Professional Documents
Culture Documents
Exam of Assist Irrigation Works
Exam of Assist Irrigation Works
Instructions
1. Please make sure your Name and Registrationnumber in the space provided on cover
page of candidate registration booklet is written correctly.
2. You have 30 minutes reading time and opportunity to ask questions to the Assessor
3. All written responses must be in English.
4. At the end of the assessment return this assessment sheet to the assigned assessor
5. You may use _____________in this assessment
6. Do not bring the following items into the assessment place
Mobile phone and Written notes
SECTION A :–TRUE or FALSE
PLEASE MAKE SURE THAT THIS IS THE CORRECT ISSUE BEFORE USE
Organization Name: Document No.:
1. _____________ is a water media transporting water from the pump to the working place.
A) Water pump
B) Hoses
C) Water pump
D) Watering can
2. Which one of the following is safety equipment’s based hazards and risks assessed will
be selected on the basis of OHS regulations, such PPE and materials
A) Hand glove
PLEASE MAKE SURE THAT THIS IS THE CORRECT ISSUE BEFORE USE
Organization Name: Document No.:
3. _____________ is the material that is used to protect head from direct sun radiation.
A) Water Pump
B) HOSES
C) Sun hat
D) Watering Can
4. Risk Reports should be
A) Not completed by anyone- employees, managers
B) Signed by a Health and Safety Committee member
C) Not discussed at a Health and Safety Committee or staff meeting
D) Prevent it from Ergonomic hazard
5. One of the following is the categorized under gravitational irrigation system.
A) Surface irrigation method
B) Pressurized irrigation systems
C) Degradation of irrigated land
D) Bedrock surface irrigation method
6. Which of the following is the implementation manners of Pressurized irrigation systems
A) Sprinkler irrigation
B) None drip irrigation
C) Bedrock surface irrigation method
D) Surface irrigation method
7. During undertaking irrigation work in a safe and environmentally appropriate manner,
Sectors of highlights and awareness materials should be major impacts like:
A) Increased socio-economic condition
B) Poor water quality
C) Increased big diversity in project area
PLEASE MAKE SURE THAT THIS IS THE CORRECT ISSUE BEFORE USE
Organization Name: Document No.:
PLEASE MAKE SURE THAT THIS IS THE CORRECT ISSUE BEFORE USE
Organization Name: Document No.:
6. With what conditions, Instructions and environmental practices for making a site good
in quality is related?
PLEASE MAKE SURE THAT THIS IS THE CORRECT ISSUE BEFORE USE