PALU-03 COAL FIRED STEAM POWER PLANT (2 X 50 MW)

PT. PLN (PERSERO) CONSORTIUM WIKA-DHI-KOEN


Document No.
REV.
-
SCENARIO CHECK
0
Project Title : Palu - 3 CFSPP Project Equipment Name : PLC Panel
Customer : PT Wijaya Karya Equipment No : 10CJU01GH001
Contractor : PT Ulan Buana Engineering Date :

SCENAR AUTO MANUAL INTERLOCKING


ITEM REFERENCE DOCUMENT NO. REMARKS
IO NO. UBE WIKA PLN UBE WIKA PLN UBE WIKA PLN

Normal Stacking Line A:


From CSU-01/CSU-02 --> BC-01A SELECTED --> BC-
1 18JE05-DOC-EA-2001-0001
02A SELECTED --> DG-01 TO BC-03 --> BC-03
SELECTED --> BWSR (STACKING MODE)

Normal Stacking Line B:


From CSU-01/CSU-02 --> BC-01B SELECTED --> BC-
2 18JE05-DOC-EA-2001-0001
02B SELECTED --> DG-02 TO BC-03 --> BC-03
SELECTED --> BWSR (STACKING MODE)

Emergency Stacking Line A


From CSU-01/CSU-02 --> BC-01A SELECTED --> BC-
3 18JE05-DOC-EA-2001-0001
02A SELECTED --> DG-01 TO BC-04 --> BC-04 --> TC-
01

Emergency Stacking Line B


From CSU-01/CSU-02 --> BC-01B SELECTED --> BC-
4 18JE05-DOC-EA-2001-0001
02B SELECTED --> DG-02 TO BC-04 --> BC-04 --> TC-
01
SCENAR AUTO MANUAL INTERLOCKING
ITEM REFERENCE DOCUMENT NO. REMARKS
IO NO. UBE WIKA PLN UBE WIKA PLN UBE WIKA PLN

Normal Reclaiming Line A


BWSR (RECLAIMING MODE) --> BC-03 SELECTED -->
5 DG-03 TO VS-01A --> VS-01A SELECTED --> CR-01A 18JE05-DOC-EA-2001-0001
SELECTED --> BC-06A SELECTED --> BC-07A
SELECTED --> FIXED PLOUGH --> COAL BUNKER

Normal Reclaiming Line B


BWSR (RECLAIMING MODE) --> BC-03 SELECTED -->
6 DG-03 TO VS-01B --> VS-01B SELECTED --> CR-01B 18JE05-DOC-EA-2001-0001
SELECTED --> BC-06B SELECTED --> BC-07B
SELECTED --> FIXED PLOUGH --> COAL BUNKER

Emergency Reclaiming Line A


OGF SELECTED --> BC-05 SELECTED --> DG-03 TO VS-
7 01A --> VS-01A SELECTED --> CR-01A SELECTED --> 18JE05-DOC-EA-2001-0001
BC-06A SELECTED --> BC-07A SELECTED --> FIXED
PLOUGH --> COAL BUNKER

Normal Reclaiming Line B


OGF SELECTED --> BC-05 SELECTED --> DG-03 TO VS-
8 01B --> VS-01B SELECTED --> CR-01B SELECTED --> 18JE05-DOC-EA-2001-0001
BC-06B SELECTED --> BC-07B SELECTED --> FIXED
PLOUGH --> COAL BUNKER

CONCLUTION PREPARED & TESTED BY, WITNESSED BY WITNESSED BY APPROVED BY,


UBE WIKA-DHI-KOEN PLN PUSMANPRO PLN UPP SULTENG
Accepted

Not Accepted

DATE : DATE : DATE : DATE :


NAME : NAME : NAME : NAME :