 4564

Subject: Quantity Takeoff

Quantity
Deduct Quantity after
Unit/Portion ion
opening

Ground
L Unit H/EA Sub-total deduction

DRAINAGE_GROUND FLOOR_TYPICAL ROOM TYPE A/B/D_Ø40MM SEWER 7.68 M 7.68 7.68


DRAINAGE_GROUND FLOOR WITH FIRST FLOOR_TYPICAL ROOM TYPE /A/B/D_Ø40MM SEWER 7.46 M 7.46 7.46
DRAINAGE_TYPICAL SLUICE_Ø40MM SEWER 7.34 M 7.34 7.34 3
DRAINAGE_TYPICAL ROOM TYPE C_Ø40MM SEWER 8.95 M 8.95 8.95 6
DRAINAGE_TYPICAL ACCESABLE_Ø40MM SEWER 4.88 M 4.88 4.88 6
Ø80MM TRADE WASTE VENTS ALONG WALL TO ROOF DISCHARGE
DRAINAGE_GROUND FLOOR_Ø80MM TRADE WASTE VENTS ALONG WALL TO ROOF DISCHARGE 1 EA 1 1 1
Ø50MM TRADE WASTE VENTS ALONG WALL TO ROOF DISCHARGE
DRAINAGE_GROUND FLOOR_Ø50MM TRADE WASTE VENTS ALONG WALL TO ROOF DISCHARGE 1 EA 1 1 1
VENT
DRAINAGE_GROUND FLOOR_VENT 3 EA 3 3 1
DRAINAGE_GROUND FLOOR_VENT 1 EA 1 1 1
DRAINAGE_FIRST FLOOR_VENT 1 EA 1 1
NEW VENT
DRAINAGE_GROUND FLOOR_NEW VENT PIPE 3.31 M 3.31 3.31 1
DRAINAGE _GROUND FLOOR_NEW VENT PIPE 13.41 M 13.41 13.41 1
DRAINAGE_FIRST FLOOR_NEW VENT PIPE 1.46 M 1.46 1.46
NEW 500 LITRE UNDERGROUND GREASE ARRESTOR WITH GAS TIGHT HEAVY DUTY COVER
DRAINAGE_SITE_NEW 500 LITRE UNDERGROUND GREASE ARRESTOR WITH GAS TIGHT HEAVY DUTY COVER 1 EA 1 1 1
NEW 150MM SEWER CONNECTION
DRAINAGE_SITE_GULLY TRAP 1 EA 1 1 1
GULLY TRAP
DRAINAGE_SITE_GULLY TRAP 2 EA 2 2 1
Ø65MM SOIL VENT
DRAINAGE_ROOF_Ø65MM SOIL VENT 2 EA 2 2
DRAINAGE_FIRST FLOOR_SOIL VENT 65MM 2 EA 2 2
Ø50MM SOIL VENT
DRAINAGE_FIRST FLOOR_SOIL VENT 50MM 25 EA 25 25
DRAINAGE_ROOF_Ø50MM SOIL VENT 27 EA 27 27
Ø65MM SEWER VENT
DRAINAGE_SITE_65MM SEWER VENT WITHIN WALL CAVITY TO ROOF DISCHARGE 1 EA 1 1 1
DRAINAGE_GROUND FLOOR_Ø65MM SEWER VENT 2 EA 2 2 1
Ø50MM SEWER VENT
DRAINAGE_TYPICAL ROMM TYPE A/B/D_FIRST FLOOR_Ø50MM SEWER VENT 6.86 M 6.86 6.86
Ø100MM SOIL STACK
DRAINAGE_GROUND FLOOR_Ø100MM SOIL STACK 25 EA 25 25 1
NEW SANITARY WASTER PIPEWORK
DRAINAGE_FIRST FLOOR_NEW SANITARY WASTER PIPEWORK 80.21 M 80.21 80.21
GAS LAYOUT

Prepared by: Philip 26 of 35


engr_philipncesar@yahoo.com
Project: PREMIER PACIFIC PARADISE
Location: LOT 5 MENZIES DRIVE, PACIFIC PARADISE QLD 4564

Subject: Quantity Takeoff

Quantity
Deduct Quantity after
Unit/Portion ion
opening

Ground
L Unit H/EA Sub-total deduction

Ø65MM LPG Cu O/C


GAS_SITE_ASSUMED 65 NEW LP GAS PIPEWORK 32.82 M 32.82 32.82 1
GAS_GROUND FLOOR_65 LPG Cu O/C 43.72 M 43.72 43.72 1
GAS_GROUND FLOOR_65 LPG Cu O/C 70.99 M 70.99 70.99 1
GAS_GROUND FLOOR_50 LPG Cu O/C 52.84 M 52.84 52.84 1
Ø40MM LPG Cu O/C
GAS_GROUND FLOOR_40 LPG Cu O/C 68.68 M 68.68 68.68 1
Ø32MM LPG Cu O/C
GAS_GROUND FLOOR_32 LPG Cu O/C 41.04 M 41.04 41.04 1
20MM GAS ISOLATION VALVE FOR GAS BBQ CONNECTION
GAS_SITE_20MM GAS ISOLATION VALVE FOR GAS BBQ CONNECTION 1 EA 1 1 1
GAS_GROUND FLOOR_20MM GAS ISOLATION VALVE FOR GAS BBQ CONNECTION 1 EA 1 1 1
ISOLATING VALVE
GAS_GROUND FLOOR_ ISOLATING VALVE 5 EA 5 5 1
GAS_GROUND FLOOR_ ISOLATING VALVE 4 EA 4 4 1
GAS_GROUND FLOOR_ ISOLATING VALVE 2 EA 2 2 1
25MM GAS DROPPER TO UNDER GROUND
GAS_GROUND FLOOR_25MM GAS DROPPER TO UNDERGROUND 1 EA 1 1 1
GAS_GROUND FLOOR_25MM GAS DROPPER TO UNDER GROUND 1 EA 1 1 1
NEW SECOND STAGE REGULATOR WITH SOLENOID VALVE FOR GAS SUPPLY TO BUILDING-TO BE HOUSED WITHIN A WEATHER PROOF ENCLOSURE W/ REGULATOR OUTLET
SET @ 2.75KPA SUPPLY
GAS_SITE_NEW SECOND STAGE REGULATOR WITH SOLENOID VALVE FOR GAS SUPPLY TO BUILDING-TO BE HOUSED WITHIN A WEATHER PROOF 1 EA 1 1 1
ENCLOSURE
NEW 7500 LITREW/ REGULATOR
LPG OUTLET WITH
GAS BULLET COMPLETE SET @ 2.75KPA
FIRST STAGE SUPPLY
REGULATOR
GAS_SITE_NEW 7500 LITRE LPG GAS BULLET COMPLETE WITH FIRST STAGE REGULATOR 1 EA 1 1 1
NEW 25MM LPG HIGH PRESSURE GAS MAIN SUPPLY AT 75KPA
GAS_SITE_NEW 25MM LPG HIGH PRESSURE GAS MAIN SUPPLY AT 75KPA 1 EA 1 1 1
LPG EMERGENCY PUSH BUTTON
GAS_GROUND FLOOR_LPG EMERGENCY PUSH BUTTON 1 EA 1 1 1
RAINWATER LAYOUT
RW LINE Ø65MM
RAINWATER_GROUND FLOOR_65 RW Cu O/C 226.35 M 226.35 226.35 1
RAINWATER_GROUND FLOOR_65 RW Cu O/C 169.81 M 169.81 169.81 1
RAINWATER_GROUND FLOOR_65 RW Cu O/C 80.2 M 80.2 80.2 1
RAINWATER_SITE_ASSUMED 65 RW Cu O/C 9.9 M 9.9 9.9 1
RW LINE Ø40MM
RAINWATER_TYPICAL ACCESABLE_Ø40MM RW 3.24 M 3.24 3.24 6
RAINWATER_GROUND FLOOR_40 RW Cu O/C 46.18 M 46.18 46.18 1
RW LINE Ø20MM
RAINWATER_GROUND FLOOR_TYPICAL ROOM TYPE A/B/D_Ø20MM RW 2.64 M 2.64 2.64 78
RAINWATER_TYPICAL ROOM TYPE C_Ø20MM RW 3.32 M 3.32 3.32 6

Prepared by: Philip 27 of 35


engr_philipncesar@yahoo.com
Project: PREMIER PACIFIC PARADISE
Location: LOT 5 MENZIES DRIVE, PACIFIC PARADISE QLD 4564

Subject: Quantity Takeoff

Quantity
Deduct Quantity after
Unit/Portion ion
opening

Ground
L Unit H/EA Sub-total deduction

NEW SUBMERSIBLE PRESSURE PUMP FOR TOILET FLUSHING COMPLETE WITH ALL WIRING, CONTROLS AND LOW LEVEL SENSOR
RAINWATER_SITE_NEW SUBMERSIBLE PRESSURE PUMP FOR TOILET FLUSHING COMPLETE WITH ALL WIRING, CONTROLS AND LOW LEVEL 1 EA 1 1 1
SENSOR
AUTOMATIC CHANGE OVER VALVE COMPLETE W/ 40MM
RAINWATER_GROUND FLOOR_AUTOMATIC CHANGE OVER VALVE COMPLETE W/ 40MM 1 EA 1 1 1
IRRIGATION
100MM UNDER GROUND CONDUIT FOR IRRIGATION
IRRIGATION_SITE_100MM UNDER GROUND CONDUIT FOR IRRIGATION 14.28 M 14.28 14.28 1

Prepared by: Philip 28 of 35


engr_philipncesar@yahoo.com
Total Quantity Unit
Total
Roof

Nos.
1ST

1 134.33 M
1 373.23 M
1 229.56 M
1 122.09 M
1 1 23.80 M

1 7 25.76 M
1 4 38.16 M

1 75.64 M

22 100 344.00 M
2 8 49.52 M

1 29.44 M

1 87.07 M
1 41.82 M
1 36.71 M

1 76.48 M
1 84.79 M
1 6.87 M
1 1 18.22 M

1 126.68 M
1 20.65 M
1 121.48 M
1 143.42 M

1 68.19 M

1 7 26.39 M
1 4 40.24 M

22 100 348.00 M
2 8 41.92 M

Prepared by: Philip 29 of 35


engr_philipncesar@yahoo.com
Total Quantity Unit
Total
Roof

Nos.
1ST

1 18.00 EA
1 10.00 EA
1 11.00 EA
1 1.00 EA

1 10.00 EA
1 2.00 EA
1 8.00 EA

1 49.00 EA
1 43.00 EA
1 25.00 EA
1 1 4.00 EA
2 2 2.00 EA

1 16.00 EA
1 3.00 EA
1 9.00 EA
22 100 200.00 EA
1 7 7.00 EA
1 1 5.00 EA
1 4 12.00 EA
2 2 4.00 EA

1 16.00 EA
1 4.00 EA
1 13.00 EA
22 100 300.00 EA
1 7 14.00 EA
1 4 16.00 EA
1 1 5.00 EA
2 2 6.00 EA

1 2.00 EA
1 4.00 EA
1 4 16.00 EA
2 2 8.00 EA

Prepared by: Philip 30 of 35


engr_philipncesar@yahoo.com
Total Quantity Unit
Total
Roof

Nos.
1ST

1 1.00 EA
1 6.00 EA
1 9.00 EA
1 4 8.00 EA
1 1 1.00 EA
1 1 1.00 EA
1 1 2.00 EA

1 1.00 EA
1 1 2.00 EA
1 1 1.00 EA

1 1.00 EA

1 10.00 EA

1 2.00 EA

1 1.00 EA

1 1.00 EA
1 1.00 EA

1 1 3.00 EA

1 60.08 M
1 253.36 M
1 67.00 M
1 122.28 M

1 25.80 M
1 8.84 M
1 10.69 M
1 135.35 M
1 54.60 M
1 6.16 M

1 12.34 M

Prepared by: Philip 31 of 35


engr_philipncesar@yahoo.com
Total Quantity Unit
Total
Roof

Nos.
1ST

1 97.13 M
1 1 16.88 M

1 1.00 EA
1 8.00 EA
1 3.00 EA
1 4 4.00 EA
1 1 1.00 EA

1 2.00 EA
1 1 7.00 EA
78 78.00 EA
22 22 22.00 EA
2 8 8.00 EA

1 4.00 EA
1 48.00 EA
1 43.00 EA
1 32.00 EA
1 2.00 EA
1 1 7.00 EA
78 78.00 EA
1 4 4.00 EA
2 8 8.00 EA
1 7 7.00 EA
1 1 1.00 EA
22 22 22.00 EA

1 7.00 EA
1 2.00 EA
1 1 8.00 EA
78 78.00 EA
2 8 8.00 EA
1 7 7.00 EA
1 4 4.00 EA
22 22 22.00 EA
22 22 22.00 EA
22 22 22.00 EA

Prepared by: Philip 32 of 35


engr_philipncesar@yahoo.com
Total Quantity Unit
Total
Roof

Nos.
1ST

22 22 168.96 M
22 22 164.12 M
1 4 29.36 M
2 8 71.60 M
1 7 34.16 M

1 1.00 EA

1 1.00 EA

1 3.00 EA
1 1.00 EA
1 1 1.00 EA

1 3.31 M
1 13.41 M
1 1 1.46 M

1 1.00 EA

1 1.00 EA

1 2.00 EA

1 1 2.00 EA
22 22 44.00 EA

1 1 25.00 EA
1 1 27.00 EA

1 1.00 EA
1 2.00 EA

22 22 150.92 M

1 25.00 EA

1 1 80.21 M

Prepared by: Philip 33 of 35


engr_philipncesar@yahoo.com
Total Quantity Unit
Total
Roof

Nos.
1ST

1 32.82 M
1 43.72 M
1 70.99 M
1 52.84 M

1 68.68 M

1 41.04 M

1 1.00 EA
1 1.00 EA

1 5.00 EA
1 4.00 EA
1 2.00 EA

1 1.00 EA
1 1.00 EA

1 1.00 EA

1 1.00 EA

1 1.00 EA

1 1.00 EA

1 226.35 M
1 169.81 M
1 80.20 M
1 9.90 M

1 7 22.68 M
1 46.18 M

22 100 264.00 M
2 8 26.56 M

Prepared by: Philip 34 of 35


engr_philipncesar@yahoo.com
Total Quantity Unit
Total
Roof

Nos.
1ST

1 1.00 EA

1 1.00 EA

1 14.28 M

Prepared by: Philip 35 of 35