Moh Bidadari P&S R1
Moh Bidadari P&S R1
B:
APPENDIX I SANITARY DRAINAGE AND PLUMBING SERVICES INSTALLATION
$ -
1. SUB-TOTAL FOR POLYCLINIC SANITARY DRAINAGE SYSTEM
$ -
2. SUB-TOTAL FOR POLYCLINIC SANITARY DRAINAGE SYSTEM
$ -
3. SUB-TOTAL FOR POLYCLINIC PLUMBING INSTALLATION
$ -
4. SUB-TOTAL FOR NURSING HOME PLUMBING INSTALLATION
$ -
5. SUB-TOTAL FOR NURSING HOME TOWN GAS INSTALLATION
A.1 All provisions of general requirements including but not limited to the follow ing:
Site Management of specialist team including QPs, LEW, licensed plumbers, BIM
a
operators, etc.
Delivery, transportation, hoisting (including mobile crane for heavy equipment, eg .
b tanks), and full protections to equipment and materials on site.
Coordination w ith builders and other trades of w orks, making good to finishes and
c proper termination of w orks for a complete installations including painting and
labelling, ICDD coordination and meetings.
All shop draw ings production, technical submitals, calculations, samples and mock
d ups, coordination and setting out w ith other trades to produce coordinated
draw ings, etc,
e BIM softw ares, hardw ares, resources, support and production
All necessary permits, fee, liaison and obtain necessary clearances w ith local
f authorities (PUB, NEA, BCA,FSSD, LTA, EMA, SPPG, etc) having jurisdiction over
the installations including PE endorsement.
g Testing and Commissioning
O&M manuals, as-built draw ings, asset and inventory list, spare-part list,
h completed BIM model as specified, all test reports and certifications, all w arranties
and licenses, all relevant permits and certificates.
Full comprehensive maintenance for the w hole duration of the defects liability
period (until the end of the DLP of the last Phase of the project (Phase 2))
i including but not limited to provision for 24 x 7 hot line, maintenance support
team on site, free training and operation, stocks, consumables, etc.
j Provision of veritcal riser modules for all plumbing and sanitary risers
Provision for pump on skid for potable, NEWater w ater transfer and booster
k
pumps, hot w ater pumps c/w industry standard prefabricated pump skid sizes.
Carried forward
$ -
ITEM DESCRIPTION AMOUNT (S$)
Brought forward $ -
POLYCLINIC PLUMBING INSTALLATION
A.2 Basement Sump Pump System
Carpark Drainage
Supply and installation of duty standby sump pumps c/w pipew orks, valve
fittings,
a chain block, control panel, bracket support, electrical w iring, conduit, petrol
interceptor
and all other associated accessories as specified in specifications, speciifcation
schedule
i Domestic Tank
ii New ater Tank
iii Hydrant Tank
iv Sprinkler Tank
A.2 Carpark Storm Water Drainage System
Supply and installation of duty standby sump pumps c/w pipew orks, valve
fittings,
a chain block, control panel, bracket support, electrical w iring, conduit, and all other
associated accessories as specified in specifications, speciifcation draw ings and
schedule
A.3 Basment Diaphram Wall Drainage System
Supply and installation of duty standby sump pumps c/w pipew orks, valve
fittings,
a control panel, bracket support, electrical w iring, conduit, and all other associated
schedule
Carried forward
$ -
APPENDIX I - BREAKDOWN COST OF WORKS
ITEM DESCRIPTION AMOUNT (S$)
Brought forward $ -
A.5 Underground Sanitary Drainage System
a Supply and install of Sanitary drainlines and all other associated accessories.
e CCTV inspection for existing sew er line connection as per PUB requirement.
B.2 From Basement Domestic Water Transfer Tank to Roof Storage Tank
a All transfer mains and risers, inclusive of vertical riser module, piping, valves and
fittings, pipe sleeves, supports and mounting brackets, accessories, etc., until
complete connection to the storage tanks.
One (1) lots of Domestic Water FRP Storage Tanks and tank accessories, inclusive
b of pipe cap-off for other serviceses connection, etc. all as show n and specified at
roof.
One (1) lots of booster pump-sets (c/w Skid Base), pneumatic tanks, control
panels, etc., inclusive of all earthing, w iring / trunking / conduit, electrodes,
c
sensors, associated piping, valves and fittings, accessories, etc. all as show n and
specified.
One (1) lot of medical equipment break tank, control panels, etc. inclusive of all
earthing, w iring / trunking / conduit, electrodes, sensors, associated piping, valves
d
and fittings, accessories, etc. until final termination of plumbing w orks to medical
equipment, etc. all as show n and specified.
e Refuse chute sprinkler system c/w controls and w iring
f Cold w ater pipe w ork complete w ith supports, valves, fittings and accessories to
Hosereel Water Tank, etc as show n and specified.
Carried forward $ -
Brought forward $ -
From Basement NEWater Transfer Tank to Roof Storage and A/C Make-up water
B.3
Tank:
All transfer mains and risers, inclusive of vertical riser modulem piping, valves and
a fittings, pipe sleeves, supports and mounting brackets, accessories, etc., until
complete connection to the storage tanks.
One (1) lots of NEWater FRP Storage Tanks and tank accessories, inclusive of
b pipe cap-off for other serviceses connection, etc. all as show n and specified.
One (1) lots of booster pump-sets (c/w Skid Base), pneumatic tanks, control
panels, etc., inclusive of all earthing, w iring / trunking / conduit, electrodes,
c
sensors, associated piping, valves and fittings, accessories, etc. all as show n and
specified.
d Cold w ater pipe w ork complete w ith supports, valves, fittings and accessories to
irrigation tank, etc. all as show n and specified.
B.4 From Roof Storage Tanks to all vertical risers (PUB - Domestic line):
a All supply mains and riser piping, inclusive of vertical riser module, valves and
fittings, PRVs, pipe sleeves, supports and mounting brackets, and all other
accessories, etc., terminate w ith isolating valves on every floors and every branch-
offs.
Carried forward $ -
a Basement 1
b Level 1
c Level 2
d Level 3
e Level 4
Carried forward
$ -
C.1 All provisions of general requirements including but not limited to the follow ing:
Site Management of specialist team including QPs, LEW, licensed plumbers, BIM
a
operators, etc.
Delivery, transportation, hoisting (including mobile crane for heavy equipment, eg .
b tanks), and full protections to equipment and materials on site.
Coordination w ith builders and other trades of w orks, making good to finishes and
c proper termination of w orks for a complete installations including painting and
labelling, ICDD coordination and meetings.
All shop draw ings production, technical submitals, calculations, samples and mock
d ups, coordination and setting out w ith other trades to produce coordinated
draw ings, etc,
e BIM softw ares, hardw ares, resources, support and production
All necessary permits, fee, liaison and obtain necessary clearances w ith local
f authorities (PUB, NEA, BCA,FSSD, LTA, EMA, SPPG, etc) having jurisdiction over
the installations including PE endorsement.
g Testing and Commissioning
O&M manuals, as-built draw ings, asset and inventory list, spare-part list,
h completed BIM model as specified, all test reports and certifications, all w arranties
and licenses, all relevant permits and certificates.
Full comprehensive maintenance for the w hole duration of the defects liability
period (until the end of the DLP of the last Phase of the project (Phase 2))
i including but not limited to provision for 24 x 7 hot line, maintenance support
team on site, free training and operation, stocks, consumables, etc.
j Provision of veritcal riser modules for all plumbing and sanitary risers
Provision for pump on skid for potable, NEWater w ater transfer and booster
k
pumps, hot w ater pumps c/w industry standard prefabricated pump skid sizes.
Carried forward
$ -
ITEM DESCRIPTION AMOUNT (S$)
Brought forward $ -
C.1 Basement Sump Pump System
Water Tank Overflow Sump Pump
a Supply and installation of duty standby sump pumps c/w pipew orks, valve
fittings, chain block, control panel, bracket support, electrical w iring, conduit, and
all other associated accessories as specified in specifications, speciifcation
draw ings and schedule
i Domestic Tank
C.2 Underground Sanitary Drainage System
a Supply and install of Sanitary drainlines and all other associated accessories.
e CCTV inspection for existing sew er line connection as per PUB requirement.
C.6 Any other Sanitary Drainage w orks w hich are necessary for the completion of the
Works and/or including in the Draw ings and Specifications but not included above
(please specify) :-
i
ii
iii
SUB-TOTAL FOR SANITARY DRAINAGE SYSTEM (TO BE CARRIED FORWARD $ -
TO PAGE I-1-3, ITEM 1, SUMMARY OF COST FOR SANITARY DRAINAGE AND
PLUMBING SERVICES INSTALLATION.)
ITEM DESCRIPTION AMOUNT (S$)
NURSING HOME PLUMBING INSTALLATION
D.1 PUB Incoming Pipework
a Supply and Installation of water supply (PUB) and connections inclusive of all PUB water
meters housing, valve chamber, piping, valves and fittings, pipe sleeves, flanges, soil excavation
and back-filing, pipe haunching, pipe sleeves, accessories,etc. all shown and specified.
Carried forward $ -
a Basement 1
b Level 1
c Level 2
d Level 3
e Level 4
Carried forward
$ -
ITEM DESCRIPTION AMOUNT (S$)
Brought forward $ -
f Level 5
g Level 6
h Level 7
i Level 8
j Roof
D.5 All sub-meterings including remote metering system and to meet Green Mark
Requirements and integration back to BMS for a real time and fully functional
monitoring of w ater consumption including alarms / detections (leaks, overflow ,
underflow , backflow s, etc.), all as show n and specified.
a PUB Domestic Water (Potable)
D.6 Hot Water System
a Supply and installation of w ater heaters complete w ith accessories.
Level 3 to Level 8 (Fully integrated, packaged heating system incorporating the
heat pumps, heat stores, back-up heating elements, w iring, control panel, conduit
i
and all other necessary accessories for safe and efficient operation)(Nursing Home
area)
Hot w ater piping system - all floor vertical and horizontal distribution piping
inclusive of insulation c/w jacketing, all valves and fittings, submeters,
ii
accessories, etc. until final termination of plumbing w orks to all the hot w ater
fittings (include kitchen and laundry), etc., all as show n and specified.
a Level 8 Kitchen
b Level 8 Laundry
c Level 8 to Level 6 all hot w ater outlets (pressurise pipeline)
d Level 8 to Level 3 all hot w ater outlets (gravity pipeline)
Carried forward
$ -
E.7 Acoustic treatment and vibration control all as show n and specified
BMS interfacing to monitoring for Water tank high/low level, pump status, sump w ater level, trip
E.8 alarm and etc.
Any other Plumbing Installation Works w hich are necessary for the completion of
E.9 the Works and/or including in the Draw ings and Specifications but not included
above (please specify) :-
i
ii
iii
SUB-TOTAL FOR PLUMBING AND GAS INSTALLATION (TO BE CARRIED $ -
FORWARD TO PAGE I-3, ITEM 2, SUMMARY OF COST FOR SANITARY
DRAINAGE AND PLUMBING SERVICES INSTALLATION)
SUB-TOTAL FOR PLUMBING AND GAS INSTALLATION (TO BE CARRIED FORWARD TO PAGE I-3, $ -
ITEM 2, SUMMARY OF COST FOR SANITARY DRAINAGE AND PLUMBING SERVICES
INSTALLATION)