I m p l e m e n t a t i o n of P r o d u c t i o n
T e c h n i q u e s for p r o d u c t i v i t y ,
Q u a l i t y a n d Cost R e d u c t i o n .
T e c h n i q u e s of IE (Works Study),
L e a n & Six-sigma,
Dilip Kumar
Gayen
HANDBOOK
ON PRODUCTION EFFICIENCY FOR MSME
Implementation the production techniques for productivity, quality and cost optimization
Techniques of Industrial Engineering (Works Study), Lean & Six-sigma, TQM & TPM,
Layout, Control and monitoring, Innovations for Making a Smart Factory
This book is written for the benefit of MSME organizations, their stakeholders, production managers,
supervisors and for the persons of Mechanical Engineering qualified to comprehend about the efficient
production techniques to enhance their competency. Various production tools and techniques are defined for
optimum utilization of resources, low cost production with quality. Implementation steps are incorporated with
the principles of each production techniques and balancing of technology & techniques for resource
optimization. Major proposed techniques on productivity and efficiency are on Industrial engineering techniques
through work study for developing production norms, Lean manufacturing for wastage reduction, Total quality
for quality culture, Six-sigma for business excellence, Total productive maintenance for plant efficiency and
Innovation for application of human intelligence. Application of these techniques will enable the factory to take
robust steps towards making smart manufacturing by transforming the production system from traditional to
world class, for global presence through market driven, customer-oriented quality, cost and delivery.
MBA, PGDPM, ME, IE Research Scholar, SSBB, Lean Six-Sigma, TQM & TPM (APO –
Asian Productivity Organization, Japan), Lean I 4.0 (APO), Data Analytics, SME
Innovation & Smart Production (APO), ZED Trainer, Lead Auditor QMS
Expert in management & production techniques, Productivity, Quality, Lean I 4.0, Six-
Sigma, BPR & BPM, ZED, Business Solution, Performance Measurement, TQM, TPM,
Works Study for Production & Manpower Norms, Design Incentive Schemes, Process Re-
engineering, HRM – Org. Restructuring, Manpower Assessment & Utilization,
PCMM, HRD – TNS&TNI, Training, Manpower Optimization & Planning, Cluster
Development, Safety, Organization Innovation, Grading of Educational Institutes, Socio-
economic Impact Study & Survey and Project E&M
This Book is Dedicated
to
My Mentor Daishaku Ikeda
An Educator, Peace Propagator and Social Reformist
*
He said in daily guidance May 30 th, “Adversity makes the man. Indeed, adversity is severe, father-
like teacher for your self-perfection. Only when you put yourself in a position from which you
can never retreat even a single step, can you display your hidden capabilities”.
ACKNOWLEDGEMENT
This book is designed as per the various country’s requirement for efficient production sectors for global presence, and also to accomplish
India’s Prime Minister’s vision to make capable manufacturing industries through his ‘Make in India’ movement. This vision is universally
applicable for all countries.
I hereby acknowledge my appreciation to Mr. S K. Bose (Ex-DGM, NTPC), Dr. P C. Basak (PhD IITC, Ex-Prof. of IGNOU & Murthal Engineering
College), Mr. Avik Mitra (Ex-Advisor of Quality Council of India), Late Dr. S. N. Nandi (PhD IITD, Ex-DDG of NPC), Dr. Sujan Chakraborty, Ex-
member of Parliament in India and Mrs. Soma Datta, my wife, for their support in knowledge and encouragement during my struggling period.
I am grateful to all experts, who have enriched my knowledge through various sources of information, suggestions, lectures, web publications,
books, articles, personal guidance & suggestions. My heartfelt appreciation to all my BSG members who always support me through their prayers.
I also thankful to my associates, who were engaged in various studies, assignments, and projects, particularly Laxminaran, Kamlesh, Ashutosh,
Mridul, Deepak, Dibas, Soumen, Abhishake, Ajay, Amit, and Chandan and others.
The organizations, where I am associated for various assignments, particularly Asian Productivity Organization, Japan; Quality council of India,
National Productivity Council of India, CDC and NABARD Consultancy Services.
The urgency and necessity of this book is to elevate the manufacturing industries to be globally competitive in
the current pandemic situation by increasing productivity and efficiency, to enable the organizations to progress
towards more efficiency which is essential for the finest products with competitive cost and satisfied customer.
Requirement for making an efficient plant is to optimize the utilization of resources, emphasizing on
productivity and capacity, unsurpassed quality, on time delivery, competitive price and engagement the
employees with their commitment. Prepare the plant with the culture of innovation, digitalize the data,
effectively set up the workplace, improve in machine performance and make efficient production lines with less
processing times, to make it competitive.
This book covers the most used techniques as well as next generation technical tools, recommended on training
& learning, skills & competency and other areas, aiming at the optimum utilization of existing technological
capacity with techniques at the factory’s respective workplaces.
The defined techniques will support to overcome the industry challenges, both in the form of internal efficiency
and external difficulties to create the opportunity of more business and make the method to compete in the
global market. Today, all industries drive for customers, new business generation, market penetration and for
sustainable growth; which could be achieved through the establishment of efficient production system and
providing best price to customers with quality. The coverage of the primary and important techniques of
improvements in this book are;
Persons who are working in the same industry or in same factory for a long time for producing specific products
and for a cluster of customers, are experienced and competent in the preparation of production plan and material
utilization. This handbook will also assist them to be more competent for setting up a world class and efficient
plant. They will be capable to design machines, develop skills, lean the inefficiencies and also to implement the
productive maintenance.
The purpose of this writing, is to fulfill the expectations of an entrepreneur to find the method on which the
people and organization be capable to improve performance, plan to promote quality, create opportunity to
deliver the best to their customers and for adding values in their business.
There are total sixteen chapters in this book, which seems to be bit lengthy, but in present context it is imperative
that, all industries are technically progressed and implemented the higher of level production techniques and
improved technologies through semi or full automation. So, keeping in mind the technological ranges, financial
scale of industries and importantly type of country it is operating, the attempt is to cover as many industries as
possible, and as per the countries’ technological level.
Several technical tools are systematically described through basic concepts, principles, methods and their steps
of implementation, so that, one can read systematically to comprehend how it could be applicable in their
respective workplace. The chapters and contents are made on the basis of preliminary requirements of the
industries for evolving them at the higher-level technical advancement.
At the end of each chapter, questions are enclosed for reader’s self-analysis, review, re-learning and for better
understanding. SME corner is also stated to highlight the excerpts of the chapter for SME representatives aiming
at revision, application and understanding the core applicable areas of the techniques described in that chapter.
The terminology used as manufacturing or production repeatedly in various techniques, but the perception is
that, these techniques are covered for both the manufacturing and production units.
The effective decision, training on techniques and passion in learning are essential for intrusion of any
technique. So, industry should plan on extensive on-site technical training for implementation and make
arrangements for handholding the entire manpower of the factory through the internal or external experts in shop
floor & production.
The writing covers in the expanses of capacity, innovation, supervision and managerial skill, Lean
manufacturing, Total quality management, Total productive maintenance, Six-sigma techniques, Cellular
manufacturing, Process reengineering, Smart factory and How to start the improvement journey.
Any factory intending to implement these techniques prudently and diligently, can reduce 5 to 30% of its
operating cost and can become capable to penetrate strongly in their country’s market and thereafter globally.
2 CHAPTER – II 34 - 48
About the Developed Model for Improvement and efficiency
2.1 Coverage and specialty of this MSME improvement Model 35
2.2 Basic Features of This Model 35
2.3 Technical coverage this model for MSME 38
2.4 About Customer 40
2.5 Strategy of Marketing for Customers 40
2.6 Preference of an customers 41
2.7 Internal strategy on the products and services 41
2.8 Capacity Improvement for Efficiency 42
Capacity Improvement
2.9 Process of Improvement in Capacity 42
2.10 Capacity Improvement Flow Chart 43
2.11 Optimum Utilization of Resources: Definition of resources 43
2.12 Combination of Technology and Techniques in the manufacturing Industry 44
2.13 Manufacturing throughput 45
2.14 Calculation of throughput 45
2.15 6 Effective Ways to Improve Manufacturing Throughput 45
2.16 Theory of Constraints in Industry 45
3 CHAPTER - III 48 - 73
Existing Plant & Process Study
3.1 Introduction 49
3.2 Principles of an efficient Plant 49
3.3 Study on existing plant & processes 50
3.4 Planning and Establishment of Data collection points 51
3.5 Major Types of Documents and Purpose of Collection 52
3.6 Standard contents of a format, documents and MIS 54
3.7 Format of Plant Self Audit and Assessment 63
3.8 Plant overall monitoring MIS 70
CHAPTER - IV 73 –
4
Techniques of Productivity Improvement 110
4.1 Introduction 74
4.2 Approaches of Productivity Measurement 75
Major Available Techniques for Productivity & performance Enhancement
4.3 75
and their Applicability
4.4 Productivity Inducing Factors 77
4.5 Purpose of productivity: Productivity improves standard of living 77
4.6 Factors tending to reduce productivity 79
4.7 Ineffective time due to management 79
4.8 Ineffective time within the control of worker 80
4.9 Principles for Improving Productivity at Work 80
4.10 Measurement of Productivity 80
4.11 Fixation and Standardization of the Times of Operations and Processing 81
4.12 Recoding and Monitoring / Follow Up Procedures 83
Page
Sr. No. Areas
No.
4.13 WORK STUDY 84
4.14 Process for Time Stud y and Man p ower Norms 84
4.15 Advantag es of Work Stud y 85
4.16 Princip les of WS 85
4.17 METHOD STUDY 85
4.18 Ob jectives of Method Stud y 86
4.19 Sco p e of Method Stud y 86
4.20 Motion stud y 86
4.21 Princip le of Motion stud y 86
4.22 Procedures involved in Methods Stud y 86
4.23 Selection of the Job in Method Stud y 87
4.24 Factors in the method stud y for selection of jobs 87
4.25 Recordin g , examine and Develo p Techniq ues under Method Stud y 88
4.26 Most commonly used chart and diag rams in Methods Stud y 88
4.27 Macro motion charts 89
4.28 Micro Motion Definition, Purp ose and Advantag es 90
4.29 Strin g diag ram 92
4.30 WORK MEASUREMENT 93
4.31 Predetermined motion time stud y (PMTS) 94
4.32 Stud y of Time, Recodin g and Stud y Sheet 96
4.33 Standard ratin g and Performance 96
4.34 Allowances 97
4.35 Industry use of time stud y 100
How the time study with derived standard time enhanced the manpower
4.36 104
utilization and saved the man p ower
Modern techniques of productivity improvement using Industry 4.0
4.37 105
techniq ues
4.38 Develo p ment in Manufacturin g Technolo gy 108
CHAPTER - V 111 –
5
Creativity and Innovation for SMEs 120
5.1 Introduction 112
5.2 About Innovation 1132
5.3 Pro g ress of Innovation 112
5.4 Imp ortance of Innovation 113
5.5 Princip les of Innovation 113
5.6 5 p rincip les of Rosenfeld, g ive life to the p rocess 114
5.7 Imp ortant asp ects of creativity and motivation 114
5.8 App roaches of Innovation 115
5.9 Innovation Process 116
5.10 Corp orate Innovation Strategy 117
Steps of creating Innovation Culture: Steps of Innovation Culture in an
5.11 117
Org anization
5.12 Comp arison of Kaizen and Innovation 119
CHAPTER - VI 121 –
6
Mana g erial and Supervision Skills 134
6.1 Introduction 122
6.2 How Manag ers and su p ervisors help the Org anization most 122
6.3 Functions of Manag er and su p ervisor 123
6.4 Role of Manag ers and su p ervisors 123
6.5 Skills and Comp etency Req uired Manag ers and su p ervisors 123
6.6 Basic work / job p ortfolio of M & S – Technical 125
6.7 Critical factors of the activities / work / jobs 125
6.8 Manag er’s and su p ervisor’s success acumen 125
6.9 Ethics, discip line and Integ rity in workin g 126
6.10 Samp le Roles of a Su p ervisors and manag ers 126
6.11 Process of definin g daily workin g areas of the staffs 127
6.12 Job Evaluation: Listin g and analy sis of Daily Activities 128
6.13 Develo p multi-skill amon g the workmen 129
Chapter - IX 269 –
9
Total Productive Maintenance 333
9.1 Introduction 270
9.2 TPM – History 270
9.3 Purpose and scope of TPM 270
9.4 Basic Maintenance p ractices and TPM Techniq ues 272
9.5 Sy stem Reliability 273
9.6 About Failures 275
9.7 About losses, 16 major losses in the Plant 276
9.8 Basic Maintenance p rocess and p ractices in the Plant 279
9.9 12 Step s of TPM imp lementation in an org anization 280
Improving Administrative Efficiency through Makigami (Paper Roll)
9.10 308
Analy sis
9.11 Basic activities of the Maintenance Dep artment 311
9.12 Maintenance Worksho p 312
9.13 Case Stud y : Reduction in Breakdown Time 313
9.14 Industry TPM Stud y 316
9.15 About EPN analy sis 318
9.16 Daily CLIT (Cleanin g , Lubrication, Insp ection and Tig htenin g Sheet) 318
9.17 About Fu g uai 330
Chapter - X 334 –
10
Concept of Six Sig ma 360
10.1 Introduction 335
10.2 Meanin g and sy mbol of “Sig ma” and Z 336
10.3 Six sig ma Techniq ues, sy stem and manag erial app roach 337
10.4 Kano Model 339
10.5 Lean Six Sig ma Princip les 339
10.6 Six-Sig ma Imp lementation Phases 343
10.7 Define 343
10.8 Measure 344
10.9 Some Statistical Analy sis in Measurement 349
10.10 Analy sis 353
10.11 Imp rovement 355
10.12 Control 356
10.13 Failure Mode Effect Analy sis (FMEA) 358
10.14 Quality Function Dep lo y ment (QFD) 359
CHAPTER - XI 361 –
11
Desig n of Ex periments (DOE), Ta g uchi Method and Research 377
11.1 Introduction: Desig n of Ex p eriments (DOE) 362
11.2 History of Desig n of ex p eriments 362
11.3 Basic p rincip le of Desig n of Ex p eriments 365
11.4 Classification of factors as p er Tag uchi 366
11.5 Dr. Genichi Tag uchi Method 369
11.6 The Taguchi Definition of Quality 369
Page
Sr. No. Areas
No.
11.7 TAGUCHI PROCESS 369
11.8 Nonex p erimental Research Desig ns and Survey Research 374
11.9 Characteristics of g ood Survey Research 375
Chapter - XII 378 –
12
Control and Monitoring and Training and Skills 395
12.1 About Control and Monitorin g 379
12.2 Samp le Plant Performance Parameters 381
Chapter - XV 450 –
15
Modern Production Techniques: Industry 4.0 465
15.1 About Smart Factory 451
15.2 Contents of Smart Factory 451
15.3 Techniq ues and Technolo gy of Smart Factory 451
Imperatives of On-Line Quality and Productivity in Smart Factory, Making
15.4 453
Dig ital Thread
15.5 SF Imp lementation within a Plant 454
15.6 Industry 4.0 Readiness Check Points 457
15. 7 Benefits of smart factory and Industry 4.0 464
Chapter – XVI 466 –
16
Im plementation Journey 473
16.1 Manufacturin g Industry Efficiency Imp rovement Imp lementation Pro ject 467
16.2 Knowled g e and understandin g 467
16.3 Direction towards Manufacturin g Efficiency 467
16.4 Nine way s to increase p roductivity in the manufacturin g facilities 468
16.5 Typ es of Imp rovements envisag ed in the Industry 468
16.6 Sources of Imp rovements in manufacturin g industry 468
16.7 Necessary Technicalities for a Factory 469
16.8 Intrinsic p roblems of the Plant and industry on efficiency 469
16.9 Plannin g and direction towards efficiency 470
16.10 Efficiency measurement Scorecard 473
Page
Sr. No. Areas
No.
Annexure
Annexure – I: Case Studies on Time Measurement 475
Annexure – II: Recommendation is supported by Time Study Summary
478
sheet details (as p er the WS Norms)
Annexure – III: Kaizen Su gg estion Sheet 480
Annexure – IV: Line Balancin g Samp les 482
Annexure – V: Process Flow: SIPOC 483
Annexure – VI: Samp le Road Map of the IE and Lean stud y 485
Annexure – VII: Time Study sheet for Measuring the Standard Time from 486
Workstation Observed Time
Bibliography and sources: 487
Figure and Charts
Page
Sr. No. Areas
No.
Figure 1 Linkage effect of Manufacturing industry 19
Figure 2 World Bank SME report 21
Figure 3 Importance of Manufacturing sector 26
Figure 4 Progress of Industrial Revolutions 27
Figure 5 Challenges in manufacturing industries 29
Figure 6 Baldrige Criteria for Performance Excellence 30
Figure 7 Technical Coverage of the MSME model 37
Figure 8 Structure of the MSME Improvement Model 38
Figure 9 Implementation process as per the model 39
Figure 10 Customers in Business 40
Figure 11 Approach to customer 41
Figure 12 Processes of improving capacity in the existing set up 42
Techniques of Productivity and Efficiency Improvement in a
Figure 23 42
Manufacturing Unit
Figure 34 Improvement Flow chart 43
Figure 45 Optimum utilization resources 43
Figure 56 Combination of Technology and techniques in industry 44
Figure 17 Existing study for estimation of the plant and processes 49
Figure 18 Types of data in an organization 52
Figure 19 Types of Plant related documents 53
Figure 20 Contents of various MIS 54
Figure 21 Types Data as per the collection of information 54
Figure 22 OEE Data expand and collection 56
Figure 23 Quality related data at various levels 57
Figure 24 Production related data 58
Figure 25 Maintenance related data 59
Figure 26 Approaches towards Productivity 75
Figure 27 Controlling factors of Productivity 77
Figure 28 Total production in any prevailing system 82
Figure 29 Work study Framework 84
Figure 30 Types of Charts and Diagrams in Method study 88
Figure 31 Operation Process Chart, collected 89
Figure 32 Two Handed process chart 90
Figure 33 Workstation Layout 90
Figure 34 Multiple Activity Chart 90
Figure 35 The standard symbols used in representing the 18 therbligs 91
Figure 36 SUMO Chart 91
Figure 37 Random number table 93
Figure 38 Steps in Time Study 94
Figure 39 MTM study movements 95
Figure 40 Time study sheet 96
Figure 41 Time allowance Table 98
Figure 42 Balancing of Mannual and M/c Operations, based on Time study 100
Figure 43 Consolidated Process Flows 102
Figure 44 Country ranking on patent 112
Figure 45 Aspects of creativity and motivation 114
Figure 46 Organization culture in creativity and innovation 115
Figure 47 People process of Innovation 116
Figure 48 Organization Process of Innovation 116
Figure 49 Corporate Innovation Strategy 117
Figure 50 Responsibility of Innovations through Job enrichment 117
Figure 51 Functions of Managers and Supervisors 123
Figure 52 Role of Managers and supervisors 123
Figure 53 Skills and Competency Required Managers and supervisors 124
Figure 54 Basic work / job portfolio of M & S - Technical 125
Figure 55 Critical factors of the activities / work / jobs 125
Figure 56 Job / Activity Analysis 128
Figure 57 Lean Philosophy 136
Figure 58 Applicable Technical Tools in lean manufacturing 137
Page
Sr. No. Areas
No.
Figure 59 Use of Technical Tools for various Wastage Reduction 138
Figure 60 Sample VSM in Group of Operations 144
Figure 61 Total Value Stream Duration/ Length 144
Figure 62 Planning through PDCA Cycle 147
Figure 63 Define Lean Implementation Project 149
Figure 64 Lean Project for Improvement 150
Figure 65 Lean Project Team members 151
Figure 66 Lean Project Implementation Processes for Lean Teams 151
Figure 67 Procedures followed to conduct the study 156
Figure 68 Horizontal deployment of Lean projects and techniques 165
Figure 69 Benefits of 5S 181
Figure 70 Basic 5S Techniques / Methodologies 182
Figure 71 5S Study and implementation 190
Figure 72 Sensei Masaaki Imai, Founder & Chairman Kaizen Institute 208
Figure 73 Basic Cycle of improvement 208
Figure 74 Kaizen improvement approach 211
Figure 75 PDCA in Kaizen Biltz 211
Figure 76 Window of Yamazumi chart 212
Figure 77 Improvement towards Zero Changeover 216
Figure 78 Acceleration of the Progress 229
Figure 79 Dimensions of Quality 246
Figure 80 Types of Quality 247
Figure 81 Progress of the quality to total quality 247
Figure 82 Cost of quality 248
Figure 83 Management of system quality 249
Figure 84 Quality elevation in the plant 250
Figure 85 Division of 7QC Tools 252
Figure 86 Sample Process Flow Chart 253
Figure 87 Histogram 254
Figure 88 Example of scatter diagram 257
Figure 89 TQM Essential Role in Organization 260
Figure 90 Re-structure for making more Efficient Organization 263
Figure 91 Principles of TQM 264
Figure 92 Flow of TQM 265
Figure 93 Structure of TQM Implementation 266
Figure 94 History of Planned maintenance 271
Figure 95 Categorization of Maintenance 273
Figure 96 Plant TPM 273
Figure 97 Categorization of 16 Major Losses 276
Figure 98 TPM Pillar subcommittee 281
Figure 99 Need of TPM 282
Figure 100 Pillars of TPM 285
Figure 101 Pillars of TPM Implementation 285
Figure 102 Makigami Analysis on 7 Big Administrative Losses 308
Figure 103 Basic Activities of the Maintenance Section 311
Figure 104 Phases and purpose of Six-sigma 337
Figure 105 Six-sigma contents and methodologies 338
Figure 106 Kano Analysis (collected) 330
Figure 107 Activities in Define Stage 343
Figure 108 Activities in the Measure Phase 344
Figure 109 Process of Error and Measurement of Variation 347
Figure 110 Types of Errors 347
Figure 111 Basic Hypothesis Tests in Analyse Phase 353
Figure 112 Process in Improve Stage 355
Figure 113 Techniques of Control 356
Figure 114 Terminology, Test group in Testing 363
Figure 115 Randomized complete block design 366
Figure 116 Taguchi Process 1 369
Figure 117 Performance Measurement areas 380
Figure 118 Training Need Assessment 391
Figure 119 Training Process Cycle 392
Figure 120 Sample Training Matrix 393
Page
Sr. No. Areas
No.
Figure 121 Types of layouts 398
Figure 122 Considering Factors for Layout Design 413
Figure 123 Plant New Layout after IE Study 424
Figure 124 Basics about Processes 428
Figure 125 7 enablers of BPM 428
Figure 126 Process Competency 429
Figure 127 Process Change and Improvement Methods 430
Figure 128 Standard Business Process in an organization 431
Figure 129 Standard Manufacturing Functional aspects 432
Figure 130 Process of reengineering for SMEs 433
Figure 131 Improvement under Reengineering study 435
Figure 132 Single Piece Production Flow 439
Figure 133 Contents of Smart Manufacturing 451
Factors of Smart Manufacturing, source - Asian Productivity
Figure 134 451
Organization, Japan
Figure 135 Dimensions of Smart Factory 452
Figure 136 Techniques of Smart Factory 453
Figure 137 Aspects of Lean Smart Plant for Efficiency and Effectiveness 454
Identifications of the primary activities and business functions that
Figure 138 empowers through Industry 4.0 technologies (source: Industry 4.0 455
by CGI Manufacturing)
Figure 139 Types of improvement in manufacturing industry 468
Figure 140 Levels of Manufacturing and production techniques 469
Figure 141 Types of Planning 470
Tables
Page
Sr. No. Areas
No.
Table No. 1 Application of Technology in the Developing Countries 44
Table No. 2 Application of Technology Trend in the Developed Countries 44
Table No. 3 Various types of data and its importance 50
Table No. 4 Department-wise controlled documents 55
Table No. 5 OEE Covers the Following Departments 56
Table No. 6 Sample Department-Wise Controlled Documents/ Formats / MIS 56
Table No. 7 Quality Data 57
Table No. 8 Levels and areas to be covered in Formats/ Documents 57
Table No. 9 Production data 58
Table No. Machine Records Documentations
59
10
Table No. Documents verification Table
60
11
Table No. Department-wise controlled documents/ formats / MIS/ Planning
60
12
Table No. Machine Trail Report Table
61
13
Table No. Departmental Achievement
61
14
Table No. Source of Data for the following Reports
62
15
Table No. Assess status and level of the Unit
63
16
Table No. Self-Assessment Sheet
64
17
Table No. Sample Plant Monthly Assessment MIS
70
18
Table No. Sample Monitoring MIS, One of the Plant’s Overall Resource
71
19 Utilization and Production
Table No. Techniques / Implementation Studies
75
20
Table No. Measurement of Productivity
80
21
Table No. Basic Work Contents / Operations
82
22
Table No. Time study sheet
97
23
Table No. Balancing of Operations
101
23A
Table No. Manpower Utilization Analysis Sheet, through Time Study
104
23B
Table No. Innovation Competencies and Origination Initiatives
116
24
Table No. Comparison of Kaizen and Innovation
119
25
Table No. Types of Work at the floor and Engagement
126
26
Table No. To Make Woking Norms / Activity Norms by the Departments
127
27
Table No. Process of assessing the jobs for developing the norms by dept.
127
28 head and group head
Table No. Listing and analysis of Daily Activities
128
29
Table No. Sample of revising the activities of packing operators
128
30
Table No. Skills evaluation sheet as per existing jobs
130
31
Table No. Basic job evaluation sheet in the factory
131
31A
Table No. Basic job score sheet
132
31B
Page
Sr. No. Areas
No.
Table No. Lean Manufacturing Tools/ Techniques
137
32
Table No. Data Collection on Rework
152
33
Table No. Action Plan based on R-C Analysis
151
34
Table No. Sample Action Follow up Sheet
158
35
Table No. After implementation data collection Table
161
36
Table No. After Implementation Data collection result
162
37
Table No. Lean Implementation Monitoring sheet
167
38
Table No. Internal Improvement Follow Up and Action Plan on It
169
39
Table No. Inventory Assessment sheet
172
40
Table No. Sample Kaizen follow up Sheet for Lean Manufacturing
173
41 Techniques Implementation
Table No. Job Check list
174
42
Table No. Quality Check Sheet
175
43
Table No. Lean Improvement Action Plan
176
44
Table No. Lean Improvements Result sheet
177
45
Table No. Inventory Causes Check Points
178
46
Table No. Lean Milestone based Planning Report Preparation
179
47
Table No. Lean Planning for application
180
48
Table No. Japanese Corresponding 'S' methodologies
181
49
Table No. 5S Audit sheet of the Shop Floors
191
50
Table No. 5S Daily Check Sheet
193
51
Table No. 5S Assessment (shade boxes to indicate current level)
195
52
Table No. 5S Maturity Level Summary
196
53
Table No. Office 5S Action Plan
197
54
Table No. Red Tag Items Log
197
55
Table No. Manufacturing Area 5S Evaluation Check sheet
199
56
Table No. “S”, Circle the block, describing the area being assessed
202
57
Table No. Describing Office all 5S, Scores
203
58
Table No. Comparison of SMED and TPM
226
59
Table No. Identify Pilot Area and measure the Job
226
60
Table No. Examples of Poka-Yokes, as per expert description
240
61
Table No. Quality Tools invented by quality Gurus
247
62
Table No. Sample Design of Check sheet with Check Points
253
63
Table No. Comparison of TQM and TPM
271
64
Page
Sr. No. Areas
No.
Table No. Purpose of TPM Implementation
272
65
Table No. Classification of losses
278
66
Table No. Phases of TPM Implementation
280
67
Table No. TPM Master Planning
282
68
Table No. Management of Kaizen Theme
288
69
Table No. Workshop Equipment (plant Repair & Maintenance)
312
69A
Table No. Sample Overall equipment efficiency Measurement Sheet
316
69B
Table No. Daily CLIT (Cleaning, Lubrication, Inspection and Tightening
318
70 Sheet)
Table No. TPM Action Plan
320
71
Table No. Machine maintenance breakdown records
322
72
Table No. Preventive/ Schedule Maintenance
323
73
Table No. Maintenance Workman Skill Sheet
323
74
Table No. Spare Parts Criticality Assessment
325
75
Table No. Spare Parts Criticality Assessment: Sample Zipper M/c
327
76
Table No. List of Critical Electrical Spare
320
77
Table No. FUGUAI CHART
330
78
Table No. Proposed Recording Process of the Workshop Logbook
331
78A
Table No. Daily Machine Check Sheet
332
79
In any manufacturing and production system, the heart is their workplace and shop-floor. It is center of creation
of maximum items in the world for human necessities, by the means of utilization of science, technology,
techniques, engineering, innovation, intelligence, research & development and new methods. Modern center of
Trade and commerce also depends on best production system and techniques. One country’s development in 21st
century depends on best production techniques, technology, innovation with competitiveness and efficiency.
An efficient production system, is a method for producing low cost and competitive products for domestic and
international market & for all customers. Almost all country’s maximum contribution of GDP depends on their
manufacturing industries with its’ associated trade and commerce. Production is the core economic activities for
the both developed and developing countries for its’ backward & forward linkages with all other industries. It
contributes a country through money velocity, more boost in trade, infrastructure, people’s standard of living,
foreign investment and country’s brand image & values in international market and economic forum.
Local inputs, resources
like Agri, Artisans,
infrastructure
Engagement of
educated person.
Manufacturi
mg
Country GDP
and
Developmen
Country’s economy, GDP and earning depends on their best production system. Big economies in Asia, like
Singapore, Japan, south Korea, Taiwan and China have the efficient, qualitative products with competitive price
and production system in automobile, electronics, computer hardware and all other customized goods and
services. They have developed their countries manufacturing policies on the small, medium and large industries
separately aiming at cost, quality, delivery and services.
The fundamentals of efficient production, are the efficient utilization of raw materials or all inputs, technology
with techniques and methods. Various production system has advanced their technologies, many have efficient
methods, many are depending on manual working, space, processing, craftsmanship etc., so, the efficient
production system produced with time optimization, minimum losses, optimizes their utilization of resources
and drive the system as per the customers, market and business.
Optimum utilization of each factors is the indicators in the efficient production system. The goal of writing this
book is how to create efficiency through optimum utilization X factors in production.
Manufacturing and production started in the 1ft Industrial Revolution, as a transformation & conversion of raw
materials to finished goods with the human efforts. Now, almost all human necessities are fulfilled by production
processes though new discoveries and innovations and for more customer attraction in organized sector.
Economic development in any country in the world depends on the best production system for increasing the
trade volume with effective business processes, creating the technical and technology prospects, new dimension
of research & development and employment patterns.
The trends from 1st Industrial Revolution to modern production, classified into Four Industrial Revolutions,
Industry 1.0 to 4.0. It evolves as per the process, techniques and technology of production. These natural trends
of improvements occur due to improvement in challenges on productivity, quality and technology.
It is a vision to fulfill the target for better production in creation and satisfaction of the expectations of its users
and customers, to comply the demand of their citizens, families, society, countries and throughout the globe.
Modern civilization depends on the best adopted production system for making the necessities of human
comfort.
As an example, it has 33.4% of India’s production, out of these, around 126 are MSME associations (World Bank
report). There are varieties of output and services provided by SMEs in various clusters at various states and
districts. The specialty of SMEs is Mannual, Semi-automatic, Automatic production system. With various
constrains and challenges in SMEs, these are investment & finance, technology & techniques, knowledge &
entrepreneurship, production wastages, infrastructure, seasonal inputs, market & raw materials, marketing for
domestic and internal customers and business promotion etc. However, units are always faced obstacles in the
price, quality, delivery and environment affects. In SACs (South Asian Countries) there are obstacles in some
regions, due to lack of basic infrastructure to set up SME units and to send their products to the nearest local
markets.
Many SMEs are developed on the basis of locally inputs & resources, initiated by local peoples, local skills &
craftmanship, processing and packaging of GI (Geographical Identification) items, which generates the
continuous local employment where migration of local people to the nearest city is a problem. SMEs in SACs,
which becoming more competitive mostly in labor-intensive industries, creates an employment opportunity
through Agri-based units with the concept of SFAC (Small Farmers Argo-business Consortium) in India which is
based on local self-help groups as per local produce and government support with finance and infrastructure.
Also in developing countries, with agriculture produce and natural resources, SMEs playing a major role for
employment, utilization of local produce to make agriculture more profitable & commercial (one example,
Maubva in Gujarat based on onion & garlic processing cluster, one decade back no one imagined it), contribution
to the GDPs and restrict the bulk migration of villagers to various town and cities.
Nixnbvr oF ► .....ml MXMI Formal Woman Annual Formal Nai Jobi
Flnjhnc* Gup M&ME Famine* Gap H®uulr»d from 2017-2030—
(OiHlont) <DlHk?n»| ( rzn
1 .T >*•
Diihon TrMIkHi CSI.U U
I -
• Mr m nV
•MWkrca
1
•* •*• >•-*
■
In the revolutions in industries, through Industry 4.0, the Fourth Industrial Revolution entails the digitalization.
It is in the factory processes, production, and service industries, that all have developing more effectively with
the advent of powerful computers, cloud computing, the Industrial Internet of Things (IIoT), data analytics,
robotics, artificial intelligence, and machine learning, with considering as per the factor of cost efficiency &
market orientation.
Importance of Efficiency
Reduction in the wastage resources
Optimization, i.e. optimum utilization of resources is the economic efficiency, which results to best serve
for an economy and GDP
Better control on price for generating new market with expansion
Operational efficiency, is a measure on, how well the factory converts operations into financial benefit
Operational efficiency
On business context, operational efficiency measures on, how much costs are incurred during a given economic
or financial activity, where lower the costs equal greater efficiency. Operational efficiency is the competency of
an enterprise to deliver products or services to its customers in the most cost-effective manner. It is only
possible, while still ensuring the higher quality of its products, service and support. From the end of investors
and traders, markets reflect the operational efficiency when and where transaction costs are low.
Moreover, increasing in productivity may leads to more efficiency. When the production process gets
strengthened by better selling, more investments, it elevates the production rate. These might be executed
through introduction of automated equipment, improving logistics, acquiring more skilled laborers, and
implementing Lean production methodologies etc. If the line moves and improved faster, the productivity also
moves upwards.
Efficiency
The productivity was more focused on increasing the quantity which are being manufactured,
and efficiency refers to the quality, cost, wastage and effectiveness of the work executed. The efficiency
definition is ‘the ability to do something or produce something without wasting materials, time, machinery
performance and money’ etc. It means that efficiency is often expressed by a percentage, with 100% being the
ideal target with maximum efficiency.
To gain production efficiency, plant need to produce more output with the same amount of time and other
constraints, to pick the right set of performance indicators that will help to do, depending on where are the plant
running on the productivity in the efficiency journey.
There are various ways to enhance efficiency that also boost productivity, investing in improvements in the
production lines and those are value added for it. In the coming chapters, it will reflect with the various tools and
techniques.
Factors contributing to organizational efficiency
Efficiency includes the following areas;
Manpower – Competency, involvement, skills, innovations etc.
Management/ Leadership – Best utilization of resources and monitoring the performance for efficiency through
Effectiveness
System & Process – Efficiently utilization of the resources / inputs, cultures, customers,
Plant and Machinery – Cost, production efficiency - OEE, output, delivery, technology and operations
Tools and Techniques – Improvement techniques, test & measurement, analysis, minimization of wastages,
continuation of the highest system efficiency.
As per the expert description, the list of the most important production KPIs and metrics are as follows:
Production is a value addition by transforming the raw materials into finished products, for some purpose and
use. Finished outputs of a plant may be an input for others, intermediate and final products. All outputs should be
acceptable by next activities, operations or from customers. Value addition will be completed when outputs are
acceptable by the next process or final use.
Production have huge and long economic linkages, starting from the sources of raw material, value additions,
outputs, distribution channels, after sales services, banking, transportation, infrastructure etc. It involves many
people in directly and indirectly by generating employment, income, purchasing power, demand of other
materials, standard of living and overall economic development. So, aiming at the better impact on economic
linkages and value addition, any production ought to be efficient and effective.
of Local
Materials
h
Utilization Technology
and
Techniques
H Generating
employmen
incomeand
Purchasing
power
GDP
* Overall
economic
development * -
Standard of
living
Skills,
Competency
and
Professionalism
-improve menu
i n Science.
Technology
and
-'J-
Banking and
Finance
K Trade and
Commerce
h National
Reserve
The above-mentioned processes are combination of thermo-dynamics, casting, forming, welding, forging,
drawing with traditional & modern automatic techniques with applying the statistical & mathematical
calculation method.
When production system diversifies, so their techniques and processes also. There are millions of production
processes in the world and it is also increasing the day by day. One Technicians who are working in similar types
and categories of industries becomes more specialized in their production. In the competitive business world
same sectors are using different production process and techniques, it indicates the vast variations.
Change in production process is also important as per the product size & specifications, numbers, duration and
raw materials. More automation, leads less scope of flexibilities and more investment required. Detailed on are
discussed in next chapters.
Change in the manufacturing and production technology and techniques throughout the industrial revolutions;
1st Industrial
Revolution: 2nd industrial 3rd industrial 4th industrial
Revolution:
Steam and Revolution: Revolution: IT
combustion Electric Engine System IndustryA.O,
Automation
engine
Figure 4: Progress of Industrial Revolutions
The significant difference between Manufacturing and Production is that, manufacturing is the process in
which raw material is converted into the tangible products, whereas, the production creates utility as is the
process in which article or items is made for the purpose of the consumption or for customers by combining the
different resources. In manufacturing engineering, it talks about various process of production an object, but
production engineering talks about various features of production from manufacturing to planning to the entire
setup and arrangement of everything.
The area in a production facility, where assembly or production is carried out, either by an automated system or
by workers or a combination of both. The shop floor may include equipment, inventory and storage areas etc. In
any production plant, shop floor in the core areas of production with combination of man, machine, raw
materials, design, WIP, finished products. Internal human motion, therblig, work place layout, flow & position of
the materials etc. are the important points in the shop floor design.
There are various techniques invented and tested, which are later applied and practiced in the industries such as
Industrial Engineering throughput times, motions of operations with balancing of each operations. Developed
techniques are Lean manufacturing techniques for reduction in wastages, Six Sigma for monitoring and
improvement, Total quality for organization excellence, Total productive maintenance for machinery & plant
performance and Industry 4.0 for digitization & automation.
These interventions connected to the great gurus in the world, with their contribution in the industry and towards
business & commerce. Deming, Masaki mai, Ishikawa, Juran, Scott Sink, F W Taylor, F & L Gilbreth, Philip
Crosby, Shigeo Shingo, Malcom Baldridge are the industry respected gurus connected in the areas of
organization excellence, quality, continuous improvement, quick changeover for operators, productivity, business
excellence etc.
Many large industries developed their own organization technical and strategic work culture with internal
standards, like maximum automobile giants developed for them, and also for their supplier, equipment
providers.
The primary purpose of this book, is to develop the combination techniques and methods, to help factories for
reduction in cost, competitiveness and to contribute their own countries’ GDP.
Internal challenges of manufacturing industries always on non-optimum utilization resources, which depends on
system efficiency with process & techniques adopted in the plant, with better control & monitoring system,
comparatively more downtime, low efficiency, dearth of skills and competencies, business planning &
regulations, and product diversifications etc.
External challenges related low customer responsiveness, market threat, increasing cost of resources with
diminishing return, volatile market, risk and insecurity etc.
Dearth of Skillsand
Uncontrolled Downtime
incompetency in workforce
Aggravating To
I
Lesser profit Margins
J
Loss in Market Share
-» LowRoI
If the challenges of industry could be categorized as per the challenge from perspective of owners, stakeholders
and management, it will be the business, market & product threat, price and competition. Top level in the
organization faced the business challenges all times, from the investment to finance, government and country
regulations, decision for diversifications, market penetration etc. Strategy is the most import part on which
survival and progress in the organization depends.
Next challenges forced towards supervisors and managers, which are performance, efficiency, optimum
utilization of resources etc. These are internal challenges, overcoming these makes the plant better and
competitive. Challenges are how to make plant competitive to world class on the basis of cost benefit, which
only be possible when workplace will be more productive and efficient.
There should be encouraged people with engagement, technically productive and creative in the shop floor. The
major challenges for internal efficiency are make production system most effective, generate competent
employees and always make the plant Lean. Cost and quality are the chronic challenges for plant to survive in
the industry. The industry observation is that, requirements of technical training for the plant, needs to be
prioritized with primarily aiming at skills and competency.
E. Deming theory is most applicable to confront these challenges, who developed 14 key principles for
management for transforming business to effective business. Create consistency of purpose toward improvement
of product and service, with the aim to become more competitive and stay in business, and to provide
employment. It is important to adopt this philosophy in the new economic age. His most used method is PDCA
(Plan, do, check and act) or PDSA (Plan, do, study and act) for continuous improvement
Developed country’s most prevalent business excellence model developed by Malcom Baldrige. His performance
excellence criteria are a framework for organization to explore for improvement in overall performance. Seven
categories make up the best USA business award criteria: starts from strategic planning to personal learning, to
know how the organization sets strategic directions and governs the key action plans.
These Gaps stated in this chapter on SMEs, are developed after the visits of the units in various Asian countries
for their improvement, assessment, productivity, improvement and Lean implementation etc. It is not only
observed, but discussed repeatedly with owners, sr. individuals, supervisors and workers of the concerned units
with predesigned blank format of data and check list for their valuable inputs. Analyzed their existing data,
forms, records etc., of the unit after visit and made these gap and on the basis of gaps as an action plan,
developed for various cluster for proper planning and monitoring of the lean manufacturing and productivity
problems.
The mentioned gaps of the units as a whole, and these are existing in a range of 20-80% according the various
types, locations and counties of the units, with their production and service facilities. Unit owners and
stakeholders should take it a stern threat for their units and take preventive action on it as a priority to eradicate
it.
Wastages
Units have major Wastages in the areas due to the following reasons;
1) Time : Due to improper work-flow in the lines
2) Motion : Absence of standards in workplace and in layout
3) Transportation : Due to shop-floor layout problem
4) Scrap : Problem of identification and analysis of quality
5) Overproduction : Workers & supervisors knowledge gap
6) Over-processing : Also, for workers and supervisor’s knowledge gap
7) Defects : Quality planning problems
Scrap
In units, major scraps, happened in most of the units, piled up due to long term gap in decision on release and
removal problems. Supervisors and owners could not decide the existing scrap on use or not. So, absence of
confidence may be one of the root causes. But the internal Lean Team justified about the scrap as an unnecessary
item blocked the space in the shop floor and helps the units to remove it, with Technical assessment.
Customers
In the units and in SME clusters, the units have differentiated products with different level and graded
customers. Most of the units, supervisors and workers are not aware about the customers’ detailed specifications
(now SMEs are careful on it), criticality in their requirements & demand. The awareness among the workers and
supervisors should be that, they at-least concern about customers’ feedback on their output & effort and know
the importance of the customers support & encouragement to them. The ultimate goal of their working is to
satisfy the customers through the conciseness and awareness about the customers with quality and delivery of
their products and services.
Units should develop and use of production parameters, ratio analysis and suitable measurements for controlling
for production, price, quality and delivery.
CHAPTER - II
This Model is a guideline on areas of planning, implementation, practice and improve production system
competitive and smart to convince and attract the international customers. How the Indian SMEs should develop
entrepreneurship on various techniques & technology, production and process, with better business promotion
with techniques.
This model also follows the Vision of zero defects and Theories of Edward Deming, Scott Sink, Masaki Mai,
Ishikawa and Business Excellence of Malcom Baldridge with the techniques Lean-Six Sigma, TQM & TPM etc.
This also caters the Smart Business Process, Smart Technology and Techniques with Smart Solutions in problems
& working in the SMEs. This is the first model developed focusing on the Indian Industries’ efficiency and
competitiveness.
The purpose of defining, is to provide a technical support to SMEs, who are many times searching for the
improvement techniques and methods for their plant & small production set ups. This is very low cost but
extensive coverage which required minimum support from experts. SMEs might use these techniques for their
self-learning and implementation for sustainable growth and improvement.
Global small businesses could follow the initial easy areas of productivity and quality techniques for
improvement and follow the rest techniques for next levels. Explanations on techniques are defined in various
chapters, which will help the SMEs to understand through self-learning the techniques as described in this
prototype.
Recommendation on Productivity
1. Revision in system & processes with reengineering approach as per the client’s/ customer’s requirement
2. Balancing the minimum and higher level of technical interventions
3. It encouraged both Team and individual excellencies
Lean Six-Sigma
1. Balancing of Lean and Six Sigma measurement techniques
2. Cost saving techniques on material, process time, energy, inventory, rework etc.
Sustainability
1. With SoPs, Formats, Check points etc. for C&M
2. It is a forward-looking model with continuous improvement in healing approach
IMPROVEMENT MODEL
ProgreM
Fintfout
Panning Factor/ to
Smart MTg.
f-
£iSi
Techniques
Organized Data on
; Production, Time and Delivery |
Collection of D a t e
M / c Utilization a n Quality - Rework
Demand
and
Purchasin
g Power
Catalyst
for Earning
improvem
ent
Importanc
e of
Customer
in
Business
Defines Values for
your
the Products
Quality Services
Centrefor
Business
The concept of Quality Function Deployment (QFD), first developed in Japan on 1972 by Yoji Akao and Shigeru
Mizuno to design customer satisfaction into a service offering before it is produced while working for
Mitsubishi's shipyard and later it was adopted by other companies including Toyota and its supply chain. It is a
structured methodology and use mathematical tool to identify and quantify customers' requirements and
translate them into the key critical parameters. It is a systematic way of obtaining information and analysing
with objective of shortening product development cycle, combines with several types of matrices into one to
form a house-like structure. Make the product & service planning on customer driven, for easy, safe and
comfortable product and to translate the ‘fuzzy’ requirements into quantitative service design requirements are
the content.
The objective is reaching the customers with the efficiency & product excellences for long term business
planning with big investment, to be market dominated industry and for competitive advantage.
Product and Quality developed with internal efficiency, and for external factors like strategy according the focus
in market places – domestic and international, country strategy on production and customer access for MSMEs,
is the prime areas.
Interventions of
Improvement
Techniques and
Human Intelligence techniques. Skills.
Innovation,
Creativity. Leaning
Process Modification
a n d Reengineering
When Productivity improves, plants also scores in the level of efficiency. There are other initiatives for
improving the productivity and efficiency, described in below figure;
Productivity improvement
through quality improvement
Productionand manpowernorms Productivity
for saving in operational cost and i.e. defects reduction
improvement through
increase in productivity M/c efficiency &
utilizationtime
Apply PDCA
Cycle
RESOURCES
Te Techniques
Inputs ncilog Manpower Plant Capital Energy and Time
Management
-------Raw price and
Material Machines Skills Layoyt Fixed
Tnokr-nnd
— World n Equipmen
InLSTiig'enc
Working
Progress
■Semr-tinished
Goods
Utilization of resources
Enhancement of productivity dependent on utilization of resources. When all other resources remain constant,
time is the major factor for calculation of productivity. In a same production line and machine, productivity will
increase with more output produced in less time.
2.12 Combination of Technology and Techniques in the manufacturing Industry
Manufacturing and production efficiency are based on technology and techniques, and total technological
interventions in various industries also depends on various combinations technologies for their products.
Semi- Mannualwith
SMEs automatic Machine
Process operations/
processes
Capital Intensive
Industry R a n g e f r o m Mix of
Medium Mannual and
Automation.
higher Techniques
Mostly
Large
Goldratt in the book, Theory of Constraints, outlines a five-step process to applying the theory:
1. Identify the process' constraints
2. Decide the best to exploit the process constraints
3. Subsidiary everything else to the above decisions
4. Evaluate the process constraints
5. Remove the constraint and re-evaluate the process
The Relational integrity constraint is the rule/ way that enforces basic and fundamental information-
based constraints. Relational integrity constraint is used to ensure accuracy and consistency of data in
a relational database. Such a grouping uses the relational model (a technical term for this plan).
Relational Constraints in Database Management System (DBMS) are the constraints imposed to ensure database
correctness. Types and categories of constraints in DBMS are Domain Integrity Constraint, Referential
Integrity Constraint, Tuple Uniqueness Constraint, Key Constraint, Entity Integrity Constraint.
F SME corner
SMEs may comprehend their business challenges from their country, industry and from business
reports from local and global business associations. Critically, find out the unit's gap as per the
challenges, make a team for workplace-based capacity improvement. Estimate the output yield
rate, raw materials wastages with other resource wastages. Technology could not be changed
every day of in short period, so that, techniques is most important. Comprehend the constrains
to access the customers, avoid to miss-out customers with a wrong delivery or any decision
intended for more profit or cost over-shooting production batch.
Measure your production capacity with time utilization, plan for technology in long term and
make your plant easier and more comprehensive.
A Traditional shop floor could earn good profit or may be profitable for its monopoly or unique products,
innovated processes, but it may not be an efficient shop floor and plant, which could earn more and even may
increase profit through becoming the organized plant. Sometimes, management missed these points to focus and
to overcome it.
Use of technology and implementing the various techniques, a traditional plant could be improved as an efficient
plant. Various traditional plants become organized for the competitiveness in the domestic and international
market to better accomplish the customers’ demand with enterprising capability.
Due to various other business focus, most of the MSMEs have traditional shop floor which are struggling in the
competition. Comparatively improved plant means more productivity with Quality. These are essential to
improve and investment on productivity and quality following are obligatory areas to prioritize;
F i n d o u t Existing
System
Reduction in wastages of
Conducted underand overcapacity of
sections
Inhouse and External
Operations
Man. M/cs and Plant
Util iIizatio ns
Controlled and uncontrolled
operations
Figure 17: Existing study for estimation of the plant and processes
3.3 Study on existing plant & processes
Study of the plant means, critically and periodically measure, analyse and realize the production floors, and
understand the plant, where the deficiencies to be reduced. When supervisors and managers daily visits and
observe the same plant, the possibility to accustomed in the existing arrangements. So, it is always difficult to
look at your plant with new eye and fresh mind. To understand the abnormality and deficiencies, the knowledge
on production, technology, machine, efficiency and utilization is essential. Every alternative year plant should be
verified, analysed and studied by internal trained manpower or by external expert.
Various organizations and progressive groups, developed the check points for their vendor organizations like
TATA, Eicher, Japanese and Korean Automobiles for providing best quality for their customers. These check
points applied to identify the deficiencies and upgrading them. Organizations who want to improve their level of
operating standards could use the self-assessment table to audit their plant and production system.
MSME should realize about the significance of data, records and documents. In the present industrial era, there
are new concept arises on Big data with analytics through digitization. But for traditional industries, so far, the
data collection is not prioritised in daily activities. What company realised the vital data means the records &
documents on finance, administration, materials purchase and some areas of cost only. The mindset on data
preservation are that, it is time consuming, extra workload, no value addition in the plant, extra cost of
manpower, and sometimes lack of knowledge which are the primary areas for lagging in data and information.
Even identification of are not developed, which are the secondary data & analysed data, source of secondary
data, data verification and how the data could be utilized in the decision making.
For any day to day work, like managerial & supervision, major decisions, planning, assessment, customers
problems & complains, any plant accidents and losses, failures, cost, benefit, profit, self-assessment etc., it
should be data driven. Any major decision and action based on experience, on chance and suggestions without
facts and reality, may not ensure the achievement on target like delivery and profit. Any such decision, have
limited chance of success and sometimes it leads to wastage also.
During the various study and analysis, it is observed that most of the companies in the similar industries have
lack of planning on data collection. They are lacking in preparing the list of required data, formats, Log books,
standardise the sources of primary data etc., to understand, control and monitor of the plant, and activities at
glance in monthly or yearly, other than financial data and other than ISO compliances.
There are several types of organized data and recoding process which observed in industry, at a glance is
mentioned herewith for the better comprehension;
Types of Data
When an organization grows continuously to become a market leader, data also becoming more and more vital to
Lead, control and monitor. The types of data are important from the analysis, and various data have their
different analysis processes. Now a day’s data analysis is used through various analytics. Following are the types
of data in statistics.
Types of Data
Discrete Continuous
Documentations
Machine a n d
Production Equipments Quality Admii Accounts
RunningTime reuucuori in
Manpower, Availability, Wastages a n d Salary. R e t e n t i o n , P r o f i t , Financial
Output, Delive P e r f o r m a n c e etc. Customer Remuneration Result etc.
Productivity e i Satisfaction
Records and data are now collected in large organization through on line by SCADA (Supervisory control and
data acquisition), a computer system for gathering and analyzing real time data, manufacturer of machine now a
days installs, Control Panel - PLC Panels, CNCs, Control Panels, Automatic Power Factor Improvement Panel
and PLC Control Panel etc.
Production
Controlling a n d
Other MIS Documents
Supportin for
g Areas Quality
Manufacturing
Industry
Maintenance
Primary Data
Secondary Data Result /
At used For Analysis Performance Data
The Source
1. Production
2. Quality
3. Maintenance
4. Planning
5. Marketing
6. Finance
7. Dispatch
8. Figure 21: Types Data as per the collection of information Services
9. Corporate and Plant’s Overall MIS etc.
In-house Charts (control & improvement) – Quality, OEE, Productivity, Improvement and study data etc.
Table No. 4: Department-wise controlled documents
Frequency / Daily/
Sr. Departments / Name of the Code/ Purpose with
Weekly/ Monthly/
No. Sections Formats Ref. No. Data
Yearly
Types of Formats
Work in progress Documents
Quality formats
1) Online Quality, to identify online rejection, in M/c-wise and/ or product-wise
Use of Trend and Run Chart/ Control Chart etc.
2) Offline Quality;
Inspection Process
Customer Return
Rework items
Final Inspection/ Customer’s Quality, As per the Customer Defined Specifications - Formats
Required synchronization
Software with Product Code
Job Card
Mannual Coding etc.
Production Format
1) Productivity Related Formats
2) Manpower Productivity
3) As Per Production Norms
i) i)
Machine Performance
Product / Outputi) Machine Utilization/
Quality / Defects Availity
and Availability
ii) Product-wise M/c OEE
ii) Relate to Customers’ii) Shift-wise m/c or
Feedback equipment Performance
Random
|H Place
Checking |l Feedback I
Improvenoent
Machine-wiseB Customers B
Planning
W c- wise
At W o r k Quality P roductivil
Output
Place Feedback
Product- Corrective M an p o w e d
wise Action Utilization
W i t h Job Innovation
Sustainability J Kaizen
Card
Maintenance
P r o d u c t - w i s e - Wc
Maintenance
Information
RecordsAction
lypesoi
Maintenance with M/c P e r f o r m a n c e
Procedures a n d Monitoring
Practices. S c h e d u l e .
DEE I m p r o v e m e n t
Wc P e r f o r m a n c e s
Verification
Check Sr. Assessment / Scoring scale & Points / Scores Assessor’s
Score
Points No. Measure guidance Documents Awarded Remarks
(a)
No Visual Board
1 0
is observed
Visual Board
exists, but without
2 1 Updated
Documents and
Records
Visual Board
exists, but with
1 3 Visual Control 2 limited
Documents and
Records
Visual Board with
4 3 Documents and
Records
Visual Board with
Updated
5 4
Documents and
Records
No proper
identification and
6 0
Not managed
with any standard
Some tags/ check
points seen,
7 1 identifying the
material in bins
/trolleys.
Proper tagging
with different
8 2
colour codes
exists
Route cards, with
9 3 proper tags and
check sheets
Materials as per
Identification of the Process Flow
2 in process is identified w.r.t.
material Challan / ID
numbers, job
10 4
cards etc. and
Inspection status
is evident, signed
by internal
inspection
Good system to
identify Work in
Process (WIP) at
various stages as
Under Inspection,
11 5 Re-work,
Rejected,
Accepted.
Traceability is
observable in the
plant
3 12 Continuous 0 No Concept of
Improvement Improvement
Techniques Techniques
adopted in the
plant
Concept of
Improvement
13 1 Techniques
nobody
participated
Very Limited
Participation of
14 2
employees and
workmen
Participation but
Limited
15 3 Implementation
of Plan &
suggestions
Participation but
Implementation
16 4 of Plan &
suggestions in
Limited areas
Employee
Participation with
Implementation
17 5
of Plan &
suggestions with
Benefits
Premises & shop
Floor are not
clean and not
18 0
disciplined in
handling the
Wastages
Plant and Only
office area clean
but no discipline
19 1 in wastage
handling and
wastage reduction
concept
Only important
machines kept
clean and few
people are aware
20 2
on wastage
handling and
wastage reduction
concept
Only gangways
Cleanliness,
kept clean, most
discipline and
4 machines not
Wastage
maintained in a
awareness
21 3 clean state and
limited wastage
handling and
wastage reduction
started
Only selected
areas on shop
floor and office
22 4 clean and wastage
handling and
wastage reduction
started
Entire premises
including
workshops clean/
green exercise, 5S
and wastage
23 5
handling and
wastage reduction
started with
benefits
calculation
5 24 Maintenance 0 Only breakdown
system, TPM maintenance is
and OEE carried out and
not any OEE
Concept
Maintenance
schedules do not
exist but some
amount of
25 1 preventive
maintenance
activity is evident
and not any OEE
Concept
Maintenance
covers only
critical
equipment, and
26 2 maintenance
schedules are not
rigidly followed
and only aware of
M/c Performance
As above, but
maintenance
schedules are
followed. Stock is
maintained for
27 3
critical spares,
know OEE
Concept and
Uptime of equip >
80%
System in place
for PM of all
equipment and
schedules
followed. Critical
spare stock
28 4 maintained,
uptime> 80% and
OEE is above
50% as per the
types of Industry
with TPM Started
to implement
System in place
for Productive
Maintenance of
all equipment
including
predictive
maintenance. Rest
29 5
same as above.
Uptime>80% and
OEE is above
70% as per the
types of Industry
with TPM
implemented
6 Tools, Machines There is no
and other system to
Manufacturing maintain the
30 / Production 0 production tools,
facilities Equipment and
M/c List with
History
31 1 Only corrective
actions are taken
whenever
problem is
encountered, no
presence of
planned activity
and Equipment
and M/c List with
History cards are
available to
limited areas
System is under
development,
however such
tools & check-
points are
inspected before
32 2 start of
production and
Equipment and
M/c List with
History cards are
available in the
Plant
First piece and
last piece reports
are made, acted
up on before start
of production and
33 3
New Equipment
and M/c
Modernization
under
consideration
System of such
tooling and M/c
in the pant with
34 4 proper inspection
are started with
Process SoPs are
made
M/cs in the plant
with proper
inspection with
Utilization are
recording and
inhouse Benefits
35 5 of New
Technology are
established linked
with market
demand and
customer
feedback
7 Productivity Internal rejection
and Quality levels are not
36 status 0 tracked, No
system for PPM
analysis
Level of internal
rejection target is
recorded with
37 1
PPM level and
Productivity is
counting
Level of internal
rejection is
reducing of
38 2
various sections
and M/cs and it is
recorded
Analysis on the
Reduction of
Rejection/
39 3
Rework / Repair
started by making
QC Teams
40 4 Analysis on the
Reduction of
Rejection/
Rework / Repair
started by making
QC Teams with
RC Analysis &
7QC Tools
Analysis on the
Reduction of
Rejection/
Rework / Repair
started by making
QC Teams with
41 5
RC Analysis &
7QC Tools,
benefits are
received in
Productivity and
Quality
8 Records for Records and
Productivity, Formats are not
42 0
Quality and made, available
incoming and/ or used
materials Records and
Formats are
made, available
and used only for
43 1
rejections /
Rework / Repair
and no corrective
action is available
Records and
Formats are
made, available
and used only for
rejections /
44 2
Rework / Repair
and materials
wastages
recordings and
CAPA started
Records and
Formats are
made, available
and used only for
rejections /
45 3 Rework / Repair,
Productivity and
materials
wastages
recordings and
CAPA started
Records and
Formats are
made, available
and used only for
rejections /
Rework / Repair,
Productivity and
46 4 materials
wastages
recordings and
CAPA started as
per feedback
given for
variations
sources/ section
47 5 Records and
Formats are made
on 7 wastages &
rejections /
Rework / Repair,
Productivity,
materials
wastages are
reducing and
CAPA benefited
as per feedback
given for
variations
sources/ section
Plant has not
planned in
48 0 Delivery and
controlling,
unaware of this
Delivery is
Planned as per the
49 1
Production Time
and Takt Time
70% Delivery are
50 2
conforming
Productivity Team
Availability of are made for
9
Control System Analysis and
51 3
Corrective Action
on Delay in
Delivery
Productivity and
52 4 Delivery
controlling stated
On Time Delivery
is 95% and Total
(Internal +
53 5
External)
Rejection is less
than 5%
No Process and
Section-wise
Work instructions
and safety check
54 0 points exists and
observed, of such
instructions not
made or
displayed
Work instructions
(WI) are made for
some selected
55 1 areas &
processes; but not
aware to follow
these
Work instructions
are making and
56 2
safety norms are
displayed
Review and
Work
Verifications of
Instructions,
10 57 3 Work instructions
safety and
and safety norms
other facilities
are displayed
It reviewed
periodically;
58 4 operators are
trained & plan is
followed
WIs are displayed
at work place are
reviewed
periodically and
being followed,
House Keeping
and safety in
59 5 specially in
processing plant,
Wastage
management/
Extract Effluent,
chemical
treatment facilities
are made
11 60 Method of 0 No Planning is
implementing developed to
engineering adopt these
changes in systems and has
production and no management
communication initiatives
No documented
system planned,
developed and
informs to the
61 1 shop floor when it
requires as per the
production / new
products and
alteration
Manufacturer/
production shop
floor is in the
process of
establishing this
62 2 system, has kept
management
informed in
writing about any
process and
operation changes
Process Planning
implemented but
result not
calculated with
success / failure
63 3
communicated to
the management
or management
have initiative in
these areas
System
implemented and
success rate are
increasing and if
manufacturer is
64 4
an OEM / supplier
all improvements
are
communicated to
Client
Process,
Operation and
System of
monitoring are in
place, 100%
communication
65 5
exists with
Original
Manufacturer /
Client while
implementing any
change
12 Management No Check points
of Quality and no audits
66 0
were developed
or planned
Check points and
67 1 audits are missed
to verify
Proper follow up
of check points
68 2
and audits are not
conducted
Proper follow up
of check points
69 3
and audits are
conducted
70 4 Check points and
audits are
conducted and
modified as per
the changes
All Check points
and audits are
conducted and
71 5 modified as per
the changes, and
the scheduled
audits taken place
13 Manufacturer No Time analysis
involves Client and Takt Time on
Orders in the Customers’
change of orders, No Time
72 0
process of Operations,
balancing of
operations are
developed.
Reengineering,
Training,
Delivery / time
study / M/c &
Manpower Times,
73 1 balancing of
operations are
started. Failure
Mode Effective
Analysis (FMEA)
is not in practice
Delivery duration,
standard
operation time,
M/c & Manpower
Times and
balancing of
operations are
74 2 followed in the
plant. Failure
Mode Effective
Analysis (FMEA)
with high Risk
Priority Number
(RPN) training
started
Delivery Time
Improved after
implementation of
standard
operation times,
OTIF – On Time
75 3
in Full concept
started. FMEA
with high Risk
Priority Number
(RPN) training
started
All Delivery Time
Improved after
implementation of
standard
operation times,
OTIF – On Time
76 4
in Full concept
started. FMEA
with RPN training
completed and
connected with
C&M in the Plant
77 5 Reengineering,
Training,
Delivery / time
study / M/c &
Manpower Times,
balancing of
operations are
developed &
continued in the
plant. (FMEA) is
started and
reviewed for high
Risk Priority
Number (RPN),
Process qualified
& operators are
trained
No Control and
Monitoring
(C&M) exist and
No process of
78 0
quality and
productivity
monitoring is
carried out
Recording
process are
developed for
79 1 C&M in many
areas, but not
followed for more
than one key area
C&M records
started but
verifications not
completed and
Formats are not
80 2
standardised and
operators/
supervisors
training, not
Implementation adequate
of controlling C&M records
14 and monitoring started,
system on shop verifications are
floor completed and
Formats are
81 3
standardising and
operators/
supervisors
training started,
but not adequate
C&M records
started,
verifications are
completed and
Formats are
82 4
standardising and
operator/
supervisors
training
completed
Monthly C&M
records
completed with
analysis & actions
83 5
on week areas of
performance,
retraining
continues
15 Quality Organized
Assurance and inspection and
inspection and Assurance
84 0
approval process not
process started or
observed
85 1 Organized
inspection and
Assurance
process started
and such
approval is given
occasionally
Assurance
process is started
or observed as
86 2 per the sections
and departments,
training and
orientation
Technical Process
Assurance is
started through
7QC, Run Chart
87 3
in the sections
and departments,
training and
orientation started
Technical Process
Assurance
process in the
88 4 sections and
departments
through QC
Teams and PDCA
Basis of TQM is
started with a
Planning after
implementation of
89 5
Assurance
process in the
sections and
departments
Materials/ Items
are not
identifiable in
90 0
various Work
stations &
Sections
Material
identification
system exists but
91 1 number of lapses
& missing are
observed /
encountered.
System
developed, but
such
identification
92 2
Materials loses its identity
Identification after issue to
for its status as production and
16 Under sections
Inspection, In developed
Accepted, system some
Rejected stores materials
93 3
and maintenance
are seen
unidentified
In developed
system it is
followed, but one
94 4
/two cases of non-
conformities and
mistakes occurs
System fully
developed with
Tags in material at
all locations and
95 5
mfg. stages with
customer
complain items in
plant
17 96 Effectiveness of 0 No problem-
Human solving skills /
Resources evidence and
development utilization of
and Optimum practice seen
Utilization. Calculation of
Problem utilization and
solving ability problem-solving
development techniques used
97 1 in isolation
without any
concerted
systematic back
up
Supplier is in the
process of
developing HR
98 2
plans of which
problem-solving
training is a part
Training on
problem solving
is a part of
99 3 Human Resource
planning, but not
yet initiated.
Check time plan
Training in
problem solving
is a part of
Human Resource
100 4
in the planning
but coverage is
<100%, (check
effectiveness)
Training in
problem solving
is a part of
Human Resource
101 5 planning and
imparted to all
employees,
effectiveness
observed
18 Customer No system 5
Driven Plant / evident and
complaint evidence of
handling clearance of
102 0
mechanism conformities
(QDF) given by Internal
& External
Customers
Informal system
to handle
customer
complaints as per
the voice of
customers with
Organized
Formats, OEM/
Plant Corrective
Action Report
103 1
(PCAR)/
corrective or
premeditative
actions not in
focus and non-
conformance
given by Internal
& External
Customers/
Auditors
104 2 Organized system
on development,
but informal
system is present
for handling
customer
complaints/
PCAR/ non-
conformance
given by
customers audit
are not cleared in
proper
Structured system
to handle
customer
complaint /
105 3
PCAR, but the
Corrective action
& completion is
not in place
Organized system
to handle
customer
complaint /
PCAR, the
Corrective action
& completion is
106 4
in place and
analysis started
with QDF
(Quality
Framework
Document)
techniques
Centralized
system to handle
customer
complaint /
PCAR, the
Corrective action
107 5 & completion is
in place, and
analysis started
with QDF
techniques and
implemented in
the plant
HACCP,
FSSAI, The Clauses and
Pollution process of various
19 108 Control 1 certifications are 10
Certificate for implemented and
special continued
processes
Plant applying
philosophy of
Lean Six Sigma,
Any Techniques to develop the
20 109 Lean and Six- 1 system as per 10
Sigma market and
customers’
feedback and
constraints
21 110 TOTAL
Sample: Monitoring MIS as per customer Delivery and section-wise work Flow
It Includes various types of formats and MIS for better controlling and monitoring of the plant & shop floor.
Table No. 18: Sample Plant Monthly Assessment MIS
•A *<■. D*j«
Table No. 19: Sample Monitoring MIS, one of the plant’s overall resource utilization and production
ij=B“
:sr
ig~
iSl,
KAciul Dntxfch ■
Annual i*»< Pan Tarpai
<KfMrtM| I ’<M|
I Good'|wipro«e«
pad < D«fe»*ed
SME corner
It is essential, SMEs do maintain and apply the principles the efficiency and make it aware to the
plant peoples. Train the supervisors or managers about how to conduct the instant requirement of
any small studies in the plant. Importance of keeping records and data, entire planning for total
data, primary collection points. What types of productivity and quality data required? List of all
Formats and who will be responsible the data collection.
Develop Record and Data preservation procedures, soft copy or printed copy, nos. of Files for
documentation, and Data analysis procedures. After initial starting of recording, verify the data
and keeping procedures, so that it would be useful.
Listing the nos. of MIS to be used for the plant. Design the plant MIS internally or take the help of
experienced person.
Self-assessment questions
European Productivity Agency (EPA) has defined productivity as, “Productivity is an attitude of mind. It is the
mentality of progress, of the constant improvements of that which exists. It is the certainty of being able to do
better today than yesterday and continuously. It is the constant adaptation of economic and social life to
changing conditions. It is the continual effort to apply new techniques and methods. It is the faith in progress.”
Frederick W. Taylor (1856-1915) was the first man in history who deemed for work assessment by systematic
observation and measurement. It developed the measurement of standard times; which also adjusted with
applicable allowances as per the International Labour Organization Norms, aiming at incessant effort from
workmen. There are other Techniques used in Industry that are MOST (Maynard Operation Sequence Technique)
Study, MTM (Methods-Time Measurement) etc.
Productivity could be improved through the installation of new Technology and interventions of Techniques or
combination of both. Purpose of productivity is profitability, efficiency, better price to the customers by
reduction in cost of production, competitiveness, capacity improvement, on-time delivery, produce customer’s
quality and reduction in non-value-added activities.
In Productivity, the critical input/s are usually considered as input for productivity calculation, for controlling its
impact. After selection of input, the output is measured against this input/s on considering that utilization of
other inputs or factors are remain constant. Most of the Manufacturing units encountered the challenges to
maximization of the production at the shop-floor for increasing the productivity, to deliver their products/
outputs in a competitive price for additional returns, or for more profit in same revenue on the basis of current
capacity and fixed resources.
Process of selection of the productivity improvement tools, depends on the types of industry and its’ products &
operations. The most predominant industry practices for the measurement of productivity is based on time of
production with assuming the other factors/ inputs remains constraint. About the major used Techniques of
Productivity Improvement (PI), which is propounded by various industry experts, are described in this chapter.
Industrial Engineering (IE) techniques, one of the methods of PI based on calculating the production or output
norms, norms of manpower deployment and balancing the times of operations. IE, which based on
manufacturing engineering, analytics and machine learning; also used for the sequence of multiple operations in
a line or combination of various machines & operations and its simultaneity of various operations at various
locations or in same plant and at various sections. IE use the techniques of ‘Works Study’ which consists of
Method Study and Work Measurement. Method study is a systematic recording and examination of the existing
activities, operations and processes; it is also consisting two techniques time study and motion study.
Productivity enhancement supports to motivate the workmen for better earning, create a work standard, develops
workplace culture and boost morale through creating an even better company atmosphere. There are various
factors affecting the productivity, foremost of them are technical, managerial, processing, production set up etc.
Process of selecting the productivity improvement tools, depends on the types of industry and its’ products &
operations. The most prevalent industry practice for the measurement of productivity is based on time of
production, assuming the other factors/ inputs remains constraint and the major used techniques of productivity
improvement (PI), which is developed by experts and used in the industry are described herewith.
Quality
Optimum
Jtilization of Time
Resources
Performance
Techniques
Overall
ficiency a n d
Capacity
Better, Control
and Monitoring
Productivity Overall Plant
Improvement Performance
I n s t a l l a t i o n of M e w
Mechanisedthe
H i g h S p e e d M/cs.
Operations
C A D , C A M , CIMS
Technology > 1
SCA D A . R o b o t i c s ,
lloT, C l o u d , L a y e r
Automization
Devices,Online
Pro d u ctivity An a ly ti cs
4.3 The Major available techniques for productivity & performance enhancement and their applicability
The most used techniques for productivity are a combination of many sub-techniques or tools. It is applied as per
the factory productions and use of technology; some specific techniques are described in the below table. which
are used for productivity & performance improvement;
trolled by plant
nagement and yuaiiLy, i i i JULb, ei i e i y y , t>cicc l i i ul
authorities techniques, c&m, managerial and leadership etc.
Additional and improved in productivity, have direct link with the income of people
Under increased productivity level, factory supports, enables to increase the income of the employee which
eventually enhance the purchasing power of the people
More income in the common person’s portfolio, always increases the purchasing power which directly
impact on demands of other industries
Spending on necessities and other areas like on cloths, luxury items, children educations etc., creates more
demand for horizontal and vertical linked industries
Improve in life standards, supports other industries to grow with more income to their engaged people,
which creates the demand of this industry, where the productivity is improved.
National saving
More productivity means better utilization of resources, it saves the resources of a country with reduction in
wastages. Japan is an example; country always plans to save the resources to be cost effective and for
internationally competitive. Resources are the treasure of a country, and outputs also a treasure, so more
productivity increases with lest use other treasures. Improved productivity is value creation for any country,
reflects in its GDP.
Productivity provides the efficient production, for cost effective products, better distribution system, provide
competitiveness in domestic and international market. It also has linked in industry and agriculture productivity
with country’s efficiency and advancement. It is one pathway to be a developed country, through growth in GDP.
As per the ILO, higher productivity provides ways for raising the standard of living by:
1. Larger supplies of both consumer goods and capital goods at lower cost and prices
2. Higher real earnings
3. Improvement in working conditions, e.g. by reduced working hours
4. In general, strengthening of the economic foundations of human well-being.
Government’s responsibility
Any country and its government can generate favorable conditions for promotion of productivity, these effective
areas are:
1. Country’s industry and productivity / manufacturing policy
2. Awareness and programs on industrial productivity, performance and economic development
3. Sector-based industrial planning on promotion
4. Balance on Technology and necessary steps to maintain employment
5. Make responsible industrial associations
6. Make opportunities for industry’s competitiveness through productivity.
Last point is specifically imperative for a developing country like India and SACs. Based on productivity, the
less developed countries could progress through country’s policy on industry, productivity and entrepreneurship.
Management’s responsibility
1. Managerial responsibility is the core factor for raising productivity in any organization
2. Design and implementation on organization’s productivity programs
3. Management creates a positive environment and obtain an amicable relation with the employees
4. Decision on Techniques and continuous improvement
5. Encourage and involve Trade unions its members to provide support and co-operation when the
productivity program is beneficial to workers, as well as the organization on the whole
6. Lead the organization through productivity for best utilization resources, for increasing productivity of
resources and more employee earning
7. Control and monitoring the operations, and supporting activities with techniques and processes
8. Effective technical decision on production processes, resource combinations and disciplined way to run
the factory relies on managerial proficiency.
Productivity of material
At the planning and design of material usage:
Improve yield rate and ensure the least consumption of material
Procurement of equipment and machines with cost effective and such that consumption of material
should be economical.
At Operation stage
Effective selection of correct process
On time completion of operations with right use of the process
Operator’s training for skills
Manage the flow, handling and storage of products at all stages
Manage of times with no delay and waiting time, reduce damages during transfer.
Productivity of Land, Machines and Manpower
Effective utilization supporting inputs / factors, like plant, Machineries and Manpower to maximize
productivity
Better utilization, resembles to cost reduction with productivity
Optimum Utilization of Manpower means to reduction in the cost of manpower
Proper Layout planning for Land/ plant productivity
More M/c availability with performance
Maximize output in a certain man-hour; machine-hours etc.
Although motion study evolved into a technique for improving work methods to reduce the times. These two
techniques integrated and improved into a widely accepted method which is applicable to the improvement and
upgrading of working system at the shop floor. This integrated approaches in the working system enhancement,
is known as methods engineering, and these are included and taught in the Industrial engineering techniques.
These concepts are applied today to industries as well as service organizations, including banks, schools,
hospitals and other essential sectors of public services.
The concept and identification of ‘Work content’ with ‘Ineffective Time’ and improvement techniques assists
on how to reduce the work content and ineffective times. As per the thought of ‘Work Study’ of ILO, the
objective is to formalize the concept of ‘time to produce one unit’, in a certain level of technology. One could
assume that, it is possible to define a theoretical minimum of such times, to which some additional and
ineffective times may get added, then approach of raising productivity could be looked as a drive for
approaching towards the theoretically minimum.
As per ILO, Basic work content is the irreducible minimum time theoretically required to produce one unit of
output.
Total Work Content = Basic Work Content + Excess time
Excess Time = Time due to defects in design or specification of the product + time, due to inefficient methods of
production or in operation.
As per ILO, Ineffective time is the time for which worker or machine or both are idle due to the shortcomings of
the management or the worker.
Production Time
Basic Operation Times of
the Work Contents
But, as described earlier, work study is used in the factories for measuring the standard times of operations.
Define and fixation of standard time follows a method which is described in this section and in next pages, which
descried in a sequence.
4.13 WORK STUDY
The definition of Works Study as mentioned in the British Standard glossary is as;
Work Study is generic term for those techniques, particularly, method study and work measurement, which are
used in the examination of human work in all its context, and which lead systematically to the investigation of all
factors which affect the efficiency and economy of the situation being reviewed, in order to effect improvement.
Work-study is the basis for work system design. This follows for improving the existing sequence of operations
and proposed ways of calculating & developing the works and establishing standard times of working, that would
be performed by operators or workmen.
Work-study is encompassed by two techniques, i.e., method study and work measurement.
The other definition as describes in the British Standard glossary (BS 3138) are as;
“Method study is the systematic recording and critical examination of existing and proposed ways of doing
work, as a means of developing and applying easier and more effective methods and reducing costs.”
“Work measurement is the application or techniques designed to establish the time for a qualified worker to
carry out a specified job at a defined level or performance.”
Works Study
The process is followed by the industries to develop the production and manpower norms, as per the feasibility/
& applicability in their plant:
Now a days, works study is used in the plant to develop the Norms of production and manpower with effective
utilization of times. In a labour intensive plant, works study is the most significant tool for productivity
improvement. Most developing countries are still labour intensive so far, due to earnestness in employment
generation in that country, growth in the per capita income, investment constraints, cheap labour, rural
employment, handicraft oriented and local input-based industries. Works study is an important technique to
apply to standardize the Hourly and daily output for better productivity in those countries.
Work study is a technique for enhancing the capacity and productivity of the factories through elimination of the
wasted times and balancing of operations. It is a technique to identify the non-value adding times, for detailed
identification of all the factors, that affecting the execution of working times & methods. It is the only method
started century before, for a true measurement, with a systematic procedure-oriented technique to establish the
operation times with a possible standardization. This study also contributes to the overall saving of human
efforts, labour costs, price and as the savings will incurring and continues in overall plant operations and
products. Method study and work measurement being a part of work study, still contributes to large industries for
developing these Norms.
4.15 Advantages of Work Study (WS)
Following are the advantages of work study:
1. WS helps better utilization of time and other resources
2. It is used for balancing of operations in the production flows and assembly lines
3. WS is the key to solve the interrupted flow of production
4. It helps the plant to develop the production norms as per the time, man and machines
5. Reduces waiting times due to unbalanced times in the shop floor
6. Helps to reduce the cost of the product & production, by eliminating waste and unnecessary operations
7. Assist for betterment of Production Planning and control
8. Improves worker-management relations
9. In improved productivity, factory fulfils in delivery commitment
10. Restores better working conditions
11. Develops better workplace layout
12. Improves and assist the plant by establishing the standardisation, control and simplification
13. Through WS, factories develop the standard time for the operations and jobs
14. It helps for manpower planning, production planning and for customer commitment
15. For Mannual Operations, WS is the key techniques for productivity improvement.
4.16 Principles of WS
As per the expert view, following are the principles of WS.
Method study concerned with the broad investigation and improvement of a shop floor, the layout & design of
equipment and machines and the movement of men and materials. Motion study is an analysis of the flow,
processing of materials and the movements of men & materials, at various work stations.
There are several processes in method study from breakdown an operation or process into the component
/elements, through systematic analysis. For carrying the method study, the right training and aptitude is
necessary. True practice of method study requires:
1. Understand about plant and procedures
2. Human factors
3. Result oriented approach
4. Production details of items, operations, scheduling, flow and sequences
5. Plant layout, materials movements, work stations and workmen etc.
4.18 Objectives of Method Study
As described in ILO, the objectives of method study are:
1. Improvement in the use of men, materials and machines
2. Improvement in process and procedure
3. Improvement in the design of the plant and equipment
4. Redevelopment and improvement of plant Layout
5. Better material handling, flow of operations, production and process
6. Economy of human efforts and reduction in unnecessary fatigues
7. Improvement in safety and better work environment.
Method study are applied successfully in the shop floor, helps in the areas:
1. Plant efficiency in work methods and procedures
2. Plant layout design with sequencing in doing the work, which is the best utilization of MS
3. Uninterrupted material flow at work stations and no congestions in the floor
4. Improve in the working conditions and possible increase in labour efficiency
5. Reduction in ineffective production time with the systematic reduction of unnecessary methods
6. Steps towards optimum plant utilisation and material utilisation
7. To some extent, it reduces the production cost.
Motion study is required for the best and economic method of doing the work by workmen with man and
machine by analyzing their motions. It is also scientific method of eliminating the unproductive motion in the
operations and processes. It is based on same systematic process of recording, analyze by expert, put into
practice with standards and develop the system for productivity. It is based on the techniques developed by
Gilbreth of 18 basic motions, therblig.
1. SELECT the problems, which are related to the studies and define the work and working areas
2. RECORD the facts relevant to the problems in the study areas
3. EXAMINE the facts critically without a bias and sequence of occurrence with the suitable techniques
applicable for the study
4. DEVELOP the most practical, economic and effective method considering to all depended & in-depended
facts and situations
5. DEFINE the new and alternatives methods, to be identifiable with economic & effective method
6. SELECT the best method as per decision making procedures with concerned functional areas and people, like
management, supervisors and workers
7. INSTALL, adapt the new method as a standard practice and create awareness, orientation and train to the
concerned people
8. MAINTAIN the new standard methods on regular and not go back to the previous situation and method.
It is very much easy to observe the method study, but difficult to develop and implement. It requires the in-depth
understanding and repeated practice.
1. Economic Aspects
Economic aspects depend on the cost and expenses with time. It is important from return from investment and
losses due to waste. The Money and time, which are involved in the production should be retuned on time. The
following are the considerate economic aspects for selecting a job for study:
i) Projection of short and long-term gain
ii) Bottlenecks in operations, which makes waiting times for other operations
iii) Economic utilization of human effort, and labour cost of operations
iv) Qualitative output with reduction in scrap or defectives
v) Effective utilisation of resources
vi) Movement of materials, reduction of internal transportation
2. Technical Aspects
To select the technical aspect of the job or study, expertise on the technical knowledge very much required. The
technical factors are as follows;
i) Bottleneck operations from M/c and on M/c speed, efficiency, M/c operator’s expertise
ii) M/c Availability and running time for the production in the shift
iii) Selection of correct technology for M/c and equipment
iv) Enhance the M/c efficiency with quality and performance
v) Idle times of M/cs and causes etc.
3. Human Considerations
Human reactions should be consider related to anticipation of mental and emotional on the investigation and
change in the method. Human aspect and reactions are important areas, considered in the method study;
i) Education of Trade union’s representatives and operators on the general process and principals of method
study
ii) Reactions on changed method
iii) Understanding benefits of both sides
iv) Safe and amiable working environment
There are various chart and diagrams are used in the method study, as follows;
4.26 Most commonly used Charts and Diagrams in Methods Study
There are many charts are used in the method study. These are used as per their applicability in the shop floor
and production processes. When charts are preparing, it should be serious to care to include all movements,
operations etc., so that, no elements should be missed. Actual Facts should be understood by observing the charts
by the concerned manpower in the plant. Every chart should be identifiable separately by name, date of
preparation, revision and prepared by person and team with time and distance, scale whichever is necessary.
Diagrams
Types of Charts
On the consequences of use in the industry, charts could divide in two categories; one, Macro motion charts and
second, Micro motion charts.
Macro motion charts are used for the study of macro motions and, to study the micro motions, it uses the micro
motion chart. Industry use stop watch, videography and software to capture the motion. Any tools could be used
for measuring the macro motions and micro motions.
4.27 MACRO MOTION CHARTS
Macro motion is comparatively more related to cycle and operation times, the four charts are used to observe
and assess the macro motion;
i) Material type flow process chart – it shows the materials flow in the operations and process in the shop
flow with value addition, treatment or handled
ii) Man-type flow process chart – Flow of activities and operations by the man
iii) Equipment type flow process chart - Flow of the use of equipment.
i HH
-lb
pfp
i
i ihi
Qparatoi C
Hi 1 A
T rrie (itwiuCmJ
Stdll 11 Um-
Find Disassemble
Select Inspect
Position Plan
Assemble Rest
SIMO Chart
Simultaneous motion cycle chart (SIMO chart) is another process to record and analyse the micro motions. It is
also one of the micro motion charts with small elements and cycle time devised by Gilbreth with separable steps
of each pertinent limbs of the operator for the study.
It is recoded simultaneously of the various therbligs performed by various parts of a human body on time scale.
The recorded times are measured by the unit ‘winks’, 1 wink = 1/2000 minute. It is used for eliminating the
unnecessary or unproductive therbligs from the motions and modified sequencing in the assembly.
Diagrams used in the method study to show the actual movement and path which may not be clear on the charts
which normally shown sequence & nature of movement, it works as a supplementary of the charts. Diagram
shows the actual positions of machines in the plant layout with movement, any blockage, short & long
movements, possible disturbances in the flow etc. It is important for layout design of the plant. There are various
diagrams used in industry, these are; 1. Flow diagram and 2. String diagram.
FLOW DIAGRAM
Flow diagram is the simplest representation of the flow or link of activities in the plant. A Flow diagram
displays the overall network and inter-linked of activities and movements in the plant. Total sequence of
activities in the plant and describes the paths of material and products. Movements and activities are serially
numbered in the flow diagram. It is very commonly used in the work place in visual stream or flow of activities
and operations. When the products changed, workmen and operators could easily visualize the flows, for not to
miss-out any operations and modifications of their activities with machines and equipment. It also enables the
factory for total time and manpower calculations, blockage in flows etc.
Work sampling
In work sampling used to derive the engagement of the employee in a repetitive activity. Samples of activities
are collected to randomly observe the occurrences of these activities. It may be for workmen, clerical job, the
jobs are generally fixed but the occurrence may not be fixed for individuals. It may be used for a group of
machines, process or completion of activities in a group. After recording the observations, it is calculated for
deriving the Idle and engagement of the workmen or percentage of the time engaged and to understand the
workload of the manpower.
«• r
» T »
• « «
4 » »
• ♦ •
TIME STUDY
Figure 37: Random number table Time study is the most used
techniques in the work study, where time is used and analysed as an input of production. Time is most important
estimation for calculation of the utilization of man, machine and plant. Maximum industries do the time study
periodically to fix and give the output target in a plant, line operations and workmen. It is important for cycle
time, bottleneck operation, total production time and single piece production time etc. Various organization use
different techniques to do the time study. Many industries established industrial engineering department for
continuously doing time study as per product variations, technology and process; for estimating the delivery
time and ensure the commitment to their customers.
According to British Standard Institute time study has been defined as “The application of techniques designed
to establish the time for a qualified worker to carry out a specified job at a defined level of performance.”
Breaki ng of Operations into identifiable elements for t h e purpose of Sampling o r Time Study
> ---------------------------------------------------------------------------------------------------------------------------------------------------------------------
Critical examination of the operations a n d manpowerinvolvement in their activities
Recordingthe t i m e of work in element-wiseof t h a t operation and arriving at the operational tim-e to basic time to
standardtime.
Consideration of allowances during t h e estimation of standard times
Application t h e concept of relieving, rating to assess t h e pace of work, positionand specialty of the work etc.
Addition of various kinds of Allowances, concept of Reliever etc., (as p e r applicability) based on Technicality and
Specialty of the work
Arriving at t h e manpower involvement, requirement etc. vis-a j is operation an d/standa rd time etc.
Synthesis
It is techniques to calculate the job or operation time, where the times are calculated of the elements of the
similar jobs which was studied, calculated and analysed previously. The advantage of this study is; it fulfils the
requirement of the same or similar study for resemble operations, to save times & effort of the study, separate
individual study not required to conduct.
Since the designated as ‘first-level’ system, the first PMTS were intended to deliver the times for detailed
mannual work and thus consisted of fundamental movements, i.e. reach, grasp, move, etc. and associated times.
It is developed through immense numbers research, trials, data collection, analysis, synthesis, and validation to
produce PMTS data. A ‘Higher level’ systems, since have been devised, which is most common by combining
the fundamental movements into common and simple mannual tasks. Such higher-level systems are designed for
faster standard setting of longer cycle activity.
The criticisms of PMTS, related to their inability to provide data for movements made under ‘unnatural’
situations such as working in overcrowded conditions or with an unnatural body posture or for mental processes
and their difficulty in coping with work which is subject to interruptions. It is not considered the common exists
time allowances, multiple working or shared jobs or machines etc. and for non-repetitive jobs. However, various
systems have been derived for ‘office work’, which include tasks with a simple and predictable mental content.
Equally, another significant advantages of PMTS is that, they require a detailed description of the working
method and is useful for studying, how work is done and process, on how it can be improved, as well as
measuring the time it should take.
One of the major PMTS techniques are used in the industry, one of them is MTM (Methods-Times
Measurement) which is called as a 'family' of operating system for various levels of applicability.
MTM1 - the 'highest-level' or most detailed member of the family was developed in the 1940s by analyzing large
numbers of repetitive cycles of mannual work on film.
MTM gives values for such basic hand/ arm motions such as reach, move, turn, grasp, position, disengage, and
release, together with a small set of full body motions. The time taken to reach to an object is then given by a
table based on the kind of reach e.g. whether the object is in a fixed location, such as a tool in a tool holder - or is
a single object located on a bench, or jumbled together with other objects, etc., and the distance to be reached.
Decomposed Movements:
Movement Grasp
Cycle Read) .
, ttainpUx
Move z
Position * hit in pbx
fVutKXI
Re but
The five basic movements in MTM and the grouping of the MTM data. Source: MTM
MTM is suitable for measuring
short cycle, highly-repetitive work. Other members of the MTM family use lower level motions, i.e. in MTM2,
for example, the MTM1 motions of reach and grasp are combined into a composite motion, get; but in MTM2 is
thus quicker to apply. But more suited to longer-cycle workings, where the fine level of discrimination of MTM1
is may be unnecessary in terms of meeting accuracy requirements (MTM-1 is officially described as a procedure which
analyze any manual operation or method into the basic motions required to perform it, and assigns to each motion a predetermined time standard
which is determined by the nature of the motion and the conditions under which it is made. The MTM2 was introduced in 2007 as a 'standard'
model besides the more 'deluxe' MTM1 introduced earlier, by Carolyn Gaeta).
Most of such industrial operations could be grouped into following ten motion:
1. Reach (R)
2. Move (M)
3. Turn (T)
4. Apply Pressure (AP)
5. Grasp (G)
6. Position (P)
7. Release (RL)
8. Disengage (D)
9. Eye Times (Travel and focus) (ET and EF)
10. Body, Leg and foot Motion.
4.32 STUDY OF TIME, RECODING AND TIME STUDY SHEET
Types of times in time study
OT - Observed Time, it the time of working on a job in any condition
BT - Basic Time, it is estimated after applying rating factors in the basic time
ST - Standard time, is estimated after giving allowance in the basic time.
Computation of Standard Time, ST = BT X Allowance, BT = OT X Rating
Standard time are calculated on the qualified worker who are not very perfect or very slow. Various skills, mental
& physical abilities and training required to perform various jobs.
As per ILO, a qualified worker is one who is accepted as having the necessary physical attributes, who possess
the required intelligence and education and who has acquired the necessary skill and knowledge to carry out the
work in hand to satisfactory standard of safety, quantity and quality.
To calculate standard times, the components required are; 1) Elemental of operations for observed time; 2)
Rating factors as the speed of working and; 3) Allowances.
Standard performance is the rate of output which qualified workers will naturally achieve without over-exertion
as an average over the working day or shift, provided that they know and adhere to the specific method and
provided that they are motivated to apply themselves to their work.
The most and generally accepted rating are developed by UK and America, standard rating as per the speed of
the motion of the limbs of the man of average physique who could walk without load of speed of 4 miles or 6.4
kilometres per hour.
Table No. 23: Time study sheet (calculation)
Sheet No:
4.34 Allowances
The normal time for an operation does not contain any allowances for the worker. It is impossible to work
throughout the day, even though the most practicable, effective method has been established. Even under the best
working method situation, the job still demands the costs of human effort and some allowance must therefore, be
made for recovery from fatigue and for relaxation. Allowances must also be made to enable the worker to attend
to his personal needs.
D. Eight Conditions -
Slightly below recommended J. Monotony: Physical
value ......... O O Rather tedious ..... O 0
Well below 2 2 Tedious ........ 2 1
Very tedious 5 2
Figure 41: Time allowance Table,
Quite inadequate .... 5 5
collected
Relaxation Allowance
As per ILO industry working norms and calculation, the Relaxation allowances allows the workers to recuperate
from fatigue. Relaxation allowance used to add in the basic time on the purpose of providing the workers with
the opportunity to recover from the physiological and psychological effects of carrying out specified work, under
specified conditions and to allow attention to personal needs. The time of relaxation allowance depends on
nature of the job. Relaxation allowances are of two types - Fixed allowances and Variable allowances.
Fixed Allowances is combinations of the following two:
a. Personal needs allowance: The purpose is to give the operators a compensation time which is necessary to
take short permission from the workplace to attend to their personal needs like drinking water, smoking,
washing hands etc., as per norms, women require longer personal allowance than men. As a fair personal
allowance are 5% for men and 7% for women.
b. Allowances for basic fatigue: This allowance is given to resurrection of the lost and expended energy during
work. The common figure allowance consider as is 4% of the basic time.
Variable Allowance
An operator given the variable allowance, when working in poor environmental conditions that cannot be
improved on immediate effect which added stress and strain in performing their job.
This type of fatigue allowance is added to the fixed allowance to an operator who is engaged on medium and
heavy work and working under abnormal working conditions. The amount of variable fatigue allowance differs
for various industries and from one organization to another.
INTERFERENCE ALLOWANCE
This allowance is applicable for machine or process-controlled jobs. Operators allows interference time
allowance which occurs due to the work content of the job to compensate the operator for the unavoidable loss of
production due to simultaneous stoppage of two or more machines being operated by him.
Interference allowance varies in proportion to number of machines assigned to the operator. The interference
time of the machine increases with the work content.
CONTINGENCY ALLOWANCE
Contingency allowance is a small allowance of time, grants or sometimes included in a standard time to meet
genuine and expected items of work or delays. The precise quantity, which is not fix or uneconomical because of
their infrequent or irregular occurrence.
These types of allowance are provided for small unavoidable delays as well as for occasional minor extra work:
Some of the examples calling for contingency allowance are:
Tool breakage involving removal of tool from the holder, and all other activities to insert new tool into
the tool holder
Power failures of small duration
Obtaining the necessary tools and gauges from central tool store. Contingency allowance should not
exceed 5%.
Policy Allowance
It may be designated as administrative decision of the organization. Policy allowances are not the genuine part of
the time study, and should be used with utmost care and only applicable in clearly defined circumstances.
As per industry expert, the usual reason for making the policy allowance is to line up standard times with
requirements of wage agreement between employers and trade unions. The policy allowance is an increment,
other than bonus increment, applied to a standard time (or to some constituent part of it, e.g., work content) to
provide a satisfactory level of earnings for a specified level of performance under exceptional circumstances.
Policy allowances are sometimes made as imperfect on functioning of a division or part of a plant.
Sample industry case study on productivity improvement through balancing of operations, which improved the
machine and manpower utilization through the saving of both.
TUW* <.<■ Uf UM»U4» I
..•
M-r *«>■«««> MMM.
CUUMrMnl p«r
I, . ■ v, ',,
IslslslS
Figure 42: Balancing of Mannual and M/c Operations, based on Time study
Case Study 01: Developed production and manpower norms (cycle time & production norms) through balancing of the operations (in manual,
semi-automatic and automatic), as per the utilization of time (calculating standard time of each manual operations), optimum m/c speed for
optimum utilization of manpower through manpower saving, line in a biscuit packing section (packing 7k to 8k biscuits per minute).
Result: Reduction in manpower (20-30%) and nos. of machines, i.e. improvement in manpower productivity above 30% with optimizing the m/c
speed, reduction in m/c nos., it is conducted according the upstream production section i.e. baking/ oven operations with its capacity and feeding
section of the baking operation with its batch making process. Study conducted by the writer and his team for productivity improvement.
Case Study 02: Productivity Improvement through Process Modifications
Table No. 23A: Balancing of Operations
Starting Flow of Operations: PRODUCTIVITY IMPROVEMENT THROUGH TIME STUDY
AND BALANCING OF OPERATIONS
Flow of Operations after Time Study (Developing Standard Time of the Operation) of each
Operation and Layout (Existing)
OP16
Finishe
d
OP14
Operation Times (Mints.): OP1 – 3, OP2- 3.5 OP3- 3, OP4 – 3, OP5 – 2, OP6 – 8, OP7 – 3.5 OP8-
4, OP9-3, OP10- 4, OP11-3, OP12-4, OP13 -3, OP14- 3.5, OP15- 4.5, OP16 - 4
First Piece Production Time is 43.5 Minute, One Piece Production Time in this Line is 8.5 Minute.
Machine Operations are OP4, OP9, OP12 and OP15.
Revised Flow of Operations: Productivity Improvement through Modification in Operation/
Cycle Time and Layout
OP1
OP8 OP9 OP4 OP3 OP1
O
OP8
OP16
Finishe
d
OP6
OP6 OP1
OP7 OP13
First Piece Production: 35 Minute, One Piece Production Time in this Line: 4.5 Minute, Increase in
Productivity – 45%.
Productivity Improvement Initiatives: Balancing of the Operations, Reduction in Cycle Time,
Technological Intervention by installation of Two New M/cs Or Workstations with two addition in
manpower, Modification in Layout, to complete the Line.
For balancing of operations in a Line with sub-assemblies, or child-parts assembling, the design of the process
flow of operations is most import for visual control. Counting of operations, and identification of delays in
operation & material flow makes easier in this process flows.
A process flow chart (PFC) of Fabrication in a 630 KVA Transformer Production unit, which consists of 230
Operations is described below;
p
■0 1:
■0 6 ■e M © ■•
0 0 0' ©I ’ * €■ 0-0 «
0 0 0 : 0 • 0 0 .0 0; •
0 © 0 . 0 0 0 0 © .. . 0 0 0 _ _ _!©•. 0 ©_.
0© 000:© © C’1 •
■0 ■ : ©•
— • 0 0 0
0 0 0 00 0
Time could be divided in the industry as per the nature, occurrences and per the levels of working in different
organization hierarchy. These are, operation time, testing time, meeting, discussion, decision making, planning,
personal time, engaged time, delay & waiting time etc. Broadly times are divided into value added and non-
value-added times. One has to plan on the best use of non-value-added times. It depends on practice and through
time consciousness.
One country’s success of public services and e-governance depend on, the on-time service availability to the
public. All technology, process and techniques are developed for efficient services, which is on time to reach all
targeted areas. For limited time services, emergency services, natural calamities, where efficiency depends on
the preparedness, planning, trial and practice; time is most vital factors to manage.
Best utilization of the times depends on the discipline, awareness, continuous assessment, possible recording for
verifications, practice and result. It is applicable for any organization, individual, social or individual life.
Industry use various techniques to develop the time utilization for which Work study, Lean, Six-sigma etc., are
developed and new era of industry 4.0 is progressed for multi-dimensional production facilities in a limited time
with automation.
Service based and non-automated industry could count, how some minutes saved in day, have immense impact
on cost and total savings in that industry.
Illustration: If each man saves 10 minutes in day of his total working time, what will be the Impact on time
saving and cost of a plant of 200 Manpower. Plant have one shift and 300days of working and 250 days of an
employee works. The result is 1,111 man-days (working of 7.5 Hours in day excluding Lunch) of could be saved,
it may be 6 days of working in the Plant. It will save immense direct and indirect cost in the Plant. But these
required technical expertise to develop is sustainably.
Utilize of the time depends on the basis of planning and aptly application of the identified methodologies
Control the factors for un-utilizations, during the long process times in factory and significantly when
there is excess capacity in the production Lines in terms of machines and manpower.
Table No. 23B: Manpower Utilization Analysis Sheet, through Time Study
Manpower Study for 6 Track M/cs
Proposed Manpower
Cycle Time (Output/ Mints.) Proposed Manpow
Utilization
Machine No. of
Production
Speed, MP/min
Sr. Machine Norms Operators: Workmen1:
pouch (1
No. Number (Pouches/ Nos. of Nos. of
per MP=72 Others Operators Workmen1 Operators Workmen
Mints.) Packets Packets per
minute Pouches)
per Minute Minute
Note: Manpower for standard packaging norms should be 6 Packet per Minute, as per the standard time = 10 sec. per packet. The productivity
study and calculation are also applicable for the new installed 3 FFS 6 track Machines.
Therefore, Manpower Utilization Increased by 20%. The total manpower saving (in Two shift) = 10
F For more time study-based report, Pl. see the Annexure – I to III
4.37 Modern techniques of Productivity Improvement using Industry 4.0 techniques
Now industry is passing in the phases of Industry 4.0, consist of digitization of all activities with automation,
artificial intelligence, layer devices, Industrial internet of things with human and business intelligence. It is new
dimension towards immediate response to the customers, market driven and substitute of human effort in the
critical operation to zeroing the mistakes. There are nine designated areas of I 4.0, the majors are discussed
herewith and rest in the industry 4.0 chapter.
5 Modern Technologies Impacting Manufacturers
Industry has always demanded for better technology for cost, quality and customers. From big data analytics to
advanced robotics, the game-changing benefits of modern technologies are helping manufacturers and industries
to reduce human intervention, increase plant productivity and gain a competitive edge.
State of art technologies, such as use robots, big data analytics, the internet of things and 3-D printing/ additive
production among others, are shaping the future of production by investing through technology in production,
improving the speed of operations and minimizing errors. Since productivity is critical to the success to plant,
every manufacturer is expected to make significant investments in these technologies.
Here are five technologies that are positively impacting the manufacturing industry.
1. The Industrial Internet of Things
The industrial internet of things (IIoT) denotes the extension and use of the internet of things (IoT) in industrial
sectors and its applications. The usefulness of the internet of things (IoT) are rapidly being implemented in the
industry and production area, which provides plant owners, a way to increase productivity and decrease the
difficulties and constraints in processes. It is expected that by 2020-21, the number of IoT-enabled devices will
reach the 25 billion mark, if any exigencies not happen.
With a strong focus on machine-to-machine (M2M) communication, the industrial internet of things (IIoT) is an
incorporation of various technologies, such as machine learning, big data, sensor data, cloud integration and
machine automation. These technologies are being used in the areas like predictive and proactive maintenance,
real-time/ on-time monitoring, resource optimization, supply-chain visibility, cross-facility operations analysis,
and safety; enabling the plant managers to minimize downtime and enhance process efficiency.
Like in regular maintenance and repair, these are essentials for smooth plant operations. However, not all
equipment and devices need maintenance at the same time. The IIoT enables and allows plant managers to
employ conditional monitoring and predictive maintenance of the equipment. The real-time performance
monitoring helps them plan their maintenance schedule around when it is actually necessary, reducing the
likelihood of unplanned outages and the ensuing loss of productivity.
Likewise, IoT-enabled and sensor-embedded equipment, which can communicate the data that helps the supply-
chain team track assets by using RFID (radio-frequency identification) and GPS sensors, take stock of inventory,
forecast, gauge the vendor relations and schedule predictive maintenance programs.
At present, IoT goes beyond the normal consumer devices and internetworking of physical devices usually
associated with the IoT. The distinct feature is the connection of information technology (IT) and operational
technology (OT). OT refers to the networking of operational processes and industrial control systems (ICSs),
including human machine interfaces (HMIs), supervisory control and data acquisition (SCADA) systems,
distributed control systems (DCSs), and programmable logic controllers (PLCs).
2. Big Data Analytics
Today Manufacturers seek to achieve true business intelligence through collecting, analyzing, and sharing data
across all key functional domains. In this structure, production systems are not only more efficient but can also
respond in a timely manner to changing business needs, including signals from business associates and
customers. Big data analytics enables several paths for improving asset performance, streamlining production
processes and facilitating product customization. As per recent Honeywell survey, it reflects that 68 percent of
American manufacturers are already investing in big data analytics. Now, manufacturers are able to make
informed decisions using productivity and waste performance data provided by big data analytics, lowering
operating costs and increasing the overall yield.
3. Artificial Intelligence and Machine Learning
Artificial intelligence (AI) denotes and assumes as the simulation of human intelligence in machines that are
programmed to think like humans and impressionist their actions. The term could be applied to any machine that
exhibits traits associated with a human mind such as learning and problem-solving. Previous several decades,
robotics and mechanization have been employed by manufacturers to increase productivity and minimize
production costs per unit. Artificial intelligence (AI) and machine learning seem to be the next upsurge in
manufacturing industry. AI is helping production teams analyze data and use the insights to replace inventory,
reduce operational costs and offer seamless quality control over the entire production process.
The age of robots without self-analysis, engaged in critical production tasks comes to end by replacing AI and
machine learning are making it possible for robots and humans to collaborate with each other, creating agile
production processes that learn, improve and make smart manufacturing decisions. Therefore, manufacturers can
employ industrial robotics and smart automation to manage mundane tasks and focus their time and resources on
revenue-generating tasks such as research and development, product line extension and better customer service.
4. 3-D Printing / Additive Manufacturing
The 3-D printing or additive layer production technology is set to make a huge impact on high-end industries
such as aerospace, mining machinery, automobiles, firearms, commercial and service machinery, and other
industrial equipment.
Mostly AM technologies envisaged as recycling of material. As a result, it is meeting the requirements of
Industry 4.0. In the aerospace industry, it is applied to manufacture light structures with reduced weight and also
applied to replace heavy components. This revolutionary technology allows manufacturers to create physical
products from complex digital designs stored in 3-D computer-aided design (CAD) files.
There are different types of technologies used in AM such as Stereolithography (SLA), Selective Laser Sintering
(SLS), Fused Deposition Modeling (FDM), Direct Metal Laser Sintering (DMLS), Poly-jet 3D Printing (PJP),
Inkjet 3D Printing (IJP), Laminated Object Manufacturing (LOM), Colour-Jet-Printing (CJP), Electron Beam
Melting (EBM) and Multi-Jet-Printing (MJP). It manufactures a customized product as per the customers'
requirement in lesser time and cost. Due to its flexibility in design and manufacturing, this technology can
quickly launch a new product.
Moreover, the increasing applications of 3-D printing in manufacturing are giving rise to manufacturing as a
service (MaaS), enabling companies to maintain an up-to-date infrastructure that caters to multiple clients and
negating the need to purchase new equipment.
5. Augmented Reality and Virtual Reality
Virtual reality and augmented reality are used in several sectors from consumer applications to manufacturers. In
production, the augmented reality offers great value in innumerable applications, in combination with several
other technologies as per usual. Virtual reality (VR) is simplifying the product design process by eliminating the
need to build complex prototypes. Designers and engineers are using VR to create realistic product models,
allowing them to digitally see their designs and troubleshoot potential issues before starting production. Clients
can also review and interact with these digital designs, simulations and integrated devices, significantly reducing
the time needed for designing to manufacturing the finished product.
Automobile manufacturers are now using virtual reality to ensure their cars are tested at an early phase of the
vehicle development process, decreasing the time and cost involved in modifying the designs, tolerances and
safety features etc.
Since prognostic analytics are critical to a production facility's operational efficiency, plant managers are
expected to increasingly depend on VR to review workflows, improve benchmarking processes and maintain
compliance through training protocols.
As manufacturers continue to implement these modern technologies to control all aspects of the production
process, improvements can be expected in overall productivity and profitability. Companies aiming to stay
relevant in the ever-competitive market, cannot afford to ignore the positive influence of each of these
technologies.
4.38 Development in Production Technology
There are actually multiple types of processes a manufacturer or producers uses, and those can be grouped into
four main categories: casting and molding, machining, joining, and shearing and forming.
Classification Based on Function of Process: 1) Process for changing Physical properties of work piece. 2)
Casting process 3) Primary metal working processes. 4) Shearing and Forming processes. 5) Joining processes.
6) Machining processes.
CAM is very much useful to design and control the manufacturing. It helps to achieve the effectiveness in
production system by line balancing.
i) Production Planning and Control
ii) Capacity Requirements Planning (CRP), Manufacturing Resources Planning (MRP) and Materials
Requirement Planning (MRP)
iii) Automated Inspection.
Plant should conduct the time study in every 3- o r 4-years gap to validate the existing operations /
process times, production norms, manpower norms and modifications in the planning. Even, any
change in products, machines, addition of lines, shifting the plant etc., management should conduct
the Time study and make the new norms in the plant.
Managers and supervisors of the plant ought to be trained i n work study, and for large industry
where IE Team or department exists, all manpower must be trained on how to conduct the Method
and Time study, balancing of operations i n an engineering industry where products are more than
100 nos. and thousands of operations executed every day.
It is observed that when an organization, first time do the Time and motion study with
implementation, gains at least 5% -20% productivity and other indirect cost (like manpower and
materials etc.), where large number of manpower engaged i n the plant.
Automation has the Investment burden but Time study has not any investment, except study
Self-assessment questions
1) What could be the approaches of productivity measurement in your plant?
2) What are factors influencing the productivity in your plant?
3) Purpose of productivity: Productivity improves standard of living
4) How you Measure the productivity in your plant?
5) How work study will help your plant for productivity?
6) What are process for time study for making the manpower norms?
7) What are objectives of Method Study?
8) What are procedures involved in Methods Study?
9) What are the most commonly used chart and diagrams in Methods Study?
10) What are Macro motion charts and String diagram?
11) What is importance of Predetermined motion time study (PMTS)?
12) How you do the Standard rating for standard time?
13) How you use of time study for productivity?
14) What are the modern techniques of productivity improvement?
CHAPTER - V
Creativity and Innovation
5. INTRODUCTION
“I have not failed; I’ve just found 10,000 ways that won’t work”, Thomas Edison. How many light bulbs did
Thomas Edison break before he found one that worked?? “I have not failed; I’ve just found 10,000 ways that
won’t work”. He said.
“Many of life's failures are people who did not realize how close
they were to success when they gave up.” Edison said.
Innovation in Art
Innovation is thought as inventions comes in century created by great persons like Newton,
Einstein etc., but it is a human effort through their intelligence. It is a manifestation of perfection already within
them. One person working for assigned or self-selected jobs, there is scope of improvement and change as
described & proved by Thomas Alva Edison. These are points of self-encouragement by individuals towards
innovation.
In industry, creativity and innovation is required for new techniques, process, technology, identification of
solutions on problem, costless or cost-effective solution within the industry to win in the competition.
Encouragement, internal intelligence is essential for competently advancement. Innovation required for
customers, business, process and of course for cost benefit.
Key points of innovation are, it is accomplishment oriented, in an organization, it is based on customer, process,
product and services. It makes simpler to understand and apply, higher goal with may be smaller start, learning
from failures, based on test, try, revised, modified and corrections; come from continuous work, stimulate from
gratitude and acknowledgement.
I able 2 Country ranking ol plrats granted in 1990 io 2000
Benchmarking is the process of understanding and studying in detail and identifying the best practices and
processes of the top company in the industry practice it as method or benchmark. Benchmark is developed on the
expectation that through learnings from the process enables the bench-marker to create an effective path-way of
improvement resulting to increase in efficiency and competitiveness.
In the report, 'Pathways to Innovation Excellence’ describes that innovation is the only activity that will pull out
of the low-growth recovery, that are hindered in at any situation. Existing product portfolios and markets can be
benefited from innovations. But the complexity of pushing the boundaries makes the whole exercise potentially
not worth which troubles the organizations.
Any organization can create the innovation by strategic planning on the structure of people through individual or
group motivations for thinking new as an involvement in daily working.
About the comfort zones to innovate, the report divides innovators into four separate streams.
Low innovators, may put in the work for developing a place in the own organization and market, but they don't
go very far way in the peer group comparison with limitations. They are limited in the extent to which they learn
from other companies to apply in their own industry.
Medium innovators do effort and they are knowledgeable in their opponents' innovations. But, in most of the
cases, it doesn't bother to look what others in their periphery, or other’s activities. They don't view on creations
other organizations in the industries.
Good innovators are dedicated to their own innovation processes through constantly monitor innovations in their
own company & industries and they from the starting, takes lead from other good innovators across the industry.
Maximum innovators prepare the innovations with better exercise and keep looks on what is going on in the other
originations, and also, they put as much effort on innovation in the most industries do by captivating an all-
inclusive view from where they draw stimulus for going beyond their limit.
The third principle: Passion is the fuel, and pain is the hidden ingredient. Passion is what propels ideas. It’s what
transforms other resources into profits, but it never shows up on a balance sheet. Unfortunately, when pursuing a
passion or following a dream, pain is part of the process. Innovation leaders need to take the pain with the
passion and learn to manage both effectively.
A fourth principle that underlies the methods for innovation: Co-locating drives effective exchange. Co-location
refers to physical proximity between people. It is a key for building the trust that is essential to the innovation
process. It also increases the possibility for greater exchange of information, stimulation of creative thinking in
one another and critique of ideas during their formative stage.
Fifth: Differences should be leveraged. The differences that normally divide people — such as language, culture,
and problem-solving styles, can be an advantage to innovation. When differences are used constructively, they
can be leveraged to enhance and sustain the innovation process.
Use these 5 principles in your organization to stay focused and stay ahead.
" J
Organization
Culture
Motivation
Learning on
environmen identificatio
t n
There is very simple description of breaking the innovations in three approaches as per their adoption in the
industry according the business processes:
Ideas-driven innovation: This may be resembled with Kaizen approach (described in Lean Manufacturing
Chapter) by generating and collecting participant’s ideas from various sources, screening and filtering until
gambles are selected. Once the ideas are selected for development, it prepares for implementation. The lead time
for this process is different from industry to another industry may be one to five years.
Research driven ideas: Research and development is the basic traditional approach. It is cost incurring method
also. but innovation in R&D could be introduced in the industry. In this approach, the ideas are generated &
collected in huge number from various research efforts and screened them into a number of selected for
improvement, applicability and potential ideas. This research-driven approach, innovators are the smallest in
group, as the development cycle for this approach may takes comparatively longer time may be upto 10 years
from approval stage to final implementation. Organizations that takes this approach would do best to align
themselves with industries. For example, in pharmaceuticals and oil and gas exploration industries which are
huge infrastructure investment based, though, many of these promising projects will be rejected at any stage of
the development process until completion, but innovation process should be continued.
Analysis driven innovation: This approach is a systematic analysis based of all ideas as per the stages and steps
of application and implementation in the company. The generated ideas draw in a methodical array from
analysis, starting form industry, market, competitors and the internal competences. A set of managerial strategy
controls on the decision of the approval and progress on that the projects resolve for initiation, or not or when.
The innovation is implemented as a selected project basis for development, may changes discontinued, many
other for any deviations of faults in ideas. This process typically takes one to five years and be supported by
shifting markets, and offer products with long life-cycles, such as automotive industries and software makers
etc.
Progress
Stage
Innovation
Competencie
s and
Origination
Initiatives Organization initiative and effort towards Innovation
At the
Less initiative and effort towards Innovation beginnin
stage
Starting o
Innovatio
No Innovation in thinking and process in thinkin
and
process
People Thinking and Commitment
Methodology
People Structure fo r
of
Involve me St a nd ar d iz at i
Co I Iecti n g o n and
nt
Ideas Sustainability
D e v e l o p Organization P u r p o s e
Define the Path
Making G o a l
L Strategy Cuture
Develop
Path and Method
R o a d Map t o Developthe
C u l t u r e of Org.
follow Structur
thinking Process o f
from Collecting
Views, Establish t h e / '
Problems.
Ideas, Standardizat
Solutions ion and
and Sustains b i l i t
Evaluatefor y
Implementat
Job Enlargement
5.11 Steps of creating Innovation Culture
Steps of Innovation Culture in an Organization
1) Develop organization purpose
2) Transforming the problems into individual goal & strategy to solve
3) Create the foundation of creative thinking, value addition and innovation
4) Define the path of thinking and innovation
5) Develop the path and road map to follow
6) Create culture of encourage and for making a creative culture
7) Develop the culture of thinking from problems
8) Technical method for implementation of innovative ideas
9) Process of collecting views, ideas, solutions and evaluate for implementation
10) Restructure the tasks and include creativity in performance assessment score
11) Enclose the innovation as a part of responsibility in job
12) Establish the standardization and sustainability on creativity and innovation
Culture of Innovation
Culture of innovation, here describes as creation of innovative environment that supports creative thinking and
advances efforts to extract economic and social value from knowledge, and, in doing so, generates new or
improved products, services or processes.
The BICI explores the 10 steps of organisational innovation which are considered essential for organisations to develop an innovative culture.
These are:
Step 1. Strategize the corporate direction
Step 2. Planning the business and operations
Step 3. Alignment the cultural with progress
Step 4. Education and training for creativity and innovation
Step 5. Thoughts of management
Step 6. Possible measure the innovation
Step 7. Set up rewards and recognition in the innovation culture
Step 8. Support from top level
Step 9. Make the budget, finance and commercialisation for sharing to innovators
Step 10. Create climate of human resources development
Industry and organization require innovations, creations and innovators. It should not think, only make basis on
laboratory and research-based methods to discover new things, simple creative mind answers many critical
situations in business and for customers. All organization must start to think to apply human mind and
intelligence in the business.
SME Corner
It is essential for all types industries to encourage, make arrangement, develop culture for
innovation, Make awareness on significance of creativity and innovation among people.
Management could engage the educational institutes with their internal innovation. Most of the
factories yet to start the innovation culture, but i t is part of apt entrepreneurship.
SMEs follow the principle and strategy of innovation and set example being an innovator.
Through the innovation and human creativity most of the SMEs could plan to solve the maximum
problems internally, which will be benefited the factory in the reduction of yearly external
consultancy cost,
Self-assessment questions
1) What is Innovation?
2) What is Importance of Innovation?
3) Principles of Innovation
4) What is 5 principles according to Rosenfeld?
5) What are the important aspects of creativity and motivation?
6) Which are approaches of Innovation and Innovation Process?
7) How you make Innovation Strategy?
8) What are the important steps of creating innovation culture: steps of innovation culture in an organization?
CHAPTER - VI
Role of supervisors is crucial in SMEs and also for shop-floors in large organizations also, who deals from raw
materials to customers and owner to workers. Supervisors to be trained as per their requirement, may be
administration, work process, technology, manpower management etc., as per industry and its trend. Industries
are less focused on supervision skills, competencies, and their technical and behavioral perspectives.
In the roles of managers for leading the organization relies on supervision, and soul of a supervisor inbuild
everywhere to monitor the abnormalities, direction for corrective actions, planning and decision making. So, a
manager is a supervisor also and for that reason the chapter designed on supervision and managerial role.
Here, the managers and supervision skills are defined as per the industry requirement, jobs perspective, attitude,
common role and techniques, which will help them to perform better in the factory.
Set u p
Quality in Culture of
Products, continuous
People and Improvement
Process and
Motivation
Participative
• Participate during Prime Value Silent workers
Educator work and decision, Supportive creators with invisible
not let workers virtue
alone
Good
Link between communicator Recognize effort
Management and Sharer of Success Work in Team
Workers with inter &.intra of other
personal
1) Technical
2) Managerial - Decision
3) Human Relation
4) Improvement
Techniques of Production.
Processand Quality
Analytical
Administrative
Financial
Managerial
Skills and Decision Making
Competency of
Managersand
Supervisors Icompletion of Organization
I Expectations
Motivator
H u m a n Relation ProblemSolver
Participative Leader
Measure: Understanding the existing situation of an organization with the aspects of man, machine/ technology,
methods & techniques, materials, working & HR culture. Comparison it for identification of within the
individual and through retrospection.
Method: Be enterprise and enhance own competency to adjust the situation with courage, discipline, learning
and developed competencies. If situation is against you or anyone, learn from the improvements and use it as an
opportunity to enhance the capability. Evaluate, how you could create values in the present situation in
immediate effect and in future.
Motivate: Motive the people around you, groups under you and manage boss by your good intension, by
building trust and interpersonal relationship. Self-motivation, creativity and application of your intelligence is
the way to change poison into medicine.
6.9 Ethics, discipline and integrity in working
Try to avoid the following unethical practices which may appears in the way of short-term winning, but not help
you in long term sustenance.
Hiding own weakness and competency by acting, pretending, time passing before next option or change
Mis-lead people to hide inefficiencies
Excessive manage superiors and bosses to survive in the job
Take the advantage of good supportive situation and culture, without own value addition
Don’t Grab the other person’s or your subordinate’s success as your success.
Always try to be a good human being and contributor, when you leave the organization, everybody would realize
your absence and missed you, will create a gap in your position. This will help you in the time of necessity.
Table No. 27: To Make workin g norms / activity norms b y the dep artments
Sr.
Major/ sample Activity Areas
No.
1 Daily mornin g or evenin g meetin g
2 Plant / own work areas or work stations visit
3 Work Allocation to the subordinates
4 Controllin g and monitorin g of the section / g rou p ’s activities
Regular technical or specialised work for process plant, engineering sections and other
5
technical section man p ower
6 Assig ned jobs and tasks
7 Work p ro g ress / work rep ort writin g
8 Section Related Admin. & Financial work
9 An y dep artmental / section’s imp rovement resp onsibilities and workin g
10 Sp ecialised Jobs – like p ro jects, seasonal / occasional work, trainin g etc.
11 An y monthly / y early extra work allotted from the p lant to p manag ement
12 Any overtime work as per occasional requirements
NOTE: Plant Cou ld use th e ab ove-mentioned areas a jo b ch ecklist for jo b rev iews
table no. 28: Process of assessin g the jobs for develo p in g the norms b y dep artment head and g rou p heads
Name of the
Sr.
Activity Areas Person - Time Remark
No.
Desig nation -
1 Daily Morning or Evening Meeting
2 Plant / Own Work Areas or Work Stations visit
3 Work Allocation to the Subordinates
Controlling and Monitoring of the Section /
4
Groups Activities
Regular Technical or Specialised work for
5 Process Plant, Engineering sections and other
Technical section Manpower
6 Assigned Jobs and Tasks
7 Work Progress / Work Report Writing
8 Section Related Admin. & Financial work
Any Departmental / Section’s Improvement
9
Responsibilities and working
Specialised Jobs – Like Projects, Seasonal /
10
Occasional work, Training etc.
Any Monthly / Yearly Extra Work allotted
11
from the Plant Top Management
Any Overtime Work as per occasional
12
Requirements
Process,
Activity Time
and Process o f
Occurrence - Execution by Any SOPs
Daily, Weekly, Individualsor Defined
Monthly a n d Group
Yearly
So, Multi-Skill is a methodology to be applied to optimize the utilization of manpower. Manpower should
prepare for alternative charges of workstations by including addition of 1-2 nos. of skills in their competency.
A specific & periodic skill assessment with skills or competency matrix be prepared and updated, and
development should be planned in the first priorities through skills. Plant management must undertake multi-
skill task to develop within the plant, to be more professional for this improvement with each individual’s multi-
skill chart.
Table No. 31: Skills evaluation sheet as per existing jobs
Skills Evaluation Sheet as per Existing Jobs
Name of the Supervisors
Sr.
SKILLS AREAS (Control and Planning Division Manpower, QC
No.
Section with Desig nation etc.)
A Existing Working Skills ( a )
1 Working Section / Sections
5 Specialized trainings
Years of experience in Existing
6
(Planned - Years) Section
7 Interpersonal skills
Degree of supervisory skills (Target
8
Achievement)
B EFFORTS ON ANALYSIS ( a )
1 Diversity of tasks
2 Complexity of tasks
3 Creativity of thinking
Analytical problem and solving
4
with Action Plan
5 Physical application of skills
6 Degree of assistance / Expectation
Future Planning for Improvement
C
(a)
Work Planning and Self
1
Imp rovement
Man / Workmen Monitoring &
2
Manag ement Skills
3 Self-Management and Reporting
D RESPONSIBILITY ( a )
1 Decision-making authority
2 Scope of organization under control
3 Scope of organization impacted
Degree of integration of work with
4
others
5 Impact of failure or risk of job
Ability to perform tasks without
6
su p ervisions from Manag ement
Table No. 31A: Basic job evaluation sheet in the factory
Working
Process
Sr. Department/ Workmen Job Working Working Work/ Existing Improvement Proposed
(Mannual, Remark
No. Section Category Category Place Tools Operations Skills Required Skills
M/c,
Both)
1
2 Chemical
3 Processing
4 and
5 Moulding
6 Section
7
8
9
10
11
12 Stitching /
Closing
13
Section
14
15
16
17
18
19
20 Lasting /
Finishing
21
Section
22
23
24
25
26
27
Packing
28
Section
29
30
31
32
33
34 Other
35 Sections
36
37
Table No. 31B: Basic job score sheet
Job-wise, Job Score Matrix
LEVELS
Compensable or Critical Factors Moderate
Minimum I Low II High IV
III
1. RESPONSIBILITY
a) Safety of others 25 50 75 100
b) Equipment and materials 20 40 60 80
c) Assisting trainees 5 20 35 50
d) Product/service quality 20 40 60 80
2. SKILL
a) Experience 45 90 135 180
b) Education/training 25 50 75 100
3. EFFORTS
a) Physical 25 50 75 100
b) Mental 35 70 105 150
4. WORKING CONDITIONS
a) Unpleasant 20 40 60 80
b) Hazards 20 40 60 80
TOTAL 1000
Doc. No.:
Review Date:
Next Review Due On:
DEPARIKtMT • FABRICATION
WORKSTATION s
WORKER NAME :
Photo
AGE :
ADDRESS :
CONTACT NO.
01 Drawing
02 Shearing
03 Drilling
04 Bending
05 G a s cutting
06 Welding MIG
07 Welding ARC
08 Welding TIG
09 Grinding
IO L e a k a g e T esting
* Change the above S k i l l s accord Eng to the Section and Plant
NOTE;
PREPARED BY APPROVED BY
( H R DEPTT)
SME Corner
SMEs, might not recruit or not required higher level professional managers or specialized technicians,
but competent supervisors' and managers' role is important. Rather, supervisors and managers should
fulfill the gap of specialized manpower by their multi-furious activities and experiences.
Capable M&Ss are essential for SMEs, with workplace related Jobs and competency. Owners and
company management should closely monitor their activities, unless they are well comprehended the
plant activities from Internal workmen to customers, all process, M/c & equipment specifications,
safety, plant capacity, productivity and quality techniques.
If any gap of knowledge, i t is essential M&S must participate the external training courses in these
areas.
A Trained and competent M&S, could reduce the operation cost by 10- 15% in any factory.
Self-assessment questions
Lean Manufacturing
7.1 INTRODUCTION: Lean Manufacturing
The term “Lean Production” first thought up by John Krafcik at International Motor Vehicle Program (IMVP) at
MIT, in the 80’s.
The term was popularized by James P. Womack, Daniel T. Jones and Daniel Ross of IMVP at MIT, in their world-
famous book ‘The Machine That Changed the World’, that was published in 1990.
Lean originates from the Toyota Production System or through the techniques of Just-In-Time (JIT) production,
Henry Ford and other are the forerunners. The progress of Lean manufacturing and JIT Production goes back to
Eli Whitney with the concept of interchangeable parts.
Taiichi Ohno ( 大野耐一 , Ōno Taiichi, February 29, 1912 – May 28, 1990) was a Japanese industrial engineer
and businessman. He is designated as the father of the Toyota Production System, which inspired Lean
Manufacturing in the U.S. He invented the seven wastes (or muda in Japanese) as part of this system.
Lean manufacturing is a production technique, use the word “lean or reduction” for the purpose of focusing and
eliminating of wastages from the workplace and production system. Reduction may be economic use, saving or
control, Lean purposes are;
1. Lessening in the total production time
2. Decrease in the material use
3. Lessening in the requirement of human movement and effort
4. Reduction in the space of production
5. Decrease in the use of inventory
6. Saving in manpower through optimum utilization
Lean manufacturing is a business improvement cum customer engrossed techniques. As the success of the
business as a whole, depends largely on satisfying customer demands, Lean allows the manufacturing activities
to become more closely aligned with other company goals and activities. The core of Lean is around doing things
that add values from the customer's perspective.
Flow of
Jll
Stop Any
Production
Abnormality
PULL System
Autonomation
- Budd
T akt Time HE1JUNKA Human
Intelligence
Sequencing
Heijunka (hi-JUNE-kuh), is a Japanese word which means leveling, is another purpose of Lean. It is one of
the Lean methodologies of process improvement, through leveling & balancing of operations / processes that
helps organizations to match unpredictable customers’ demand patterns and elimination in manufacturing
wastage through leveling the types and quantity of production over a fixed period of time.
The Japanese original term – heijunka ( 平 準 化 ), is a technique for reducing the mura i.e. unevenness/
disharmony which in turn reduces muda (waste) through production leveling. It is a vital to the development of
production efficiency, was applied in the Toyota Production System, i.e. lean manufacturing.
Jidoka reflects the ‘Automatic detection of problems or defects at an early stage and proceed with the production
only after resolving the problem at its root cause.’
55
KANBA Value Mi te TPM
ISyJTtam ZeiWai iT-otal
Sv—am M=1 M stale Ek chan
aeveia I
pisiem ■
Standard lE Self-directei
JIT a n d 7QCTools.
operation 5S cSX Techniques. wo ms
Kanban Kaizen &
procedures SPOS& Po'ki Layout
Poka Yoke
(SOPs), Just-
in-Time
Overproduction: It is more production than the customer demanded, which stores for a time may be short or
long duration before selling. Used of more materials costs to the business, misuse of inputs and outputs,
unnecessary space occupancy etc., are the consequences of the overproduction. It may be occurs due to seasonal
effect, market fluctuation, speculative demand, one-time low-cost raw material procurement are causes of
unpredictive & uncontrolled overproduction. Causes for overproduction waste include:
Unplanned RM procurement without Just-in-Time / case logic
Improper batch size
Probable occurrence of defects
Unbalanced operations and process setup time
Improper scheduling
Standard time of operations not measured
Unbalanced parts and RMs of various production centers
Unprofessional managed and traditional plant.
Waiting Time: It is time of waiting for Man, Machine, Materials, Planning and instructions. More waiting is
unproductive times in the plant’s utilization. Waiting times is very difficult for dentification and elimination
also. It requires methodical data collection, balancing the activities with well-thought-out applications. Causes
of waiting time wastage includes:
Not defined standard times of operations
Unbalanced work processes
More occurrence of breakdowns
Poor Layout of the Plant and work station
Breakup or uneven in value streams and flow of operations
Imbalanced material flow
Poor communication and information within the plant
Weak industrial engineering teams
Unnecessary searching times of Die, Tools, Designs, Materials, back up operations and child parts etc.
Inventory or Work in Process (WIP): WIP occurs in the plant due to lack production & material planning, lot
& batch mismatched, pair & accessories and child part mismatch, delivery problem and customer return etc. The
causes of WIP are;
Gap in planning
Overlapping of orders, delivery, defective materials, space constraints etc.
Product and process complexity and missing
Poor scheduling
Customer return
Transport and delivery problems
Unbalanced work distribution
Obstructions in Value-stream flows.
Processing Wastage: Over-processing is the processing wastage, which is non-value-added operations and
activities, when products not required or due to its presence, products may be defective. It also unproductive
activities in the plant which should be eliminated with sustainability. Various causes for over-processing wastage
included due to;
Not developed product-wise or process-wise SoPs
Operators not aware or practiced the correct numbers of activity elements or operations
Product changes without process changes, occurs mistakes
No mistake proofing or alarm system for over processing
Misunderstanding of customer specifications
Just-in-case logic
Lack of work planning and communications
Unverified approvals
Internal Transportation: Internal transportation is waste in times, manpower efforts and over engagement of
manpower. More transportation is caused for waiting time, delay in operations and large production time. It
exists in the plant due to:
Poor plant layout and sequence of work stations
Inflexible production flow and set up
Interrupted flow and blockage of materials
Poor production planning
Lack of fixing the workstations.
Internal Motion: More motion of manpower is unproductive and non-value addition in the plant. It is very
much invisible, and only observed when method and motion study conducted in the plant. Only trained
manpower could do this study. Elimination of motions and transportation have immense impact on productivity
and cost saving. More motions in the plant occurs for the:
Inappropriate workstation design
Absence of application of therblig during workstation design
Understudied work methods
Improper material positioning and movement
Untrained manpower and supervisors.
Defective Products: Rejection, rework and reprocessing is occurred due to defective production of outputs. This
is most costly wastages, which has enormous impact on cost and reputation of the organization. Plant incurred
opportunity losses due to defects. Various techniques are developed to reduce the defects. The causes which
creates the defects are:
Untrained and negligence from manpower
Weak quality control techniques
Method and measurement problems in the working
Misunderstanding of customer specifications
Lack of quality maintenance of machines
Inadequate inspection process
Imperfection in process and product design.
Underutilizing Manpower: Underutilized and misuse of manpower includes the loss of manpower,
administrative costs and underutilization of human capacity. It happened due to the following reasons:
Not defined operation standard time
Unplanned Manpower planning
Skills Matrix not established
Poor work distribution
Unprofessional business culture
Absence of skills training
No Training need identified for all levels of employees.
Wastages are that enemy, for which the Lean concept developed for competition on cost, quality, delivery and for
customers attraction. Focus on how to eliminate all wastages and Lean the un-productive areas with
sustainability. It improves plant performance and productivity of all resources. A country’s industrial
accomplishment relies on the competition, planning on loss reduction in the form of wastage from all sectors of
the industry, including public services. It has positive impact on country’s GDP, and also Lean develops a system
that drives for the customers.
1. Identify Value
Identifying value is defined as the first step or first Lean principle, in the journey of becoming lean. This step
requires businesses to outline the customers value and process to fulfill their products or services to meet those
values. It requires;
Developing products to meet the requirements of customers
Eradicating that features which do not explicitly meet that needs.
3. Create Flow
Efficient product flow requires items to move from production to shipping without disruption. Hindrance arises
from time & extra processes, that could be achieved by strategically organizing the work floor, which describes
in third Lean principle, i.e. Flow. Uninterrupted and smooth flow is one of the pillars of Lean. Every factor, from
people, equipment to materials and shipping, must be taken into account, to ascertain the product’s seamlessly
movement through the production lines or operations.
A well-organized and interrupted flows in shop floor ensures in optimization of production time, inventory
cost and material handling.
4. Establish Pull
It is another pillar of Lean and closely related to producing flow, which used techniques of pull-based production
system, the fourth Lean principle, requires for businesses too. Traditional production systems use a push system
(when there is no pull), it starts from purchasing or supplies and proceeds materials without obeying the
manufacturing process, even when there isn't an order. Push systems are easy to create, they often result in large
inventories and a significant amount of work-in-progress (WIP). Pull system requires a well-planned method and
disciplined work techniques.
5. Seek Perfection
Lean always planned and way forward towards perfection, which is another final Lean manufacturing principle.
Companies seeks perfection in all functions for Lean. While transforming for perfection, it might
straightforward, but it is often one of the most difficult principles to successfully put on in the workplace.
Looking for perfection requires continuous development in their practices and often requires a swing in the
workplace culture, for which Kaizen, a philosophy of continuous improvement, helps businesses with this
alteration by creating a culture to develop perfection, which management always aspires. Kaizen focuses on
making small, incremental changes and requires for every people from all functional areas to help and improve
the business practices.
Over the time, Kaizen becomes essential to involve people’s and their intelligence, results in increased
efficiency, lower costs, greater productivity, and better-quality products.
Cycle Time: Cycle time is called one-piece production time in the machine or in the line. In the Line one-piece
production time is calculated as per the bottleneck operation time in the line. Some, industry concept also refers
manufacturing/ production cycle time refers to the time, required or spent to convert raw materials into finished
goods. It could describe as throughput time. Theoretically, it is the length of time from the start of production to
the delivery of the final products.
Total Production time: It is total or addition of all operations or processing times of a product/ lot / in the plant.
It’s also the longest time which the all operations are covered from the point of receiving of the materials in the
shop floor to ready to delivery.
Lead Time: It is total time starting from receiving order from customers to delivery to the customers. In other
way, production lead time or manufacturing lead time is the period of time between a customer order being
placed and an order being fulfilled, completed and delivered. One can find its resemblances with Kanban time
i.e. the lead time starts when the request is added to the backlog and ends, when the product is delivered.
Takt time: Takt time is the maximum acceptable time to meet the demands of the customer. In other words, Takt
Time is the speed with which the product needs to be created to satisfy the needs of the customer. The Takt Time
Formula = (Net Time Available for Production)/ (Customer's Daily Demand). In another way it explains as takt
time is the time which is excess time after completion of total production. It is calculated as Takt time = (Total
time approved from the customer) – (Total Production or Lead time). Takt time is important for material
availability, plant shut down, pre-occupied of the lines with other orders and planning for cost effective
production.
7.8 SHORT DESCRIPTION OF LEAN TECHNIQUES
5S: A techniques, starts from housekeeping but at present becomes prerequisite for an industry to maintain the
standard to reduce the indiscipline in movement of man and material. 5S used for best space and shop floor
utilization, hygiene, safety and control of internal transportation. It is described detailed in 5S Implementation
chapter.
Kaizen: It is a theme of continuous improvement, first applied in Toyota and then percolates to the industries as
a philosophy of continuous improvement methods in Lean journey. Now Kaizen becomes a radical game changer
for industry with human participation with a problem-solving acumen. Detailed described in Kaizen chapter on
concept and implementation.
Cellular or Flow Manufacturing (CM): This process is the links the manual and machine operations with
materials positioning into the most efficient combination to maximize the value-added combination while
minimizing waste of motion, time and other contributing resources. Designing better layout and cell construction
helps to achieve simplified flows by integrating process operations in a one-way material flow. CM is one of the
primary techniques used to obtain the Lean benefits of shorter lead-times, improved quality, reduced inventories,
simplified scheduling, and minimized material handling.
Pull System, follow the pulls, the customer's order from the shipping department, which prompts new items to
be manufactured and signals that additional supplies need to be purchased. It also called Kanban, under Lean
manufacturing help businesses to establish a pull system to control the flow of materials in a production system.
This method of controlling the flow of resources by replacing only, what the customer has consumed. There are
several major benefits to pull systems; one benefit is the reduction of Work-In-Process (WIP); the second major
benefit is it reduces scheduling complexities. Pull Systems consist of production based on actual consumption,
small lot sizes, low inventories, management by vision, and better communication. Pull system eliminates
sources of waste in the production flow.
Value Stream Mapping (VSM): Value Stream Map is a visual presentation of the process flow, both material,
operations and information. It is used to provide an overview of the ‘present state’ of manufacturing process.
Producing this present state flow diagram will helps to identify all steps within the process, the basis of which
are value adding and non-value adding.
After mapping of the present state, a plant could clearly analyze with what opportunities are for eliminating the
non-value adding steps. Thus a ‘future state’ Maps of a process is created showing the improved, value-based
and streamlined flow. This method enables a production system / line to view at the ‘Big Picture’ of a
manufacturing process. Today VSM software developed to visualize and optimize any process or everything,
other-wise, it would be drawn by hand & in pencil for review & modification.
Sample existing VSM for Jewellery; s-necklace as per the core operation areas
Operations are described with Elements / sub-operations
- -T •
” Internal/ Interna I f
Interna I
JO Aartisan r Out of
Gift of R.0Z to
JO from Vendor the Titan
Titan
Titan to □ peratio Stores'
Artisan's Artisa n' s ns Time Hosur
1 Bay Hosur
1 Day Line of 2 IBHrs. Hrs., 1 -2 Day
1-2 Days 2 Days
Total VSM Time in SCT (Supply Chain Time) for Plant: 9 Days and CPM 11 Days
Note: Measurement of CPM (Critical Process Method /Time) is done by taking the maximum operation/ processes time of each production section /
unit/ activities.
Standard Time Variables, Revised as per Value Analysis on Operation Time: Online Artisan’s Total Operation Time 18hrs/ Two Days, this the
Cycle Time of 1 Pcs Operation of S-Necklace.
Next Revised Time Variables: Batch operation, work segregation and one-piece production line, where there are delays in red marked in the VSM,
where there is scope of Improvement.
Kaizen Burst: Required to change these critical areas for reduction in long delivery time due to long CT, and make it to short CT for short delivery
time, introduction of short duration Kaizen initiative through IE Techniques through the balancing the operations and 7QC Techniques for reduction
in rework & rejection from vendor/ supplier.
7QC Tools
It is a defects identifications and quality control Tool used in industry to reduce defects and defectives. 7QC
tools developed by various Gurus and Masaki Mai towards the journey of TQM. The most important techniques
of 7QC tools are, Pareto chart and Ishikawa diagram etc. It consists of seven techniques which is discussed in
TQM and quality chapter in this book.
Total Productive Maintenance (TPM): It consists of a company-wide upkeep of plant & equipment through
maintenance covering the entire equipment life cycle. TPM requires an initiative from management for
participation by every employee. The purpose of TPM is to minimize downtime, develop method of various
maintenance and to maximize machine availability for performance. TPM consists of eight pillars which
discussed in TPM chapter.
Setup time Reduction: During the production, various products and combinations processes are changed as per
customer’s orders and specifications. Times requires to do new set up in the machines and combination of
equipment. So, set up driven by the need of being able to change over a given process to produce a different
product in the most efficient manner. Reducing Setup (or Changeover) is the lean manufacturing technique
allowing the mixing of production/ products without slowing or disrupting output or creating higher costs,
associated with non-value adding activities.
In Lean changeovers, it adds no value and therefore should be minimized with the goal in reduction and
elimination in downtimes due to internal and external activities. The setup process should be viewed from two
different perspectives, one is Internal steps conducted and requires complete when the machine is stopped,
versus external steps conducted and finished offline while the machine is in operation. Quick Changeover will
increase productivity, reduce lead-time, lower total costs, and increase flexibility to adapt to a changing market
and/or product mix.
Just-In-Time (JIT): It also called Kanban in TPS (Toyota Production System), or as may describe it as demand-
pull manufacturing, world-class manufacturing, and agile manufacturing are just a few of these strategies in
Lean Manufacturing. Kanban is resembled to lean and just-in-time (JIT) production, is a visual system for
managing work as it moves through a process. Kanban also a concept related to where it is used as a scheduling
system that tells what to produce, when to produce it, and how much to produce, when all are viewed from a total
systems perspective.
There are similarities with Pull, Kanban or JIT is an inventory management strategy; one of its elements
is Kanban. Kanban is a pull or demand type of scheduling system, usually in the form of job cards, bins, palettes,
or boxes. JIT uses Kanban as a means to prevent inventory-related costs.
The Kanban method is an approach to change management, that is designed to meet minimal resistance.
However, it encourages continuous small incremental and evolutionary changes to any existing system.
Many people could be involved at time, integrates additional expertise to solve the problem
PDCA does not necessitate in-depth expertise when working with highly technical or critical processes
It easy to understand to execute
This method can be learned and discuss quickly
Keeps everyone focused on the areas of problems to being addressed
In easy clarified goals of the project for involving everyone in individual and in team
Easy to distribute the accountability for completing tasks
Advanced a culture of continuous improvement.
Strategy for Application and
application &< trial of ne
Improvement process
Act on developed
Find process checking
Improvement and information and
organize the Team defined approach
After the above discussion, it is clarified what is importance of Lean, but it also equally important to know what
is not, Lean does not mean ‘Lean and Mean’. Sometimes many erroneously thinking in the goal of Lean is to
save & fire people and make the over-involved people with more workload. It is important for learning, team
effort for to be more productive. After implementation; salary, recognition and rewards are included in the work
culture in many organizations. Through 5S implementation at work place, improved in comfortably spending
more time in the workplace with easy access of materials and effort in a hygienic condition. Employees
understanding on increased competency through Training under Lean implementation. With core value concept
in Lean, customers become more benefited with quality and cost.
In the above example the cost to bring the product to market, plus profit dictates the selling price of a product.
Particularly in the global economy this thought is rarely reflective in the present practices. Competition and
customer demand repeatedly set selling prices. Process of controlling the costs through eliminating non value-
added activities, a Lean manufacturing culture directly affects cost.
By implementing and obeying Lean principles, companies realized the direct cost savings by driving out waste
and make significant improvements additionally in other areas:
Employee motivation and involvement
Gain in productivity
Customer satisfaction due to reduced defects and improved delivery
Faster growth in the market
Vorne Products and Lean Manufacturing
A manufacturing truth – “you cannot change that which you do not measure”. Vorne visual displays provide real-
time information to enhance Lean manufacturing initiatives and create a true visual factory environment.
The visual display of information makes change possible by informing operators of critical real-time production
information. As per Vorne, imagine driving a car without real-time information, no gauges, lights or any
indication of how the vehicle is performing. It would be difficult to maintain a proper speed, watch for indication
of required maintenance and to monitor critical processes.
The fact is, whatever the goal; increasing productivity, reducing downtime, or enhancing communication; Vorne
message and production monitoring displays are an outstanding choice in these areas.
Second, Lean techniques could be used, when there will be problems related to quality, process, customers and
other functional areas of the organization. This technique evolves and refers as Lean-six sigma.
Step I:
Identification Wastages in
the Existing Process, Tools
and Techniques
In the sections, it is initiated through the process of identification the problems, identification of the project for
improvements in the production sections, technical basis for identification of problems and details about the
projects.
Root cause analysis, Pareto Chart & other Quality Technical Tools are used in the data analysis. All the Tools are
presented below the data and problem analysis.
Basis of the selection of the project: Technical tools used for identification of problems
i) Pareto Analyses of the data of the problems
ii) Root Cause Analysis
iii) Feedback from the team members
iv) Numerical Nos. i.e. in counting the actual failures
v) During the implementation of 5S, Kaizen
vi) During implementation and collection of internal data and information MIS for collection
vii) Through the Time and Motion Study.
RCA of t h e Verification
Reyi ew of complaint by □Tractive of corrective
Possible I m p a c t action
p r e v i o u s data t h e team action
of t h e Project a n d T rends
V
Communicati
cm of statu s
Closure of to t h e
Identification complaint Centralized
Analysis/ Review and
of all t h e a b o v e coordinator
Categorization
Pro bl ems of p r o b l e m s Toil No. 1: CanpUints «ehed o n 46 Nos.
Sr.lto. Types ComplMil Identified Problems co Coftylants Co ml Receiving Male
All the sections of the plant and the technical team decides to involve themselves in the wastage reduction
through Lean manufacturing techniques in the plant, in each section have selected the most important and
potential areas of the improvements on the basis of customers feedback (internal & external), manufacturing
fault & defects, wastages in materials etc.
So, the selected improvements under one project i.e. reduction in wastages in the most improvement potential /
affected areas by giving target of improvements to the respected sections.
Shorting the list of improvement projects, kick off the study and improvement, on the same time, or developed
steps internally as per applicability in the plant.
Step 2
Develop Teams and engage in Training
Teams should be formed from the functional areas at the preliminary level of the plant and cross functional at the
Top level. All the Team members should be Trained on the Lean aspects – Tools & Techniques, about Project and
Personal involvement required with the daily activities. There always misconceptions about full involvement of
employees for the project with daily activities, rather Team members should plan the amount and time of
involvement in various meeting, discussion, data collection or analysis as the daily or periodically convenient
times / durations. There should be understanding among the team members that after the project / study
implementation, their work effort / workload will be comparatively less and work will be in discipline and
standardize method, which will save time for more involvement in the existing work.
Plant Team Leader
I 1 1
Leader 1 Leader 2 Leader 3 Leader 4 Leader 5 Leader 6 Leader?
MM MM MM MM MM MM
1 Team 1 1 Team 1 1 T earn 1 1 Team 1 1 Team 1 Team 1
1 Members! iMembersI Members Members Members! Members Membersl
STANDARDIZATION ( S O P )
Step 3
Data collection and analysis
Data collection of the Lean project is organized method to understand the initial disposition of the project and
visualize the real problems with intensity and extension. Data should be actual and on-site recording of the
process of collection. It is important because after completion of the project implementation, the resemble test
and experiment should conduct in homogeneous condition to estimate the veracity of the study/ project with
benefit.
Important points for the Data collection;
Define the collection points as per the most critical areas for representing the problem and to make
solution
Define a homogeneous method of data collection; standard procedure to follow by all persons whoever
collecting the data with a standard format and decided times
Any problem and variation in collection method and timings, immediate communication to the team
leader
There are some methods used in the industry for data analysis, following are the data analysis procedures;
Pareto Analysis for ranking and significance for the identification of the major causes for solution
Root-Cause analysis for likely areas of roots for further solution
Why Why analysis for solution finding
Delphi method etc.
Following are the Sample data collection and analysis in the projects with analysis;
Table No. 33: Sample Data collection on rework
REWORK APRIL- May- Jul- Aug- Sep- Oct- Nov-
LIFTER Jun-15
PERCENTAGE 15 15 15 15 15 15 15
BAR
(%) 18.5 6.3 18.2 50.0 4.5 11.5 5.9 3.3
REWORK APRIL- May- Jul- Aug- Sep- Oct- Nov-
SHELL Jun-15
PERCENTAGE 15 15 15 15 15 15 15
PLATE
(%) 18.18 50.00 40.00 0.00 7.14 0.00 12.50 9.09
HEAD REWORK APRIL- May- Jun-15 Jul- Aug- Sep- Oct- Nov-
PLATE PERCENTAGE 15 15 15 15 15 15 15
(%) 33.33 66.67 100.00 78.57 15.38 0.00 22.22 20.00
REWORK APRIL- May- Jul- Aug- Sep- Oct- Nov-
GRATE Jun-15
PERCENTAGE 15 15 15 15 15 15 15
PLATE
(%) 42.86 75.00 100.00 0.00 150.00 23.08 0.00 0.00
REWORK APRIL- May- Jul- Aug- Sep- Oct- Nov-
FILLING PERCENTAGE Jun-15
15 15 15 15 15 15 15
SEGMENT
(%) 16.67 0.00 0.00 10.00 0.00 0.00 0.00 0.00
APRIL- May- Jun- Jul- Aug- Sep- Oct- Nov-
MONTHS
15 15 15 15 15 15 15 15
TOTAL
64 36 103 63 66 89 77 62
ASSEMBLY
TOTAL TOTAL
14 16 24 23 8 6 5 3
REWORK
REWORK
PERCENTAGE 21.88 44.44 23.30 36.51 12.12 6.74 6.49 4.84
(%)
Analysis
FISHBONE DIAGRAM FOR MOULD ASSEMBLY
( ENVIRONMENT
■’t.RLNO.X
| MATERIAL
REWORK IN GRA.TC PI
MOULD ASSEMDL
MISTAKE T O
DIME NSION
NO S U r r i C F N T
SPEW HOLE
“NOT CLEAR
GUIDE P I N ANU
LOWLH ejuitiu
| MATERIAL MAN
tJ'iSSSTblJ* — -
Cause & Effect Diagram for Less Flow Cause & Effect Diagram for Spongy and air entrapment
ices SlirA
Ccrepuid ysc&a/
:nrf«pK 3a ri
lPUahmta
•worgUinfe wctjn 'i. 34iri< cbagn
Ctfdtfars-
Cause & Effect Diagram for Undercure Cause & Effect Diagram for wrong reinforcement placement
-Peso nnel
Wiceig
Jnderux: tenfarontei
I aactmeit
LINE CARTON Datel: 14-07-14 Date2: 15-07-14 Date3: 10-07-14 Date* 17-04-14 Date5: 18-07-14 Date6: 19-07-14 Date7: 20-07-14
PACKING Defects/ Defects/ Defects/ Defects/ Defects/ Defects/ Defects/
Total
Sr. Defects A A2 Bl B2 Al A2 Bl B2 Al A2 B l B2 Al A2 Bl B2 Al A2 Bl B 2 Al A2 Bl B2 Al A2 Bl B2
No. 1
Machine Punching
1 problem 4 9 0 1 14
Flap opening
2 problem 3 1 10 12 9 0 11 9 8 11 30 40 26 12 86 110 42 3 4B 22 58 4 25 25 48 19 13 8 693
13 46
3 Leakage problem 7 15 35 30 17 18 225 220 62 162 148 165 0
106 60 350 132 120 97 93 79 28 77 37 43 64 60 45 3085
PM specifications
4 O
problem
Vendor end PM
5 problem 2 11 0 0 5 3 4 3 28
7 Printing problem ID
m o ID srH rj
ID s
CM s
nj in 8
tn
co o 3 co
r-< (N o
m
IN CM o
r—< r—< a
ni m
m 3
uo
in
CM in on E 3 § 2690
IN O CO O in CT> o -d- ni o o
8 Weight variation <N in ID a 8 s? o o ID O in O g m s o 1044
9 Inner laminate
problem
O
IO Others O
g
1 H36l
s I in ID
j 1284
1076
1023
11 TOTAL 1 § a §
s
in a 1' K § 8 B 2 s s s 3 < §
1
§
W e i g h t variation | if olllmn
Percent
17% 7tt
s
s
Leakage problem
21%
1000- - 20 P r i n t i n g pinblrwn
1B%
0
Adhesive pasting
problem
S4%
Vendor end
P M problem
1%
C2 1493 912 814 736 328 127
Percent 33.9 20.7 18.5 16.7 7.4 2.9
Cum% 33.9 54.5 73.0 89.7 97.1 100.0
Material
\ for Defects
/
f Fennel situ at a u c q c r t o h e rcthccled.
i n Line
/ Carton
/ AlDiw.iim [-■-tkLiri y catail - I I <>a is. rirjL
' olicjned with the rollers. i
Line cpi’oo e a r g u i d e alionrrent is out.
Methods
Step 4
Implementation Planning and Implement as per Planning
The most important step under Lean / lean-six-sigma Project is implementation of the planned improvements.
After data analysis, team starts the implementation with some specific method. The specific methods are as
follows;
F Discuss the analysis in the team meeting
F Find the solutions from the participation of each individuals
F Collections of solutions, suggestions through repeated on-site visits and analysis
F Selection of best suited solutions as per the ranking of the obvious and immediate solutions, cost effective
solutions, short-long term implementation, solutions depends on other section, implementation required the
approval of top management or any joint decision of management and sections
F Define responsibility of implementation with time and action points
F Develop and follow up the formats & data tables for action plan, duration, verification dates and completion
signature with responsible person and Team leader.
Root C a u s e
Collective A l l o c a t i o n of
analysis and
Data Analysis D e c i s i o n for Implementation
Develop Action
Improvements Responsibilities
Plan
A c t i o n o.n Com | »n of
Review of R e s u l t Data collection
Implementation th e A Plan
X:
iMECMtelKIt tOHIItMK WtlhHI HAXtflm * aAMTotx JOtB TIL WOT 1*. 18 01 M 01Oi 15
Laaa Blank WMrfhi BH.CRUKAV IN SCALE HIRE PMUVIM li &AMTOCH JI 12 ts ji tn la 31 12 18
« M»»H In*Mt ilaakau, SHORT NISI R l TOM COtftRCP RAI-E»I r 12 IQ 1& 12 I I IS w iQ is ta t i is CaaAawaaa
M XT ------------- au aMaptMaMA li. tela* .adu.«<1M O l lBw«««|te 1< *» Ateaadr icimfad <AmI«< CaM'al
«4 vaalfv M* Jote Cad 8-awMBawr CIA,. Onj'.a.j
1— -**-• I. CnatmaMma ciaaitea ciaaa vaaMad VIM*. Maa «M •»<*•
Uw>«1Iwal
Ad O»aaM««
K VW
v
Open Tray of the Adhesive before QC and Corrective action which was Closed / Covered Tray of the Adhesive before QC and Corrective
caused for Evaporation and Concentration of the Liquid action which is Now Controlled from Evaporation and Concentration
of the Liquid
Existing Punching Problems are solved/ reduced after Installed of new
more pressured Punching Fingers Printer of the Line are Repaired and Maintaining for Correct and Legi
Printing as per the Quality of the Carton
After collecting data, the result would be compared/ measured with improvement in the expected and previous
studied areas to ensure that expected result is achieved, the amount of financial benefit will be calculated on
total benefit in a year and for long implemented project it may be for total five year.
LINE CARTON PACKING SECTION Datel: 9-8-14 Date?: 11-8- 14 Datel: 12-8-14 Aug.
- Xpert M/g Detects/ Rejection Detects/ Rejection Detects/ Rejection Total Per 7 Days
Sr. No. Detects Al A2 Bl B2 Al A2 Bl B2 Al A2 Bl B2 Day
1 Machine Punching problem 0 0 0 0 O 0 0 0 O 0 0 O 0 o
2 Flap opening problem 69 59 30 21 6 50 14 6 17 20 30 20 342 114
3 Leakage problem 21 22 35 32 42 0 41 43 38 31 210 65 530 193.333 1353 33
4 PM specifications problem 0 0 0 0 o O 0 0 !O 0 0 0 0 O O
5 Vendor end PM problem 12 5 0 0 O 0 0 0 o 0 0 0 17 5.66667 39.6667
6 Adhesive pasting problem 73 75 40 35 32 62 48 52 40 30 70 ioq 657 219 1533
rzizz Printing problem
Weight variation
35
20
25 3
4
0
72
20
18
17
21
9
32
22
3
103
29 45
325
284
108.333 758.335
94.6667 662.667
9 Innerlaminate problem 0 0 O o □ o 0 0 0 o 0 0 0 0 O
ID Others 0 o O o o O O 0 i 0 □ 0 O 0 o O
11 Total 187 185 140 143 87 184 141 139 106 442 315 2205 735 5145
All the packing m/cs are purchased from the manufacturing companies with mixing with the automations, but it
has no control on defects and productivity. So, the human intelligences are very much important to specify the
m/cs according the capacity, efficiency and productivity with minimizing the loss in time and products.
Knowledge creation
1. Reduction in m/c stoppage time
Presently the stoppage time of the packing M/cs are reduced with the following analysis;
Product-wise i.e. M/c utilization
Packing Material-wise M/c utilization
M/c Performance–wise Product selection
More Schedule Maintenance of the M/cs which improves the Utilization and Scalability of the M/cs
Horizontal deployment
Develop Implementation Instruction to
I n t e r n a l QC t h e s a m e Process follow t h e other Any System-
a n d Techniques of Production
Team a n d t h e Similar M/cs, centres, Units etc. wise
Training to t h e Modification
other QCs Process a n d by t h e
Techniques Management
I n t e r U n i t , sections
m a d e QCs for a n y
New areas of
Development
r»d uctlor
B rejkdo
7.12 Project Charter for Management on Lean Implementation
1) Introduction to the Project: About the project, process, production areas with M/c & Flow mapping,
manpower, inputs, output with existing activities, operations and team etc.
2) Process description & measurement plan: Whole process will describe, as per the process and operations
of the selected project. Data of existing operations, M/cs performance, safety, output, times etc.
3) Situational Analysis with Observation: Situational analysis is developed on the basis of understanding of
the environment in which a project & plan is delivered. Sometimes, it may accomplish by means of
a SWOT analysis (Strengths, Weaknesses, Opportunities and Threats), how to conduct the analysis during
the project execution for planned, and in an unexpected situation. Continuous analysis during the project
and observations helps the better and on-time completion of the project.
4) Improvement Plan: It is most significant part in the project to plan for execution and improvement. The
purpose of the process improvement plan is aiming at the documentation of the process, followed by
the project team. Significant is how to identify the various activities, analyze various processes & steps,
determine improvements can be made, improvement measures and efficiently completion.
5) Standardization of the activities: In the standardized of the project, the activities are made standardized
for sustainably further follow the same practice or application. It may be followed through developing
SoPs, after implementation, or may be as per description of the degree of absence of variation in
implementing, such practices developed by Stevenson in 1993.
6) Phase wise & unit wise achievement: Achievement form the project is the outcome from the project from
customer, process and business perspective. It may be presented by tangible or intangible, quality and
motivation etc.
7.13 Lean and Improvement Monitoring
Sr. On Responsible
STUDY AREAS Started Completed Remark
No. Progress Team
C KAIZEN
Processes of the Study and Implementation
1 Team Formation
2 Training of the Internal Team
3 Develop Internal Kaizen Team
4 Collection of Suggestions – Develop Suggestion Box
5 Collection of Problems – Individuals and Departments
6 Employee Innovations
7 Improvement Action Plan
Implementation of the Important Suggestions on the Most
8
Important and Instant Result basis – Long & Short Term
9 Review Meetings
10 Calculation of the Financial Benefits
11 Departmental Improvement Planning
12 Kaizen Evaluation /Report Preparation
D QUALITY – 7QC
Processes of the Study and Implementation
1 Develop Internal QC Teams
Collection of Problems – Individuals and Departments related to
2
Quality and Defects
3 Defects Data Collection
4 C-E and W-W Analysis
5 Implementation Planning of the Action Plan
6 Implementation Teams / Employees
7 Review Meetin g s
E MAINTENANCE
Processes of the Study and Im plementation
1 Develo p Internal Maintenance QC Team
2 Modification of the Maintenance Stores
3 Imp lementation Plant – Autonomous Maintenance
4 Imp lementation of CAPA (corrective and p reventive action )
5 Prep aration of maintenance p rocedure and schedule
6 Action Plan on Imp rovements
7 Imp lementation of the Plans
8 Sp are p arts criticality assessment
F OTHER AREAS
1 Visual Control
2 Formats of MIS
5 Stud y Examination of the Internal Team members
Table No. 39: Internal improvement follow up and action plan sheet
Internal im provement follow-up and action plan on it
RC
Analysis
Completed Completed / Any
by Plant/
Sr. Study and /Conducted Implemented Remark/ Review /
Status A Star
No. Working Areas by By A Star Result Retraining
Team, if
Consultant Team Required
it not
Im proved
Productivity and
Quality study on
1 the Existing a a Completed
System and
Process
Internal Time,
Process Flow with
Tools and
2 a a Completed
Techniques on
Section-wise are
studies
Gaps on the Basis
3 of Analysis a a Completed
Mentioned
VSM Study done
for Major Items /
4 a a Completed
Total Material
Travel Time
Operation Times
5 are studies in a a Completed
Major Products
Training Areas are
6 a a Completed
Identified
Implementation
7 Plan and Process a a Completed
are mentioned
Work Follow up
Continuing by
8 are Identified as a a
Plant Teams
per Sections
Implementation
Suggestions and
Pro g ress
Section-wise
Distribution and
9 writing of Daily a a Started
Activities/
Lo g book
Section-wise Pl. keep
Written
10 Defects / Rework a a Started
Documents
Identification on It
11 Define the Activity a a Started, Except
of the Supervisors Final Polish on
with New Addition Manpower-
wise Rework
of Work on
Identifications
Maintain the Daily
Activities with
Time based Work
Distribution,
Worker-wise
Defects
Identification and
Implementation of
Solutions on the
Basis of RC on
Rework and
Material Wastage
Study Report
Submission and
Discussion on
12 Implementation a a
and Discussion
with Internal
Teams
Training on
Productivity,
Quality and Basics
13 on Lean a a
Techniques,
Discussed in
Training Program
Operation-wise
Line balancing of
14 a a
the work in the
plant
Working Times of Writing in the
Each Items which Section-wise in
15 a a
will Perpetual for Board Started
this Plant from Oct. 2019
Pl. keep the
Focus on Documents
Started with
Reduction on by Central
16 a a RC and Action
Defects / Rework Plant
Dept. and
below 5% all sections
also
Start of all
Improvements
17 Initiatives on Shop a a
Floor
Implementation
Monitoring the
18 Shop Floor NA a
Implementation
Progress and
Problems
19 Identification NA
during
Implementation
Quality as per the
Individual
20 NA a
Involvement &
Progress
R-C on Failures,
Rework and
21 Material Wastages a
with Solutions and
Action Plan
22 Re-Training a a
Assess the Basic
Knowledge
23 a a
Improvement in
the Shop Floor
24 Supervisors and a a
workmen
Responsibility and
Internal Target.
Special attention to
25 a
Polishing section
Capacity Analysis
26 as per prepared a a
MIS
27 Polish Section MIS a
Data Collection
and Analysis of the
28 Delivery
Performance of
unit
An Excel sheet on
sections is Made
29 for Section-wise a
Daily Monitoring
of Output
QC TEAM
BUILDING: Initial
3 nos. Quality
Circle Teams are
made:
IMPEMENTATION
TEAM – Leader
Gautam Shah,
30 PRODUCTIVITY a
TEAM – Leader
Vinod ji,
QUALITY YEAM-
Head Santosh and
5S/ 6S TEAM –
Head Sanjay ji
(Head HR) and
Vijay Chauhan
Visual of all QC
Teams Chart with
Visual in the
31 a
Common areas of
the Plant are Started but not
suggested Completed
Next Steps of
Action and
Implementation
Recommended
Innovation in Request to These areas
Working and Complete these should be
Targets as per Stated as
32 Manpower for
the Discussion continuous
Total Involvement in Training and basis and
in Implementation Implementatio completed the
5S/ 6S Audit in the n Follow up Implementatio
session n by 24th
Plant with Sections
33 Dec. Pl.
Audit Report and take it a
Review Meeting Challenge to
Competency of achieve these,
it is important
34 Manpower and
to enhance the
Process Ownership Internal
Capacity Building Capacity
of all Section 100%
Delivery
35 through
Performance
Opportunity and and Upgrade
Constraints the Status in
Control and this sheet
Monitoring MIS:
36 Control Charts for
all Controlling
Factors in the Plant
Next Phase of
37 Training and
Orientation
38 Kaizen Box with
Suggestions and
Manpower-wise
Innovations
Planning
Team -wise Target
and Action on
39
Distribution of
Improvements
Internal
Improvement
Follow up and If
40 not Improved,
make Internal RC
Analysis,
mandatory
Focus on Capacity
Improvement of
Final Polish section
by Distributing the
QC Team Leader-
wise Product
41
Category
Distribution for
Productivity and
Quality, as
discussed on dated
11/12/19
Target to Achieve
the Target of FTA /
FTR 95% of all
Sections (90% for
42
Final Polish) by the
End of this Month
and Overall FTA
above 91%
Communicate to
43 me for any
Technical Problems
Reduction in
Material Wastages
44
below 2.5% in the
Plant
Target to Polish
Section daily
output to Achieve
the TITAN Order
45
on Daily Basis out
as per the
Developed MIS
Sheet
46 RC Started
Solutions is
47
Implementing
Report and Data
48
Collection
Working Time and
49 Operation time
verification
Quality Team
50 Training and Job
Rotation
Management
51
Follow up
7.14 INVENTORY ASSESSMENT (Self-Assessment Sheet)
6. Electric
board near
gantry Install on
crane for columns.
heavy tank
fabrication.
There are
Weld a
two scrap
partition in
7. Use one bins, one
one scrap
scrap bin for steel
bin, and
instead of and
increase
two. another for
it's length
plant
if required.
wastage
Req-- An
electric
torque
wrench, a
hydraulic
pallet type
trolley.
All related
I/C will
To revised Second determine
Existing existing time the level of
ii.
check lists check list review 5S as per
Maintaining
are on as per lean on DSR
the system
shop floor. consultant 12/04/11 format on
observation at floor. 11/04/11 in
presence of
HR.
Conversion
iii. Present 5s
of check
Determine status of
sheet in
the level of department
Hindi,
5S is 5/25
05/04/11
; Name
1 2 3 4 5 6 7 8 9 10 11 12 1J 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
'arty Code
Table No. 43: Quality check sheet
SCAS QUALITY CHECK SHEET
Details
Heat no.
Size
Grade
Length required
Total quantity REQ.: ACTUAL:
Elongation
Hardness
Resistivity
Ultrasonic test
A Blow holes
Chemical
A) Copper
B) Tin
C) Phosphorus
D) Lead
E) Zinc
Cracks
Inspection by
Date
Shift
Sample Lean Improvement Action
Before After
Quantitative/
Sr. Area of Action Date/ Section/ Action Action Signed
Qualitative Remarks
No. Improvement Taken Time dept (With (With By
Benefit
Picture) Picture)
Duration of
1 Orientation
with workers
Duration of
Orientation
2
with
su p ervisors
Duration of
3 Orientation
with CEO
4 5 S Level
Time
5
Utilization
Manpower
6
Utilization
Inventory
7
Reduction
8 Space Saving
Defect
9
Reduction
Rework
10
Reduction
Motion
11
Imp rovement
Transportation
12
Imp rovement
Over
13 Processing
Reduction
Through put
14
increment
Skill
15
Imp rovement
Break Down
16
Reduction
No. of Check
17 sheet / Format
/ Action p lan
18 Visual display
Improvements of Lean manufacturing implementation
Table No. 45: Lean Improvements Result sheet
Improvements Result Remark
Sr.
Particulars Pre- Lean Post
No.
Lean
1 Overall Capacity of the Plant
2 Production Lead Time
3 Product Cycle Time
4 Set Up Time
5 Change Over Times
6 Reduction in Waiting Times
7 SoPs (Stannard Operating Processes)
8 Improvement in 5S score
9 Salvage value of Total Scraps
10 Space Utilization
11 Overall Transportation
12 Layout / Cellular Layout
13 Product-wise PPR or DPMO
14 External and Internal PPM
15 Product FTR and FTA
16 Overall Delivery Performance
Implementation of the Suggestion
17
Scheme
Energy Conservation measures and
18
the benefits accrued
Materials saving potential (if any
19 during implementation of any of the
KAIZENS)
20 Labour Productivity
21 Inventory Turnover
TLC (Note: DRM= Days of Raw DRM + DWIP +
22 Material, DWIP= Days of WIP, DFG = 15 +4+3
DFG= Days of Finished Goods) = 22 days
Improvement in the VQR (Vendor
23
Quality Rating) Score
Improvement in the Supplier point
24 checklist scoring, as per the
Automobile
Implementation of any visual
management system (Safety
25 Measures, Visual work instructions,
Teams, Single point Learning, ID
Tags etc.)
Implementation of any systems for
26 continuous improvement and
sustenance of the Lean Initiatives
Overall Financial benefits during
27
Lean Implementation
Table No. 46: Inventory causes check points
Task / Activities1
Task /Activities 2
Employee
Participati
on
Control of
Manpower Moraleand
Motion Motivation
time
5S
Managemen
Workplace t
Ownership commitment
Team,
Culture
7.16.2 Benefits of 5S
To the Individual
i) Better employee engagement in the work
ii) Improve in individual work performance
iii) Positive improvement, change in attitude and comfort in working
iv) Plant and organization change in work culture
v) Reduction in human physical effort, workload and stresses
vi) Possibilities of prevention of mistakes
Figure 69: Benefits of 5S
vii) Develops a process of thinking and
analyzing among people about workplace
viii) Improvement in the quality of the working life.
To the Organization
Saving in the internal motion and transportation time
Improvement in effectiveness and efficiency related to movement of man, machine, and materials
Efficient Management of the Plant
Better space management
Better work culture through improvement in individual commitment, punctuality & discipline
Reduction in missing of materials, tools, equipment and information etc.
It is one of the techniques of reduction in unproductive & non-value adding operations and activities in the
shop floor
On time retrieval of information and documents
Better utilization of space, workplace layout, equipment, & other resources
Reduction in inventory money
Organization reputation and customer’s satisfaction.
Disciplines in the sorting are, elimination of the unnecessary items from the workplace, reduce the waste of time
on finding and searching the items. In an organized working place becomes more comfortable to locate and
identify the materials, leave & keep the tools in correct places, have specific place, common area for everyone’s
access. The main problems are getting rid of some unused materials and without decider of the orders as per the
shape, urgency, importance and usage.
Process of Implementation
Setting Objective
Distinguish between wanted and unwanted and get freed from dirtiness in the shop floor
Planning for unneeded items and establish criteria for wanted and unwanted items
Initial salvation of scraps
Clear the unused and scrap occupied areas
Stratify each item which various raw materials, consumables, frequency of usage of equipment and
decide as per the requirements
Take visuals through photographs, videos etc., of the working areas, may be by using the technique of
fixed position photography for improvement in cleaning & monitoring and display the same in the 5S
chart, report or in plant visual board.
A ::x.
f —„ £ -
1 ¥
Die stacking with ID’s and Colour
Alignment of the dies on the 5S Team in the plants coding
display board in saves 40 square
meter space
In setting, the tools, tool boxes, Dies, equipmet and other useful item kept in order in identifiable order. All raw
materials, WIPs, finished items, defective items, customers return, delays delivies, work instruction, work
design, check points and proces flows should be kept in a identifiable orders. Organizing the materials and tools
as per the ranking and frequency of the work in the plant, so that no waste of times, items in waiting and
searching should exist in the plant. It is motivating, safe, no risk of hitting or stucking, spilling, while looking
for tools or any other items. It reduces risk of occupational accidents, chemical hazars and unsfae material edges.
Implementation
Objective of Seiton
The purpose of set in order is to set up and well-organized position of all needed items near the working stations
of each employees in the plant. It controls the human motion and efforts which saved immense areas in the plant.
The major decision-making areas are the stratifying the items into different groups as per use, place and safety
which are as follows;
Occurrence and amount of usage
Category of item
Areas and position of storage required
Availability and frequency of requirement
Planning on storage location and type of storage equipment
Develop the places for each material such as clothes, shoes, drinking waters, personal using items, other
than working materials.
Activity on Seiton
The activities are set in order are related to implementation and distribution work, responsibilities and
completion.
List of Items to put in set in orders as per the use
Design of the storage as per the materials types, volume and distance
Individual layout identification for set in orders with identification the keeping in boxes or in shelves
Areas of putting the storages
Storing the items on the basis of decided storage locations and sections
Locational identification of all parts / items of moving, components of finished & semi-finished items,
materials with dust prone as far as possible of the various production and processing sectors
Planning of the storage space and workplace inputs & equipment positioning shelves on such that when
items are removed, empty space will be visible, and dissimilar or different items cannot be put into the
same place, right materials at right places.
Develop communication with visual display about materials flow positioned and disposal with the aim of
what is stored where, and by whom, when and procedures
Use of standardization and sustainability with formats, training, orientation, discipline for self-control
Control and monitoring with checking on random of the items are retrievable in a certain time limit, and
time taken for identification, should be a targeted or within the benchmarked time may be within 30
seconds or instantly
Day to day random checking by supervisors on discipline in keeping and using the materials.
In cleaning is physically clean and hygiene up the working areas and prolonging the lives of machines &
equipment kept them always in good & working condition. Participation of each employee in daily own worplace
cleaning should be in practice. Standardize the cleaninig process with existing and new tools and develop better
maintenance of self-used tools and equipment as part of discipline and routine activities of the job.
Identyfication of souce of dust and dirtyness and hazards for safer working environment. Improvement of
effectiveness and effeciency of the plant and organization.
Implementation
Develop Objectives
Primary objective of Seiso is to eliminating of waste, filthy and foreign materials from the working areas for a
hygienic & cleaned work place. Define the objectives on the basis in the following areas;
Internal detection, monitoring as per recording, segregation of the sections as per dirtiness
Observe the various type of trash, filth and unused materials around the employees and their workplace
Develop internal monitoring teams to discuss, guide and assess the situation
Internal discussion with the developed action plan, solvation on causes for various types of garbage, dust
and unused material at various places
Develop and avail the internal cleaning tools & equipment, and train how to use.
Action Plan
Initial Seiso or cleaning starts in the plant as a master cleaning with each individuals’ participation and then in
periodical basis of the Master cleaning with the 5S audit performance. Most of the cleaning occurs in the shop
floor daily basis as per the developed duration with check points.
Initial audit of the plant on Seiso as per production sections
4. SEIKETSU (Standardize)
All cleaning, sorting and set in order required to continue in a disciplined method and maintain a standard of
housekeeping at workplace, at all times and not back to the starting phase as before 5S started. For maintaining
standards, continuous improvement in this process.
Seiketsu is important for creating & maintaining the standards to keep the work areas organized, clean and
orderly and also in documented. This practice should be made as a part of the working life of each individual in
the plant. The essential part of Seiketsu are as follows;
Always focus on standards of processes which could be controlled by continuity and involvement
Every employee should follow the standards, comprehend and continue these with improvement and
techniques
Understand the benefits of individuals, plant, outputs and customers
It is for standards of life, also entails for discipline in work.
Implementation
Objective
The objective is upholding the cleanness of the plant on a continuous basis with steady upraise of the standards
with maintaining this standard with a discipline action with participation and engagement of each employee as a
part of their routine job.
Action Plan
Initial Audit and develop system of periodic audits is the core action points of Seiketsu
Develop Audit check sheets with check lists of cleaning of the floors, machine and equipment cleaning
All check points are the measurement process of 5S standards in the plant
Special check points for critical areas for better maintain of the workplace
Establish the set of checkpoints for measuring storage, toilets, canteen, reception etc., for unique and
specific areas
Distribute the responsibilities to fill the checklists, sign on it and keep in a folder for reference audit and
checking
Decide a frequency for check sheet filling
Set up Audit team to check, verify the process of filling, documentation, meeting agenda and discussion
points
Management discussion on the points for improvement areas new tools, set in order stationaries, any
failure and for motivation to employee also
Set up of the photo assessments, videos, surprise visit etc.
Implementation
Objective
Acceptance and follow the discipline naturally to implement the 5S in the organization. Highlight the learning
points from it. Safe, hygienic and enjoyable engagement in the working. The place of working should be
comfortable and place for application of knowledge for each person and it only possible in good culture like 5S.
Your place of working should be your identity.
Planning
Management initiatives and involvement is necessary to make a policy and employee morale and
recognition for motivation.
Internal plant specific Training module, to train from experts or training from internal manpower.
6. Safety
It is now included by experts in 5S techniques. Safety precaution, safety equipment and safety practices reduce
the probability of the accidents, losses and saves the lives and injury in human body. For ensuring safety in the
plant, needs a special drive in the plant with training, awareness about unsafe items. Places, critical M/cs etc.,
where safety norms are implemented as per industry rules. All the above safety points ensure protection of the
Plant, but during the 5S audit, safety points are to be verified by the audit team as 6S Audit.
®0@©Q@
0000®®
Personal
Protective
Equipment
Safety Visuals
5S Managing Group
1) Management approval for the beginning of 5S with benefits and prospects of organization with customers
2) Prepare 5S driving plan including acknowledgment and recognition
3) Deploy the Area/ District/ Zonal/ Regional Office/ Workshop/ office 5S coordinators for the factory and
working areas. The coordinator preferably supervisory staff, working in the area and should be a go-getter
as well as practitioner
4) Development of a plan for first 3S implementation by respective office/ worker’s team
5) Formally announce for the launching of 5S program in office/ shop floor using various available processes
in the organization
6) Starting photograph of the critical areas, departments, most dirty areas and major improvement
opportunities
7) Divide the plant and shop floor in various sub-sections for better implementation and controlling
8) Deploy the zone/ area coordinator for each sub areas and separate plan should be prepared for each sub
areas.
9) Schedule the monthly or fortnightly meeting days for each sub-area to review & verifications of the
progress, preparations and develop check sheets for self-audit scores in each sub area. Decision on the
audit’s frequency of S2 and S3 with action plan.
10) Conduct audit and do initial self-assessment using audit sheet.
11) Set up 5S core team for driving the implementation.
Gain from 5S
Some significant benefits observed at companies practicing 5S in all over world include:
1) Shop floor and workstations becomes clean and better organized
2) Shop-floor and office operation become easier and safer
3) Improved the Quality and standard of the organization
4) Observable results by enhancing more and new ideas
5) Adoption of self-disciple by the employees
6) People become proud for their ownership of the workplace
7) Image to the customer and market about the factory for better business opportunities
8) Low employee turnover
9) Increased number of suggestions
10) Better use of floor space
11) Less work-in progress and inventories
12) Better flow of work
13) Low machine breakdown rates
14) Low accident rates
15) High product quality.
Cleaning Operation
The sources, ways and means to get rid of the source of generation of the dust have to found out with required
Time for cleaning to be reducing in continuous practice. Starting may be from 30 minutes to 15 minutes to 5
minutes which can be fixed as standards for daily activities.
Change in methods in cleaning, use of different tools, daily practice and use of surplus time for cleaning the
hidden spots is the part of improvement. Cover personal computers after use, care of windows and ventilation
areas, chalk dust (if it is used) etc.
Process of Implementation
Design and Implementation based check points
Define objectives
Develop Teams with responsibilities
Internal communication system
Empowrrment of employees with openion
Orientation and Training
MIS for follow up and feedback
Periodical updates
Develop the standardizations and culture of continuous order and improvement.
Emplementat
Improvemen ion of 5S
ts of the Process with
Photo Points Sustainabilit
Steps of 5S Implementation
1) Management approval for 5S Implementation
2) Construct 5S Teams with the members for various locations and sections of the Plant
3) Training on importance and concept of 5S Audit, daily check list, cleaning process etc.
4) Master cleaning days mainly for sorting, and management involvement and drive communication process
5) Implementation Team and Photo, Single Points photo spot etc.
6) 5S visuals in the plant
7) Calculation of 5S benefits
8) Sustainability planning
9) 5S Awards and recognitions.
ST- -
• -f-_
Sl. Evaluation
Details Results Remarks
No. Point
1 Sort Unsafe items in work area
There should not be any un-needed items in the
area?
Check the tools and tools area. Check the
fixtures.
Only Updated Drawings should be used on shop
floor.
Check the red tag area.
Check defective products are not mixed with
good products.
Check the Off-Cut Scrap and ensure it is not
more than TWO days before.
Is defect part's storage box appointed separately?
Is Machine's Die kept properly in Rack at their
designated location?
Are Welding/Checking fixtures kept properly in
Rack at their designated location?
Are machine tools kept properly in tool box at
their designated location?
Is Operators personal goods (Cloths, Shoes and
2 Set in Order Lunch Box etc.) maintain properly.
Is RM Sheets/Parts storage maintained properly?
Is Rework part's storage area appointed
separately?
Is In process part's storage are appointed
separately?
Is in Finish part's storage are appointed
separately?
Does equipment/machine maintenance do
regularly?
Does shop floor and work stations cleaning is
done regularly?
Does material storage bins cleaning are done
regularly?
Does FG/RM area is Rust/Dust free or covered to
3 Shine avoid Rust/Dust?
There should not be any spitting on the floor and
wall.
Do the worker and Supervisor are applying the
Shine method on themselves?
Ensure there are no Oily M/C's and Floor.
Ensure there are no goods on the floor.
Are there Control Plan, Work Instructions &
Checklists posted
Check the inspection standard FPI, IPQC & LPI
& PDIR.
Check the patrolling inspection carried out by
standard.
Are Control Plan, Work Instructions & Checklists
4 Standardize up to date?
Check the Rejection rate recording item by item.
Check Production, Quality, Maintenance board
up to date.
Are visual aids in use, up to date and effective in
telling how the area is performing?
Are there Root Card /Job Card Followed?
5 Sustain Are team members continuously improving their
area or at least sustaining previous
improvements?
Were corrective actions taken on low scores from
previous audits?
Do Line Leader/Workers understand their role in
5S?
Is there any control on Tool History Card?
Have Sort-Straighten-Shine-Standardize been
fully implemented and functioning well?
Is there any system (record) of Instrument
Calibration?
Is there any system (record) of M/C
maintenance?
Are their goals, actual performance, reasons for
variation, and corrective actions visible, up to
date and used as an operational tool?
Check all electrical panels are clean and clear of
any obstacles.
Check the accessibility height of all the items.
Check the fire extinguishers & boards are clean
and regularly checked.
6 Safety Check the First Aid box and accident records
(complete and detailed).
Check the documents and actual status of
improvement activity on safety about identified
problem.
Are safe work practices (risk assessments and
WI) in place and being followed.
Table No. 51: 5S Daily Check Sheet
5S Daily Check Sheet
Department: Machine Shop Month:
Sr. DAY
ITEMS
No. 1 2 3 4 5 6 7 8 9
1 Raw material stored at designated place
In process material stored at designated
2
place
Finished Material stored at designated
3
place
4 Tools/Spare parts kept at designated place
Housekeeping items kept at designated
5
place
All SOP's /WI displayed/kept at correct
6
locations
7 Machines are dust free and clean
8 Floor is clean
9 All bins are identified and clean
10 All trolleys in working order
11 Work stations are clean and dust free
12 All machines are in good working order
Only required spare parts, materials, WIP,
13
etc. are present at the work station
Only the required tools are present at the
14
work stations
Only the required furniture is present at
15
the work station
Tripping dangers such as electrical
16
cables, loose wires etc. are removed
Locations for containers, boxes, bins etc.
17
are clearly defined and identified
Tools have a designated storage location
18
and within reach of o p erator
Paper work is clearly labeled and has
19
clearly defined and labeled location
Furniture is clearly identified (numbered
20
and named ) and p laced at identified p lace
Working area requiring PPE's are clearly
21
labeled
Stop switches and breakers are highly
22 visible and located for easy access in case
of emerg ency
Fire extinguishers and other emergency
23 items are prominently displaced and
unobstructed
24 Walkway s are clearly defined
Containers, boxes, bins are clean and not
25
damag ed. They are neatly stacked
Walls, partitions, railings etc. are painted
26
and kep t clean
All cleaning items are neatly stored and is
27
readily available when req uired
Equipment maintenance records are
28
visible and clearly stated
Sufficient lighting and ventilation
29
available
Product waste is consistently and often
30 cleaned up and removed from the work
p lace
Display boards, activity chart, upto date
31
and reg ular
The result of the previous audit is posted
32
and clearly visible
33 Areas for improvement identified during
the previous audit have been improved
34 All workers/Staffs are aware of 5S
Leadership can explain why 5S is
35
important
NOTE: The above Check Points would be customized according the Sections of the Shop Floor
Base Lining of Current level
Table No. 52: 5S Assessment (shade boxes to indicate current level, internationally p racticed and used assessment Table)
5S Assessment (shade boxes to indicate current level)
Beginner Visual Systematic Preventive
Level Baseline 0 Basic 2 Score
1 3 4 5
Needed /un-
Red tag area List of needed
Needed and needed
created; all items Un-needed items
Unsafe items in un-needed items
Sort un-needed developed, are not allowed in
work area. items found separated,
items maintained, area.
in work area. un-needed
removed. posted.
tagged.
Needed and
Needed
un-needed Needed items
Needed items have
Placement of items are can be retrieved Method for
items stored dedicated
Set in items causes placed within (cell adding/deleting
in an positions
Order unsafe randomly target) seconds indicators for
organized that are
conditions. throughout and (cell target) needed items
manner. clearly
the number of steps.
indicated
workplace.
Work area Root cause
Spills, waste, Area and Standard
and machines Daily inspection sources of dirt,
trash, etc. equipment work layout
Shine are not of plant and grease & spillage
produce unsafe cleaned posted and
cleaned on a area occurs. have been
conditions. daily. maintained.
regular basis. eliminated.
Methods of
Methods of work posted
Methods of
No work Methods of work and Methods of work
work
Standardiz methods or work not documented consistently are regularly
consistently
e procedures completely but not used by reviewed and
used by all cell
documented. documented. consistently some cell improved.
team members.
used. team
members.
5S 5S assessment Root causes of
No routine 5S activities assessment conducted on a problems
Occasional,
review/correction conducted conducted regular basis revealed by 5S
Sustain unscheduled
of unsafe on regular occasionally and recurring assessment are
5S activity.
conditions. basis. and results problems are identified and
posted. identified. eliminated.
TOTAL SCORE (MAX OF 25)
OVERALL 5S SCORE - X % (INDEXED TO 100)
Table No. 53: 5S Maturity Level Summary (Common use in the Plant develo ped by Ex perts)
5S MATURITY LEVEL SUMMARY
MATURITY
SORT SET IN ORDER SHINE STANDARDIZE SUSTAIN
LEVEL
Area
Anyone can employees
walk into have devised a Employees
the work dependable are
area and and continually
Employees
Employees easily locate documented seeking the
maintain
LEVEL are items. method of elimination of
consistent
5 continually Abnormal preventive waste; all
### ### ### ### standards in ###
Focus on seeking conditions cleaning and changes are
compliance
Prevention improvement are visually maintenance. documented
with the 5S
opportunities. obvious and Work area and
program.
corrective cleanliness information is
action and shared with
measures organization employees.
are in place. are a way of
life.
A
dependable
and
A documented
dependable method has
Workplace
documented been Checklists
5S schedules method
method has established exist showing
LEVEL detailing tasks improvements
been to that
4 and are visible
established to ### recognize, ### ### ### employees ###
Focus on responsibilities and
maintain a with a follow through
Consistency are understood understood
work area visual on 5S
and practiced. by all
free of sweep, if schedules.
employees.
unnecessary items are
items. out of place
or exceed
quantity
limits.
All Designated Workplace 5S schedules
5S schedules
unnecessary locations method detailing tasks
detailing tasks
LEVEL items have are marked improvements and
and
3 been ### to make ### ### are being ### responsibilities ###
responsibilities
Make It Visual removed organization incorporated have been
are developed
from the more and developed and
and utilized.
work area. visible. documented. are utilized.
Workplace A recognized
A Workplace
Necessary methods are effort has been
designated areas are
LEVEL and un- being made to
location has cleaned on a
2 necessary ### ### ### improved, but ### improve the ###
been regularly
Focus on Basics items are changes have condition of
established scheduled
separated. not been the work
for all items. basis.
documented. environment.
Necessary
Tools,
and No attempt is
supplies,
unnecessary Workplace being made to Minimal
LEVEL books and
items are areas are dirty document or attention is
1 Just ### materials ### ### ### ###
mixed and improve spent on
Beginning are
together in disorganized. current housekeeping.
randomly
the work processes.
located.
area.
Table No. 54: Office 5S action p lan
open
There are 0 action
items
Objective:
Code: A- Action; R -
Recommendation; S - Status: O - Open; C – Complete
Statement
Item Current Responsibility Start End Date Remarks /
Code Description Status
# Date Primary Date Date Closed Comments
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
RED TAG
ISSUE OR PROBLEM: TAG#
ACTION TAKEN:
Manufacturing Area 5S Evaluation Check sheet
(Collected, developed by Industry 5S Experts)
Score for week ending ________________
5S: Sustain
All documents are labeled as to
contents. Obsolete or unused
1. Document
documents are routinely purged. This
control
includes files as well as computer file
storage.
There is a disciplined system of
2. 5S control and control and maintenance to assure that
sustaining each of the above items is maintained
at the highest possible level.
The responsible plant manager / staff
3.Work area person should visit each work area at
visits least monthly and initial/ date the 5S
audit checklist.
Scoring Key:
NA = Not applicable to this area (do not count in total possible score)
0 = No Evidence of implementation.
1 = Some Evidence but major gaps.
2 = Implemented and conforming in about 1/2 of the areas where applicable.
3 = Established and conforming in most areas with some gaps, little or no improvement activities.
4 = Only a Few Minor Gaps Remain and good improvement efforts & use of other Lean tools.
5 = Excellent 5S Lean Conformance with Substantial Improvement Activities with Employee Involvement.
Audit Team: Refer to details below for explanation of each question. If further clarification or examples are
needed ask supervisors or lean coordinator. The audit is a tool for improvement so include clear comments and
conduct employee interviews to understand what has been done and why.
Comments: Include specific gaps, exceptional and below standard examples as well as ideas for improvement.
Employee Interview (EI): Interview an employee or two from the area to better understand how Lean & 5S are
working in the area. (You do not need to ask all questions, just when you need to get a better understanding of
where they are.)
Audited Team: Corrective action should be taken for scores of 0 or 1. Consider all suggestions and ideas.
5S Manufacturing Evaluation Week of ___/____/____ Assessor: __________________ Area or Zone:________________________
For each “S”, Circle the block which comes closest to describing the area being assessed.
Table No. 57: “S”, Circle the block, describing the area being assessed
5 Points 3 Points 0 Points
4 Points 2 Points 1 Point
World Minimum
Very Good Marginal Unacceptable Poor
Class Acceptable
The area Generally
Every item Minimal has some More clutter cluttered.
Station is
in the area is clutter, but clutter and and Quite a few
cluttered/unsafe.
needed and a small unneeded unnecessary unnecessary
Many
up-to-date. amount of items. equipment. items either
unnecessary
Consider: unneeded Some items There is no on benches,
items
- Supplies supplies, stored on unneeded desks,
Separate/ everywhere.
- Tools tools, top of furniture or shelves or
Sort Much unneeded
- Equipment equipment, cabinets. equipment, cabinets.
furniture, &
- Furniture furniture, Some but desks, Some
equipment.
- Documents documents needed shelves and unneeded
Emergency
- Bulletin or general items are cabinets furniture and
equipment
board items. not have excess equipment.
blocked.
postings available or items. Items stored
on order. on floor.
Area well
organized. Area well
Area
Most organized.
moderately
Area very moveable With the Inadequate
organized.
well items have exception organization.
Many key
organized. a of a few Many key
items have Poor
Excellent designated problems, items have no
a organization.
visual location. most items designated
designated Little indication
controls are Although have a location.
location, for a designated
in place. not perfect, designated Shelves and
but some do place for
There is a most appropriate drawers are
not, and anything. Items
designated locations location, poorly
some items improperly
or labeled are good, and most labeled.
are stored on the
location for and items tools, Aisles or
improperly floor and
Straighten all items. are stored documents equipment
stored. benches. Trip
Locations properly. & supplies markings are
Equipment hazards.
are Equipment, are stored not clear or
and aisles Furniture and
convenient tooling & properly. straight. Very
may not be tools located far
and items related All aisles few visual
clearly from where
are stored supplies are are marked, controls or
marked. needed.
properly. co-located but some instructions
Although No current
Equipment & orderly. moveable are evident.
some visual visual controls,
and aisles Many equipment Safety
controls are signs or labels.
have visual is not. equipment is
in place,
designated controls are Many not
many more
markings in place. visual designated.
could be
Aisles are controls are
added.
neat & in place.
clear.
Most items
Area is very
in the area There is
dirty. Furniture,
are clean some
Everything Everything Area needs to equipment,
and clutter.
in the area is in the area be picked shelves,
functional. Some items
in “like is clean and up. Items fixtures, and
Oil stocks are not
new” functional. have not been tools area
are neat. clean and/or
condition. Oil stocks cleaned in coated with dirt
Some swept.
Scrub/ Oil stocks are not some time. and/or oil.
equipment Some oil
Shine are not needed. Significant oil Possible health
malfunction leakage in
required. Floors are leakage. and safety
or needs pan. Floors
No dust or clean, and Floor is dirty hazards exist,
painting. and/or
dirt baskets are and/or waste such as trip
Floors are waste
anywhere. emptied containers are hazards, or
pretty clean containers
Floors shine. daily. full. obstructed
and baskets are
emergency
are emptied marginal.
items or exits.
daily.
Standardize A 5S A 5S Although a Although a There is no There is no
checklist is checklist is 5S checklist 5S checklist evidence that evidence that a
posted in the posted and is not is not a 5S checklist 5S Checklist
area and it is seems to be posted, it is posted, it is exists for the exists for the
clearly followed. available. available. area. All area. PM log is
followed All All required All required required PMs not up to date.
everyday. required PMs have PMs have have been Metrics and
All required PMs have been been performed. charts in the
PMs have been performed. performed. Metrics and area are not
been performed. All metrics Metrics and charts in the current.
performed. All metrics and charts charts in the area are not
All metrics and charts in the area area are not current.
and charts in in the area are current. current. It is
the area are are current. It is unclear that
current. It is It is clear somewhat follow-up
clear that that follow- clear that actions to
follow-up up actions follow-up identified
actions to to actions to problems
identified identified identified have been
problems problems problems done.
have been have been have been
done. done. done.
There is a
There is a There is a There is a
system in There is no There is no
clearly system in system in
the area system in the system or
documented the area the area and
and area and little commitment
Sustain and and strong spotty
moderate interest in within the
followed interest in interest in
interest in maintaining organization to
system to maintaining maintaining
maintaining 5S. sustaining 5S.
maintain 5S. 5S. 5S.
5S.
# of 5’s circled:____ X 5 = ______ Opportunities for Improvement:Who When
# of 4’s circled:____ X 4 = ______ •
7.16.6 OFFICE 5S
Office 5S is developed by Industry 5S Experts, which is collected and unchanged version is included herewith.
A Who audits?
A.1: An audit has to be carried out by at least 2 auditors; one of the auditors has to come from the area being audited. The auditors are
accompanied by an employee from the work area.
A.2: The audit team should have subject matter knowledge (knowledge of the organisation, local processes and technology) as well as
methodology competence (re. 5S, KVP techniques etc.).
C.8: Audit results should be entered into the audit report form immediately and signed by the auditors and staff from the work area.
40
20
2S
I I
| 2005 |
4S 3S
7.17 KAIZEN FOR RAPID IMPROVEMENT
7.17.1 INTRODUCTION
The concept and techniques of Kaizen is a Japanese term, translated meaning as ‘kai = change and zen = good’,
change for better and used as ‘continual improvement. This concept creates a movement in the manufacturing
and other industries through the thinking the better in any situation. Disciplined and organized thinking could do
better from accepting the problems to finding the solutions. This concept transfers the problems and difficulties
to opportunity for getting solutions, improvement and efficiency towards perfection.
It is a simple concept, but very strong and impacts radically. Various process,
techniques and methods are invented to take this concept to way forward to make the system and the
organization better. Almost all industries in the world who implemented this concept, realized the effectiveness
of this techniques. Kaizen is one of the essential and powerful techniques in Lean manufacturing and it was
applied in Toyota with a small to big changes for improvement after encouraging and applying human
intelligences and engaging process owners in the plant.
What Is KAIZEN?
As described Kaizen is the Japanese word that means to “Change for the Good”.
Doing any ‘little’ thing better everyday defines kaizen – Slow,
Gradual but Constant improvement in any area that will ELIMINATE
Figure 72: Sensei Masaaki Imai,
Founder & Chairman Kaizen
Institute Waste and improve customer satisfaction.
Kaizen means continual or continuous improvement in Personal Life, Home Life, Social Life, and Working Life.
When Applied to the Workplace, Kaizen Means Continuing Improvement Involving Everyone – Managers and
Workers Alike; MASAKI IMAI
Encourag
ement to
em ployee
Scalability
: Repeat Identificat
the best ion of
for other problem!
areas
Team for
Data analysts action
and
Validation of plan &
im piemen
improvement tation
Drive for
Im piemen
tation
Fundamentals of Improvements
1) Start with small improvement
2) Start with our problems not their problems
K a i z e n Cycle
for Continuous
Improvement
3) Start with easy and obvious opportunity areas
4) Improvement should be a part of daily routine or in Periodic
5) Encourages for the collection of group wisdom
6) Never rejects any idea before trying or verifying
Figure 73: Basic Cycle of improvement
7) Find and Highlights problems, do not hide
them
8) Problem is the friend to teach about possible solutions and also opportunity of learning
9) Do not wait for good day, start immediately.
2. Kaizen Events: Defined improvements with the action plan. It is specific improvement within a time limit.
Management and people involved in analysing their VSM (Vale steam Map) to solve a specific problem. All
events must be aligned with broader operational goals and processes, in order to have a sustainable impact.
3. Kaikaku: it is Radical changes, when small changes aren’t enough to drive the improvements, an organization
needs to be competitive or effective. That’s time, when to turn to Kaikaku. Unlike Kaizen, which focuses on
incremental changes, Kaikaku describes a process where an entire organization is focused on a radical process
transformation. Rather than improving a process, Kaikaku may ensures the organization moves to a massive or
entirely new process. It may change of total plant automation, digitization of the recoding keeping and cloud
computing.
© Innovation
o (b) KAIZEN
£ ( a ) Maintenance
TIME
TRADITIONAL APPROACH KAIZEN APPROACH
(Innovation but poor maintenance)
Kaizen Strategy
1) Find and solve problems
2) Improve productivity, efficiency and capacity
3) Enhance the success rate
4) Face challenges & competition
5) People involvement
6) Advance in culture
7) Benefit of organization through customers.
Deming
Cycle
Figure 74: Kaizen improvement approach
7.17.6 Kaizen Approach
Plan
Act Do
Check
The Team
Selected the kaizen team members mostly chosen from the functional areas and from working sections. It needs
to be multi-level and multi-functional and representatives from the entire process may want to choose. These
people will become the hand-holders & champions for the new way and play a significant role in convincing the
efficacy of the techniques, and both people & process oriented in the plant.
Yamazumi is a Japanese word that literally means to stack up. Toyota uses Yamazumi work balance charts to
visually present the work content of a series of tasks and facilitate work balancing and the isolation and
elimination of non-value-added work content.
It is a single click in Timer Pro will send the entire Yamazumi balance chart to Excel (shown in Fig. 76). The
work elements are automatically sized in proportion to the work content. In addition, the video snippets are
embedded in the Excel sheet. Timer Pro includes a free player that will allow these videos to be replayed directly
on the factory floor i.e. the end users do not require Timer Pro to review the video content. From Excel the charts
can be printed in any size; many companies print out the charts over 3 feet tall for worker and management for
review.
7.17.11 KOBETSU-KAIZEN
“Kobetsu-Kaizen” means to the “individual improvement for further efficient production systems.” It means
efforts to select model equipment or a model line and to confront the challenge target of zero losses through
project team activities according to improvement themes. This concept is used in productive maintenance
concept for zero losses. It takes the form of activities through project teams composed of managerial staff
members and through small workshop groups.
The procedures for the implementation of “Kobetsu-Kaizen” by managerial staff members are as follows:
1. Establish a project team
A team of several members should be organized, with the line manager in charge of the model equipment
serving as its leader.
2. Assortment of model equipment
Model equipment or a model line should be chosen.
3. Grasping and confirmation of 16 major losses (detailed about 16 losses are described in TPM chapter) from
selected model line
Setup is a sequence of work starting from removal of jigs or tools upon the completion of the on-going
production, clearing up, cleaning; preparation, attachment, adjustment, and measurement of jigs or tools required
for the next item and manufacturing of non-defective products.
The main task is how to reduce the internal time during which machine stopped working and extend the external
time with industrial engineering approach.
There remain many matters to be addressed to shorten the time spent on ‘internal setup’ (setup during machine
stoppage) and ‘external setup’ (setup without machine stoppage) based on IE approach.
Three basic condition required to establish to move to zero changeover time for a general-purpose press;
Standardization of Dies: Dies are to be standardized in four respect;
1) Die height
2) Die Sizes (small, medium and large)
3) Clamp height
4) Clamp position
Other standardization will make as per the requirement. It is a genba method in the shop floor, a systematic
method is written in “Kaizen for Quick Changeover’ by Kenichi Sekine and Keisuke Arai.
7.17.13 GENBA KAIZEN
1 st SETUP
2 nd SETUP
v-
Situational Analysis
Before starting this project, Clutch Housing have two setups for machining. In first setup Milling, Drilling &
Tapping and in second set up Drilling, Boring & Milling operations are done respectively
After examine all operations, it is found that there is no need of two setups for machining this Job. It has seen a
strong possibility of machining this job in a single setup with desired fixture. There were chances of error in two
setups.
After the Study of the Sorting activity in the Processing section, it is observed that single manpower is sorting 35
kg of cut dates in an hour. The average requirement of cut dates in a month is 123 ton. (122965 kg) = approx.
123 Tones.
So, required man hour for sorting this item = 122965/35 = 3513 Man-hour = 439 Man-days (8 Hrs. working)
Proposed System
>■ -- • •
« - ■
• • * w
/1
6 JI
Approx. Sorting Productivity after Implementation of the Conveyor
Item Name sorting per man per hour(kg)
Cut Dates 108 kg
Calculations Justify the Above Result:
Estimation Data from observation of the Existing Process, 4kg cut dates occupy 9 sq. ft. area for proper sorting.
Belt linear speed = π*d*n/12 = 8.37 ft/min. (Here, d=4” roller diameter and n= 8 Rpm) (As per discussion with
the maintenance)
Belt width = 450 mm (one side); so, approx. working width will be 300 mm. (0.98 ft)
1 ft belt will carry 0.43 kg cut dates (1.79 Kg. / Man/ Min.)
So, cut dates will be sorted in an hour by Two Manpower= 0.43*8.37*60= 216 kg.
Hence, cut dates will be sorted in a hour by a manpower = 216/2= 108 kg. (Approx.)
So, required man hour for sorting this item = 122965/108 = 1139 Man-hour = 142 Man-days (8 Hrs. working).
So, Approx. Man-days Saving = 297
Note: This estimation will replicate to other Items also in similar process of calculation with different results
Constraint Factor: Amount i.e. % of Wastages in the sorting item and speed of manpower.
KAIZEN REPORT
KAIZEN REPORT
• WIMTHIMf -
Mr.l<*Oldi«h<vn
WGCMJTtD BY
BEFORE KAIZEN (PROBLEM) PLEASE GIVE BRIEF DESCRIPTION AFTER KAIZEN ( H O W I M P R O V E D ) PHASE GIVE BIDE F DESCRIPTION
WHAT a nil rwoRiMT hVMM FOUR®’ 'A HAT IS TMF CDUKTIBMI AW KI ’ WHERE IMnEMEMTID ?
U.SnMra v'MM 'MiMMtottif. MfMMCMCH.IrH (MPwMWn
* ri ' « n . c rM r-o— • ■
MrtiCM'OuMO? RMlfMfKTfD T
11412014 n«M!t
iO Io V\O 1 o-»
#8
X*uT «£
KAIZEN REPORT
W>UN 1W1IMIMID F
/O 3 -Por
•ATI
1. ill
----------- - -
Sv- J**
Problem: Spark tester ivos not stoped after Team Members: Nagesh, Bhupendera
identifing the fault in wire.
Type of Problem:
Status:Spark tester was not stoped after identifing Status: Now spark Tester is stop automatically when the
the fault in wire. fault is catched.
Problem faced During Implementation Work Done: A circuit has been introduced in panal That stop
spark tester if any fault is catched.
Tangible Benefit: Now labour cost about Rs 6000 is Intengible Benefit: Now faults are esaily Checked By:
saved by performing two task by the same person identified.
at the same time.
KAIZEN SHEET Kaizen No.
Type of Problem:
Jjll HR
Status:Oxyzen cylinder is carried manually i.e by Status: Now oxygen cylinder is carried on trolly.
rolling on the floor.
Result: Now oxygen cylinder is transferred in very few min from one place to other. Prepared By: Shivendra
Tangible Benefit: Now time taken in covering the 5 Intengible Benefit: Time taken in transferring Checked By:
meters distance with oxygen cylinder is reduced the oxygen cylinder is reduced and Softy
from 7 min to 2 min. factors increased.
For the selection of the job, it may as per observation by operators or maintenance/ changeover team at least two
weeks about scope to save production time and opportunity from business and customers. All equipment and
machine should prepare for the initial opportunity, for unproductive time reduction. For further opportunity of
more changeover time reduction, next phase of planning is required for it.
For plant-wide implementation of SMED the following initiatives are essentials as per industry experiences;
i) Internal Planning as per the scope of SMED in the organization
ii) Develop internal QC Team to involve in the concerned operators and supervisors
iii) Training and Handholding through an initial common Genba with videos of a changeover
iv) Initial Brainstorming session, how it could be improved and what would be their role
SMED Trolly with all arrangements of changeover tools,
parts, Die etc., should be ready before in the shop the machine for change. The least and minimization of
operation with minimum time should be spend to change during equipment stoppage is the target in changeovers.
The least is the internal elements, the least will be change time to progress towards zero changeover time.
Die Storage and
Movement in Die
Trolley during
Table No. 60: Identify Pilot Area and measure the Job
Areas Description
The existing changeovers are very long with Old
Time of
methods with significant opportunity to reduction may
Changeovers
be all changeovers more than one-hour
More nos. changeovers with more times, may be 2-3
Frequency nos. per day with variation in durations, may give the
priority
It is as per the business opportunity of the
Scope of
organization, product price, forward and backward
Saving
lined or networked equipment
Areas Description
Study team or expert is familiar with the equipment
with operators, maintenance personnel, quality
Understanding
assurance, and supervisors, who would be engaged and
motivated
The equipment with more constraints and critical, have
Constraint
more opportunity to improve. Any improvement could
Factors
bring immediate result, might select first
Started the elements or activities related to the job/ changeover once the target equipment has been selected.
Record the elements of the job and baseline times for the changeover. Changeover time should be measured as
the time between production of the last good part (at full speed) and production of the first good part (at full
speed), there should be homogeneity condition in both the occasions. Be cognizant of the ‘Hawthorne Effect’ (it
reflects the fact that people will modify their behavior simply because they are being observed); changeover
times may temporarily improve as a simple result of observing their process. When possible, use prior data to
baseline the changeover time.
i) List out the elements as an internal and external from the video as does in Time study
ii) Noting times of each elements as per the sequence, it may as we follow the Standard time in time study
iii) If manpower more than one, as a human element, all movement and working of all manpower ought to be
noted.
iv) During videography, points to be noted that separate videos to be taken for man and machine for better
understanding and analyzing
During the element selection, the queries must be from the team is that element, as currently performed or with
minimal change can be completed while the equipment is in operation.
If the categorize the element as external and move it before or after the changeover, as appropriate.
This is conducted through preparing in a list of elements that are candidates for further action. This list should be
prioritized, so that most promising candidates are acted on first. Fundamentally, this comes down to performing
a cost/ benefit analysis for each candidate element:
Cost as measured by the materials and labor needed to make the necessary changes
Benefit as measured by the time that will be eliminated from the changeover
Once the list has been prioritized work can begin on making the necessary changes
Instances of techniques that can be used to convert internal elements to external are:
Item Description
Advance Prepare parts in advance (e.g. preheat dies in advance of
Preparation the changeover)
Use duplicate jigs (e.g. perform alignment and other
Jigs
adjustments in advance of the changeover)
Modularize equipment (e.g. replace a printer instead of
Modularize adjusting the print head so the printer can be configured
for a new part number in advance of the changeover)
Modify equipment (e.g. add guarding to enable safe
Modify
cleaning while the process is running)
The deliverable from this step should be an updated list of changeover elements, with fewer internal elements,
and additional external elements, performed before or after the changeover.
Implementation Ttrne.'Effort
As per expert description, during the
implementation of SMED, it is helpful to recognize that there are two broad categories of improvement:
i) Human, achieved through preparation and in the organization
ii) Technical is achieved through engineering
Experience has taught that; the human elements are typically much faster and less expensive to improve then the
technical elements. In other words, the quick wins are usually with the human elements. Avoid the temptation,
especially with technically proficient teams, to over-focus on technical elements. Instead, focus first on the
human elements.
The following chart illustrates this principle, showing example areas of opportunity for SMED projects.
Avoid the temptation, especially with technically proficient teams, to focus on technical improvements, instead
of, first focus on human – skills & knowledge improvements.
7.18.5 GENBA SMED
PROJECT NAME: Die Changeover
Introduction to the Project
Project planned for reduction in Changeover Time literally, changing a die on a PDC Machine in whatever
possible optimum time i.e. reduction in time taken between the last piece of previous lot and first piece of next
setup .Before starting this project in a single setup from Housing Gear 4741 to Timing gear 0155 are taken 215
minutes for PDC-01. Due to this high setup time productive time becomes less in a shift.
Sl.
Activities
Before 1 After
No. In seconds
1 Cleanin g and Removin g all eq uip ment of p revious castin g 276 124
2 Carry in g chain p ulley and hook it with fixed flap of Die 195 163
Unfastening fixed flap of Die and place it to its dedicated
3 695 678
p lace
4 Carrying chain pulley and hook it with moving flap of Die 154 118
Unfastening moving flap of Die and place it to its dedicated
5 p lace 693 649
Cleaning of T slot of Pattern and pull out bumper pins of
6 206 206
Movin g Pattern.
7 Cleanin g of PDC M/C b y air p ressure 156 51
8 Read Die Pro g rammin g 163 129
9 Remove cover from Tiber Rod and clean it 53 18
10 Unfastenin g Tiber Nuts 675 190
11 Op erate M/C for Lockin g scale settin g 80 80
12 Fastenin g the Pattern lockin g bolt & Tiber Nut 110 110
13 Carry in g & Put Bump er Pin in movin g Pattern 220 28
14 Put stud in movin g Pattern accordin g to measurement 191 84
15 Carry in g fixed flap of die and fit it in PDC Machine 915 794
16 Fastenin g of clamp of fixed flap 1460 1247
17 Hook & Chain-p ully removin g from fixed flap of Die 144 78
Die lifting by chain-pulley and air washing then fit it in the
18 705 597
machine
19 Sandwich movin g & fixed flap of Die 267 234
20 Tiber nut clamp fastenin g & Cover it. 102 79
21 Fastenin g Clamp of movin g flap 1127 682
22 Chain p ully ap art from the Die 85 85
23 Oilin g of die and slider 150 45
24 Pressure valve settin g 89 89
25 Carry in g cy linder for heatin g and start heatin g 396 104
26 Heatin g of Die 2580 2580
27 Pourin g of material 840 840
28 1st Piece 180 180
12907
10262 Sec
29 Total Sec
215 Mins 171 Mins
Situational Analysis
After examine the video, it’s understood that, the setup time was 215 Mins which includes various external and
internal activities. The detail has been shown in above in table. The die set up was traditionally practiced with no
SMED culture with the workers. There is no synchronization of the activities of the operator and helper. They/
team (supervisor, operator and helper) were not aware the importance and method of of Quick Changeover
activities. Some observations of the units were as follows:
Observations
i. Retrieval time for tools was high.
ii. There is no common riser attachment.
iii. Fastening and unfastening time was very high.
iv. Random clamps are used for die locking.
v. No parallel operations between helper and operator.
Improvement Plan
A. Define the operator’s and helper’s activities parallelly
B. Material handling equipment for die handling to be upgraded
C. Availability of all Tools proximity to the machines during changeover/ dedicated tool kit for each machine
D. Standard clamp is used for die locking
E. Availability of Dies in minimum possible distance from the machine
F. Convert some internal activities into external activities
150
mm
100
50
Time
Before After
Study Study
■ Time in
171.0333
Mims.
B. Productive time increase 45 minutes per
shift.
Opportunity benefits
(monetary) accrued/ expected
from this project = 45 X 5 X 10
= Rs. 2250 per month, and
Note: The standard opportunity cost estimated by the organization towards the cost of Pressure Die Casting is
approximately Rs. 300 per hr. i.e. Rs. 5/- per minute.
Before SMED
External Time
Internal activities Time (sec)
activities (sec)
1. De-clamping 107
2. Pull out Die from m/c 52
3. Holder Unfastening 152
4. Carrying overhead crane near m/c 98
5. Previous Die to Die Rack 257 No
external
6. New Die to M/C 110 activitie
7. Die adjustment & Holder fastening 110 s before
project
8. Die Clamping 196
9. Lead screw setting 147
10. First Pcs approval and some adjustment 268
1387 Sec or
TOTAL
23 mins
Situational Analysis
After critically examine the video, team understood that the setup time was 1387 Sec or/ 23 Mins which
includes, only various internal activities. The detail has been shown in above in table. The die set up was
traditionally practiced with no SMED culture with the workers. There is no synchronization of the activities of
the Operator and helper. They (Supervisor, Operator and Helper) were not aware of Quick Changeover practices.
Few observations are as follows;
Observations
i. Retrieval time for Dies & tools was high
ii. There is no common riser attachment
iii. No tool or Trolly box near the m/c’s
iv. Random clamps are used for die locking
v. No parallel operations between helper and operator
Improvement Plan
Sr.
Improvement Plan Initiatives Remarks
No.
Die arranged at minimum possible
Retrieval time for Dies & tools
1 distance with ID’s. See Fig:
was high
Tool BPX is made
Die Clamping and De-clamping
2 Standard size of clamps is used.
time is very high.
No parallel operations between Define the operator’s and helper’s
3
helper and operator. activities synchronously.
4. No activities external activities Convert some internal activities See Table:
i.e. when machine run. into external activities.
Fig: Dedicated Tool Box Fig: Die stacking with ID’s and Colour coding
No 4.
External Carrying
1. De- 1. De-
clamping
107 Activities clamping
107 S 91 overhead 98 40
Before crane
Project near m/c
2. Pull out 2. Pull out 6. New
Die from 52 Die from 52 S 52 Die to 110 67
m/c m/c M/C
208 138
3. Holder 3. Holder Sec Sec or
152 152 S 133 Total
Unfastening Unfastening or 3.5 2
mints. mints.
4. Carrying
5. Previous
overhead
98 Die to Die 257 E/S 64
crane near
Rack
m/c
7. Die
5. Previous
adjustment
Die to Die 257 110 S 87
& Holder
Rack
fastening
6. New Die 8. Die
110 196 S 122
to M/C Clamping
7. Die
9. Lead
adjustment
110 screw 147 S 44
& Holder
setting
fastening
10. First Pcs
8. Die approval
196 268 41
Clamping and some
adjustment
634
9. Lead 1289Sec Sec
screw 147 Total or or
setting 21 mins 11
mins
10. First Pcs 268
approval
and some
adjustment
1387
Sec
Total or
23
mins
25
20
15
10
Time
(Min
Note: Indirect benefits
(A) – Increased Productive Time per Day (Mins).
(B) – Avg. per Minute Conversion Cost (Rs.).
(C) – Working days in a Month (No’s)
There is next step of improvement also on progress by internal manpower when their understanding and skills in these areas will
improve, it will further reduce the Changeovers times to within 6 minutes.
7.19 POKA-YOKE
Poka-yoke ( ポ カ ヨケ ) is a Japanese term that means ‘mistake-proofing’ or ‘unintentional error prevention’.
A poka-yoke is a mechanism or a process that helps to prevent or avoid (yokeru) mistakes (poka) occurs by any
operator.
During the working in stations, many mistakes happened which human mind might not find or correct
immediately or in an unusual happening in stressed circumstances; implementation of poka-yoke mechanism
prevents these mistakes. It may be automatic or situation generated, which alarms or signals the operators to be
avoid or aware in the moment. Today mistake proofing system saves many lives from prevention accidents and
human loss. Various losses also recovered and saved from this technique. Common alarm of smoke, fire, hand
protection guard in the m/cs, overflowing of waters & chemicals, overloading etc., are common example of
poka-yoke in industry, homes and hospitals. Today more innovations in electronics industry, the more preventive
mechanism is discovered and installed in stations of public utilities and work places.
Dr. Shigeo Shingo, originally developed the mistake-proofing idea by comprehending its value as an effective
quality control technique to formalize its use in Japanese manufacturing, mainly in Toyota as the poka-yoke
system. Today, this concept is in wide use in outside of Japan. Toyota Motor Corporation, whose production
system Shingo helped to design, averages twelve poka-yoke devices per machine in their manufacturing plants,
thus validating the concept as beneficial to the present industry. It was originally described as baka-yoke, but as
this means "fool-proofing" (or "idiot-proofing") the name was changed to the milder poka-yoke, i.e., "error
avoidance." More broadly, the term can refer to any behavior-shaping constraint designed into a process to
prevent incorrect operation by the operators.
Poka-yoke is primarily as mistake-proofing, goof-proofing, and foolproof working methods in the factory, to
solve the repetitive tasks that rely on human memory or watchfulness or alertness during the continuous
involved work and guard against any lapses could not happen. It can be seen as one of the three common
components of ‘zero-defect quality control’ performed by Japanese companies.
Zero Defects, an important concept to maintain customer satisfaction & loyalty and long-term association. Long
term gain on cost and volume of business, eliminating process wastes, such as defects, through implementation
of Poka-yoke efforts, results in more repeatable and reproducible processes. In this way processes become more
efficient and be more cost effective.
Mistake Proof or Poka Yoke is also a process, which maybe not noticing that an error is made or a machine is not
functioning, does not make a person stupid or foolish. Not noticing that Manpower are called for a Work, but the
M/c is Fault or the Truck are not reached or scheduled or not matched make a supervisor or Production
Management persons stupid or foolish.
1. Control Approach
Shuts down the process when an error occurs. Keeps the ‘suspect’ part in place when an operation is
incomplete. Takes human element out of the equation; does not depend on an operator or assembler. It has a high
capability of achieving zero defects. Machine stops when an irregularity is detected.
2. Warning Approach
Signals that leads the operator to stop the process and correct the problem. Sometimes an automatic shut off
system is not an option. A warning or alarm system could be used to get an operator’s attention. Lift is an
example of an alarm system using dials, lights and sounds to bring attention to the problem. Color coding is also
an effective non automatic option.
There are three types poka-yoke systems that can be used to fail-safe the server: task poka-yokes,
treatment poka-yokes, and tangible poka-yokes. It contributes the following areas;
Lower costs of safety and accidents
Elimination of mistakes and errors and improved quality
Reduction in human deployment cost for prevention of mistakes
Enhance the production flexibility
More operators’ involvement in critical work and attitudes
Decreased in production times with improved production capacity
Simplified and improved techniques of working
Increased safety and security of human life
2. Blinking light and alarm: it is a modular design with strong housing for all indoor and outdoor applications
in tough conditions wherever machine status needs to be displayed and warning signals given.
3. Limit Switch: A limit switch is an electromechanical device that consists of an actuator mechanically
linked with a set of contacts. When any object comes into contact with the actuator, the device operates the
contacts to make or break an electrical connection. Limit switches are used in a different type of
applications and environments because of their ruggedness, ease of installation, and reliability of operation.
Limit Switch can determine the presence / absence, passing, positioning, and end of travel of an object.
Limit switch were first used to define the limit of travel of an object; hence the name ‘Limit Switch’.
4. Sensor: A sensor is a transducer whose purpose is to sense (that is, to detect) some characteristic of its
environs. It detects events or changes in quantities and provides a corresponding output, generally as an
electrical or optical signal; for example, a thermocouple converts temperature to an output voltage. In
industry a mercury-in-glass thermometer is also considered a sensor;
Treatment Poka-Yokes
Treatment poka-yokes focus on the social interaction between the customer and the service provider i.e. through
eye contact, greeting etc. By mistake-proofing or standardizing what servers say and do to customers, managers
can reasonably ensure that customers receive proper, fair and consistent treatment. It can designate like human
behavioral point also.
Tangible Poka-Yokes
Tangible poka-yokes attempt to improve the tangible, physical impression and experience for the customer in
addition to the direct task of the server like dirty office, disheveled server, sloppy documents. In Motorola, a
control-oriented poka-yoke used in the legal department by having a second lawyer inspect all legal work for
spelling, presentation, and arithmetic. In this way, the legal department is ensuring that the "tangibles" of the
service are satisfactory in addition to the task of the service i.e. legal work.
Customer Poka-Yokes
Fail-safe for the customers through, consists of three of poka-yoke systems: preparation poka-yokes, encounter
poka-yokes, and resolution poka-yokes. From the Expert specific description, following are the details of
customer Poka Yoke;
Preparation Poka-Yokes
Preparation poka-yokes attempt to fully prepare the customer before they even enter the service. An example of
a warning-oriented, preparation poka-yoke is the notice, that a university sends to each student prior to
registration for the next semester detailing the courses he needs to finish his degree. This system could be
converted to a control system by having an automated registration process which would not allow students to
sign up for classes out of sequence or until all prerequisites are met.
Encounter Poka-Yokes
Encounter poka-yokes attempt to fail-safe a customer at a service who may misunderstand, ignore, or forget the
nature of the service or their role in it. A good example of a control-oriented, encounter poka-yoke is the use of
concrete curbing at an oil & lube shop that directs customers, so that they do not/ cannot pull the wrong way into
the station. This system also assists in the selection process so that customers are not served out of order.
Resolution Poka-Yokes
Resolution poka-yokes attempt to remind customers of the value of their input to the continuous improvement of
a service. A hotel which uses an automated check-out system through the television in each room could attach a
few questions to the check-out process to ensure the customer provides feedback on key issues. This would be a
control-oriented resolution poka-yoke. Obviously, one of the keys to the success of any customer-oriented poka-
yoke is to obtain willing customer participation.
7.19.6 Barriers to Implementation and Recommendations of Poka Yoke
Patel, Dale and Shaw note that there are a number of barriers a firm might face when implementing poka-yoke
devices within their system. These are as follows;
i) Difficulty in accepting change
ii) Justification of the investment
iii) Using inappropriate and ineffective methods
iv) Time requirements
v) Difficulty encountered as a result of continuous process
Stewart and Grout, in an article entitled "The Human Side of Mistake-Proofing," make the following
recommendations for the implementation of poka-yoke devices:
The outcome of the process or routine must be known in advance so as to have a standard for comparison.
Following are Stewart and Grout version on poka yoke.
1. The process must be stable, i.e., outcomes are not changing
2. There must be an ability to create a break between cause and effect in the process so as to provide an opportunity to insert a poka-yoke
3. Surroundings requiring substantial operator skill are prime locations for poka-yoke devices
4. Settings where training or turnover cost is high are prime locations for poka-yoke devices
5. Settings with frequent interruptions and distractions are prime locations for poka-yoke devices
6. Environments with a consistent set of mixed products are prime locations for poka-yoke devices
7. The beginning of any process where there are multiple other possible processes that could be initiated are a prime location for poka-yoke
devices
8. Locations in the process with similarly positioned or configured parts, controls or tools are prime locations for poka-yoke devices
9. Any point in the process requiring replacement or orientation of parts in order to prevent mispositioning is a prime location for poka-yoke
devices
10. Any point in the process where adjustments are made for machine or process setups is a prime location for poka-yoke devices.
Poka-yoke is based on prediction, detection and prevention. That is, recognizing that a defect is about to occur or
recognizing that a defect has occurred. Thus, there are two basic types of poka-yoke systems, which are
mentioned earlier. The control poka-yoke does not allow a process to begin or continue after an error has
occurred. It takes the response to a specific type of error out of the hands of the operator. For example, a fixture
on a machine may be equipped with a sensing device that will not allow the process to continue unless the part is
properly inserted.
A second type of poka-yoke provides some type of warning when an error occurs. This does not prevent the
error, but immediately stops the process when an error is detected. This type of poka-yoke is useful for mass
production environments with rapid processing as the device prevents mass production of scrapped material. In
the situations where large losses of time or resources do not acceptable or give expected result, a warning poka-
yoke is warranted. All that is needed is a way to ensure that the error is investigated and corrected in a timely
manner. These could be described as control and warning approach.
Poka-yokes can be as simple as a steel pin on a fixture that keeps incorrectly placed parts from fitting properly,
or they can be as complex as a fuzzy logic, in neural network used to automatically detect tool breakage and
immediately stop the machine. Surprisingly, the simple low-cost devices tend to be in the majority. Regardless of
degree of simplicity, all poka-yokes fall into one of three categories, as described by experts: contact methods,
fixed-value methods, and motion-step methods. Each is briefly discussed below.
Contact Methods
Contact methods are based on some type of sensing device which detects abnormalities in the product's shape or
dimension and responds accordingly. Interference pins, notches with matching locator pins, limit switches and
proximity switches are sometimes used to ensure that a part is positioned correctly before work occurs.
Asymmetric parts with matching work fixtures can also alleviate incorrect positioning. If orientation is not
critical, symmetrical designs can then be used to prevent defects.
Contact methods are useful in situations which encourage mistakes. Such situations involve rapid repetition,
infrequent production, or environmental problems such as poor lighting, high or low heat, excess humidity, dust,
noise, or anything which distracts a worker. Paul Dvorak, in "Poka-Yoke Designs Make Assemblies Mistake
proof," an article appearing in ‘Machine Design’, recommends that the maintenance engineer investigate at least
four areas for potential problems that require contact method solutions:
i) Look for where the product will fail if parts are assembled incorrectly
ii) Look for small features critical to proper assembly
iii) Beware of relying on subtle differences to determine top from bottom or front from back, especially if
the parts are painted dark colors
iv) Beware of designs so complicated that they confuse inexperienced operators.
Fixed-Value Methods
Fixed-value methods are used in processes where the same activity is repeated several times, such as tightening
of bolts. This method frequently involves very simple techniques, such as methods that allow operators to easily
track how often this activity has been performed. Dvorak gives the example of an operator who is responsible for
tightening down six bolts on a product. Before passing the product on, the tightening process is performed a
fixed number of times (may be six).
A simple poka-yoke device would incorporate the use of a wrench dipped in diluted paint. Since untightened
bolts will not have paint on them, the operator can easily see if operators have performed the process the
required number of times. A second example (from Dvorak) would be the use of packaged material in the exact
(fixed) quantities needed to complete the process. If the bolts were stored in containers of six, the operator could
easily see when the process was still incomplete as the box would still contain one or more bolts.
Motion-Step Method
The motion-step method is useful for processes requiring several different activities performed in sequence by a
single operator. This is similar to the fixed-value situation in that the operator is responsible for multiple
activities but instead of performing the same activity multiple times the operator performs different activities.
First, each step in the process is identified by the specific motions needed to complete it.
Table No. 61: Examples of Poka-Yokes, as per expert description
Poka Yokes Contact Type Warning Type
A device on a drill counts the number of holes
A steel pin on a fixture keeps
Contact drilled in a work piece; a buzzer sounds if the
incorrectly placed parts from
Method work piece is removed before the correct number
fitting properly.
of holes have been drilled.
Light sensors determine if
each crayon is present in
Fixed-value Bolts are tightened with a wrench dipped in paint.
each box; if a crayon is
Type Bolts with no paint on them are still untightened.
missing, the machines will
stop automatically.
A simple proximity switch A device detects when each component is
Motion- opens after all components removed from a dispenser; if a component is not
Step
are loaded in the proper removed, the device alerts the assembler before
Method
order. he can move on to another unit.
Then devices are created to detect whether each motion is performed and then alert the operator when a step is
skipped. An assembly process could utilize a device that senses when all required components are present at the
start of the process for each unit. The devices could then detect when each component is removed from its
dispenser, if a component is not removed, the sensing device alerts the assembler before operator can move on to
another unit.
Self-Checks
Poka-yoke devices, as described by experts, which provides the fastest possible feedback about defects and allow
workers to assess the quality of their own work are referred to as self-checks. Self-checks can be used to allow
workers to rapidly identify slips or work errors such as incomplete or omitted operations and to verify the
existence or absence of an attribute. For example, at Brigham and Women's Hospital, a computer system is used
to check and process doctors' prescriptions.
Sample Examples: A number of "real world" applications are presented in the business and engineering
literature, by the expert. Below is a list of examples of poka-yoke applications. James R. Evans and William M.
Lindsay presented, these examples in their book ‘The Management and Control of Quality’:
Color-coding a wiring template to assist the worker
Installing a device on a drill to count the number of holes drilled in a work piece; a buzzer sounds if the
work piece is removed before the correct number of holes has been drilled.
Cassette covers were frequently scratched when the screwdriver slipped out of the screw slot and slid
against the plastic covers. The screw design was changed to prevent the screwdriver from slipping.
A metal roller is used to laminate two surfaces bonded with hot melted glue. The glue tended to stick to the
roller and cause defects in the laminate surface. An investigation showed that if the roller were dampened
the glue would not stick. A secondary roller was added to dampen the steel roller during the process,
preventing the glue from sticking.
One production step at Motorola involves putting alphabetic characters on a keyboard, then checking to
make sure each key is placed correctly. A group of workers designed a clear template with the letters
positioned slightly off center. By holding the template over the keyboard, assemblers can quickly spot
mistakes.
a
I >
■'wSK
<3.
1) Problem / Present status: Over-flowing of the materials in
the feeder hopper, filling though screw feeder. It makes wastage of the materials, shop floor dirtiness,
abrogation in work.
2) Machine: Sanko (Sachet Machine)
3) Analysis: Why 1 - Manual controlling of screw feeder as per Sanko hopper level.
4) Solution: Screw feeder was intermittently start & stopped as per the level of powder inside the machine
hopper. Chances of weight variation at low level.
Hopper Sanko
(Sachet Machine)
5) Poka yoke theme: Warning approach though Synchronization of Screw feeder with Sanko
machine.
6) Idea: Install one Capacitive sensor to monitor the hopper level in Sanko machine & operate the screw feeder
accordingly.
7) Counter measure: One capacitive Sensor with 24 V DC power supply installed on Sanko machine to give
operation command to screw feeder.
8) Result: Installation of Sensor mounted at hopper top position.
9) Benefit: Shop of overflowing of materials and reduction in waste of finished material for packing.
SME Corner
Entire Lean Techniques are very much important to implement in SMEs, After Time study, Lean is
most essential techniques to improve profit of the organization. SMEs must start the Lean
implementation from beginning of the plant. All techniques are described above with a sample
implementation based on problems.
Some essential Techniques are inevitable for SMEs like 5S, Kaizen, SMED - mostly in engineering
industries for Prevention of mistakes.
It is the most effective management philosophy of the plant, which provides confident to present
the product and plant in front of customers, win in competition with commitment. Owners required
to be determined to be personally involve in Lean journey. It is the unique techniques for business
expansion with quality and productivity.
Self-assessment questions
Quality and total quality is the backbone of an organization, which shows preparedness of an organization for
their customers through people, products and processes. Total quality is the extended approach and dimension of
quality which shouts for quality for all corners, functions, operations, persons – directly or indirectly attached, in
all items and thought process.
When an organization is in loss, disarray, unfocussed, unmoving, stopped growth and at the point of devastation,
only thinking on Quality, journey for total quality and drive for quality aiming at customers, saves organization.
Management of quality through unity, action, output, communication and trust for organization and customers is
the fundamentals of Total Quality Management (TQM).
Skills, competency and innovation in the work, are basics of human quality. These qualities are important for the
products and services with the target of zero faults, process with quality standards, organization with established
compliance rules, makes the business in success, and TQM approaches makes it possible to improve
organization efficiency. Quality enables the business confidence to encounter customer challenges with internal
strength and determination.
ISO are criteria or rules set up for organizations that helps to regulate the compliance across the national
borders. These rules make it easier to conduct business on a level playing field and also allow more collaboration
by overcoming local or regional constraints.
ISO definition on quality: "The totality of features and characteristics of a product or service that bear on its
ability to satisfy stated or implied needs". As per ASQ (American Society for Quality is a global community of
people passionate about quality), Quality standards are defined as documents that provide requirements,
specifications, guidelines, or characteristics that can be used consistently to ensure that materials, products,
processes, and services are fit for their purpose.
It clarifies defined standards and requirements, that makes easier for companies to meet what their consumers
consider ‘quality’ and they improve the overall vision of what the company should work toward right direction,
where quality management systems come into play.
Quality for
Customer
s
Manpower Qualityfor
Products
Quality of and
Quality Services
System
and
Organizatio
n Quality
Customer Quality are related to product features, colours, functions, aesthetics, design, availability, performance,
serviceability etc. It is important for better market assess, market size and business extension. Price is one of the
challenges for customers and market assess. QFD (quality function deployment) is one technique used for
customer’s quality through market survey and analyze through QFDs.
Engineered Quality is related to failures, defects, unacceptable features in the products like noise, vibration,
unsafe, lest problems etc., which is related to low cost of the product and create satisfaction through best
manufacturing techniques.
TYPES OF QUALITY
1
Internal Quality External Customer Engineered
Quality Quality Quality
Concept of Internal quality is connected with generation of engineered quality in the plant by various points of
checking or inspection. Quality assurance in the plant ensures through online by immediate workmen or
operators and offline for sample lab testing and other method. There are various types of quality improvement
techniques used in the industry. The detailed of these areas are described in this chapter for better understanding
of quality and reduction in defects.
Online are based on internal inspection and testing of the products. External quality is mostly for the outsourced
products of items like semi-finished, raw materials etc., and may be customer’s quality from return, transport
losses etc.
History of quality improvement starts from inspection to at present assurance to total quality.
Quality Control Total Quality
Inspection of (SPC a n d other Quality Assurance Management
Materials a n d TechnicalTools, (System Driven (Involvement a n d
Outputs Focusingon f o r Quality Commitment all
Improvement)
Customers) People)
Different perceptions on Quality and tools are propounded by various quality gurus, which are as follows;
Table No. 62: Quality Tools invented by quality gurus
Name Concept Developed Techniques
Juran Trilogy QP, QC and QI
Crosby Zero Defect Conformance of Requirement,
Prevention of Non-Conformance
Ishikawa Quality Circle Cause-Effect Diagram, SPC
Deming 14 Point of To Improve Quality, Productivity
Management and Competitiveness
Taguchi Robust Design Noise of Business
Shewhart Control Chart Economic Control of Quality of
Manufactured Products
Feigenbaum Company-Wide- Employee and Management
Quality-Control Involvement – Total Quality Control
– TQC
Ronald Fisher DOE and ANNOVA Design of Experiment and Analysis
of Variance
Shigeo Poka Yoke, Lean Single Minute Exchange of Die
Shingo Production
Cost of quality is actually cost or loss to be incurred due to poor quality and failure on providing non-conformed
quality. If customer received any defective item in quality and return to the producer, the supplier incurred the
total cost of correction, resupply etc., and other intangible losses, which describes below;
TOTAL C O S T OF QUALITY
Rework: Rework is performed on the defective item when some operation or some elements in the operations is
missed out, under processed or incomplete operations and due to human negligence happened during the
manufacturing or production.
Repair: Some defects are reconditioned and conformed with repairing the product. Points of repairing may be
raised from internal checking or from external complaints from customers.
Partial Recovered: Some perishable products return from the market due to expiry date, old stocks which is
partially recovered by some process or unused boxes etc., after conforming the testing procedures.
Secondary and substitute: Some chemical products which do not pass the quality tests are used for any other
products as raw materials, kept as a sample for references, sold in the secondary market as an input or other use
etc.
Planning
For
I m p r o v e m en t
Management of S y s t e m Quality
and
Improvement
“ Succ
Innovative
5 MU
Muri, Muda, Mushi, Muchi, Mura
Overstressed, Waste, Ignorance, Untrained, Non-uniform
5 GEN
Genba, Genbutsu, Genjitsu, Genri, Gensoku
On Site, Actual Thing, Reality, Theory, Principal
Purpose of QC
The important use of QC for an Organization;
Increase productivity
Improve quality
Boost employee morale.
Basic Features of QC
Volunteers
Set rules and priorities
Decisions made by consensus
Use of organized approaches to problem-solving.
Team Exercise
Break down into teams of various implementing groups of people, as per availability nos. in the plant
Establish a leader and control for the Circle
Have a brainstorming and problem-solving session to resolve the issue
Agenda and attendance
The sessions consist and focused on problems.
The first guru who proposed seven basic tools is Dr. Kaoru Ishikawa in 1968, by publishing a book
entitled “Gemba no QC Shuho” that was concerned managing quality through techniques and practices for
Japanese firms. It was intended to be applied for self-study and training for employees by foremen or in QC
reading groups in Japan. It is in this book, that the seven basic quality control tools were first proposed, which is
valuable source when applying the seven basic tools (Omachonu and Ross, 2004).
These seven basic quality control tools, which introduced by Dr. Ishikawa, are: 1) Check sheets; 2) Graphs
(Trend Analysis); 3) Histograms; 4) Pareto charts; 5) Cause-and-effect diagrams; 6) Scatter diagrams; 7) Control
charts. Figure – 85 indicates the categorizations and relationships among these seven tools and their utilizations
for the identification and analysis of improvement of quality (Kerzner, 2009).
Check Sheet /
Data Tables Scatter
Pareto Analysis
Diagram
Flow Chart Root- cause
Control Chart/
Analysis
Histogram Run Chart
CHIPPER M/C
VINNER CHIP
PAD
SCREENING
4
CHIPS
SILO
WASHING
DIGESTER HOUSE
BLOW TANK
KNOTTER
BSW
SCREENING
BLEACHING Plant
2. Check Sheet
It is a structured method to check, verify and collect quality-related data as a means for assessing a process or as
an input for correction and analyses. The check sheet is a form / document used to collect data in real time at the
location where the data is generated. In check sheet, Data are collected and tabulated on the check sheet to record
the frequency of specific events during a data collection period.
It is prepared as a consistent, effective, and economical approach to be applied in the auditing of quality
assurance for reviewing and to follow the steps in a particular process. Check points in check sheet also help the
user to arrange the data for the utilization later (Montgomery, 2009; Omachonu and Ross, 2004). The main
advantages of check sheets, are to be very easily to apply and understand, and it can make a clear picture of the
situation and condition of the organization. It is one of the oldest but efficient and powerful tools to identify
frequently problems. It doesn’t have effective ability to analyze the quality problem into the workplace, but used
of check sheets are in several, three major types are such as Defect-location check sheets; tally check sheets, and;
defect-cause check sheets.
Table No. 63: Samp le desig n of check sheet with check p oints
Parts Production Details with Name of the QC
Products Name:
Description: Date and Shift: Member:
Sr. Check Points
Sub Prat: 1 Status (√. x) Remark
No. Details
Sub Prat: 2
3. Histogram
Histogram is very useful tool to present and describe in a graphical form in frequency distribution to observed
values of a variable. It plays an important role to describe and understand the properties of data such as spread or
range of the data, and variability of the data. It also describes the symmetry of the data. It is one type of bar chart
that visualizes both attribute and variable data of a product or process, also assists users to show the distribution
of data and the amount of variation within a process.
Histogram describes a comparative value of various units and a measure of central tendency i.e., through mean,
mode and average. Proper design, required properly identify for those working into the operation process can
easily be utilized and understood them. A histogram can be applied to investigate and identify the underlying
distribution of the variable being explored.
I 1,212, 20?, 211 JU, J I ?, JlW, J 1 1, J I J I A J I . . AV, 2 1 1, 212, 2Jft JI.'?, J I I , J JIW, 2 I I , J H. . I I', ’I.', 2 1t.2S >.
av. zjs. j j f , z i a at.', aw, ,'ii, a i s . a . a . a w , .>1«. /ja ,w ?«:. x: i . n z z . a i J . a j a . a i G . aia, 211.aHU1s.21a
3 11.2I.4 212,21 J. JW, 2 1 1 217?,2 1J, J I * . J I A 2 1 * . 296, 2 1 6.215, « ?,JIS, J1.6. J IB, JIW, 21 A J I 5. 21 A 210. «H, 2 1 4,291,
z i j . ’jj, .'12.Z35. ,'jr, .’Ji. .'ii, a j j , ,'pj. as, a;.a, a i i . z i a z i j . .'iftzjj. a j i . aj*. an. asa, a i ° . ai?
20> ff X
jus iff/
J0!» R
2 2 □25 30 -ID 19
4. Pareto Diagram
A Pareto chart is a type of chart that contains both bars and a line graph, where individual values are represented
in descending order by bars, and the cumulative total is represented by the line. This chart introduced by an
Italian economist, named Vilfredo Pareto, who worked with income and other unequal distributions in 19th
century, he noticed that 80% of the wealth was owned by only 20% of the population. Later, Pareto principle was
developed by Juran in 1950s. A Pareto chart is a special type of histogram that can easily be applied to find and
prioritize quality problems, conditions, or their causes of in the organization (Juran and Godfrey, 1998).
Another, it is a type of bar chart that shows the relative importance of variables, prioritized in descending order
from left to right side of the chart. The purpose of the Pareto chart is to highlight the most important among a
typically large set of factors. In quality control, it often represents the most common sources of defects, the
highest occurring type of defect, or the most frequent reasons for customer complaints. It also ranks the
problems or causes.
The purpose of the Pareto chart through the statistical tools, figure out the different kind of nonconformity from
data figures, maintenance data, repair data, parts scrap rates, or other sources. Also, Pareto chart can generate a
mean for investigating concerning quality improvement, and improving efficiency, ‘material waste, energy
conservation, safety issues, cost reductions’, etc., as the below Figure demonstrated concerning Pareto chart, it
can able to improve the production before and after changes (Montgomery, 2009; Kerzner, 2009; Omachonu and
Ross, 2004).
0.00 0.0%
Sealer Panel Conveyors Meeh Auger Clutch
(Electrical) Folding/Timing
The cause-effect diagram is a problem-solving tool that identifies the root of the problem, analyzes
systematically all the potential or real causes that result in a single effect. It is an efficient tool that equips the
organization to explore for the possible causes of a problem (Juran and Godfrey, 1998). This diagram can provide
the problem-solving efforts by gathering and organizing the possible causes, reaching a common understanding
of the problem, exposing gaps in existing knowledge, ranking the most probable causes, and studying each
cause” (Omachonu and Ross, 2004). The generic categories of the cause and effect diagram are usually six
elements i.e. causes such as environment/ mother cause, materials, machine, measurement, man, and method, as
indicated in the below Figure. Furthermore, ‘potential causes, can be indicated by arrows entering the main cause
arrow (Neyestani, 2017).
Allocation of
6. Scatter diagrams
A Scatter (XY) Plot has points that show the relationship between two sets of data. In this example, each dot
shows one person's weight versus may be their height. Scatter diagram is a powerful tool to draw the distribution
of information in two dimensions, which helps to detect and analyze a pattern relationships between two quality
and compliance variables (as an independent variable and a dependent variable), and understanding if there is a
relationship between them, so what kind of the relationship is (Weak or strong and positive or negative).
The Scatter diagram method is the simplest method to study the correlation between two variables wherein the
values for each pair of variables is plotted on a graph in the form of dots thereby obtaining as many points as the
number of observations. Scatter diagrams are very useful in regression modeling (Montgomery, 2009; Oakland,
2003). The scatter diagram can indicate that there is which one of these following correlation between two
variables: a) Positive correlation; b) Negative correlation, and c) No correlation.
Scatter Diagram
2000
1500
1000
500
0
0 2 4 € 8 10 12 14
A Advertisement I in thousand rupees}
* Sales (in thousand rupees!
- - - Linear (Advertisement I in thousand rupees 1>
7. Control Charts
The control chart is a graph used to study how a process changes over time. Data are plotted in time order with a
central line for the average, an upper line for the upper control limit, and a lower line for the lower control limit.
Control charts is a special form of ‘run chart that it illustrates the amount and nature of variation in the process
over time’. Also, it can draw and describe what has been happening in the process. Therefore, it is very important
to apply control chart, because it can observe and monitor the process to study process, that is in ‘statistical
control’ in accordant to the samplings or samplings are between UCL and LCL (upper control limit (UCL) and
the lower control limit (LCL)). If the ‘statistical control’ is not between UCL and LCL, so it means the process is
out of control, then control can be applied to find causes of quality problem, as shown in the below Figure that A
point is in control and B point is out of control.
Moving Range I ndvidual Value
1000
500
500
500
A point
I -MR
Chart
of
B point
I -MR
Chart
of
Cl
Run Chart of Travel days upto dispatch
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Sample
In definition of total quality management (TQM), it describes a management approach to long-term success
through customer satisfaction and internal preparedness for quality. Through TQM effort, all members of an
organization participate in improving processes, products, services and the culture, on which everybody work to
build quality.
Joseph Juran was one of the founders of total quality management, with E Deming. It is originated in the
Japanese industry in year 1954. TQM is managerial approach for long term association with customers with all
employees’ participation for total quality through culture for business success.
The ranges of total quality extend from the entire organization with its employees and stakeholders.
Responsibilities, total participation & involvement, focus on business through focus on customers are the natural
trend TQM Techniques. Now in the new dimensions of TQM, it aims to total business solution through efficiency
with continuous improvement and culture of trustworthy.
In spite of new the business trend i.e. Industry 4.0, TQM is becoming more relevant for its Managerial approach
towards continuous value creation in any Business. It is an approach towards qualitative & quantitative result in
business, better control of business, continuous improvement and culture of sustainability.
In developing countries, the application and implementation of TQM is comparatively less as comparison of
Japanese Industries and other companies in developed Asian countries and America, where its implementation is
realized as an essential in an organization for performance. Various world-wide scholarly articles reflect the
effectiveness of TQM on the quality, productivity, human resources and organizational performance.
Effectiveness of TQM also depends on expertise of the resource person or leader who should have enormous
working experiences in this arena.
Big companies who have implemented TQM, are Ford Motor Company, Phillips Semiconductor, SGL Carbon,
Motorola and Toyota Motor Company etc.
There are five major aspects of TQM, and each are essential for successful application.
r
Commitment
and
Understanding of
Employees
Quality
Improvement
Culture
More Focus on
Customers
Effective Control
1) Commitment and
understanding the concept among employees
Figure 89: TQM Essential Role in Organization
The starting point of TQM is employee
commitment and understanding the Total Quality Management (TQM) policies and make them a fundamental
part of their work by ensuring within the organization. Employees should be communicated about the corporate
goals and comprehend the importance of these goals to the overall success of their organization. Employees need
to realize what is the outcomes and individual benefit like achievement and the target. TQM continues, applies
and extended through the employees.
TQM sustains and progressed through an established, disciplined and accepted rules to follow, which is the
culture of quality. Paradigm change in thinking of employees towards customers, organization and quality
through commitment is fundamental of TQM culture.
In most of the organization, people don’t see or communicate to their customers, then how you satisfy your
customers; TQM create awareness for essentials for customers through values, daily work, completion all tasks
on time and work under well-established system. This important point for management use to motivate
employee for engagement in work.
5) Effective Control
Control have two impacts in TQM, first is essential to monitor and measure the performance of the business and
second to control the application, progress and result of TQM. Develop a measurement system to understand the
state/ level of business at any point of time, and it usually done through a structured MIS (Management
Information System) with all resource information or design organization scorecard. TQM also ensures the
effective control of all the resources, targets and progress as per the planning.
Another essential for TQM, it is flexible with convergence of many techniques and steps. Based on market,
opportunity, challenges, TQM makes organization a strong and adaptable. It makes people, system and process
efficient for customers.
1) Produce quality in work and culture is the first: It is techniques cum culture of an organization also to
focus on customers, process and business by the people and for the people. It is a practice in daily life by
all for purposes of organization and personal life.
2) Always focus on the customers: Do for the customer and it is possible when do some study, research on
demand and understanding on needs and expectations for the customers. Communicate and measure
customers, manage and continue the relationship and balance the customer satisfactions with other
interest such business, employees, stakeholders and suppliers.
3) Employee engagement and Commitment: It is most important part of TQM for employee
communication and awareness about the aspects of TQM values. Empower and values their presence,
understanding, contribution, participation and engagement in their work. Make an environment of
learning opportunity, competencies, experiences and recognitions. Develop QC for expressing ideas,
views, problems & solutions and apply intelligences.
4) Have a systematic strategic approach: The focus on efficiency and effectiveness of the of the
organization on decision and implementation. As per the principle of ISO standard “Identifying,
understanding and managing interrelated processes as a system contributes to the organization’s
effectiveness and efficiency in achieving its objectives”. Make is as strategy for all people’s quality of
Line, supporting functions and secondary functions as part of assurance of quality. Define and make the
improvements, various targets in as objectives for all.
5) Process approaches of Production, Services and Business: Develop various all process in a flow and
assimilate it with value-stream of the products. QC groups for all functions, knowledge group for the
organization, should generate in the organization for solutions of bottlenecks in functional departments
like production, marketing, services, quality, IT; which are direct or indirectly related to customer, process
and business partners.
6) System Driven and Integrated: Most of the organization in the context of present business constraints
understanding the system approach for all solutions, which horizontal and vertically integrated of
activities and functions. System approach takes long time to develop, but it reflects as an established rule
to be followed by all as a culture of an organization, maybe it technical or human respective. Quality
improvement will be a part of system-oriented progress.
7) Improve continuously and continually: Develop the policies of continual or continuous improvement
with awareness, innovation and training to patriciate by all. It improves knowledge, performance,
engagement and clarity of presence in the organization
8) Develop and Encourage on mutual respect, trust and teamwork: People respects the trust building and
teamwork, which is the mainstay of TQM. People involvement and reduction in employee turnover
depends on this culture of engagement. All large organizations are based on this HR culture and on the
concept of TQM for long-term existence with sustainability.
9) Fact and analyzed based decision making: Collect, analyze the data and information in decision making.
Data should be realistic, reliable and accurate for decision on organization, customers, projects and
processes with valid methods of collection.
10) Effective communication: Establish the formal, informal and official line of communication for clarity
about organization and individual role and responsibilities. Everybody could be informed, understand
about the decision making and progress of the organization. Large organization develops written
communication through HR publication for better understanding and achievement of the employees,
which encouraged then for better performance.
TQM Approach
1) It should be an organization-wide approach to continuously delighting customer through relentless and
continuous improvement through product and service excellence.
2) Aims to transform everyone in the organization through progressive changes in attitudes, culture,
structures and system.
3) Focus on radically transformation of business and its performance.
System
Driven
Involvem
ent
Principles
of TQM
Total
Approach Continuous
from Improveme
Supplierto nt
Customer
1) Understand about the organization on existing output, manpower, skills, training and system with the
structured formats
2) Existing flow of operational activities, departmental activities and critical areas, functional areas,
department levels etc.
3) Core group formation and planning in the areas of techniques and process of TQM implementation
4) Training: Creating and building competent people on quality and responsibility with mutual trust; how to
focus on customers, reflect quality in daily working, value engineering and reduction in process loss
5) Teams: Develop Department-wise QC Teams with Action Plan (PDCA Cycle) on implementing areas
6) Cultural Initiatives and design TQM Framework Templates
7) People Involvement on Problem solving
8) Connect the organization performance with people performance: on time completion of commitment to
customers
9) New Technical Interventions: Accordingly, the level and types of organization, in technology and
techniques
10) Department’s objectives and department-wise quality policy/ mission
11) Increase in Manpower Involvement and Reliability
12) Modifications of Process Flow, it required
13) New IT Interventions and journey towards Industry 4.0
14) For Manufacturing sector reduction in defects and 8 types of wastages
15) Internal Innovation, Research and Knowledge Management Groups
16) Connect Business Performance with People Performance: Departmental and organization scorecard:
performance reward
17) May be International Benchmark on same organizations in the industry
18) Continuous work on the Future Road Map.
TQM Implementation Methodology
Process will be Modified According the Types of Organization: Service and Manufacturing
Is jiccraicmcrt J ' - - - -
|
.F RO*
| My
TQM is a value creating journey for business and organization. When organization will progress in the favorable
market opportunities, TQM will work as the bonding among employees through quality in relationship. It defines
the relationship with all manpower, fellow employees, subordinates, bosses and organization. TQM is a non-
ending journey of culture in business.
SME Corner
Quality is most valuable areas for business, customers, cost reduction and system efficiency. It is
essential for any business, family and social life.
Defects which never add values, rather degrade the business values and dis-satisfies the
customers.
Ail SMEs must include the defects reduction techniques with application and interventions of
Quality Tools like 7Q Tools, CAPA (Corrective and preventive action) on all problems and defects.
Implement the R-C Analysis for all levels of manpower may be in their language to do the Root-
cause for all work-related problems at shops, implement it and display in the visual board for their
pride and recognition.
Self-assessment questions
On TQM
i) What are the essentials of TQM in an organization?
ii) What will be commitment and understanding of employees on TQM?
iii) How to create the culture of quality improvement?
iv) What are the principles of TQM?
v) How to start the TQM Initiates in an organization?
vi) What is the process of TQM implementation?
vii) What are TQM intervention and methodology?
viii) What are the Quality tools / techniques used in TQM?
Chapter - IX
Total Productive Maintenance
9.1 INTRODUCTION
In previous chapters various techniques are discussed for factory improvement on productivity, quality, Lean
management and other essentials techniques for capacity improvement. From the first industrial revolution and
throughout the other industrial revolutions, the technology is rapidly changed for the quick and mass production,
aiming at on-time delivery, customer delight, more quality, process simplification, reduction in human effort
through robotics and automation. During these revolutions, evolution occurred through continuous changing &
interventions of technology and techniques, by replacing old technology or old concepts. It is a continuing
throughout the years and decades.
Total productive maintenance (TPM) is a technical concept for maintaining the plant and equipment for their
sustainable performance and efficient use. It is a driver or technical process used in the industry for increasing
the life of the installed technologies, create employee morale, more customer satisfaction and best possible
business result. TPM improves the corporate culture through improve in the utilization of manpower and
machines. TPM ensures the efficient plant to provide qualitative and quantitative products for the customers. It
enhances the productivity and reduces losses occurs due to breakdown and stoppage of work. An optimum
utilized plant has saved immense cost for their organization. A well-maintained plant confirms optimum
utilization of technology and its resources.
Challenges in the use of technology are, to maximize the capacity utilization, keep up the plant availability,
performance, competency & efficiency of maintenance people, cost of maintenance etc. TPM accomplished the
expectations of management and investors for making sustainability use of the technology and on time
production.
9.2 TPM – History
Concept of TPM first started in Japan in 1950’s, after introduction of preventive maintenance to reduce the
breakdowns. Preventive maintenance was first started in USA. Nippondenso, the supplier of Toyota was the first
company in Japan started implementation of preventive maintenance as a concept of daily maintenance in 1960.
Nippondenso started preventive maintenance, which was conducted by maintenance team as a dedicated group
and existing operators are engaged for producing the goods, but, however, due to automation in the plant
maintenance required more specialized personnel. To solve this problem, management decided to engage the
operators for routine maintenance and immediate faults and maintenance group do the critical & essential
maintenance work. This was the first concept of Autonomous maintenance introduced in the industry.
Nippondenso, in this way started preventive maintenance with autonomous maintenance through involving
operators. When the maintenance people started modifications of the maintenance equipment or with new
equipment, this led to prevention of maintenance, and in this continuation and conglomeration of preventive
maintenance, with maintenance prevention and maintainability improvement give evolution of Productive
maintenance. It generates a total commitment to high quality and zero losses that leads to the birth of Total
Productive Maintenance. Productive maintenance started for more life cycle of machine and equipment, saved
the cost of maintenance, applied quality circle, employee participation and training. Nippondenso awarded for
prestigious plant prize, for developing and implementing the first concept of TPM by the Japanese Institute of
Plant Engineers (JIPE). As internationally accepted TPM benchmark developed by the JIPM under Seiichi
Nakajima, he may be regarded as the father of TPM.
TPM is based on the techniques for reduction in system abnormality which eliminates losses and wastages to the
organization. The scopes under TPM are;
1) Establish a system of maintenance in the plant and its machineries
2) Maximize the efficiency and effectiveness of the equipment
3) Develop a system to expand the life of equipment and machines
4) Ensures safety of the plant
5) Reduction in cost of maintenance of plant and machineries
6) Employee morale, motivation and quality of the plant
7) Employee involvement in technology from top to bottom
8) Overall performance of the plant
9) Overcome challenges from market competition and customers’ quality
10) It consists of various maintenance process
11) Defines the steps of implementation for Total maintenance.
By Planned Total
Inspection Productive
for any maintenanc Maintenanc
e
Abnormality . e
History and Trend of Maintenance
• •
Breakdown Preventive Corrective Maintenance
maintenance (BM) maintenance (PM) maintenance (CM) Prevention (MP)
-i L " " ____-
uupiemei iLatiuri;
D e c l a r a t i o no f r e s o l v e t o
in the plant: process and practices in introduceTPM by top
Various p l a n n e d a n d t h e P l a n t ; OEE m a n a g e m e n t , TPM
u n p l a n n e d stoppages Calculation, SomeM/c introduction education and
w o r k . Lacks o f b a s i c Maintenance T e c h n i q u e s - campaign. TPM promotion
c o n d i t i o n s a n d absence o f Schedule,Breakdown and organization a nd manager
a n a l y s i s . L a c k Knowledge Preventive,Quality p i l o t m o d e l , Setting b a s i c
and training on Maintenanceetc., policy a n d target forTPM,
maintenance. Problem of Maintenance C h a r t (Fuguih Preparation of TPM m a s t e r
Layout and organized Data a n d Visuals o n M/c p l a n . Kick off, Establish o f
s h o p f l o o r . Machine St History a n d records.
equipment records with M a i n t e n a n c e e t c . . T o o l Kit
the breakdowns, Non- description a n d positions.
conformance of Quality, Equipment Inventory ma n a g e merit syste m ,
Improperanalysis of the K e e p i n g P r o c e d u r e . M/c Establish o f q u a l i t y
p r o b l e m s a n d also m a n u a l s a n d m a j o r M/c L o g maintenance system.
acceptance o f it. Safety is Books, Operator's Training Establish o f office TPM,
n o t p r i o r i t i s e d , No cost andskill upgradation. Establish o f s a f e t y a n d
evolution on the Activity B o a r d a n d environment system,
equipment inventory m o n i t o r i n g , CAPA etc. Evaluation (TPMpyrpllpnrp
TPM Office
9. 5 System Reliability
Lusser’s law (multiplication principle) is a prediction of reliability named after Robert Lusser.
It states that the reliability of a series system is equal to the product of the reliability of its component
subsystems, if their failure modes are known to be statistically independent. This method is similar to the;
R = R1×R2×R3×R4×R5× ・・・・・・・ RX
Parallel system
Reliability is complementary to probability of failure, i.e.
R(t) = 1 –F(t), or R(t) = 1 –Π[1 −Rj(t)]. R(t) = 1 –F(t), or R(t) = 1 –Π[1 −Rj(t)]
For example, if two components are arranged in parallel, each with reliability R1 = R2 = 0.9, that is, F1 = F2 =
0.1, the resultant probability of failure is F = 0.1 × 0.1 = 0.01. The resultant reliability is R = 1 – 0.01 = 0.99.
This feature is sometimes used for reliability increasing by using redundant parts.
Q - Quality
Improvement in quality through the target of zero defects through machine.
C – Cost
In increased performance or better utilization inputs, decreases the wastage of inputs and cost of output. TPM
could reduce the manufacturing cost upto 30-40% according types of industry.
D – Delivery
In TPM implementation organization always may ensure the target of 100% delivery achievement, on time in
full.
S – Safety
In JIPM is mentioned that safety is one of the priorities of TPM. In safe environment, employees become more
motivated for involvement.
M – Moral
It improves the moral of the people and more engagement which is one of the intangible benefits of TPM.
R - Reliability
System reliability is added in the PQCDSM for customer’s loyalty and sustainability in business.
Example: TPM implementation in BAL (Bajaj Auto Limited), ‘Total Productive Maintenance (TPM) Policy that enables Tier I and II vendors to
improve their operational, human and cost efficiencies. At the end of FY 2017-18, 163 Tier I vendor groups and 267 Tier II vendors were
practicing TPM. It implemented as per business responsibility of the organization.
Category of Failures
There are three types of machine failures based on the frequency of occurrence. Major causes of failure of
machine are as follows;
Sudden failure
It is an unforeseen and unanticipated breakdown or failure of the machine with understandable causes.
Intermittent failure
It occurs infrequently or randomly. Here the causes of failure are difficult to identify. This type of failure is quite
exasperating and annoying to the plant, but it can be prevented by understanding & anticipating the probability
of causes and possibility of happening by addressing them during maintenance.
Gradual failure
It is the easiest failure to be anticipated and to be prevented by doing routine checkup, maintenance and
inspections. Operating process of this machine and equipment should monitor as per the priority.
Another expert view, the types of failure or, in part, the root cause of the failure indicates the appropriate course
of action to take correctively. Keeping the types and sources of failure in mind, it may assist to avoid or prevent
failures.
If a failure occurs too quickly, collect the appropriate information to determine the types of failure and the
corrective action becomes may be very difficult.
In this context, there are another concept, known as Failure modes, effects, and diagnostic
analysis (FMEDA). It is a technique and extension of FMEA (Failure mode effect analysis) to
generate failure rates in the safety models through each important category such as safe detected,
safe undetected, dangerous detected, dangerous undetected etc. It is a systematic analysis technique
to obtain subsystem or product level failure rates, failure modes and diagnostic capability. The
FMEDA technique considers as:
i) It includes all components in design
ii) Functionality of each component
iii) Failure modes of each component
iv) The effect of each component failure mode on the product functionality
v) Ability of any automatic diagnostics to detect the failure
vi) Design strength (considering the safety factors) and
vii) Operational profile.
With the given component in database, calibrated with field of failure data that reflects reasonably
accurate, this method could predict the product/ process level failure rate and failure mode data,
for a given application. Once the predictions have been shown to be more accurate, than field
warranty return analysis or even typical field failure analysis specified that these methods depend
on reports that typically do not have sufficient detail information in failure records.
9.7 About losses: 16 major losses in the Plant
As described losses is wastage in the plant and in any manufacturing system to reduce and control. Losses in the
system are related to man, machine & material, and however, the target is to eliminate them or generate a system
to prevent them.
The losses have been divided into 16 categories which are as follows;
1. 8 major losses are related of machine and equipment
2. 5 major losses are related to Manpower and man-hour
3. 3 major losses of product resources
1 6 Major Losses
Management Loss, Me
replacement loss, Start-up oss. Line Organization Yield Losses, Energy, Die.
loss. Minorstoppages, idling
loss, Speed reduction loss. Distribution Loss Tool and Jig Losses
Defects, rework loss,
3. Cutting blade replacement loss: This loss is common in the plant and machines, may be as a consumable
item due to unproductive & natural for wear, tear or damage. It is a loss in time, measured in hours, such as
replacing cutting & grinding tools, saw blades and lathe tools etc.
4. Start-up loss: Here losses occurred during the starting and getting output from the equipment with the state
and setup to get the correct and verified quality. There are various types of times spend during setup due to
temperature or operating temperature, testing time, adjustments, cooling, compressor, hydraulic, correct
weight, preparation of supporting equipment etc.
5. Minor stoppage & idling loss: These stoppages are minor maybe less than one minute but it happens due to
minor equipment, line & material blockage, power failure, quality and other issues. These are may be in
regular or chronic in nature, which mostly may not be noted.
6. Speed reduction loss: When machine and equipment or line not running in a standard or optimum speed, this
loss happens. It is due to quality, problem of maintenance, instrument, special trail or observation, balancing
of other supporting activities etc. Unit of measurement in rate or tones as per unit’s output.
7. Defect & rework loss: All rework, repair, minor changes which are corrected during the production is the
rework losses. It has multiple impact losses due to stoppage, making slow the lines or operations and
changeovers also.
8. Shutdown loss: It is stoppage of the work for planned or unplanned maintenance, unplanned production,
cleaning or sudden change in working environment or special customer inspection etc. Unit measurements in
time / hours.
Most of the Losses has monetary impact in the cost of the output, so most of the losses might be count in
monetary terms.
The objective of TPM is maximization of equipment effectiveness. TPM aims at maximization of machine
utilization and not merely machine availability rather in efficiency. One of the pillars of TPM activities i.e.
Kaizen implementation follows efficiency of equipment, operators, material and energy. These are
immoderations of productivity and aiming to achieving substantial impact. Kaizen and others pilers are planned
and implemented to methodically & sustainably eliminate 16 major losses.
Phase – I: Preparation
In this phase, TPM initiative started by management as a part of strategies in the organization with prioritize in
the responsibility of top management during the implementation. Project preparation, team building and policy
making is the actions in this phase. It is a strategic decision of a plant, a administrative decision also.
Phase – II: Introduction
This is an occasion for inviting all including suppliers to know that the plant / client organization expectations
on quality supply aspects. It also includes the related companies as partners and affiliated companies, probable
customers, sisters concern etc. Many might learn from the occasion and some may help with ideas and customers
should get the communication that organization cares for quality, output and fault & losses free environment.
Initial management discussion and analysis is called Shoki-Ryudo-Kanri in Japanese for system designed to
reaffirm the quality and product specifications of new products in regards the customer perspective.
Step – III: Starting of TPM in the organization with developed pilot model
During this phase the Pilot model of TPM will executed and the TPM Board Committee establishes in a meeting.
The TPM Manager and some stuff helps for communication between Kaizen activities on site and TPM Board
Committee. These are the preliminary phase under TPM before implementation. The structure of TPM board and
sub-committee is described as below;
Top M a n a g e m e n t
TPM
Man-agecr
The goal of TPM could develop in the focus like, increase production & productivity, also boosting for
workers' job satisfaction and morale. Employees are empowered with the ownership & accountability and pride
in utilizing the life and use of the equipment they operate, and reducing costs in that process.
al al
Need .. Need
■ Threa ■ adva-
t and ntage
Basic policy
H i g h priority action
PQCDSMR t a r g e t a n d B e n c h m a r k i n g
Failure
Loading time
Setup &
losses Ad justment
Kaizen
Cutting blades Theme
Operating time
Start-up
Downtime losses
Minor
Net operating Sto pp ag e
time Performance losses Speed losses
Defects /
Valued rework
Defect losses
operating time
The ways to make your office like Toyota plant as per Lean learning are as follows;
Build a skills Matrix for your office
Establish and display standard work
Create an information flow map as per ‘TPM execution flow’ and workshop & tools under TPM.
OEE = A x PE x Q
OEE = (Operating time / Working hours) x (Net Operating time / Operating time) x (Valued operating time / Net
operating time)
Net Operating Valued operating
Operating time
time time
Net operating
OEE Working hours Operating time
time
Availability of the Machine
Quality Output
Machine Performance
A - Availability of the machine. Availability is proportion of time machine is actually available out of time it
should be available.
A = (MTBF - MTTR) / MTBF.
MTBF - Mean Time Between Failures = (Total Running Time) / Number of Failures.
MTTR - Mean Time to Repair.
PE - Performance Efficiency. It is defined by RE X SE.
Rate efficiency, RE: Actual average cycle time, which may be slower than design cycle time because of jams,
bottlenecks etc. Output is reduced because of logjams, blockage etc.
Speed efficiency, SE: Actual cycle time is slower than design cycle time, machine output is reduced because it is
running at reduced speed.
Q - Refers to quality rate. Which is a percentage of good parts out of total produced sometimes it may call
‘yield’.
Gap in the OEE Calculation
Difficult to differentiate the calculated value from a standard value and a theoretical figure;
There is a problem in a setup of a standard value and a theoretical
figure
3 5
i i
i. h
5
r 1
I 1
■
lA
5S
ipknicnt-ifc
bumon}
5S Implementation
TPM starts with the implementation of 5S with the cleaning, organized with standard and sustainable workplace.
Organized work place controls the human motion and materials move. It also includes the study based planned
layout. Detailed about 5S already described in Lean manufacturing chapter. If Lean techniques are implemented
in the plant, that means Pillar – I is completed and team could verify it and forward to the next step.
Seiketsu - Standardization
Develop practice for ever same, it in repetition and decide on standards for keeping the work place / machines
and pathways be well-ordered and clean. This standard implemented and maintained by all with inspection,
improve and implementation for whole organization.
Kobetsu-Kaizen
Kobetsu-Kaizen is conceptualised as per concept of ‘individual improvement’ for efficient production systems.
It is implemented as the theme for the project team, developing the model equipment or by model lines with the
target of zero losses. It is also discussed in the Lean manufacture chapter, as a technique for reduction in various
losses. As per the JIPM, the improvement process of Kobetsu and Dandori – Kaizen is described below;
Dandori Kaizen
With the theme of Zero changeover time, developed in Japan for internally competitiveness for wide-variety,
small-lot, and just-in-time production. The purpose was to achieve zero changeover as defined the changeover
could be complete on three minutes. It must improve the layout of the production line with expense with
implementation of ‘process raze’ by creating zero defect production line and reduction in staffing patter. This
technique is full concept and requires further discussion, but perspective and significance are described in Lean
chapter. Factories first use the techniques of SMED and then forwards to Dandori Kaizen or both could do
simultaneously.
About 4M
In the industrial history, various problems happened particularly in the manufacturing and processes are
commonly make defects in the final output, accidents occurred during work, machine & equipment faults which
have immense economic loss to the industry.
The 4 M´s is merely describes and denotes as, Man-Power, Machinery or equipment, Method and Materials.
The first “M”, stands for the Manpower or workforce, which are the one’s responsible of doing the activities
concerning the operations, process in any manual, semi-automatic or totally automatic system. The second “M”,
denotes as Machinery or equipment which is used and the whole mechanical and automatic part of the process, in
the place where the manufacturing activities are performed. The third important “M”, means the Method, that is
the procedure or practice implemented to use in any process or operation. The fourth “M”, refers to the
Materials, i.e. raw materials which the factory uses for making the output or product.
The in dept knowledge on 4M enables the plant possibly as the causal elements when a fault appears for fast
identification of the problem and way forward towards solve it as quickly as possible, avoiding repetition and
quality faults, to save time, money and effort.
Ο Possibility complete
Key points of Kaizen in processing industry are, unit cost and supervision of the consumption of material,
subsidiary material, fuel, electrical power, packaging material etc. for following areas;
F Reduction of material losses
F Reduction of energy losses
F Process simplification
F Reduction of maintenance cost
F Improve in total process efficiency
F Better presence in the market
Kaizen management and application tools are similar of 7QC tools with check points, stratification, histogram,
pareto chart, cause-effect diagram, scatter diagram, run or control chart.
Poka-Yoke ( Fail-Proof )
It is used in TPM structure where standards are necessary, and it is difficult to prevent completely the human
mistake through it. It is also necessary to establish fail-proof system in the plant. It is detailed discussed in the
Lean chapter.
PILLAR 3: JISHU HOZEN, Autonomous maintenance
This pillar is most value-added and significant concept & technique in TPM journey. It starts by engaging the
operators towards skilling, developing and enabling them to be able to take care of small maintenance tasks with
their own initiative. Through it, maintenance period would be reduced with freeing up the skilled maintenance
people to spend time on more critical & specialized maintenance and do the technical repairs and activities
during the total stoppage of lines. The theme is ‘own m/c first responsibility of operators’ for upkeeping of their
equipment to prevent it from deteriorating and more waiting time. It also reduces the cost of the operation
through reduction in stoppage time and maintenance cost.
Policy
1. Continuous improvement in tool and equipment
2. Skills and flexibility for operators to operate and maintain
3. Fault and defects elimination at source through active employee participation
4. Stepwise implementation of Autonomous maintenance procedures.
Step0 Preparation
It starts with training and follow other standard steps of preparation;
i) Basic education for AM, safety and maintenance with some manual of work
ii) Set up activity board
iii) Prepare Tags (blue and red)
iv) Prepare Documents
v) Prepare audit system
vi) Prepare basic maintenance tools for cleaning, lubrication and inspection
vii) Organize small groups
viii) Set the schedule (Select the model machine or line)
ix) 3S activity around the machine.
Activity Board - 1
Factory Autonomous maintenance
Activity Board-2
Common contents of the activity Board -2, all following areas;
i) Group introduction
ii) Activity area, machine, line and Loss analysis (loss map)
iii) OEE Calculation (if possible) and graph
iv) Activity master schedule and individual action plan
v) Activity time (man-hour)
vi) Meeting minute
vii) Number of tag attach and detach (use graphs)
viii) Tagging map
ix) Kaizen sheet (before and after)
x) One-point lesson
Tagging procedures
Attach blue tags on the points that operators can restore.
F Attach red tags on the points that require restore by maintenance team or others.
F Detach tags after restoration.
AUDIT
Prepare of audit (make some audit sheets as the plant set up like machines and products) as per the auditing
areas;
Auditors should be top management and middle-level managers
Presentation of step activity on the activity board by AM group (may be 15minutes)
Presentation of step activity at the machine by AM group (may be 15minutes)
Assessment and meeting by auditors (may be 15 minutes)
Announcement of the result and comment from top management
Audit has to be executed by each step of AM.
Step2: Countermeasures for source of contamination and hard to access
Meeting for step 2 and / with review of step1
Reconfirm the safety
Check the contamination/ pollution point, kind and volume
Check the hard to access area
Make graph on cleaning, inspection, lubrication time
Measurement of initial time for each
Make some plan to reduce each time by kaizen sheet
Action Points
F Eliminate or reduce contamination by kaizen
F Change machine design or make some tool by kaizen to reduce CIL time
F Planning of countermeasures schedule
Prevention of Deterioration
Before and After Pictures
Test covers for prevention flying apart of chip
Kaizen for source of contamination
Kaizen activity around the Machine
Kaizen activity for elimination of Losses
Visual Control - 1
Visualization of Machine
It is better that Operation and maintenance activity will be efficient;
Visualization of working point
Level of inspection and lubrication
V belt, chain indication (direction, type, etc. )
Fluid distinction, valve condition (open, close)
Notice of dangerous area
Operating condition, abnormality, number of outputs
Step6: Standardization
Process control system should be simple and reliable and review and Integration process control standard.
F Distribution standard
F Work standard
F Data record standard
F Spare parts standard
F Quality assurance standard
F Maintenance standard
F Kaizen for Review standard
The above-mentioned steps are discussed in detail as per the following points:
1. Train the Employees
Educate the employees about TPM, purpose, advantages, on autonomous maintenance and related steps. Instruct
the employees about abnormalities in equipment, process and standardization.
3. Counter Measures
Make provision for inaccessible regions had to be reached easily. If there are many obstacles, facility like
screw to open a fly wheel door, hinge door can be used. Instead of opening a door for inspecting the
machine, acrylic sheets can be used.
To prevent worn out of machine parts, necessary action must be taken
Equipment and machine parts should be altered to prevent gathering of dirt and dust.
4. Possible Standards
Autonomous maintenance schedule must be following the below mentioned points strictly.
Timetable and agenda should be made regarding cleaning, inspection and lubrication and it also should
include standard details like when, what and how.
5. General Inspection
Employees are to be trained in disciplines like pneumatics, electrical, hydraulics, lubricant and coolant,
drives, bolts, nuts and safety.
This must be essential improvement in the technical skills of employees and use inspection manuals
appropriately.
Subsequently, share this new acquired knowledge with others employees
After acquiring these technical experiences, involved operators being well aware of machine parts and
their maintainability.
6. Autonomous Inspection
Following also the standard practices of autonomous inspection;
7. Standardization
Following also the standardization procedures associated in AM;
In this step the surroundings of machineries should be organized and undertake in AM. Necessary items
should be organized, such as, there should be no searching time or searching time is should be reduced.
Work environment might be modified such that there should be no difficulty in getting any item
Everyone should follow the work instructions strictly
Necessary spares for equipment are planned and procured as per the EPN (Equipment Priority Number,
which is described in the later part in this chapter).
8. Autonomous Management
Autonomous management is the controlling and monitoring the AM and prepare workplace instruction,
maintain discipline and progress towards end result.
OEE and OPE and other TPM targets must be achieved by continuously improve through Kaizen.
PDCA (Plan, Do, Check and Act) cycle must be implemented for Kaizen.
PILLAR 4 - Planned Maintenance, Keikaku-Hozen
In Planned maintenance (PM), activities are planned, documented, and scheduled with the aim of trouble-free
machines and equipment producing defect free products, efficient system utilization for total customer
satisfaction. In PM, downtime by having all essentially be reduced with the increase in life cycle of instruments
and machines.
Some Proactive types of maintenance concepts are also used in industries, which are as follows;
i) Predictive maintenance
ii) Condition-based maintenance
iii) Scheduled maintenance
iv) Routine maintenance
v) Emergency maintenance
3. Corrective maintenance
The concept developed in 1957, with design of weakness must be redesigned to improve reliability or improving
maintainability. Corrective maintenance task performed for identification, isolation and rectification of a fault to
ensure that the failed equipment, machine or system could be restored to an operational condition within the
tolerances or limits recognized for in-service operations.
4. Maintenance prevention
The maintenance prevention specifies the design of a new equipment which started on 1960. MP is a significant
concept for ensuring reliability and maintainability of manufacturing facilities by providing various information
collected during the actual operations in their design phase. Failures and weak points of machines are
sufficiently studied i.e., on-site information gathering to failure prevention, easier maintenance and prevents of
defects, safety and ease of manufacturing which are combined before commissioning next or new equipment.
PM Policy
1. Develop in Internal maintenance system
2. Achieve and sustain availability of machines
3. Reduction in maintenance cost
4. Reduces spare & parts inventory and management
5. Enhance reliability and maintainability of machines.
PM Target
1. Continuous improvement reliability and maintainability
2. Zero equipment failure and break down
3. Reduce maintenance cost
4. Ensure availability of spares all the time.
Five Measures for Zero Failure which are developed by experts are;
1. Fulfil the basic requirements
Cleaning / Lubrication / Retightening / Dynamic and static accuracy
2. Observe the usage condition
Current / voltage / speed / temperature / etc.
3. Restore deterioration
Control of natural deterioration
4. Improve the weak points in design
Kaizen of reliability and maintainability
5. Improve Technical skills
Operating and maintenance personnel.
Tool Management
Efficient management of tools are;
i) Importance and availability tools
ii) Storage condition of tools
iii) Inventory control of tools
iv) Supply and arrangement of tools
v) Destination management of tools based on a processing plan
vi) Life management and improvement of tools
vii) Cost Management of tools.
An EPN (Equipment Priority Number) is developed for better inventory control of maintenance spare and parts
in a plant.
Utility Management
It comprises of;
Compressed air
Hydraulic oil
Coolant (Cutting fluid)
Steam
Water, Water treatment
Gas, Chemical gas
Voltage, Frequency
Private power generator
The aim of Quality Maintenance is focused towards customer delight, through highest quality ensuring the defect
free production. Priority is to eliminating non-conformances in a systematic manner, like focused improvement.
By understanding and identification of quality consequence for what parts of the equipment affects the product
quality, eliminate begins with the current quality concerned area and then removed the potential quality concerns
from machines. It may describe as transition from reactive to proactive or quality control for quality assurance.
The process QM is to develop and setting up the equipment condition to prevent quality defects, based on the
basic concept of maintaining, faultless the equipment to maintain a flawless quality of products. Checking and
measuring the condition through time series data to verify and measure the values within standard values
develops for prevention of defects.
QM Policy
1. Defect free products and conditions by controlling the equipment
2. Focus of prevention of defects from the source
3. Develop quality assurance activities to support customers and reliability
4. Emphasis on poka-yoke for fool proofed system
5. On-time and on-line detection and elimination of defects
6. Implementation of quality assurance through operators.
QM Target
1. Zero defects achievement and sustainable customer satisfaction
2. Reduction in-process defects
3. Reduction in cost of quality.
Defects Counting
Process of counting, it is very much difficult to count defects of each shift of Av. 30 Lakhs per day
Pouch are packaging. I t is very much time and manpower consuming.
So, Plant should develop a better process for correct nos. of defective pouches for calculating the
defects rate, on the aim of quality estimation i n the plant.
The Suitable method for exact defect calculation should be in M/c-wise Defects of SKU-wise Defects.
Trend of Sample Data of defects do not serve / help to reduce the defects by the Maintenance
Department. M/c-wise defects calculation is easy but the No. Defects/ Rejection i n which areas of
the Defects occurs (i.e. Wrinkle, Silver Line, Perforation, Tearing, Leakage, Point Shifting, Batch
Coding, Roll Change, Funnel choke, Weight Variation).
Random Sampling Calculation: It is existing process which is first time used to identify the
Defects chances, rather than exact no. of defects which would help the Maintenance department
for priority areas of Corrective action in the M/c for defects reduction. There will always be a
probability factors in PQRS (Poor Quality Recovery/ Rejection system) for correct data as there are
many chances Factors of Time, M/c, Duration, Operator etc.
Ramdom
Sampling
Applicable
sampling
Process for
t h e Mass
Quota / production
Target
Implementation of Quality Maintenance
Quality Maintenance is implemented in some phases or steps.
A. The first, aims to eliminate quality issues come out from by analyzing the defects data, so that optimum
conditions can be defined and restore to prevent defects occurring.
B. Second, do on-site situations verifications of the points creating the defects with the internal maintenance
team and machine operators
C. Third, make an action plan with the internal maintenance team after verifying the on-site situations
D. Forth, implement in the action plant in the machines / equipment through repair, modifications, replace the
spares, plan for preventions and train the operators for corrective and monitoring areas.
E. Fifth, after implement verification, which could be start after 1- or 2-week gaps immediate after QM
applications. It will be done through the data collection, following the same / homogeneous procedures
applied during the defects data collection.
F. Sixth, it consists of two steps, if it is ensuring through the data collection that improvement is validated, in
that that situation closed the project with sustainability, through starting of control or run chart and
scalability for horizontal deployment the study. In case, the situation not improved, repeat the same process
of data collection, analysis, action plan, applications and validations.
The Techniques will be used in Quality maintenance through 7QC Tools, the process discussed in Quality
chapter.
PILLAR 6: Education and Training, Kyouiku Kunren
The goal under education and training is, to have a multi-skilled revitalized employee, fit for taking
responsibility for TPM pillars, high morale and enthusiastic to come to work and perform as required self-driven
functions effectively and self-reliantly. Purpose is to upgrade the overall maintenance skills.
The employees should be trained to achieve the four phases of skills. As per the expert the goal is to create a
factory full of experts. The different process of learning and teaching of skills are;
Phase 1: Do not know
Phase 2: Know the theory/ process but cannot do
Phase 3: Can do but cannot teach
Phase 4: Can do and also teach
Policy
1. Focus on improvement of knowledge, skills and techniques
2. Creating a training environment for self-learning based on felt needs
3. Training curriculum / tools /assessment for conductive to employee revitalization
4. Training to remove employee fatigue and make work enjoyable
Target
1. Achieve and sustain downtime due to want men at zero on critical machines
2. Achieve and sustain zero losses due to lack of knowledge / skills / techniques
3. Aim for maximum participation in suggestion scheme
Skill Matrix
Define skills with points of what kind of job, what kind of skill and improve with Training through working;
1. Use of One-point lesson
2. Use of outside trainer or expert.
Following the standard practices under office TPM, developed and described in all literatures by experts in TPM
which are mentioned herewith.
Office TPM addresses twelve major losses these are;
1) Processing loss
2) Cost loss including in areas such as procurement, accounts, marketing, sales leading to high inventories
3) Communication loss
4) Idle loss
5) Set-up loss
6) Accuracy loss
7) Office equipment breakdown
8) Communication channel breakdown, telephone and fax lines
9) Time spent on retrieval of information
10) Non availability of correct on line stock status
11) Customer complaints due to logistics
12) Expenses on emergency dispatches/ purchases.
P Q C D S M in Office TPM
P - Production output lost due to want of material, Manpower productivity, Production output lost due to want of
tools.
Q - Mistakes in preparation of cheques, bills, invoices, payroll, Customer returns/warranty attributable to BOPs,
Rejection/rework in BOP's/ job work, Office area rework.
C - Buying cost/unit produced, Cost of logistics - inbound/outbound, Cost of carrying inventory, Cost of
communication, Demurrage costs.
D - Logistics losses (Delay in loading/unloading)
Delay in delivery due to any of the support functions
Delay in payments to suppliers
Delay in information
S - Safety in material handling/stores/ logistics, Safety of soft and hard data.
M - Number of Kaizens in office areas.
Makigami Analysis: In industry administrative tasks are usually hard to recognize. The Makigami method is the
process to make these tasks clearly visible by taking the actual forms, slips and other documents used in
administrative work and sticking them on a long roll of paper, to illustrate the flow of work.
By using the paper roll, anyone can tell at a glance what is going on, from the person directly responsible to
managers and staff from other relevant departments. This helps administration to identify problems and suggest
improvements.
Analysis of Makigami is an improvement tool for raising efficiency in administrative tasks. It embodies the
down-to-earth, nuts-and-bolts approach that is the central philosophy of TPM and its basic premise is to make
administrative work seen and understood.
Translator’s Note: ‘makigami’, which means ‘rolled-up paper’, is compounded from the Japanese words ‘maki’
(rolling up) and ‘kami’ (paper).
g a>
-Q ■S o g g £
g Era S cj iS ’ !
Processes
o
s
J2 5
o CT»
£
-q
E i •i
£
f
E ■S
2
f 5.
U- k.
1 W h i c h process
gj Cj o> £ £
What losses _g 5
3I£ s. s. & i
Losses g> t5 <u o si Man-hours of Loss
.52 “ 8 “8
i ■o (min/month)
£ £ £ <3 2 2 50 100 150
Duplication work Loss O O o
Too m u c h c h e c k Loss
M o n e y into t h e e n v e l o p e Los s
Lack information L o s s A O ©
© A
H o w much
Waiting Loss A A A Z
'J losses
Conveyance Loss ©d
M a n u a l C a l c u l a t i o n Loss © © ©
Rearrange t h e s l i p s Loss A A
Filing L o s s A A A
C l o s i n g envelope Loss ©
C o p y L o s s (?)
U n s k i l l e d Loss A A
Rework Loss
Operation error Loss A A,
others A A A A
50 © : More t h a n 30min.
1 0 to 30 min.
100 2k Less t h a n 1 0 min.
150
Definition of Makigami Analysis
Makigami Analysis involves a series of improvement activities carried out by internal department’s staff and
members with other relevant departments. They all meet together to:
Figure 102: Maki garni Analysis on 7 Big Administrative Losses
collected, LM Online
Understand the workflow
using the paper roll as a tool, with the aim of raising administrative efficiency and strengthening
administrative functions (both internal and interdepartmental);
Expose problems and discuss possible improvements and solutions;
Implement improvements. The results of these improvements serve to increase administrative efficiency
and strengthen administrative functions both within each department and across different departments.
In making safe working condition, TPM teams would work towards making machines safe to use for the
operators, protect the unsafe machine areas by putting machine guards, alarming system in high risk areas,
develop Standard Operating Procedures (SOP), use of personal protective equipment and first-aid kits in the
work area. Effective measures in the shop floor ensures the safety of the machines so as to have a more
productive work-force.
This pillar has an active role as per the other pillars to check and verify on a regular basis. Usually, a committee
is constituted to establish this pillar by comprising representatives of officers as well as workers. The committee
might be headed by Senior Vice President (Technical) or Chief Operation Officer with the aim of importance of
Safety is provided in the plant. Manager (Safety) is looking after functions related to safety. To create awareness
among employees, various safety slogans, Quiz, Drama, Posters, etc., related to safety may be organized at
regular intervals.
Recognition is important initiative for further improvement the TPM journey by motivating employees for
specific technical intervention and for the AM. In TPM implemented company may develop a motivating
recognition plan by awarding to good performers and comparatively better contributors in the TPM journey,
efficient learners, best group performance. These recognitions should be in a periodic basis and should be
display in the main visual notice board in the plant for the gratitude of winners.
9.11 Basic activities of the Maintenance Department
Maintenance
Planning for all Break-Down Prepare
t h e M/c in t h e Preventive
whole Plant - Maintenance of Maintenance
Weekly, Monthly t h e Plant Check-sheet
l and Yearly basis
r
verity t n e "
improvements improve t h e
and benefits of
t h e Plant on Post- performance t h e
Workshop
implementation
l of TPM u
Figure 103: Basic Activities of the Maintenance Section
Now a days, with the changed course of challenges of internal competency and market competition. Which is an
uphill task in the industry and is at an all-time high, TPM may be the one the techniques that stands between
success and total unprogressive for many companies. It has been proven to be a sequencer for that works. It can
adapt to work not only in production in the plants, but in infrastructure, product diversification, developing the
maintenance, transportation, and in a variety of other situations. Employees must be educated and convinced that
TPM is not just as a ‘program of the month’ and that management ought to be totally committed to this program,
rather the extended time frame necessary to implement. If everyone involved in the TPM program, an unusually
high rate of return will resolve, with comparison to resources invested and its expectable return.
9.12 Maintenance Workshop
For in-house better maintenance, many factories developed their own workshop for repair, reinstate and maintain
the equipment. As like TPM office, Workshop is controlled and work under maintenance department.
Toolroom, in a plant & workshop, refers to a space where various objects are made and repaired or an apparatus
space for any tool maker, particularly tools for use throughout the rest of the factory, jigs for setups, and other
parts to assist workers and, as an extension to production also. Tool room are important for training. Most of the
industries in a cluster, set up common tool room for multipurpose activities and cost effectiveness in tool design
and maintenance.
Table No. 69A: Workshop equipment (plant Repair & Maintenance)
Sr. No. Category List of Equipment Qty Type Remark
1 WS Equip. Welding and grinding machines
2 WS Equip. Cutter (maybe Plasma)
3 WS Equip. Gas welding machine
4 WS Equip. Drilling and small Lathe
5 WS Equip. Oxy Acetylene set
6 WS Equip. Hand Tools complete set
7 WS Equip. Compressor
8 WS Equip. Manual Fork lift
Complete set Electrical maintenance
9 WS Equip.
equipment
10 WS Equip. Hazardous Gases, PPE set
9.13 Case Study: Reduction in Breakdown Time
Introduction of the Project
Reduction in Breakdown time is a project for reducing equipment and machine maintenance in the entire factory.
For this project, selected the Machine-SH 01 to apply the basic TPM (Total Productive Maintenance) techniques.
This is very critical machine in the plant from production and customer’s perspective. This project covered the
machine diagnosis at normal operating conditions and objective of the project is early detection of abnormality
and its rapid result.
B/D Hrs o f S H 0 1 Before Project
100
>0
0
■ B/D
46 9 23 0 25
Hrs
In our measurement plan first of all the team collect previous year’s
maintenance data and divide this data on nature wise, reason wise and machine wise.
Situational Analysis
Areas of Breakdown F requency B/D Hrs
Blade Blunt 2 87
Spring Broken 4 21
Belt Damage 2 9
Oil Leakage 2 20
Other B/Ds 5 24
Grand Total 15 161
AM Discussion session
Maintenance
condition and its practices in the company were in poor and unorganised condition. Most of the machines have
oil leakages and other problems. There was no sign and initiatives of TPM activities. Only Breakdown
maintenance was followed by all. Supervisors and operators are not aware on to conduct the Preventive and
Predictive Maintenance practices. In SH 05 the team found different reasons of breakdown such as key broken,
Spring broken, Belt damage, gear teeth broken etc. The root cause behind the entire breakdown is poor
preventive and predictive maintenance practices.
Table: Factors of Breakdown
Improvement Plan
Standardization of the activities
Sl.
Areas of Improvement Initiatives Responsibility
No.
Availability of spare New spare blade has been
1
blade purchased
Maintenance Supervisor A. Review of critical spare parts
Follow of Daily Start Autonomous Maintenance Supervisor list is made a key point of annual
2
Maintenance Practices maintenance procedures and M/C operators maintenance plan
Operators awareness of B. Checklist for Daily
3 Training imparted to TPM Team Maintenance Supervisor
Maintenance Practices
Fuguai’s study of Daily 15 mins Gemba Visit of
maintenance
4 TPM Team C. Fuguai’s action Plan via kaizen
machine TPM Team
News Paper
D. Prepare predictive maintenance checklist.
Cartridge heater
C o m m o n c a u s e s of cartridge h e a t e r f a i l u r e s
1. Contamination is a major cause of heater failure.
Moisture, hydraulic oils, and melted plastic a r e the most common contaminants that are seen
on failed heaters. Since the magnesium oxide insulation is hygroscopic i n nature, moisture is
easily absorbed into the heater and typically results in premature heater failure.
2. Lack of Heat Sink
Heaters are designed with minimum unheated (cold) sections. I f t h e heated sections project
from the platen or mold, these sections will get extremely hot due to lack of heat transfer. This
will lead to premature heater failure.
3. High Wattage Rating
Heaters with very high wattage ratings can create temperature overshoots, uneven temperature
distribution and high heater sheath temperatures, causing premature heater failure.
H i g h Density H e a t e r s
1. Ceramic end caps to prevent contamination.
To prevent contamination specially selected grain size high purity Magnesium Oxide (MgO) is
used to fill all remaining space inside the sheath thereby increasing thermal conductivity and
dielectric strength,
2. Heaters with cold sections
Heaters with cold sections anywhere along the length of the heater to prevent overheating of
the heater sheath.
3. Heater Watt Density = W/Q x D x HL (Watt/3.14*Dia*Length)
The total wattage & Length of heater remains the same b u t watt density per inch was increased
to have cold sections throughout the heater length.
4. Operate at high Sheath temperature.
Alloy 3 2 1 Stainless Steel is used instead of SS316 to provide high temperature strength, u p to
1200°F (650°C), good thermal conductivity, resistance to corrosion and scaling. Alloy 3 2 1 is a
Nickel-Chromium Stainless Steel modified with t h e addition of Titanium.
9.14 INDUSTRY TPM STUDY
Calculation
OEE (Overall Equipment Efficiency), OEE = A x PE x Q
' d 1327443 1 5 0 11920itjpl01m anKfriUKOEB C h art
■M
a
n
t
e
n
a
n
150 105 150
c
e
B
r
e
a
k
. d
TPM monitoring
Table No. 69B: Sample Overall equipment efficiency Measurement Sheet
Fill in the highlighted areas with your production data for a single shift. In some cases, you may
have to convert units to simplify the calculation. For example, 3960 PPH (Pieces per Hour) is 66
PPM (Pieces per Minute).
Production Data
Shift Length 8 Hours = 480 Minutes
Minutes Each Minutes
Short Breaks 2 Breaks @ 15 30
= Total
Minutes Each Minutes
Meal Break 1 Breaks @ 30 30
= Total
Down Time 47 Minutes
Ideal Run Rate 60 PPM (Pieces Per Minute)
Total Pieces 19,271 Pieces
Reject Pieces 423 Pieces
Support Variable Calculation Result
Planned
Shift Length - Breaks 420 Minutes
Production Time
Operating Time Planned Production Time - Down Time 373 Minutes
Good Pieces Total Pieces - Reject Pieces 18,848 Pieces
Plant
OEE Factor Calculation
OEE%
Availability Operating Time / Planned Production Time 88.81%
Performance (Total Pieces / Operation Time) / Ideal Run Rate 86.11%
Quality Good Pieces / Total Pieces 97.80%
Overall OEE Availability x Performance x Quality 74.79%
World My
OEE Factor
Class OEE%
Availability 90.00% 88.81%
Performance 95.00% 86.11%
Quality 99.90% 97.80%
Overall OEE 85.00% 74.79%
World Class Overall OEE for discrete manufacturing plants is generally considered to be 85% or
better.
The Sample study indicate that the average Overall OEE score for discrete manufacturing plants
is approximately 75%.
Note: There are excel OEE Calculation sheet also enclosed in Annexure as per the Industry use
OEE Result
Production B/D
Color No. of OEE
Date Size Quality Time
(m 2) (min.)
change Alarm (%)
18-Apr 8" x 12" 5785 90.9 215 24 138 66.25
19-Apr 8" x 12" 5224 91.8 345 19 53 56.68
20-Apr 8" x 12" 4588 87.5 470 34 87 29.33
21-Apr 8" x 12" 5526 91.3 225 35 67 65.34
Performance Gap
-t-OEE(%) JEe(%), 2 0 - A p r ,
29.33,3, 13%
• Level - Highest
0
Percent
X
M V %
“< V
v
\
o s.
m co o
OWN
doo
d iri J
0
F MP
§050
H
n
Ba ll Mov ing
4 3 3 2 2 2.8
bearing o p eration
G.M Moving
4 3 3 2 1 2.6
bush o p eration
Helical Power
4 2 2 2 2 2.4
g ear transmission
Power
V-belt 4 1 1 1 2 1.8
transmission
9.16 Daily CLIT Sheet (Cleaning, Lubrication, Inspection and Tightening), is conducted during the scheduled plan time in the plant and
specific shop floor.
Table No. 70: Daily CLIT (Cleanin g Lubrication Insp ection and Tig htenin g Sheet)
Overall Equipment Monitoring and Effectiveness Table
Excel Table for Calculation
Duration of
Plan Time
(Min.) Total
Cycle Set Up
Part Shift PPT BDT Down OT Act.
Machine Time Length It variates Time Rejection A% P% Q% OEE%
Nam (Mint.) (Min) Time (Mint.) Prod.
Name (49 as per the (Mint.)
e (Mint.)
sec) Plant and
machineries
Hrs Min.
CNC-01 49 12 720 120 600 100 35 135 465 428 50.0 77.5% 75.17% 88.3% 51%
CNC-02 49 12 720 120 600 100 35 135 465 428 50.0 77.5% 75.17% 88.3% 51%
CNC-03 49 12 720 120 600 100 35 135 465 428 50.0 77.5% 75.17% 88.3% 51%
CNC-04 49 12 720 120 600 100 35 135 465 428 50.0 77.5% 75.17% 88.3% 51%
CNC-05 49 12 720 120 600 100 35 135 465 428 50.0 77.5% 75.17% 88.3% 51%
CNC-06 49 12 720 120 600 100 35 135 465 428 50.0 77.5% 75.17% 88.3% 51%
CNC-07 49 12 720 120 600 100 35 135 465 428 50.0 77.5% 75.17% 88.3% 51%
CNC-08 49 12 720 120 600 100 35 135 465 428 50.0 77.5% 75.17% 88.3% 51%
CNC-09 49 12 720 120 600 100 35 135 465 428 50.0 77.5% 75.17% 88.3% 51%
CNC-10 49 12 720 120 600 100 35 135 465 428 50.0 77.5% 75.17% 88.3% 51%
CNC-11 49 12 720 120 600 100 35 135 465 428 50.0 77.5% 75.17% 88.3% 51%
CNC-12 49 12 720 120 600 100 35 135 465 428 50.0 77.5% 75.17% 88.3% 51%
CNC-13 49 12 720 121 599 100 35 135 464 428 50.0 77.5% 75.33% 88.3% 52%
CNC-14 49 12 720 122 598 100 35 135 463 428 50.0 77.4% 75.49% 88.3% 52%
CNC-15 49 12 720 123 597 100 35 135 462 428 50.0 77.4% 75.66% 88.3% 52%
CNC-16 49 12 720 124 596 100 35 135 461 428 50.0 77.3% 75.82% 88.3% 52%
CNC-17 49 12 720 125 595 100 35 135 460 428 50.0 77.3% 75.99% 88.3% 52%
CNC-18 49 12 720 126 594 100 35 135 459 428 50.0 77.3% 76.15% 88.3% 52%
CNC-19 49 12 720 127 593 100 35 135 458 428 50.0 77.2% 76.32% 88.3% 52%
CNC-20 49 12 720 128 592 100 35 135 457 428 50.0 77.2% 76.48% 88.3% 52%
CNC-21 49 12 720 129 591 100 35 135 456 428 50.0 77.2% 76.65% 88.3% 52%
QC Team for TPM formed with following members:
Documentations of following
4. Action Plan: Action plan should be visual in the following format:
Table No. 71: TPM Action Plan
Execution /
Sr. Corrective New
Problem Target Responsibility Remark
No. Action Initiatives
Date
Materiel
Problems in
Machines
Se i d l e r
Methods
LEAKAGE PROBLEM
Sr.
Material Man M/C Mother cause Measure Method
No.
Heater quality not Operator not Structure not
1 Sealer
good check good
Vender not gives Operator not Sealer jaw
2
Good Quality check out
Operator may
3 be not Bolt Lose
experience
M/c not check
4 Vibration
by operator
Pressure
5
Low
6 Cleaning
SOLUTION OF LEAKAGE
Sr. Target
Problem Solution Action taken by Remark
No. Date
Sealer Quality should be Operator & maintenance
1
Problem improved person
Method should be Operator & maintenance
2
change person
Proper cleaning Operator & maintenance
3
with checkpoints person
OPENING PROBLEM
Sr. Material Man M/C Mother Measure Method
No. cause
Operators not Vender not
Quality of
1 Experienced to provided good
carton
Identify the Solution quality Spares
2 Magazine lose
3 Tai rod loose
Opening came
4
loose
5 Vacuum problem
6 Setting out
SOLUTION OF CARTON OPENING
Sr. Action taken Target
Problem Solution Remark
No. by Date
Quality of It should come by quality Section
1
carton not best check Leader
Magazine Before run the machine, it Section
2
loose should check by operator Leader
Before run the machine, it
3 Tai rod loose Operator
should check by operator
Before run the machine,
vacuum
4 vacuum air filter should be Operator
problem
check by operator
Operator should be
5 setting out Supervisor
experience
Main motor
1 AC DRIVE 3 HP 3 PHASE 415 VOLT 5 1 3 3 3 3
2.2 kw
Batch
2 L CONNECTOR-SMC-5 cutting 5 1 2 2 2 2.4
/perforation
Batch
3 AIR CYLINDER-25-5 cutting/ 5 1 2 2 2 2.4
perforation
4 FUNNEL (MODIFIED) Funnel 5 3 4 5 3 4
Batch
PERFORATION BLADE U TYPE-430
5 cutting/ 5 1 2 2 1 2.2
MM LENGTH
perforation
HORIZONTAL SEALER-430 MM
6 Sealing 4 4 2 3 4 3.4
LENGTH
SOLID STATE RELAY 701UNI ZDA
7 Heater 5 4 2 2 1 2.8
332500 P.NO.707158
PID TEMPERATURE CONTROLLER
8 Heater 5 3 2 3 3 3.2
P.NO.711110
THERMOCUPLE WIRE, J-TYPE
9 Heater 4 3 2 2 2 2.6
P.NO.904007
SOLID STATE RELAY (ZDA3325-00)
10 Heater 3 4 2 2 3 2.8
P.NO.707158
FILTER REGULATOR MAKE FESTO
11 Machine 1 1 1 1 2 1.2
FRC-1/4-DM
12 SOLINOIDE VALVE MFH-5-1/8 Machine 4 2 2 2 2 2.4
13 SOLID STATE RELAY (JDA) Heater 5 4 2 2 1 2.8
PNEUMATIC CYLINDER DNU -32-25-
14 Cutting 5 3 2 2 4 3.2
PP-VA
15 ROD END BEARING 16 LH filling 4 3 3 5 3 3.6
16 ROD END BEARING 16 RH filling 4 3 3 5 3 3.6
17 POWER SUPPLY 24V DC Panel 5 3 2 2 3 3
18 MAGNET Hopper 2 2 1 1 2 1.6
Edge
19 Web Aligner BST-500 5 2 1 1 3 2.4
Guide
Traverse Feedback cable Bulletin-,
20 Traverse 5 3 2 2 3 3
2090DANFCTS05,Series"A",No.200379
Traverse supply cable Bulletin-
21 2090DANPT16S05 series "A" No- Traverse 5 3 2 2 3 3
200379
Pull Roller OD-65mm,ID-30mm,Rubber Cutting
22 5 3 2 2 3 3
width-10mm assembly
Cutting
23 Rotary cutter Plane 5 3 2 2 3 3
assembly
Cutting
24 Rotary cutter notching,16cut,08mm 5 3 2 2 3 3
assembly
Cutting
25 STRAIGHT CUTTER 10 * 100 * 3 MM 5 5 2 2 3 3.4
assembly
26 vertical Sealer Sealing 4 2 2 2 2 2.4
27 Front box shaft Sealing 4 2 4 3 2 3
28 BEARING-LM16 Sealer Jaw 5 3 5 5 3 4.2
29 BEARING-LM20 Sealer Jaw 5 3 3 5 3 3.8
30 BEARING-LM40 Sealer Jaw 5 3 3 5 3 3.8
31 Cam Follower BEARING CF-6 Sealer Jaw 5 3 3 5 3 3.8
32 RUBBER BELT A-57 Motor 3 3 1 2 2 2.2
33 BALL BEARING 6004 Filling 5 3 3 3 3 3.4
34 BALL BEARING 6005 Filling 5 3 3 3 3 3.4
35 BALL BEARING 6006 Sealer Jaw 5 3 3 5 3 3.8
36 BALL BEARING 6205 ZZ SKF Sealer Jaw 5 3 3 5 3 3.8
F Control of Inventory and stock of the Items with score more than 3 points
Table No. 76: Spare Parts Criticalit Assessment: Sam ple Zipper M/c Sam ple
SPARE PARTS CRITICALITY ASSESSMENT: ZIPPER
Criticality
Sl. Overall
Spare Parts Description Remarks
No Importance B/D Maintenance Time Cost Criticality
Spare parts which have rating above 3 have been considered as critical parts/ spares. These parts must be available in store / inventory to reduce
breakdown time due to unavailability of spare parts.
Table No. 77: List of Critical Electrical Spare
List of Critical Electrical Spare
Criticality Overall
SI. Activities/ Remar
SPARE PART Criticalit
No. Operation Imp B/D Maint. Time Cost k
y
Power
1 Main switch ON/OFF 4 2 3 2 3 2.8
switch
2 Fuse For Safety 4 2 3 2 2 2.3
3 MCB For Safety 3 2 3 2 2 2.3
control
4 TRANSFORMER 4 2 3 2 4 3
su pp ly
Line
5 CONTECTOR 4 3 3 2 3 3
contactor
OVER LOAD Motor
6 3 3 3 2 2 2.3
RELAY safety
system
7 PUSH BATTAN Operator 2 1 3 1 1 1.6
switch
monitor &
8 HMI 4 2 3 4 3 3.2
Control
A.C motor
9 A.C DRIVE 5 2 3 5 5 4
drive
Servo
10 SERVO DRIVE motor 5 2 3 5 5 4
drive
Program
11 PLC logic 5 2 3 5 5 4
controller
Limit
12 LIMIT SWITCH 2 2 3 2 2 2.2
controller
System
13 SENSOR 4 1 3 1 1 2
Identify
Micro
14 MICRO SWITCH 3 3 3 2 2 2.6
control
Temp.
15 PID 3 2 3 2 3 2.6
controller
Pneumatic
SOLENOID /
16 4 2 3 2 3 2.8
VALVES Hydraulic
controller
Heat
17 HEATER 4 4 3 2 2 3
g enerator
Temp.
THARMOCOPAL
18 controller 3 4 3 2 2 2.8
WIRE
wire
Servo
19 SERVO MOTOR 5 1 3 4 5 3.6
motor
Screw
20 CLUTCH 4 3 3 2 4 3.2
controller
PHOTO
Clutch
21 ELECTRIC 4 3 3 2 4 3.2
controller
PANEL
Voltage
22 AVR 5 2 3 2 4 3.2
controller
23 SSR Relay 3 1 3 2 3 2.4
Supply
24 SMPS SUPPLAY 4 2 3 2 4 3
controller
Warring
25 CONNECTOR 2 1 3 2 1 1.8
connector
FOR
26 Encoder cable SERVO 5 2 3 2 5 3.3
MOTOR
9.17 About Fuguai
Fuguai in Japanese word called abnormality. The abnormality is unneeded thing which located at the wrong
places or situations. In most conditions, the abnormality affected physical, functional and safety problems
especially for machines.
GREASING
Bearing
Cross joint
Oiling
Gearbox -
winget
Gearbox -
flying saw
CHECKING
Hydraulic
pipe line
Cylinders
Gear
Shaft
Shaft
housing
Bearing
Lock
Bushes
Bolts
Name of
technician.
SME Corner
After Work study/ Time study, Lean and TQM; TPM is another important technique to be added
in the total improvement journey. It is important, that the critical and most essential production
contributor is machines, equipment and plant technology. For conservation of the efficiency
and performance, the production system required various types of maintenance. To apply the
correct method of maintenance procedures through low cost arrangements effectively, TPM is
essential to fulfill the target.
Any SME should fundamentally set up the minimum level of total maintenance concept and
then grow up i t to higher level as per the knowledge and experiences of operators and
maintenance people.
Develop plant's own TPM program, machine & equipment's record with their history, priority,
life, status, maintainability, critical list of parts and a simple analysis of these as per the
understanding of the plant maintenance people.
Impart Training to all employees as per their levels & involvement, generate a follow up /
feedback system of the machines and monthly MIS on maintenance through the maintenance
team.
Initiate the calculation of OEE of the main M/cs, Lines and plant, which will show the necessities
Self-assessment questions
On mathematical basics of Six Sigma, it may be started in 1809 by Carl Frederich Gauss through his statistical
concept of the "bell curve" provided us a graphical presentation of the number of samples in the vertical axis
against their measured values in the horizontal axis. Most samples are close to middle or average value, so the
curve expansion is highest in this area and farther the measured values from the average on the horizontal axis,
the samples becoming lower and the curve is low at each end. The ‘sigma’ stands the ‘standard deviation’, is a
measurement of this bell curve shape in steep or flat.
In the middle of 1920s, Walter A. Shewhart of Western Electric, made some important value additions in this
concept on manufacturing of machinery, which should be adjusted only when it regularly produced defective
products due to an ‘assignable cause’. He defined that defects or faults, due to ‘chance’ or ‘common causes’ or
non-assignable cause and ‘special cause’ or ‘assignable cause’ of unnatural patter. Common causes are usual,
may not require corrective action, because by simply introduce new variables without any likelihood of making
an improvement, but special cause not random, there is always an assignable cause for this. Shewhart applied a
"three Sigma" approach, statistically "normal" distribution, about 99.7% of all samples will have a value within
3 standard deviations from the average value.
Motorola is the first company in the world who developed the six-sigma methodology in mid1987. It is a
constellation of various technical tools related to quality, control chart with Shewhart tool etc. Bill Smith of
Motorola may be designated as father of six-sigma, who applied this concept and got first Malcom Baldridge
National Quality Award in the year 1988.
After the success of six-sigma in the Motorola, other companies such as General Electric, Honeywell, Dow
Chemical, DuPont, Whirlpool etc., introduced the six-sigma in their organization. Looking at the success of
these organizations, many other organizations in the world adopted six-sigma process for better quality, business
solutions, better customer services and train their employees in six-sigma processes for best system and output.
Experts gives the credit of inventing six-sigma to Motorola but Jack Welch in General Electric made it more
effective and popular.
Six-sigma approach made for better output or on dependent factor, Y = f (x), x = independent variables, in six-
sigma, it also called Input factor.
Six sigma focuses on customer, employee engagement, problems & defects, growth and monitoring.
Jack Welch, the iconic GE Chairman said on six sigma company, “I see a six-sigma company as a company,
where its management understands that variation is evil and that you can serve customers with what they want,
when they want”
It is also a data driven measurement techniques, for all critical process metrics and their contributing factors. It
is a set of tools, includes all the qualitative and quantitative techniques used in the Six Sigma to drive process
improvement. Most of such tools are statistical that included the statistical process control (SPC), control charts,
failure mode, hypothesis testing and effects analysis, and process mapping.
The phases of DMAIC is define, measure, analyze, improve and control are applicable for the process and system
improvement for existing system and from existing to better in future.
Figure 104: Phases and purpose of Six-sigma
Define
Improv Measur
e e
Analyz
e
Six Sigma is a management methodology for quality applying to the organizations to help businesses for
improving the current processes, products or services by identifying, realizing and eliminating defects. Broad
aim is to streamline quality control in manufacturing or business processes, so there is little to no variance
throughout production to final delivery to the customer.
Methodology of Six Sigma
± Standard Deviation
(“Sigma”)
Three standard deviations in between the process average and
the process variation. This variation is due to natural causes. This cannot be identified and eliminated. This is
called process width. If process width = Specification width, more defects will be noticed in the product. Always
process width should be less than specification width.
There is concept of critical input factors are introduced in the Six sigma for establishing the requirements from
customers, process and business etc., which symbolize as CTx, and x is variables. These input critical factors are
envisaged as inputs or scope for improvement. These CTs are as follows;
Critical-to-Quality (CTQ): CTQs are customer’s requirement of the supplied product or services which are in
physical aspects, weight, locations etc., of the products, through the inclusion of customer defined specifications.
It is the key characteristic to measurable as per the customers specification limit to satisfy them and represents
the quality level and quality improvement initiatives in an organization.
Critical-to-Cost (CTC): Various customers have various critical points on the basis of cost, delivery, features,
duration etc., which are customer specific requirement. To satisfy the customers, company should focus on the
customer specific characteristics in the form of cost saving oriented process changes to reduce penny from
customer’s pocket.
Critical-to-Process (CTP): It is typical area in the process which directly related to the customers, the key
process input variables. CTP is important for internal efficiency and process improvement on the focus of
customer’s specification-oriented production. The X Factors in the in CTP may be modified operations,
materials, processing temperature, pressure, heating, humidity, time as per the required settings.
Critical-to-Safety (CTS): In the line of CTQ and CTC, some industries and customers specified the products
should be safe to use, handling and transportation also in the plant and for individual use also.
Critical-to-Delivery (CTD): CTDs are related delivery at the specific point and time. It is related to payment on
delivery, product life, time of use or reprocess, sequence of next delivery which critical areas as per customers’
end.
Projects associated with these CTs are important aspects from customers or for critical requirements, future
businesses opportunities and scope to improve the business to be better than the competitors.
One
Excitement
Needs
Basic
Needs Dissatisfied
Customer
Figure 106: Kano Analysis (collected) The 7 key Six Sigma principles covers the following
areas:
1) Keep focus on the customer
2) Comprehend how work really happens
3) Make the processes flow efficiently
4) Reduce waste and concentrate on value
5) Stop defects through removing variation
6) Get buy-in from the team through collaboration
7) Make the efforts methodical and scientific.
In any organization and the project manager or line managers tries to rationalize and modernize the plant,
workflows through value streams, elimination of unnecessary with non-value added / non-business value added
process, repetitive/ over-processing work from the system to make it efficient. Lean six-sigma enables them to
perform on it.
For the manufacturing industries for to adopt/ apply the process improvement methodologies, two schools of
thought emerged for the plant managers and also may be for project managers: these are Lean techniques and
the Six Sigma method. Lean method prioritized and give importance on reducing all forms of wastage, while Six
Sigma is a data-driven measurement, testing, improving and for controlling.
Details of Lean Six Sigma Principles
1. Focus on the customers
Customer is the eventual focus for any improvement, which is the core of all business activities. Understand
customer with key functions of the company and understand means of identification the critical areas of
customer’s requirements & specification. Organization processes, control and measurement drive for the best
and most away to satisfy and attracts them. Focus on customers is the obvious target of all employees and
encourage the organization on the estimation and improvement of process competency and capability.
Alternatively, the way to identify the cause for a problem is the 5 Whys analysis, suited to slightly difficult, but
not overly complex problems, the 5 Whys analysis takes a problem and ask “Why?” five times, each time trying
to dig deeper into the queries until the original cause comes to light. When multiple causes arise, then the
problem might be too complicated for this approach and would likely be benefited from a cause-and-effect
analysis instead.
i) Document the processes: As mentioned previously, if may not know how to improve, optimize, and then
standardize with a clear view of how things are currently done.
ii) Establish and share best practices: Reducing information silos also benefits your processes; encourage
the sharing of good ideas throughout the organization.
iii) Create checklists for processes so everyone knows and follows the same steps: This will make it much
easier for new employees to get up to speed while also reducing errors that the existing employees are
likely to make/ follow.
iv) Make sure everyone gets the same training: Getting your processes working just right means that all your
employees need to be on the same page.
v) Use forms and templates: This greatly reduces confusion for employees when creating reports, responding
to customers, logging errors, etc.
vi) Automate anything that’s repetitive, boring, and therefore error-prone: Speed up the things and make
them more precise by replacing some manual tasks, especially if there’s an online application or tool that
can do it better.
Six Sigma brings in a highly scientific and rigorous approach to exploratory, quantifying, analyzing and
validating data, it is important and essentially the DMAIC process implicates that.
As part of this cultural shift, a company should always look for new ways to streamline the process and remove
waste. Keep your eye on the data, examine your bottom line, and adjust the processes where necessary.
A Six Sigma culture has the potential to factually transform employees. Organization with Six Sigma
certification are cultured to see themselves and the work to do differently than traditional employees. They are
skilled to:
i) Realize the work in terms of process flow, and not just departments and functions
ii) Start an active role in defining improvements and identifying solutions, instead of relying on management
iii) Utilize the appropriate skills to create and implement solutions
iv) Actively involve themselves in continuous improvement efforts.
Lean Six Sigma methodology captures the best of both Six Sigma and Lean methods of project management.
Any organization decides to follow this methodology, they should follow the Lean Six Sigma principles and
optimize process improvement once and for all.
10.6 Six-Sigma Implementation Phases
10.7 DEFINE PHASE
Activities in
Define Stage
Identify t h e
Customers applying Develop Project Develop Process Map
Charter
CTs
Figure 107: Activities in Define Stage Define is the first Phase of the Six
Sigma improvement methodology. During the define phase in this phase, the leaders & project teams are created
with define project charter, plotting of high-level view of the existing process and define the CTs, internal
projects and also define the needs of the customers & business process. This is the important phase in the Six
Sigma implementation, where the company develop the teams, sketch the outline of the project and plant on their
required initiatives & efforts and the leadership role for their organization.
In this phase, where some important decision includes to evaluate the team synergy, as the GB or BB team leader
as well begin the technical journey. Priority given to assembling the optimal team and analyzing each members'
stake to get best cross functional input and results. This phase also includes choosing a qualified project
manager, such as a GB or BB qualified person.
This phase should engage the Champion, frequently to ensure the team is not off to the correct path of starting.
The Champion should act as an observer to ensure progression, as acceptable. The Champion should refrain from
providing specific direction or preconceived solutions.
Project charter is a set of defined areas to describe the project, such as problem statement, business case, goal
statement, timeline, scope and team members. Project charter consist of business case, problem statement, goal
statement, scope, milestones, roles and responsibilities to design the project.
10.8 MEASURE
Measurement is the most important techniques in six-sigma and effective phase in DMAIC. The objective of this
section is to classify and comprehend the components of variation arising out of the measurement system and to
be able to use the appropriate tools for analysis, depending on the data types. The purpose of measurement is to
provide the clear measure the situation/ characteristics to identify what to measure, is it should be useful for
project and for customers, and which are not included in measurement not affect much in the decision.
In six-sigma, the most of measurement are for the project with direct or indirectly related to customer, process,
manufacturing and organization problems, impact on dependent factor Y, from independent factor, X.
There are other measurements techniques and data comprises for various aspects in the organization related to
business, productivity, manpower, finance, organization performance etc., might not linked with DMAIC six
sigma data.
Figure 108: Activities in the Measure Phase In this phase factors are critically
measurement during the project for the basic and threshold level before starting of the project for comparison the
changed position after completion of the project. Measurement is the estimation of the data, units of
measurement, collection procedure, validation before moving to analysis phase. In measurement phase
identification of potential CTx, process capability, upper & lower limits calculated. MSA – measurement system
analysis is applied to validate the data with various techniques.
Scales of Measurement
Measurement empowers the Six Sigma Teams to establish baseline process performance, to develop Y (output)
which one need to measure, identify areas where improvements can be made. Measurement System Analysis
(MSA) is a quantitative evaluation of the tools and process used in making data observations. The purpose of
establishing an MSA, is to ensure the information collected is a true representation of what is occurring in the
process.
MSA applied and implemented in an organization for the systematic data collection and analysis.
The Measurement system can be validated using in operational definitions, constructed by the Project Team to
ensure that all measurement takers completely understand what is expected during the data collection phase.
If the measurement system fails to pass analysis, before collecting data:
F Fix gage
F Fix measurement system
F Train measurement takers/ operators
The variation in measurements obtained with a
gage when it used several times by one measurer
while measuring the identical characteristic on the
same sample piece.
Gage R&R studies are a method to determine the repeatability and reproducibility of a measuring system.
Process Level Error (MSA)
Measurement of Variation
Variation D u e to Variation D u e to
Gage Operator
I
Stability, Time Linearity, Value Reproducibility
Accuracy Precision Dependent dependent
Repeatability
OV (Observed Value) = TV (True Value) + ME (Measurement Error), ME = Equipment Error and Operators
Precision: On Multiple observation, when data points are closer to each other but way from Target (maybe), the
data is said to precious. The measure for the same is the standard deviation against acceptance.
Accuracy: In Multiple observation, when data points are close to Target but away each other (maybe), then data
is said to be accurate. The measure for the same, denotes through Bias = Target – Observation Mean.
Effectiveness: When two or more subgroups are compared among each other on designated parameters, there
come on mutual agreement across parameters against total number of parameters is the score of effectiveness of
the process.
ERROR
Same: Parts,
Operator,
Equipment
Cp, Cpl, Cpu, and Cpk are the four most common and timed tested measures of process capability.
Process capability indices measure the degree to which the existing process could produce output, that meets the
customer's specification. Process capability indices can be used effectively to summarize process capability
information in a convenient unitless system.
Cp and Cpk are quantitative expressions that personify the variability of the process (its natural limits) relative
to its specification limits (customer requirements).
Formulas
Z(min USLQx xQLSI
Cp = (T) / 6 Cpk = 3 Z (USL) = (T Z (LSL) = □
On Cp, Cpk
Cp does not change when process center (avg.) changes
Cp = Cpk when process is centered
Cpk Cp always this situation
Cpk = 1.00 de facto standard
Cpk < 1.00 process producing rejects
Cp < 1.00 process not capable
Cpk = 0 process center is at one of spec. limit (U or L)
Cpk < 0 i.e. – ve value, avg outside of limits
10.9 Some Statistical Analysis in Measurement
1) Simple Correlation and Regression
2) Multiple Correlation and regression
May 100 1100 Regression Equation, Y= -852.08 + 19.07 X, For X = 108, Y = 1207.52/-
7 6100 8 177
Formula, Y=a +b1x1 + b2X2. Y = 12,510.112/-
8 6400 11 315
Salesmen X1 35
9 6900 29 170
Advertisement X2 500
10 7300 31 240
11 6950 6 184 ANOVA
17 10200 9 244
18 12200 10 305 Coefficients
Standard
t Stat
P-
Lower 95%
Upper Lower
Error value 95% 95.0%
19 10500 6 303
Intercept 3856.69 1340.77 2.88 0.01 1068.40 6644.98 1068.40
20 12800 8 320 Salesmen -104.32 39.49 -2.64 0.02 -186.44 -22.20 -186.44
21 12600 12 322 Advertisement
22 11500 14 460 (in thousand 24.60 3.92 6.27 0.00 16.45 32.77 16.45
rupees)
23 13800 11 430
24 14000 9 422
209070 354 6235
1. Hypothesis Testing Example: One Sample t-test for the Population Mean
A local car dealer wants to know if the purchasing habits of a buyer buying extras have changed. He is particularly interested in male buyers.
Based upon collected data he has estimated that the distribution of extras purchased is approximately normally distributed with an average of Rs.
2000 per customer. To test this hypothesis, he has collected the extras purchased by the last seven male customers (Rs): 2300, 2386, 1920, 1578,
3065, 2312 and 1790. Test whether the extras purchased on average has changed.
P-value or Critical t
Number of Degrees of freedom u = 6 =E26-1
Two tail p-value = 0.3371825 =TDIST(ABS(E30),E33,2)
Upper tcri = 2.4469119 =TINV(E13,E33)
Lower tcri = -2.4469119 =-TINV(E13,E33)
Before After
Person Weight Weight State Hypothesis
(B) (A) H0 : Weight
1 170 170 loss 10 lbs or
2 159 153 less (d <= 10)
3 162 129 H1 : Weight
4 153 143 loss > 10 lbs
5 177 137 (d > 10)
6 167 134 Upper one
7 158 133 tail test
8 178 128 Two Sample t
Select Test
9 141 152 Test
10 163 142 Populations
normally
11 154 140
distributed
12 159 154
13 159 143
Set level of Significance
14 138 147 significance Level =
15 161 142
16 156 149 (for solution
17 165 136 Extract
use Data
relevant
18 158 154 Analysis
statistic
19 151 140 Tools)
20 165 145
21 155 125 t-Test: Paired
22 154 140 Two Sample
for Means
23 147 125
24 156 141 Before After Weight
Weight (B) (A)
25 155 146 Mean 158.8461538 141.6538462
26 169 135 Variance 87.25538462 104.0753846
Observations 26 26
Pearson
-0.10929623
Correlation
Hypothesized
Mean 10
Difference
df 25
t Stat 2.517802176
P(T<=t) one-
0.009292088
tail
t Critical one-
1.708140761
tail
P(T<=t) two-
0.018584176
tail
t Critical two-
2.059538553
tail
Since p-value
< α, Reject Null
Decision: H0 and Rejected
Hypothesis
Accept H1
Since tcal >
tcri, Reject H0
and Accept
H1
10.10 ANALYSIS
After measurement, the data are analysed as per the occurrence, value addition, impact, root-cause and inter-
relationship. In analysis phase the process capacity is measured for ability to comply the customer
specifications. Various charts and diagrams are used for analysis of the data. Various Testing of the Data is also
is part of this analysis. Identification of the potential Xs which could impact on output or depended factor Y, also
part in this phase.
f (X)
Continuous Y Discrete Y
Continuous Contii
Discrete X. CyDx Dis Crete X , DyDx
X. CyCx
Figure 111: Basic Hypothesis Tests in Analyze Phase Basic Tests and use of Hypothesis
in Analyze Phase
In hypothesis test uses samples to infer properties of a population on the basis of an analysis and derive the
character of a sample. However, there is some chance that although the analysis is flawless, the conclusion may
be incorrect. These sampling errors are not errors in the usual sense, because they can’t be corrected (without
using 100% sampling with no measurement errors).
These types of error happen during the sample inspection of mass production of a Lot of products with standard
samples but selected or collected samples may be as chance may be defective which decided to reject the Lot
though rest samples have no faults. Alternatively, when an incorrect Lot may be accepted with chance of all
samples are correct but, in the rest, maximum is fault.
10.11 IMPROVEMENT
In the improvement phase of six-sigma team does the identification of the potential solution and then screening
the solutions, testing, improve & refining, piloting and justifying the solutions for implementation. Various
frameworks are used to generate the solution.
Improve
Use Graphical
methodsto
showcase pre-post
state for comparison
'K .U I
X Bar R
I-MR Chart Chart X Bar S Char
Discrete Data
"I
7M Tools: Affinity diagram, tree diagram, process decision program charts, matrix diagrams,
interrelationship diagrams, prioritization matrices, activity network diagram.
Pre-Control
Common Cause Chart, Exponentially Balanced Moving Average (EWMA):
The exponentially weighted moving average (EWMA) introduces lambda, which is called the smoothing
parameter. Lambda must be less than one. The exponential moving average (EMA) is identified as an
exponentially weighted moving average (EWMA), is a first-order infinite impulse response filter that applies
weighting factors which decrease exponentially. The weighting for each older datum decreases exponentially,
never reaching zero.
Six Sigma DMAIC Process
10.13 Failure Mode Effect Analysis (FMEA)
The purpose of the FMEA, to eliminate or reduction in failures, starting with the highest-priority ones. FEMA, is
a documented procedure of the current knowledge and actions about the risks of failures, for using in continuous
improvement. FMEA is used during design to prevent disappointments.
FMEA methodology, initially developed by the military, now extensively using in a variety of industries
including semiconductor processing, food service, plastics, software, and healthcare. Toyota has taken this one
step further with its Design Review Based on Failure Mode (DRBFM) approach.
FMEA identifies all the probable failure modes for the product or process. It prioritizes the failure modes for
focused attention by using a scoring model based on Severity (S), Occurrence (O) and Detect ability (D).
RPN (Risk Priority Number) = S*O*D
Based on the above suitable action plans can be created to contain the risk. It is used as a living document and
could be a good foundation for building robustness.
Definition of Terms:
Failure Mode: The way in which a specific process or input fails
Effect: The impact the failure on the Critical quality parameter
Cause: The source of variation that caused the process to fail
Current controls: Systemized devices in place to prevent or detect the failure.
Severity: Importance of an effect on critical quality parameter (1- Not severe; 10 – very severe)
Occurrence: Frequency with which a cause occurs (1 - Not likely; 10 - Very likely)
Detection: Ability of current control to detect the cause before creating a failure mode (1-likely to detect; 10-not
likely to detect).
RPN is calculated by multiplying the Severity, Occurrence and Detectability. RPN measure is used when
assessing risk to help. identify critical failure modes associated with your design or process. The RPN. values
range from 1 (absolute best) to 1000 (absolute worst).
Table No. 86: Failure Mode Effect Analysis
FMEA
Chances/ Risk
Risk
Solution for Possibility Mgt.
Failure Severity Occurrence Detection RPN Transfer
Improvement of Outcome Strategy
Plan - RTP
to Failure - RMS
Cost of
New
Operation
Production
and Internal
and Operation 9 9 8 648 Critical Accept
Production Discussion
Strategy with
could not be
Planning
reduced
Productivity
Introduction and Cost of
of New Production 8 6 5 240 Medium Accept
Technology could not be
changed
Performance
not be
Training to
Enhanced
the Manpower
and cost of 9 8 7 504 High Accept Outsourced
for Better
Manpower
Performance
not be
reduced
Fix the
Action on
Production
Productivity 8 6 6 288 Medium Reduce
Time of all
not induced
Operations
10.14 Quality Function Deployment (QFD)
QFD is a structured approach for defining customer needs or requirements and translating them into specific
plans to produce products to meet customer’s needs. Customer need also convert into the detailed engineering
specifications and plans to produce the products that fulfill those requirements of customers in compatibility.
The ‘voice of the customer’ is the term to describe these stated and unstated customer needs or requirements.
Table No. 87: QFD subject on Improve Low Productivity of XYZ organization
New
Problems - Training to Production
Reduction Fix the
Potential the Introduction and
in Process Production Completeness
X's / Scores Manpower of New Operation
Loss of Time of all Matrix
Solutions for Better Technology Strategy
RM Operations
Performance with
Planning
Reduce the 10 0 4 8 6
5 140
RM Cost
Decrease
the Time of 5 1 10 5 7 6 145
Production
Reduce in
Cost of 5 1 4 8 8 6 135
Manpower
Reduce in 1 1 4 7 6
5 95
Defects
Improve
Demand of 1 1 1 6 7
5 80
the
Customer
Process Re- 8 8 7 8 6
5 185
engineering
Deployment
110 120 145 220 185
Matrix
The first step in performing quality function deployment, is to develop a listing of technical design elements
along the roof of the house. Customer requirements with highly competitive assessments and low importance are
candidates for improvement.
SME Corner
Six sigma concepts applied in SMEs becoming more important, may be for estimating the process
capability, testing of the products, establish a measurement system for analysis and to define the
improvement areas.
As the market and business challenges enhances, customer demand analyzed with market trend
assessed for decision making; define the projects on problems and process control becoming more
essential.
One or two persons in the organization should be six-sigma trained and start the in-house training
on DMAIC techniques.
Start the SPC i n the plant, simply in excel sheet, analysis and improvements.
For important decision, organization could use the FEMA and use the QFD for better understanding
customers and about diversification i n the market.
Self-assessment questions
DESIGN OF EXPERIMENTS
(DOE),
TAGUCHI METHOD,
EXPERIMENT AND RESEARCH
DESIGN OF EXPERIMENTS (DOE)
11.1 INTRODUCTION
ASQ describes Design of experiments (DOE), is a defined as a branch of applied statistics that deals with
planning, conducting, analyzing, and interpreting controlled tests to evaluate the factors that control the value of
a parameter or group of parameters. DOE is a powerful data collection and analysis tool that can be used in a
variety of experimental situations.
Experiments involves manipulation of one or more independent variables, and observing the effect on some
outcome (dependent variable). Experiments can be done in the field or in a laboratory.
"All experiments are designed experiments; it is just that some are poorly designed and some are well-designed."
Experimental designs are used so that, the treatments may be assigned in an organized manner to allow valid
statistical analysis to be carried out on the resulting data.
Design of Experiments: It is a logical planning (or construction) of the experiment having a complete sequence
of steps taken ahead of time to ensure that the appropriate data could be obtained in a way which permits an
objective analysis of a particular problem leading to valid and precise inference in the most economic and useful
forms.
Basic Ideas
Customer Satisfaction
Design to the highest standards early in the process to eliminate all non-random errors.
Quality loss = Loss to Society quantified through “Quality Loss function”
Variation (+/-) from optimal measure results in a loss.
For best results, to get Help.
Customer Satisfaction
Ways to measure the services;
Returning customers
Number of complaints
Number of compliments
Employee attitude.
Design
Design the experiments in the following basis;
Equipment with failure and breakdowns
Specific jobs defined, distribute the responsibilities
Policies and procedures; What do you want, anyway?
Taguchi Methods of experiments.
Experiment Terminologies
Control Treatment Randomnes
group group Factors Replication Level
Experiment
Blocks An ova
al error
Control Group: A group assigned to the experiment, but not for the purpose of being exposed to the treatment.
Performance of this group serves as a baseline.
Treatment Group: The Group in an experiment which receives the specified treatment.
Factor: This term is used when an experiment involves more than one variable. These variables are often
identified as factor.
Experimental Error is the variation in the responses among experimental units which are assigned the same
treatment, and are observed under the same experimental conditions. It is measured by SSE (or MSE).
Ideally, it would like experimental error to be zero.
This is impossible because of (at least) one or more of the following reasons:
There are inherent differences in the experimental units before they receive treatments.
There is variation in the devices that record the measurements.
There is variation in applying or setting the treatments.
There are extraneous factors other than the treatments which affect the response.
Step - II
Formulation of hypothesis: Determine the factors affecting the response variable
This is best done by an expert in the field, but we'll be able to do this for most examples we'll be looking at.
Choosing an appropriate experimental technique
Examination of possible outcomes to make sure that the experiment provides the required information
Consideration of possible results from point of view of statistical analysis.
Step - III
Determine the number of experimental units: Collection of data after performing the experiment according to
plan.
In general, more experimental units is better. Unfortunately, time and money will always be limiting factors, so
we have to decide an appropriate number.
Step – IV
Determine the level(s) of each factor.
Randomize: Often, there are factors we just can't control. To mitigate their effect on the data, we
randomize the groups. By randomly assigning experimental units, these factors should be equally spread
among all groups.
Step V
Conduct the experiment.
Step VI
Test the claim.
Step VII
F Interpret the results with Statistical Analysis of data
F Drawing conclusion with appropriate level significance.
Step VIII
F Verification of evolution of results
F Drawing final conclusions and recommendations.
11.3 Basic principle of Design of Experiments
Randomization
Replication
Local Control (Blocking).
Factor Effects
Main Effect: The change in the avg. response produced by a change in the levels of the factor is called “Main
effect” of that factor. Effect of Factor:
Interaction Effect: If the two effect of one factor is different at different levels of another factor, the two factors
are said to interact (or) to have interaction.
The interaction between factors A and B is termed as “First Order Interaction” or “Two Factor Interaction” and
is denoted by A x B.
If the interaction between two factors A and B, is different at different levels of a third factor C, then there is
said to be interaction among three factors. This is referred to as “Second Order Interaction” or “Three Factor
Interaction” and is denoted by A x B x C.
Interaction Effect: If the two effect of one factor is different at different levels of another factor, the two factors
are said to interact (or) to have interaction.
The interaction between factors A and B is termed as “First Order Interaction” or “Two Factor Interaction” and is
denoted by A x B.
If the interaction between two factors A and B, is different at different levels of a third factor C, then there is
said to be interaction among three factors. This is referred to as “Second Order Interaction” or “Three Factor
Interaction” and is denoted by AxBxC.
Note: At the planning stage itself all the factors viz. Control, Fixed and uncontrollable should be recognized.
This will help to tackle them appropriately during experimentation.
th
t» r
4
*
Completely randomized designs are the simplest design in which the treatments are assigned to the
experimental units completely at random. This allows every experimental unit to have an equal probability of
receiving a treatment. In CRD, any difference among experimental units receiving the same treatment is
considered as experimental error.
CRD is the simplest design to us and it is appropriate only for experiments with homogeneous experimental
units, such as laboratory experiments, where environmental effects are relatively easy to control. In CRD is best
suited for experiments with a small number of treatments. On field experiments, where there is generally large
variation among experimental plots in such environmental factors as soil, the CRD is rarely used. Every
experimental unit has the same probability of receiving any treatment. Treatments are assigned to experimental
units completely at random using a random number table, computer program, etc.
A randomized block experiment is assumed to be a two-factor experiment., the factors are blocks and treatments.
The blocks of experimental units are uniform. There is one observation per cell. It is assumed that there is no
interaction between blocks and treatments. The degrees of freedom for the interaction is used to estimate error.
Treatments randomly assigned to each experimental unit of a block.
The Latin Square Design is for a situation in which there are two extraneous sources of variation. If the rows
and columns of a square are thought of as levels of the two extraneous variables, then in a Latin square each
treatment appears exactly once in each row and column. With the Latin Square design, we are able to control
variation in two directions.
In LSD, there are three factors: Treatments, Rows and Columns
The number of treatments = the number of rows = the number of colums = t (say).
The row-column treatments are represented by cells in a t x t array.
The treatments are assigned to row-column combinations using a Latin-square arrangement, that is each row
contains every treatment and each column contains every treatment. Every treatment occurs once in each row
and column.
Factorial Experiment
Factorial designs include two or more factors, each having more than one level or treatment. Participants
typically are randomized to a combination that includes one treatment or level from each factor. As per
description in statistics, factorial experiment is a design consists of two or more factors, each with discrete
possible values or ‘levels’, and whose experimental units take on all possible combinations of these levels across
all such factors.
Nested Designs
In certain multifactor experiments, the levels of one factor are similar but not identical for different levels of
another factor, (is unique to that particular factor) this is called hierarchical or nested design.
11.5 Dr. Genichi Taguchi Method
Born in Japan, 1924, an Electrical Engineer, worked during 1950’s to improve Japan’s post –WWII telephone
communication system. He is father of the “Taguchi Method” and “Robust Engineering”.
“Quality is
measured as the total loss to
society caused a product’
Run Experiment
Analyse Result
Confirmation
Result
4. Brainstorming Session
Attended at least by project leader/ facilitator and workers involved in the process. Other participants
may include managers and technical staff
The purpose is to identify critical variables for the quality of the product or service in question (referred to
as factors by Taguchi)
Control factor – variables under management control
Signal Factors- uncontrollable variation- uncontrollable variation
Define different factor levels (three or four) and identify possible interaction between factors
Determine experiment objectives
i) Less the better – keep the level of defectives as close to zero as possible
ii) Nominal is best - Outcome as close to target as possible
iii) More the better – Max number of units per time unit or lot without defects
3. Experimental Design
Using factor levels and objectives determined via brainstorming
Taguchi advocates off-line experimentation as a contrast to traditional on line or in process
experimentation
Care should be taken to selecting number of trials, trials condition how to measure performance etc.
4. Experimentation
Various rigorous analysis approaches like ANOVA and Multiple Regression can be used but also simpler
customized methods are available
5. Analysis
The experimentation provides “best” levels for all factors
If interactions between factors are evident – Either ignore or run a full factorial experiment
6. Conforming Experiments
The result should be validated by running experiments with all factors set to “optimal” levels
Quality Engineering
Quality engineering is an engineering optimization strategy developed by a Japanese Engineer, Dr, Genichi
Taguchi. When faced with solving engineering concerns and armed only with scientific/statistical tools, he
formed a philosophy marrying statistics and engineering methods to achieve rapid improvements in quality and
costs, by optimizing products/process designs. His career has been dedicated to the improvement, evolution, and
practical implementation of these methods.
Basically, Quality Engineering deals with activities performed for the purpose of reducing variability in
product/process function. There are two forms of Quality Engineering: Off-line and on-line Quality
Engineering.
Parameter Design
The selection of control factors (parameter) and their “optimal” levels
The objective is to make the design Robust!
Control factors are those process variables management can influence.
Ex. The procedures used and the type and amount of training
Often a complex (non-linear) relationship between the control factors and product/design performance.
The “optimal” parameter levels can be determined through experimentation.
From every trial series we can obtain an average result level and a measure of the variation, si, i=1,2,
……..,9.
These values can then be used as a basis for choosing the combination of factor levels that provides the
most robust design.
Step-1
Problem Identification
What do managers and/or employees see that need improvement
Step-2
Identify critical variables in the services that affect quality.
Open and honest discourse with all people involved.
Decide which factors are controllable and which are not.
Step-3
Using results from brainstorming session, facilitator will design an experiment.
Management must understand this part, and needs to fully support the resources needed for it.
Step-4
Use of ANOVA requires managers understand its use.
Facilitator, although in charge of the experiment of the process.
Step-5
Factors closest to target specification identified.
Means to reduce controllable variation produced.
Step-6
Set up new system using data from experiment
Test and validate results.
Conclusion
i) Best improvement is early in the process.
ii) Use expert consulting help for full experiment and implementation.
iii) Successfully used in airlines, insurance, hotels and restaurants.
iv) Quality is a major feature that sets a service apart from the rest.
11.8 Nonexperimental Research Designs and Survey Research
Research Design
Research design deals with the ways in which define the process of conducting the study, data are gathered from
sources, analysis and result etc.
Descriptive Research
Concerned with the current or past status of something
Describes achievement, attitudes, behaviours, or other characteristics of a group of subjects
Does not involve manipulation of independent variables.
Comparative Studies
Comparative study is the act of comparing two or more things on the view to discovering something about one or
all of the things being compared. Comparative study helps to define the organization structure of the subjects as
well as give the differential points between the subject and cases/ matter.
The major aim of comparative research is to identify similarities and differences between social
entities. Comparative research seeks to compare and contrast nations, cultures, societies, and institutions.
Examines the differences between two or more groups on one variable.
Example, if there a difference between second- and third-graders’ scores on a measure of self-concept?
Correlational Research
Bivariate Correlational Studies
Prediction Studies
Multiple Regression Prediction Studies.
Survey Research
Longitudinal Surveys
Cross-Sectional Surveys
Longitudinal Surveys
i) Studies in which the same group of subjects are studied over time.
ii) Trend studies use the same population across time but use different samples from that population each
time.
iii) Cohort studies examine a specific group (same population) over time.
iv) Panel studies are cohort studies that use the same sample each time.
Cross-Sectional Surveys
i) Attempt to simulate longitudinal data in a shorter time frame
ii) Data are gathered from multiple samples of the same population simultaneously
iii) May be used to study a phenomenon at one time or to gather data from multiple groups at the same time.
A Note on Surveys…
i) Need to know, in advance, how the data will be used rather than “fishing” for whatever is out there
ii) Data collection methods may vary but they must be standardized
iii) Instructions should be clear
iv) Both the instructions and survey should be pilot tested
v) Because a typical response rate to a mailed survey is only 40%-60%, follow ups should be conducted
vi) Non-respondents may introduce bias
SME Corner
I t may strike in the mind that, this chapter may be useful for large industries or the organizations,
who do the testing for new products; but i t is visionary for SMEs to grow in the knowledge and path
with vast areas, coverage and range of techniques which the industry applies.
Cluster of SMEs can do the survey and experiments, through their associations or research/
educational institutes, to make their business and products more acceptable from local to global.
Generate and execute i t with the internal efficiency, compatibility& unique features i n the products
and detailed comprehension on customers.
DoE and Taguchi method could be applied for small in-house testing and experiments for any
process with applying standard method.
So, various survey and research methods are included i n this chapter for understanding and its
utilization.
Self-assessment questions
Organization performance is the combination of Financial results, Plant & Manufacturing and Individual or
group performance. Financial Performance many instances considered as corporate performance which consist
of supporting Functions such as Marketing, IT, administration, finance, policy & strategy formulation etc.
Calculation of each process depends on develop of internal critical data, Internal validated data, Formats,
Process of collection data, training and understanding of calculation.
Financial
Result
Financial
Cost Analysis
Utilization of
Efficiency Resources
Quality
n Manufacturin
Performanc g or Plant Cost
e
Measureme Organization
Target Delivery
Performance
Other Critical
Parameter of Business and
Functional various Plant activities
areas or 13.1
Section-wise
Individual or Targets
Group individual / Group
Target,
Responsibilities
and Performance
Format
described to
Customer
the QAD and
Customer Satisfaction
1 CUSTOMER 5 Marketing 97.25 96.12 95.12 95.11 95.11
Satisfaction Report or
with Actual
Index
Data
Received (%)
PERFORMANCE Actual
OF THE PLANT Production
(Monthly or
Actual
Yearly, as
Production /
2 15 per the 10614 12659 16512 19819 25120
Target
Achievement Incentive
Production
of Plant Calculation);
Target Cul. Prods.-
MT/KL
Reduction in
Loss in
Water,
Calculation
=> Total
8 5 Production in 0.4 0.4 0.4 0.5 0.5
the Plant /
Total water
consumption
(etc., pl.
mention)
Reduction in
Loss in
Packing
Materials,
Calculation
=>(Total
9 5 6.2 2.5 4.6 1.9 1.8
Production in
the Plant /
total packing
material loss
)Total Cost of
Package
Dahi Pkg.
10 5 2.8 2.6 2.7 2.1 1.7
Mat.
Total
Employee
Production
performance
of the Plant /
HUMAN Improvement
Employee Total No. of
11 RESOURCE & 10 Planning at 250146.8 123393.0 159560.9 224253.8 226720.5
Performance Manpower
ORGANISATIONAL the Plant and
(Permanent
Performance
+ Casual/
Index
Outsourced)
Total Sales or Total
Production in Production of
this Plant/ the Plant (in
Total Cost of Monetary
COST OF Employee Manpower in Amount)/ 3540895 5077300 7949434 9822110 10954158
12 15
MANPOWER Cost this Plant Cost of 7 0 0 7 4
(Including Manpower
Permanent (Permanent +
and Contract Casual/
Manpower) Outsourced)
It will
As per the Calculate the
Existing Departmenta
PMS or l Level and
Aggregate
EMPLOYEE Individual will be
13 Individual 10 0.643
PERFORMANCE Parameters Included at
Performance
Developed the Time of
by NPC Final
Team Calculation
of Incentive
14 Total Performance 100
Index (TPI)
Table No. 90A: How to Calculate Daily Manpower with Production Norms
DAILY MANPOWER UTILISATION WITH PRODUCTION NORMS
Total
No. of Pro
Total Hr. w
Per Per Per Target Actual
Sr. Size Proposed Manpower Utilised Capacity
Products min Hour Hour Production Production
No. (gm) Manpower Available / (av. Utilisation
(Nos.) (Nos.) (Kg) (Kg) (Kg)
Allotted Working
Hrs in a
Shift)
A Paneer
1 Paneer Production NA 4 4 10 NA NA 140 1400 1250 89.29
2 Paneer Packing 200 6 6 10 5 300 60 600 350 58.33
3 Paneer Packing 1000 4 4 10 4 240 240 2400 0
B Dhai 10
1 Dahi Cup 85 4 4 10 40 2400 204 2040 0
2 Dahi Cup 200 4 4 10 40 2400 480 4800 0
3 Dahi Cup 400 4 4 10 40 2400 960 9600 0
Dahi Cartoning (48
4 85 4 4 10 20 1200 81.6 816 0 Per
Cup)
Dahi Cartoning (24
5 200 4 4 10 24 1440 115.2 1152 0 Per
Cup)
Dahi Cartoning (12
6 400 4 4 10 30 1800 144 1440 0 Per
Cup)
7 Dahi Matka 5000 5 4 10 2 120 600 4800 0 S
In
8 Dahi PP 200 2 2 10 36 2160 432 4320 0
D
In
9 Dahi PP 400 2 2 10 36 2160 864 8640 0
D
In
10 Dahi PP 1000 2 2 10 36 2160 2160 21600 0
D
In
21
C F. Milk (Filling) 180 10 10 10 36 2160 388.8 3888 and
38
Bolte
180 2 2 10 30 1800 324 3240
Retorting /Sterilizing
D PPM
1 Milk/ PPM 200 2 2 10 80 4800 960 9600
Ac
2 Milk / PPM 500 2 2 10 80 4800 2400 24000
3 Milk / PPM 1000 2 2 10 50 3000 3000 30000 Out
5 Chhach 450 2 2 10 80 4800 2160 21600
E Butter
MMloe
KV di; inc w w IM KK WK TJ Wilms A
N| (!'» W OX J.'H IflI IB 3fl Or MbHW •1
III ((1 ((( HI M in 10 01 llv '<
iim (iqu Imi' Hing rnw|| r a lijriH |rtr( nn .« Iff •F'B iffli i
If
lllbvxuiw
wiiui'r 3
wm a
IW
-.lOISIIil'IlfBl IMS im (M« .R K
w W Fl M •M 9
IMIWK,
n H.wihi|| *
injiwTOtD.
immui
Table No. 92: Sample daily output sheet with productivity
Day1 Day2 Day3
Selective
Total Day Total Total Day Total
Team Item
Sr. Available Total Work Output Available Total Available Total Work Output Av
Polish Teams Members, Categories
No. Name for this
Manpower Output on (Output+ Manpower Output Manpower Output on (Output+ Ma
Rework Rework) Rework Rework)
Team
1 9 2 11
1 8 2 10
1 QC Team 1 1 7 2 9
1 6 2 8
1 8 2 10
1 9 2 11
1 6 2 8
2 QC Team 2 1 3 2 5
1 4 2 6
1 5 2 7
1 5 2 7
1 5 2 7
3 QC Team 3 1 5 2 7
1 5 2 7
1 5 2 7
1 5 2 7
1 5 2 7
4 QC Team 4 1 5 2 7
1 5 2 7
1 5 2 7
5 TOTAL 20 ## 40 155 0 0 0 0
Analysis
6 6 2 7.75
(Productivity)
Table No. 93: Sample daily work monitoring sheet
Table No. 94: Sample Section-wise Daily Capacity Monitoring and Analysis Sheet
Section-wise Daily Capacity Monitoring and Analysis Sheet
Final
Wax Police,
Pre- Output
Sections Waxing and Casting Grinding Handmade Filing EP/MP Setting 12 Rodium Remark
polish Day
Sr. Setting MP,
No 8H
Installed/
Planned 190 190 190 190 190 190 190 190 190 110 190 120
Capacity
1 Day1 210 150 160 175 145 135 270 239 210 139 146 130 2079.29
2 Day2
3 Day3
4 Day4
5 Day5
6 Day6
7 Day7
8 Day8
9 Day9
10 Day10
11 Day11
12 Day12
13 Day13
14 Day14
15 Day15
16 Day16
17 Day17
18 Day18
19 Day19
20 Day20
21 Day21
22 Day22
23 Day23
24 Day24
25 Day25
26 Day26
27 Day27
28 Day28
29 Day29
30 Day30
31 Day31
Table No. 95: Sample Manpower Output and per-day Capacity Analysis
Name of the Department - Final Policing
Manpower Output and Per-day Capacity Analysis
Per-day Total
Manpower Per Rework Capacity Output With Output
Remark
Nos. Manpower % in 8Hrs. 8hrs. in OT with OT
Output 8Hrs.
12 10 10 9 108.00 0.001 108.0135
23 13 20 10.4 239.20 0.0001 239.20299
12 9 10 8.1 97.20 1 109.35
12 9 10 8.1 97.20 1 109.35
10 9 16 7.56 75.60 1 85.05
Through the initiatives under the Human resource management, training & development attempts to improve the
current or future employee performance by increasing an employee's ability to perform through learning. It
usually happened by changing the employee's attitude or increasing his or her skills and knowledge, which are
essential for new jobs and products.
Job andTechniqut
Identification
For Small Scale Industries, Training identified and executed as per organization needs, departmental / section
needs, specific machine or technology based, product and customer based, initiated by Managers or supervisors.
Redesign Purpose
the and
Training Outcome
program of the
t— - -------
Evaluation o f
the Training Selection
performance: of t h e
Quality and T raining
l performance , method
r
Conduct
the
Training
Industry Training Process,
it comprises of a series of steps that needs to be followed systematically to develop an
efficient training program. Training is a methodical action to perform for modifying the skills, change in
attitudes and the behavior of an individual to perform a particular job and solve a critical situation.
ADDIE is an abbreviation for the five stages of a development of a training process: Analysis, Design,
Development, Implementation, and Evaluation.
Organization select the training with a matrix, made for that organization with the following criteria;
1. Need Based
2. Customer Based
3. Employee skills and competency based
4. Program based
5. Future planning and Improvement
6. New Technology, techniques, process and statutory based etc.
QUALITY COMAPNIES TRAINING MATRIX
Minimum Training Requirements
£ ■r i
ten
J £
&
T- /a
«a
/ si
// //
9u,,p
Company Classification
1 ££
£J2 § £
o
0
J
££
/ / £*
h
J / / £
Pssr/
f s
Training class expriation interval -> Once Once 4 years Once 3 year 4 years 2 years 2 years 3 years Annual Once 3 years 4 years Annual 4 years
REQUIRED FOR ALL OFFSHORE ________
QPM Field Supervisor / Foreman X X X X X X X X X X X X X
Lease Operator
Lead Operator X X X X X X X X X X X X X
A Operator X X X X X X X X X X X X X
B Operator X X X X X X X X X X X
C Operator X X X X X X X X X X
D Operator (Roustabout) X X X X X X X
Operatori X X
Operator 2 X X
Gas Operations X X
Electrician / Operator X X X X X X X X X X
Mechanic /Operator X X X X X X X X X
l&E/PLC X X X X X X X X X X
Offshore Clerk X X X X X X
Pipeline Tech nlcian
Truck RackTechnician
QCP Superintendent X X X X X X X X X
Welder X X X X X X X
Fitter X X X X X X X
Rigger X X X X X X X
Crane Operator X X X X X X
Blaster/ Painter X X X X X X X X
Helper X X
Onshore Shippings Receiving X X X X
Onshore Shop Personne X X X
Onshore Equipment Operator X X X X X
Most HR managers use a variety of these types of training to develop an all-inclusive employee or specific need;
i) Skills Training
ii) Technical or Technology Training
iii) Training on Quality
iv) Soft Skills Training
v) Professional Training and Legal Training
vi) Team and leadership Training
vii) Managerial Training based on functions
viii) Safety Training
12.9 Few training programs for the internal manpower and improvement teams
1. Basic Concept of IE for better productivity, M/c and manpower utilization
2. Process of improvement in productivity and utilization of resources
3. Basic Lean Six-sigma techniques
4. Concept Quality – QI, QC and QA
5. Application of 7QC Tools and Basics of TQM
6. Basics about the Data – Collection and Analysis related to the Production and Quality
7. Soft Skill Training – Time Management, Team Building, Motivation etc.
8. Special Supervisors training of existing supervisors in in group/s.
Sample Training Program: Multi-skilling
Doc. No.:
Review Date:
Next Review Due On:
Photo
DEPARTMENT : FABRICATION
WORK STATION :
WORKER NAME :
AGE :
ADDRESS :
CONTACT NO.:
Sr.
AREA OF WORK STATUS REMARKS
No.
01 Drawing
02 Shearing
03 Drilling
04 Bending
05 Gas cutting
06 Welding MIG
07 Welding ARC
08 Welding TIG
09 Grinding
10 Leakage Testing
NOTE:
1: Needs Supervision 3: Can do Work Individually and Training to Others
2: Can do Work Individually 4: Can do 2, 3 + Developmental and Problem solver
PREPARED BY APPROVED BY
(HR Dept. / Plant Manager)
Note: This Types of Chart could be prepared for all Functional section in the Plant, like Maintenance, Quality,
Production, Assembly etc.
SME Corner
After the implementation of various applicable techniques, SMEs, necessarily do the monitoring
work on the improvements, daily, weekly and monthly working in various areas, mainly resources.
The core monitoring areas must include the critical areas of input, output, process, customers
and business etc.
Various samples are enclosed as per the various products and industries, which will give a
workable idea about the designing of the Production controlling and critical areas for monitoring
of the resources/ inputs, quality and delivery.
SMEs should design some important areas of training useful for their plant as per regular practice,
yearly and for any specific purposes. Plant should realize the importance on competency and
multi-skilling. Plant should make a procedure for new recruitments, promotions and to apply of
new techniques.
Self-assessment questions
In Lean techniques, concept of cellular manufacturing and 5S are the two techniques associated with plant layout
and arrangement of material for reduction of two wastages of internal motion and transportation. Space in the
plant is part of investment, may be ranted or own land, optimum utilization of space is significant in
productivity. In developed countries where cost land is comparatively high, does the space management with the
industrial engineering techniques.
A Plant layout caters all aspects of the plant staring from approach road, government regulations, land size &
dimensions, owner choice, office building, observation points, material movement, warehouse, stores etc. In
manufacturing plants, the position of production sections, flow of operations, production & operations linkages,
chemical processing, safety, training, position of control room, temporary or permanent labour accommodation,
cellular position M/c (machine) with working, and spaces for maintenance, emergency & safety. Good layout
should be flexible, uninterrupted flow of production and maintain the method of work and cost effectively.
In this chapter, the major areas are the layout for better space utilization in the shop floor. Plant layout is a
systematic and efficient functional preparation of various sections, machines, tools, equipment and other
supports services of an industrial organization. So that it could facilitate the interrupted processing of the
proposed or undertaken product in the most effective, most efficient and most economical manner in the
minimum possible time.
Fixed or
Positional Layout
Process based
and Functional
Types of layout
Layouts
Line of Product
layout
Combined
Layout
Types of Layouts
M D
M M D
M M
S
S Assem bly
Receiving and
shippng store
Product Layout
This simple layout as per the Line and flow of operations. All operations are carried out in a line as the
functional sequence. It is used in assembly line design and automobile industry as per the flow of work and times
of operations. It useful for high speed bulk manufacturing and continuous production. Resources are optimum
utilized in this layout.
Material
from Store
Casting Shaping Milling Drilling Inspection
Combined Layout
■> Line Layout
Finished Products
Process Layout
Raw Material
Majority of the manufacturing units adopt this layout as per the balancing of operations. The specialty of this
layout is based on the disciple of working, working path and reduction in unproductive reprocessing and wastage
in time.
13.3 Concept of Cellular Layout
Cellular Manufacturing
Being an important aspect in the Lean manufacturing process, cellular manufacturing (CM) is that produces
close linked of liked parts within a single line or cell of machines operated by operators, only within the line or
cell. A cell is a small scale, clearly-defined production unit within a larger factory.
Industries in developing countries are struggling for making a CM capable plant with optimum management,
excessive movement in the shop floor. Sometimes, it is mis-understood that only application of 5S makes the
plant efficient in CM.
CM unit is equipped with complete responsibility for producing a family of like parts or a product. All necessary
machines and manpower are contained within this cell, thus giving it a degree of operational autonomy. Workers
are expected to have learned a full range of operating skills required by their cell. Consequently, systematic job
rotation and training are necessary conditions for effective cell development. Complete worker training is
needed to ensure that flexible worker assignments can be fulfilled.
CM is actually an application of group technology, which described as a first pebble to achieving world class
manufacturing level. The objective of cellular manufacturing is to design cubicles/ cells in such a way that, some
measure of performance could be optimized. This estimation of performance could be productivity, cycle time,
or some other logistics measure. Estimation is observed in practice include pieces per man hour, unit cost, on-
time delivery, lead time, defect rates, and percentage of parts made cell-complete.
Cellular Flow Manufacturing is the linking of manual and machine operations into the most efficient
combination of resources to maximize value-added content while minimizing waste. The most efficient
combination implies the concept of process balancing. This process involves placing a cluster of carefully
selected sets of functionally dissimilar machines in close proximity to each other. The result is small, stand-
alone manufacturing units dedicated to the production of a set or family of parts or essentially, a miniature
version of a plant layout.
In the machinery, it may be functionally dissimilar, the family of parts produced, contains similar processing
requirements or has symmetrical similarities. Thus, all parts basically follow the same routing with some minor
variations like hopping an operation. The cells may have no conveyor-based movement of parts between
machines, or they may have a flow line connected by a conveyor that can provide automatic transfer.
Hybrid system: Cellular manufacturing is hybrid system also, that links the advantages of a job-shop with the
product layout of the in-line continuous flow. The cell design provides for quick and efficient flow, and the high
productivity associated with assembly lines. However, it also provides the flexibility of the job shop, allowing
both similar and diverse products to be added to the line without slowing the process.
Below figures 1 and 2 compares a cellular layout to that of the typical job-shop or process layout.
Figure 1 Figure 2
P recess Layout Cellular Layout
It enhances the control in production and quality, by breaking the factory into small, homogeneous and cohesive
productive units, production and quality control to make easier. Cells that are not performing according to
volume and quality targets can be easily isolated, since the parts/ products affected can be traced to a single cell.
Also, because of the productive units are small for organized, the search for the root of problems made easier.
CM Limitations
In-spite of many possibilities of improvement through cellular manufacturing, there are some limitations also;
The decision to implement cellular manufacturing requires a deep commitment to excellence and a desire to
permanently change the way factories are viewed and managed. Cellular manufacturing affects workers in a
number of ways. Among the factors now discussed are issues of self-management, motivation, employee input,
supervision, and group cohesiveness.
The next activity is often to measure time elements, including the cycle time for each operation and the lead
time required to transport and WIP between operations. Takt time, or the number of units each operation can
produce in a given time, is another important time element to assess. Time elements are typically recorded on
worksheets that graphically display the relationship between manual work time, machine work time, and
operator movement time for each step in an operation. These worksheets provide a baseline for measuring
performance under a cellular flow.
To enable a smooth conversion, it is typically necessary to evaluate the machines, equipment, and workstations
for movability and adaptability, then develop a conversion plan. In many cases, it is helpful to mock-up a single
manufacturing cell to assess its feasibility and performance. The image to the right illustrates the flow in a
cellular production environment, where parts are pulled into the system as signaled by customer demand.
Several techniques are important to facilitate effective cellular layout design and production.
SMED: Single-Minute Exchange of Die (SMED) enables an organization to quickly convert a machine or
process to produce a different product type. A single cell and set of tools can therefore produce a variety of
products without the time-consuming equipment changeover and set-up time associated with large batch-and-
queue processes, enabling the organization to quickly respond to changes in customer demand.
Autonomation: Autonomation is the transfer of human intelligence to automated machinery so that machines
are able to stop, start, load, and unload automatically. In many cases, machines can also be designed to detect the
production of a defective part, stop themselves, and signal for help. This frees operators for other value-added
work. This concept has also been known as “automation with a human touch” and jidoka, and it was pioneered by
Sakichi Toyoda in the early 1900’s when he invented automatic looms that stopped instantly when any thread
broke. This enabled one operator to manage many machines without risk of producing vast amounts of defective
cloth. This technique is closely linked to mistake-proofing or poka-yoke.
Right-Sized Equipment: Conversion to a cellular layout frequently entails the replacement of large equipment
(sometimes referred to as monuments) with smaller equipment. Right-sized equipment is often mobile so that it
can be reconfigured into a different cellular layout in a different location. In some cases, equipment vendors
offer right-sized equipment alternatives, and in other cases, companies develop such equipment in-house. A rule
of thumb is that machines need not be more than three times larger than the part they are intended to produce.
After moving the equipment and ensuring quick changeover capabilities, organizations typically document new
procedures for the new layout and train workers on the new production process. In many cases, workers from the
affected processes participate in the conversion process. The new layout is also tested and measured against the
baselines recorded in step 1 to confirm improvement.
Self-Management
Cell workers are encouraged to think creatively about production problems and are expected to arrive at
pragmatic solutions to them. While they are free to seek advice from plant management and staff, the identified
problems and subsequent analysis, and usually the solutions, are entirely their own. Workers have the authority
and are encouraged to implement and follow up on action plans to improve their work. Some managers ask cells
to set improvement targets for themselves and measure their performance in comparison to these targets. In
addition, workers are given the freedom to plan, coordinate, and control their work within their cell as long as
they meet company standards of quality, volume, time, and cost.
Motivation
Behavioral psychology proposes that challenging work assignments keep employees motivated, satisfied, and
productive. Flexible work assignments within the cells ensure that employees are constantly learning new tasks
and constantly being challenged. Job rotation within the cell introduces variety in work patterns, thereby
breaking the monotony (which has been known to cause absenteeism and problems in quality and productivity).
Industrial work is productively accomplished in a group work setting. Cellular manufacturing can energize the
group, attacking the lethargy found in many industrial situations.
Employee Input
With the cell work group energized and motivated, the employees are more likely to actively and continually
bring their mental capabilities to bear on job-related problems. Cell workers are the closest ones to the
production process, so practical ideas are likely to instigate other ideas, which could then give rise to a
continuous, almost self-sustaining chain reaction of improvement. As the workers see their own creative output
being implemented, they begin to develop self-esteem and a stronger desire to succeed. They even begin to
challenge each other to improve on their prior accomplishments.
The drive toward excellence is fueled by the human need to achieve until the desire to excel and continuously
improve becomes part of the factory culture. Then as workers learn by doing more, they become more proficient
at generating ideas which, perpetuates the cycle of improvement. Cellular manufacturing can be the structural
catalyst that starts, contains, and sustains the improvement process.
Supervision
The intense use of manufacturing cells tends to flatten the factory management structure and reduce overhead
costs. When work group autonomy, worker versatility, and small group improvement activities converge, the
need for supervision is drastically reduced, if not eliminated altogether. Cell manufacturing perpetuates the idea
that the work group should supervise itself. A workforce that is motivated, trained, and assigned specific clear
responsibility for a product or part, coupled with simplified production planning and control, does not need to be
minutely controlled or supervised in order to do a good job.
Group Cohesiveness
The creation of small-scale productions dedicated to production of a few similar parts increases work group
cohesiveness. Since each cell has few employees, typically less than fourteen, extensive interpersonal contact is
unavoidable. The workers are now part of a single, identifiable unit with operating autonomy and responsibility
for a specific product, linked by the common purpose of continually improving the productive unit for which
they are responsible. The cell structure keeps problems at a level where they are manageable and gives
employees the opportunity to exercise their creative potential in a pragmatic way. When problems calling for
technical expertise beyond that of the workers, managers and production staff can be called on to provide
assistance. Cell manufacturing builds a cohesive subculture within the wider social environment of the plant.
The use of flexible work assignments contributes even more to the group's cohesiveness and loyalty. Employees
who regularly perform the work also done by coworkers are more likely to demonstrate empathy and support
when dealing with each other on the job. If each worker has experienced each job firsthand, they are more able to
offer encouragement and advice on how the work can be improved and each worker is more receptive to the
input of his or her coworkers. Each worker can view and understand completely the task, responsibilities, and
mission that top management has dedicated to the cell. The cross-fertilization process that emerges can generate
some truly creative ideas for process improvement. As the expression goes, "as iron sharpens iron, so shall one
man sharpen another."
Finally, work group cohesiveness, reinforced by the cell structure, facilitates total people management. Due to its
small scale and mission focus, the cell can be easily mobilized. Top management is too far removed, spatially
and socially, from the workers to be able to interact with them extensively enough to significantly control the
socialization process. Management can shape corporate values and create a nurturing social environment, but it
cannot instill these values into the minds of the lower level employees. Hence, corporate values are better
communicated and instilled into daily work habits by small group processes.
The cell is better able to exercise social control over deviant workers since it can directly and immediately
manipulate social rewards and punishment. Any worker who fails to conform may find his deviant behavior
quickly detected and reacted to by the withdrawal of the social support of the cell. Deviant behavior that is
hidden from management for long periods of time is very visible to the small group and can be dealt with
quickly.
Conversely, high-performing group members are also quickly visible but are rewarded with esteem and respect
from the other cell workers. Consequently, management can work through the cell to instill the corporation's
values, attitudes, and philosophies. Once these are internalized by the group's key members, the group itself will
take over the socialization process of indoctrinating these values into the mindset of each worker.
13.6 CASE STUDY OF LAYOUT DESIGN IN AN ENGINEERING INDUSTRY
About the organization
It is an engineering organization produced the bridge joints components in their existing plant, wanted to shift to
another with a specific area. The target was the maximum utilization of the space and allocation as per the future
projection of the produced items. Space should be as per the product-wise allocation of the areas as per market
trends of that products with raw material to final delivery.
List of Products
Elastomeric Bearing
Rocker and Roller Bearings
Pod Bearings
Expansion Joint
Received Order
MS Order Place
Received Material
Internal Plate Order Procurement of
Rubber and Chemicals
Received
Making of Rubber
Machining Welding Sheet as per size
Acid Wash
Drilling
OK received in Plant
Straightness
Grinding
Adhesive Coating
Httinci
Fixing in Mould a n d
Vulcanization Process
Painting
Testing (Inspection)
Dispatched Dispatched
POT BEARING
Order R eceived
EXPANSION JOINT
Brass Sheet
Casting Raw material Received I a n d Purchase
Received RM Machining
Order and Die D rrf»r Purchased
Culling of Angle in A rrannpmp-nt
Path/ Bending
Ri7fi
Weldfng Welding:
Received Pasting of Sent to
Buffing a nd of C o l l a r s
Cast ing PTFE Binder
Grindinn
Drilling
Gri ndmg Drilling
Machining Final
Product
Stud Welding Receive d
Drilling Grinding
Parry Welding
Fitting
Straightness
Painting
Chipping and Grinding
Inspection
Painting
Dispatched Marking
Dis patched
Table:
Working
Machine Machine Area RM / WIP
Area (Sq.
Name L*W (Sq. Feet) Areas
Feet)
Needer (Mixer) 15X15 225
Main Mixing
15X13 195
Mill
Small Mixing
13X6 104
Mill
Testing Mill 4.5X10 45
Sand Blast 23X7 161
Cutting Table 12X4 48
778
Table:
I/P and O/P
Sections and Other Space Area
Area
Finished Material Storage
13X4 52 52
Table
Chemical Testing Table 7X4 12X8 76
Raw Material Area 47X8 376
Hydraulic Press 4X3 12
516
Table: Op erational details of the M/c
Amount
Tools
Name of Name Input of Input Output
Sl. Outputs Output Used in
the of Input Carried Stored Carried Remarks
No. Form Produced Material
Machine (Form) From near To
movement
Machine
1 VTL
of
Bottom Raw
Desired
Plate of Material Not Crane
Shape Drill
Pot Handling Fixed Hooks
and
Bearing Area
Size
11
2 Lathe- A (8 Feet)
As per
Raw the
Bottom Material Not Desired Crane
1 Drill
Plate Handling Fixed Shape Hooks
Area and
Size
As per
the
Shaper Not Desired Crane
2 Piston
Machine Fixed Shape Hooks
and
Size
As per
the For
Planar Not Desired weld on Crane
3 Knuckle
Machine Fixed Shape Slab Hooks
and plate
Size
As per
the
Bend Not Desired Planar Crane
4 Roller
Saw Fixed Shape Machine Hooks
and
Size
As per
Shaper the For
Machine
Not Desired weld on Crane
5 Saddle and
Fixed Shape Saddle Hooks
Planar
and plate
Machine
Size
Lathe-
3 B (6 As same as on Lathe A
Feet)
4 Planar – Big
Raw
Expansion Material Not Drilling Crane
1
Base Handling Fixed Machine Hooks
Area
Drilling Crane
2 Roller Lathe
Machine Hooks
Raw
Welded
Material Crane
3 Slab Plate with
Handling Hooks
Knuckle
Area
Raw
Material Crane
4 Knuckle Lathe
Handling Hooks
Area
Raw
Material Crane
5 Saddle Lathe
Handling Hooks
Area
6 Saddle Raw Drilling Crane
Plate Material Machine Hooks
Handling
Area
Planar
5 As same as on Lathe A
- Small
6 Shaper – A
Bend Crane
1 Piston Lathe
Saw Hooks
Raw
Top Plate
Material Welding Crane
2 of Pot
Handling with S.S. Hooks
Bearing
Area
Raw
Material Crane
3 Knuckle Lathe
Handling Hooks
Area
Raw
Material Crane
4 Saddle Lathe
Handling Hooks
Area
Shaper
7
-B
Shaper
8 As same as on Shaper – A
-C
Shaper
9
-D
10 Small Drill
Assembled
Bottom
with other
Plate of Lathe or Crane
1 Parts of
Pot VTL Hooks
Pot
Bearing
Bearing
Expansion Planar Crane
2
Base Machine Hooks
Planar Crane
3 Roller
Machine Hooks
Gas
Saddle Planar Crane
4 Cutting on
Plate Machine Hooks
Corner
5 Saddle
Saddle
6
Plate
Pot Bearings
Bottom
1
Plate
2 Piston
Elastomeric
3
Disc
4 S. S. Plate
5 Top Plate
Hydraulic
Planar Bend
Press
(3) Saw(1) Drill
MIG (Metal
ln=rt G a s )
Welding (21
Lathe
Lathe Muline ShiDcr
Drill Machine w Mechirc
Machine
Shaper
I2) Machine Drill VTL
W
PI Mcchirc
(4)
0)
Portable Gas
san (Men
Grinding Cutting Grinding Inert C- asj
Machine M/c waama iz>
ELASTOMERIC BEAIRIMQ:
E la st*?meric
Pai
EXPANSION JOINT
Acid
waitfiina
eiiiii
IISH-SI Angle
Kus ln(l
Pnlrrtfrn
Drill IVbchine
Ciiirxlmu
E lectric Arc
(Stud)
Welding Portable
Grinding
Machine
According Types of
Industry and Scaleof
Production
Production Available
Layout Space
Spaceof Constraint
Matei Man Activities
laterii
>ace
Manpower Balancingof
Space the Activities
LA'cs Operational
SI Existing Total L, Total Total L. Total
Ita
lUme CM Machines Area (L x W) L W Total Elements of the
Ho. Of M e
Setup
Ft W.Ft Ft W,ft
L w
(111 Products
2 Parallel each
1 VTL- venal Lathe 10X9 10 9 BO Shaper Machine (4) 4 43.50 25 21.75 12.5
Line
1 Parallel each
2 Lathe- A (8 Feet} 11X8 11 9 88 lathe Machine (2) 2 23.00 17.00 115 83
line
3 Lathe- B (6 Feet) 12X8 12 8 96 M Machine (2*1*3| 3 2*1 Parallel 18.00 19.00 18 12.67
8
4 Planar - Bid 20X13 20 13 260 Planar (2) 2 1 Parallel 40 22 40 11
5 u;
VTL (Vertical lathe Single with
5 Planar- Small 20X9 20 9 180 1 10 9 10 0
Machine), ( i ) ParaM Space
6 Shaper -A 105X6 105 6 63 Hydraulic Press (5) 5 2-3 Parallel 58.00 38 38.67 0
MlGlMetaltoertGas)
7 Shape - B 12X6 12 6 72 2
Wettng |7)
Testing R>gB«g and
8 Shape - C 10X7 10 7 70 3 1*2 Parallel 35.00 25 23.33 115
RA660 |3|
9 Shape - D 11X6 11 6 66 Gas Cutting |1) 1
Portable Grinding
10 Smail Drill 9X9 9 9 81 2
Machine (2)
11 □nil Bio 11X10 11 10 110 OectncArc V/eMmg (6| «
12 Testing Rig (RA 2596} 9X6 9 6 54 Bend Saw (1) 1
13 Testing Rig (RA 660) 12X10 12 10 120 Table Grinder |2| 2
MACHINE AREAS
Prnpn«*rt
fametfUKftinH lolii Ffmrrts o' tire Aims MttP Propewd GtimAieas
No. No .of Mic Atom IrKiBMewi Tofol Areen local JMwi
W>|Fl| Products IncreNe lleigm
Ho. lit
1 W . - V m e i i Latte ms 90 Stepw ItocNro |4| 4 271 6 4(65 8 M2 84 624
2 LMhe-A{3F«t;. Htt 89 Ldhellrtinepl 2 ‘34 6 562 8 736 96 812
3 Latte- B -iFwt till 96 Drill I J k h m 3 3 191 4 254 67 1U BS67
4 Ptarur-Bg 21X13 Ml Plump} 2 441 3 660 4 00 333 12M
VrLiVenfcil Uite
5 f'Uir - SrrM 3M ftl 1 ft 3 270 3 2ti) 300 571
Uxhlr>?|, |1|
6 Shaps-A K5>6 63 Hydreric Pi*»|5| 5 4!2 5 482 6 5784 300 8791
ft RU)WrPTO5-4 w ?0 11381 67
23 Projected 1OO%
Expansion J o i n t Production
24
Area
25 Sections Area
26 Dnlling Machine 3X3
27 F i n i s h e d Material Area 25X8
With F u l l of
28 Overall Area 48X22 1056 3168
3 Times
29 Store 20X11 5
31 Machining Section
l/p a n d O / p M a t e r i a l
32 28X38
Area
33 Finished Material Area 13X40
34 Elastomeric B. Section
Laminate Storage
35 9X15 225
Area
Laminate Culling
36 4X4 100
Machine
37 Laminate Cutting Area 7 5X11 0
38 Painting Aiea 12X16 384
39 Grinding Ama 12X22 440
Huffing ( a f t e r Oust)
40 6X5 150
Area
41 Packing Areo 12X22 440
42 Acid Area 10X10 240
43 TOTAL 1979 11,473.00 22,eS3.O7
Rubber Section L W
60X100 5b 115 6.325.00
Total Shop Proposed Excess
Width Length
Floor Areas Areas
Line 1 Cutting and
57 250 14260 11,381.07 2.868.93
Proposed RM
Line 2
67 260 14260 11,472.00 2,778.00
Proposed
T o ta l 28,600.00 22,863.07 5,646.93 2,778.00
Sq. Yd.7
3.000.00
Mtr.
Proposed Proposed
Existing Floor
SI. Area (Sq. Remark
PLANT AMBIANCE Areas (Ft.) Length Width Position
No. Ft)
1 Gates end Security Rooms 12 15 180
2 Small Temple with Lawn areas 30 40 1200
Outside Garden and Horticulture Graden may be in one Ptace or in
3 50 40 2000
(Total) Scattered
3/4 Rooms of 140 sqft each
4 Labour Rest Rooms 1 Quarters 16 30 480 including Build up area Actual
always reduce to av. 20%
Vacant Land - As p e r Govt. Rules
S 50 50 2500 Approx
in Av.
6 Toilet 1 Birthroom - Two 10 10 100 50 sqft
7 Parking
B Utility - Genset and Transformers
9 TOTAL 6,460.00
Common
RR M/cs PB Remark
Location
Setting of
Setting of
M/cs or
Common R M and Cutting Areas (With Band Saw) Mi'cs or W/Ss
W/Ss
(Vertic al
Vertical with
Lathe
the Line
Machine),
(1)
Drill
Machine
p-1 =3}
Final Dispatch
BACKROAD
MAIN ROAD - 1 1 4 FT
L E G A L VACANT LAND
and INTERNAL ROAD
ormer
Final Dispatch
RAR
Marking and
Testing and
Lathe & □ rilling
Painting
Welding /MIG
VTL M/c and G r i n d i n g
Bearing
POT
M»rerial Mnvpmpm
Drill M - c s
cn -Ifltade i*ea«
1
1
4
F
t
W
OPTION - 1
1 St Floor
Rest
Purchase/ Reception Room/
Conference
Library Material and Display Employee
Directors Room/s
Section – Products Toilet / Common
Chambers Bathroom Room
IT / Guest
Admin.
Accounts Back- Wt. Kitchen
& HR
office Room
GROUND FLOOR
Guard/
Stores and
Security
Maintenance
Room
Quality and
Gen-set
Lab.
NOTE: The Parking will be on the Vacant Land
1 St Floor
Reception
Conference
Library and Display –
Directors Room/s
Products Toilet /
Chambers Bathroom
IT / Guest
Admin.
Back- Wt. Kitchen
& HR
office Room
GROUND FLOOR
Guard/
Sores and
Security
Maintenance
Room
Quality and
Gen-set
Lab.
NOTE: The Parking will be on the Vacant Land
2 ND Floor
Rest
Room/
No
Employee
Construction
Purchase/ Purchase/ Common Toilet /
Room Bathroom
Material Material
Section Section
Table: Office premises desi n
Proposed
Existing Proposed
OFFICE – Measurement Floor
A Areas Area Remark
Plant OR (Ft.) Position
(Ft.) (Sq. Ft)
Leng th Width
To observe the
Plant from the
2nd Floor. 4 to 6
person Sitting
with Samples and
Production
1 15 15 225 1st Floor Furniture. Two
Office
Small Counter
would in the
Plant for Prod.
Supervisors and
for Local Use
GF OR
Maintenance at the Maintenance
2 20 20 400
Section Shop Workshop
floor
As per the Space
Quality / Lab availability in
GF OR
3 Section/ Mat. 15 15 225 any Floor,
1st Floor
Testing preferably 1st
Floor
OFFICE –
B 0
CECO
Could be
Admin. & common area of
1 20 20 400
HR HR and Accounts
GF
with Separate
2 Accounts 0 Rooms
Could be
Purchase/ common area
3 Material 0 with HR and
Section Accounts with
GF Separate Rooms
In the Entrance
Display –
4 10 5 50 of the Office
Products
Premises
Attached with
Conference Hall
5 Library 0 1st Floor
in Wall Mounted
and Drawers
6 Kitchen 10 6 60 1st Floor
IT / Back-
7 10 5 50 1st Floor
office
Rest Room/
Employee
8 12 8 96 GF
Common
Room
9 Reception 10 5 50 GF
Conference
10 20 20 400 1st Floor
Room/s
Directors Two Director
11 10 20 200 1st Floor
Chambers Rooms
Toilet /
GF and One Each Floor
12 Bathroom 12 10 240
1st Floor X2
(each Floor)
Other
13 40 10 800
Adjustments
14 Parking
15 Total 3,196.00
BACK SI DE OF THE PLANT
Scrap Area
FINISHING AREAS
PAINTING AREA
GRINDING
RUBBER AREAS
WELDING
DR- 2
DR-2
Main and Small ND Me.
Mixing Mills
-8
RM and Cutting
Main Road
Main Road
Acid
Washing Painting &
HP Wes Cutting Table
PAINTING AREA
Expansion J oint Production Area
Drilling, Welding and Finishing
GRINDING
Shop
Floor
Office
1 I WELDING
Material, Gas
Cutting with ] VTL-3
M/c
WIPetc |
Shaper
RUBBER AREAS
LEATHE
-8
I VACANT AREA
SME Corner
This chapter provides SMEs about importance of Layout for focusing the internal movements of
man, material and equipment. Unorganized plant increases the deployment of manpower for
internal transportation, WIPs, searching and rearrangement.
It also observed that in Less organized plant with old layout, overshoots the inventory cost,
overproduction, used WIP, scraps and wastages. Sometimes, old layout is unsafe for chemical
processing plants and sharp cutting materials plants.
A sample Plant Layout study is enclosed for comprehending the considering and estimating factors
before designing an Economic Layout. Cellular manufacturing is also important option for the
entrepreneurs who want to extend plant, design new plant and addition of new production Lines.
Self-assessment questions
Reengineering is the fundamental rethinking and redesign of business processes to achieve dramatic
improvements in critical, contemporary measures of performance, such as cost, quality, service and speed;
Hammer & Champy, 1993.
A specific ordering of work activities across time and space, with a beginning, an end, and clearly identified
inputs and outputs: a structure for action; Davenport, 1993.
In any manufacturing and business organization, processes are the series of connected activities & sub-activities
or operations followed for the products, outputs, completion of a task, jobs, services and projects etc. as per the
target & customer’s requirements. Important aspects of a process are process flow, internal & external processes,
control of processes, controlled & uncontrolled process, process owner and process effectiveness & efficiency
etc. Within these aspects, other areas related to it are the system & method of selecting correct process and
follow these processes, correctly execution without any failure & deviation, process improvement and its control
& monitoring. Processes are evaluated as value added process, non-value-added process from the customer’s
end, process cost and business value addition from the management. Comparatively improved manufacturing
industry in smart shop floor, most of the processes are fixed as per SOPs (Standard Operation Process) for
continuous & regular productions but in periodic & customized productions, the operations are flexible.
When we say about process reengineering it is a strategic & managerial approach and combination of all
improvements for customer satisfaction and better business result.
PROCESS
Inputs (Inputs & Internal Products, Flow Units,
Outputs Network of Activities and Buffers)
In service and public sectors, where mass customers & citizens receives the services for various areas of their
necessities from the industries like banking, telecom, super market, hospitals, railways, public transports,
airways, education sector, government administrative services & various schemes; these are the industries where
the scope of Process Reengineering (PR) are comparatively very high.
It is observed that enormous process loss occurred due to manual process, variability in customer’s demand with
variation in process time. An IT intervention with better network facilities enables the industry to reduce the
process & customer inconveniences and process delay through some extend of standardizing the processes.
Identification of critical processes, engaging efficient & competent manpower and developing control system
would enable any organization to reduce the process time and delays. In working areas technical & process
experts and efficient process owners are the real assessor of the process who improves processes through their
innovations.
Process analysis on the basis of process architect & planning, cost, process owner’s competency, innovation is
still not widespread in Industries for elimination in non-vale added process for reduction in manufacturing and
service costs. Revolution in IT which are Industry 3.0 and latest Industry 4.0 is an automatic choice to reduce
many processes, reduces the customer’s effort and increase conveniences. Industry 4.0 which supports
automation is also more effective to reduce & control the processes.
For Engineering industries where aggregate processes & operations are high (may be more than 200nos.) with
various process or operation centers which passed through various sections & decision making centers, involved
various internal & external processes, where the scope and chances of process improvement through reduction &
modification of process are comparatively high and Process Reengineering is most effective for that
organizations.
Process Process
Managem Innovation
Processes of Process ent & to
Output & Time & Governan Improveme
Services Cost nt
o Q © © 1P?-
Process
Processes F l o w , Quality & _
Value Addition, Capability Rccn“n
Control & eering
Monito ring
Figure 124: Basics about Processes
Business Process Reengineering (BPR) and Business Process Management (BPM) are the approach that enables
the organizations to strategize for new market, products, customers and regions. For that reasons, internal
competencies & competitiveness are necessary in which role of BPM are recognized. Process could be
benchmarked only when it is studied, defined and standardized.
14.2 7 Enablers of BPM: The basic enablers and elements of processes together make the sustainable based
process management. The enablers are described in figure - 123.
Process Architecture It is adiscovery, understand! n g a n d do cumentation of an organization's
bus i n ess a n d related resources i n hierarchical levels
Process Mind Set: it is for creating a n environment, where t h e organization, its p e o p l e a n d the
groups are always conscious of t h e process i n which they participate
jocess apanriTrynrispaTenriaraDili T o r c i i s t o m cornmrcmenr&senricesTaevelopingTneTooIs
a n d skills required throughout t h e organization to i d e n t i f y , analyze, improve, i n n o v a t e a n d m a n a g e
business processes
Process Support: F o r providing support throughout the organization to develop, s u s t a i n and realize
process-based m a n a g e m e n t benefits
1) Value engineering/ analysis – NVA, BVA, VA, PVA (Process Value Addition)
2) Implementation of Lean Manufacturing Techniques for elimination of NVA (Non-Value Added) Operations
3) Value Stream mapping or value chain with value analysis
4) Process - Measurement, Validation and Capability Study
5) Continuous review and analysis of processes for change and management approval & facilities
6) Introduction of New Technology and productivity & quality improvement techniques
7) Progressive organization leadership and process governance
8) Strategy on resolution of business challenges and customer’s dissatisfactions
9) Continuous analysis of operations, activities, employee performance and training
10) Develop process owner’s responsibility on improvement & innovations and competency
11) TQM for sustainable quality and people participation
12) Drive it for entire organization for process improvement as a strategy and target
Continuous Analysis
V a l u e E n g i n e e r ! ng/
of Operations.
Analysis - N V A . B V A ,
Activities. Employee
VA.PVA (Process
Performance and
Value Addition)
Training
Introduction of New
Value Stream Technology and SustakiatdeQuality.
Mapping orValue Productivity & Quality and People
Chain with value Im prove m e n t T e chniques Participation
Analysis
In a smart factories and smart service system, the techniques used are Computer-Integrated Manufacturing
(CIM), Digital Modeling and Fabrication, Industrial Control System, Intelligent Maintenance Systems, Machine
to Machine, Predictive Manufacturing System, Cyber Manufacturing, SCADA, Service 4.0 and Simulation
Software, Cognitive computing (CC) etc.
The sub-system of CIM are Computer-aided techniques are used with required devices and equipment required,
Combination of Technologies and other Tools & Techniques.
Industry 4.0 is investment based PR which benefits the organizations in the areas of to develop Internal
Competitive Market for high mass production through Technology and Techniques, develops Smart Factory for
Smart Production System to win the competition through Next Generation Technology, defines the priority areas
for implementations, plan for phase-wise intervention areas in the selective areas, services and business models,
reliability and continuous productivity, IT security, Machine safety, product lifecycles, industry value chain,
online verification with control & monitoring, workers' education and skills and socio-economic factors.
Service 4.0 under Industry 4.0 assists the service-rendering sectors in 1) Quality of services, 2) Transportation,
communications and related areas, 3) end to end processes in retail trading and home deliveries, 4) process of
wholesale trading, 5) Banking, finance, insurance, and real estate, 6) Public services & general administration.
In an organization of standard business and manufacturing, the end to end process of business starts from
planning to delivery to the customers, after sales services with control & monitoring and corrective action of
customers’ feedback. Industry should for technology as the critical to the Business and Customers.
In a standard manufacturing process consists of various functions such as production Line with primary and its
supporting/ secondary functions etc., each functional area also consists with various activities and sub-process
which area important for Process Reengineering through Industry 4.0 interventions.
14.9 Process reengineering for better public services and country development
Implementation of Process Reengineering (PR) is also essential for the government administration and
implementation of various government schemes which are not completed on time and public not realized the
benefits as it is planned. PR is required for reduction in long process time, non-value-added processes, lack of
planning on process flows & execution, network of sub-processes and time of each process in the services to
citizens.
Define the responsibilities of the process owners, training for competency improvement and adoption of TQM
culture for quality & continuous improvement are methods for on time delivery of services & quality of
execution. Process standards and process instructions are also important with shared responsibility of process
owners and regular exercise on Root-Cause analysis for any extra process time & department’s waiting time with
corrective action on prevention of any repeated delays & impediments. Any government could save the project
administration & monitoring expenses, develop the effectiveness of the projects & schemes and better value
additions from the common citizens. Government could think to involve National Quality and Productivity
councils or experts for their process improvement and reduction in process cost which will be saving of public
money. In south Asian countries, it is observed that most of the government schemes are not implemented on
time and public used to this system. So, for developing countries, PR would be an effective Tool for better
services to the public and optimum utilization of national resources.
Process Reengineering starts from Product or process redesign, implementation of the redesign plans and
Process reengineering.
Redesignthe
Process as p e r i Validate t h e
Relatedto t h e Study and Implements * Improveme
Process. Implementatio tion * nts
Productsand n Planning
Here complete plant system modifications suggested as per customers’ delivery, work modifications in Time,
Quality and planned for Working tools improvement.
In handcraft Industry
Problem Statement
Industry and organization encounter the long-term hinderance of Delivery time and Quality. Artisans are
generations working in this Trade with traditional process, techniques and attitude. Very less study in conducted
at shop floor level to understand the process of working, techniques & tools, process / operations time & it’s
fluctuations, shop floor arrangements, problems of changes, customer’s expectations, continuous engagement
and encouragement.
This is a very important and most common pattern of problems in the SMEs of Total Production time, Quality,
Jobs & Operations sequencing, Operation times, category of workmen / artisans, categorizations of jobs for
better execution, patter of operations with fluctuation of times and documentations.
Note: The terminologies of the operations name used as per the reginal language, where English terms are not used or available.
Situational Analysis
It is realized the Balancing of operations with Internal, External and Internal but out of the Line. Artisans are not
technically experienced or trained how to improve the Total production / making time. Analysis is done in Three
following areas;
Internal and External process
Quality and Competency
Total Plant process on Customer’s, Business and Tools Design Planning
Improvement Plan
Improvement Plant are made in the following areas;
Distribution of Work
Process Time
Reduction Categorize of Manpower
System/ S h o p
Floor As per Customer, Business,
d evel o p ment with Market and even in working
Tools and Tools
Techniques
The study team analyzed, identified and recommended on the times of operations and executions.
Quality Dimensions
Root Cause Analysis on Delivery Time
Quality Improvement planning as per the identifications of the following problems;
Skills Avollobilliy
L a c k o f s k l l l e d a n d Trained Technicians at
\ Ui«±Vcndur Levd
1200
§
KOO
*
8
\
\
\
300
l\
Percent
8
600
8
400
200
o
0
Cl
C3
Bi Xire'
Mina's frame m a d e
as p e r design then plasterof O u t e r f r a m e desi g n
requirement parish a n d fitting by as p e r requirement
soldering as p e r Manpower- 02
Manpower- 0 1 design
L _ _ _[■>■*-= l~. I- I I- - l~l -I ___
Antic colour
Wire cutting then Reji ready; Wire cutting then Reji ready; Wire cutting then Reji ready;
Reji with Wire arrange on Reji with Wire arrange on Reji with Wire arrange on
black wax for design and black wax for design and black wax for design and
plaster of parish and fitting plaster of parish and fitting plaster of parish and fitting
by soldering as per profile bv soldering as oer profile by soldering as per profile
Mina's frame
made as per
design
To resolve these problems, an entire improvement, training and implementation plans are deigned. The complete
projects are not included herewith, rather only changed and modified Line design mentioned in pages of some
Items. Total 70 nos. of Two-Handed process flow developed; some are mentioned in this book.
S. N.
Goloka SUMMARY
Stitching Manpower
Lining + Helper - 1 2 , Fitter -06 TARGET
Counter 120 Pair/ Da
Machine m a n -06
Marking
1H
S. N.
Golaka
Stitching +
Hasia
Q <■i 1- r h i n n
S. N
Collar Stitching
Quarter Stitching
Collar+ Quarter
Stitching
Colla r+ Titkul Attachment
Counter + Quarter
Attachment
D. N.
Vamp + Titkul
Stitching
Counter
Stitching
I
D. N.
Facing
Stitching
Collar Satao
Stitching
s. N
Clothe
Stitching
+ Tongue
Stitching
? min
I
Cleaning
3H
LINE DESIGN, Article – 2059
SUMMARY
Manpower
Helper -16, Fitter -07
Components Machine man -06
D. N.
Counter
Stitch +
Back Strip
stitching-
Marking 2H
D. N
Vamp
Stitching
2 min
Counter Fitting
1F+1H - 2 min.
Back Strip Fitting
1F+1H - 1 min
D. N.
Counter
Lining + Plug
Final
Stitching-
Ghujia Fitting
1F+1H - 2 min
D. N.
Ghujia
Stitching-
1.5 min
Plug Pasting
2H - 2min
Final Pasting
2H - I m i n
S. N.
Final Elastic
Stitching -
1.5min
Cleaning + Finishing
2H
LINE DESIGN
Component
SUMMARY
Manpower
Helper - 1 5 , Fitter - 0 8
Machine man - 0 7
D. N.
Counter
Lining
Marking 2H
s. N.
Cloth Stitch
+ Final lining
Stitch + Final
Cloth stitch-
D. N.
Counter
Stitching +
Plug Stitching
Tongue Pasting + Final
Pasting
Counter Fitting
1F+1H - 2 min
D. N.
Hasia Stitching
2 min
Hasia Fitting + Vamp Fitting
2F +1H - 3min
Ghujia Fitting
IF +1H - 2min
S. N.
Vamp
Stitching
S. N.
Ghujia
Stitching - Eyelit Punch + Eyelit Fitting
2min
2H - 3min
Cleaning + Finishing
(Inclusive of the line)
LINE DESIGN
SUMMARY
Manpower
Helper - 2 0 , Fitter -05
Machine m a n - 0 5 Components
Marking 2H
s . N.
Sticker
Stitching-
2min
Sticker Fitting
2H - 1 min
S. N.
1 st Patti
Lining
Stitchina-
1 st Patti Bleed
1F+1H - 2 min
D. N.
3rd Patti
Stitching +
Final All 3 Patti Pasting I
6H - 3 min
Chakhao
I F - 2.5 min
D. N.
2nd Patti
Stitching + Final
Stitching - Final Fitting
1F+1H - 2 min
Final Pasting
2H - 2min
Patti Pehnana
2H - 3min
D. N.
1 st Patti
Stitching + Final
Stitching
Tarash
2H - 3min
Cleaning + Finishing
(Inclusive of the Line)
PFC OF THE LASTING SECTION
Work station V
Heat Shutter
Workstation VI
Ruffing
Time- 10.25 sec
CONVEYOR OF LASTING SECTION
Delastir
Time - 6.4
Without HC
PU
Work station VII
Woik station - XIV Workstation - VIII
Sole Press
Chiller, M - 02 Time - 17.16 sec
Garari
Without M/C
Time - 20.29 sec
Without M/C
AV. Production
1101.8 pair / day
Total Manpower Active
68 Person
Conclusion
Process management, improvement and reengineering are not so far extensively implemented in businesses for
identification of non-value-added processes & operations or planning & control of processes for cost and
completion time. It is observed that implementation of PR (process reengineering) to some extend for limited
industries in limited areas. Some industries use supply chain management for improving the delivery by
controlling the process and reduces the process delays but not use reengineering as a strategy for entire
organization.
Management and Bureaucrats should be more understandable and trained about the Process Reengineering and
its implementation for the benefits to their business, public services and make impact on products & services.
The productivity councils of the developing counties could include the Process Reengineering in their Training
programs and projects for industry and for enhancing in public sector efficiency.
SME C o r n e r
Process reengineering is the techniques used for modifications in process, control the process time
and re-orientation of the execution.
SMEs must do the process analysis continuously which will make them capable to improve the
process. The trained process expert is capable to do it. Many organizations solve the delivery
problems through process rearrangements with the existing techniques and technology
From the sample of some projects, few areas could understand by SMEs, but effective process
reorientation and apply it in execution, with required analysis and process details, unit may follow it.
Self-assessment questions
i) Why Process reengineering is important for efficient business and plant management?
ii) What are the 7 Enablers of BPM?
iii) How to do Process Mapping and Process Time?
iv) How to do the process compliance and make it competent?
v) What are the Reengineering techniques and technology?
vi) What is the Process reengineering through techniques?
vii) How it is possible to do process reengineering through Industry 4.0?
viii) What is the process of implementation of process reengineering in manufacturing industry?
c Chapter - XV
Modern Production Techniques
Industry 4.0
Techniques of making smart factory for cost effective and competitive manufacturing through the concept
of smart manufacturing in Industry 4.0
Recent years, most governments of the developed countries started establishing extensive planning with
execution for accelerating the use of the Industrial internet of Things (IIoT) technologies and smart analytics
technologies in manufacturing industries, consequently to improve the overall performance, customer driven
quality and controllability of manufacturing process. SM is the integration of all recent IoT, technological
advances in computer networks, data integration and analytics to bring more speed and transparency in factories.
Robot)
CS
Augm©
nted
Realif
y
Simula
♦ion lloT
Machi
ne
Intel I ig Cloud
ence
Big
Data
Strategy requires for selection of technology and techniques, steps of Implementation for making SF in various
scales industries like Small, Medium and Large and types like manufacturing, processing, pharmacy etc. for a
country.
Efficient and
Empowered
Manpower
Customer, Smart
Stakeholders Business
and Process
Competitiven
r
Smart Smart
Solutions in Technology
Problems & and
Workina l. Techniques Key elements of SF would be intelligent
machines with latest technology, facility fleets, network with advanced sensors, controls and software
applications.
Improved Process with Reengineering, always Improves the Processes & Times, equipped with Advance
Analytics; physics-based analytics, predictive algorithms, automation with deep domain expertise, Competent
people at work - higher Service quality, Augmented Reality in Maintenance and Smart Management System,
Artificial Intelligence are techniques of SF.
Figure 1 3 5 : Dimensions of Smart Factory
P r o d u c t Specific Strategy
Smart Manufacturing H
actoi
Plant |
F SMj
S m a r t , Competent | Q u a l i t y a n d Control Processl
People |
Best Q u a l i t y i n C h e a p e r Price
O p t i m u m Cost of
Production Plant
15.4 Imperatives of On-Line Quality and Productivity in Smart Factory, Making Digital Thread
The Digital Thread, using the digital thread, the entire manufacturing and production processes could be seen as
an integrated whole. The digital part of the manufacturing process can be sub-divided into various Layers. These
are, Delivery Layer comprises devices that provides delivery of digital information to the individuals.
Operations Layer comprises, the virtual factory that the entire physical plant layout represents digitally. The
process of material flow between stations in the physical factory is equated to the process of information flow
between the virtual stations. Every machine in the physical factory is represented by a “digital twin” (a 2D or 3D
model of the physical machine with the capability to digitally analyze its structure, performance, inputs, process,
outputs, etc.) in a virtual factory.
Devices Layer comprises all of the lower level control software (programmable logic controllers) that collect
raw data from equipment, sensors, etc. Application Layer, comprises the higher-level software that performs a
certain function across multiple machines and production lines, such as, production scheduling, traceability etc.
Systems Layer, the layer that manages hardware and provides a platform for application software. Application
Software needs the system software for its execution (source: APO, Japan).
S m a r t Lean Factory
Ime? 5 peerd
Data
Manpowe
Material Quality Monitor-in
Commitm
of Output
T rend
Controlled Balanced
Validated Trained
towards
| Controlled! Assured igherOEE Shared
Process,
Inventor/ I M/c. Responsihil
stan rJiz
! ± l Preserved
Managed
Qualify a n d
Critical
I ity
Monitored
Figure 137: Aspects of Lean Smart Plant for Efficiency and Effectiveness
Plan Maintenan
Planning
Develop me
Marketing Production
ind
nt
& Sales Services
Forecastin Distributio
g methods n planning
Figure 138: Identifications of the primary activities and business functions that empowers through Industry 4.0 technologies (source: Industry 4.0
by CGI Manufacturing)
PHASE – I: It would be a study-based planning as the existing critical & constraint areas of outputs, business,
market & customers. Criticality areas are related to business, customer, quality and constraints of speed,
delivery, supply chain etc., cost of initial investment, cost benefit analysis, return on investment, design the
possible areas of improvements in technology and application of digitization, phase-wise implementation
planning from short to long-term. Develop internal implementation process & implementation flow chart with
time limit with monitoring.
PHASE – III: Phase-wise implementation sustainability with scalability and continuous improvement of the
implemented areas with sustainable businesses.
Digitization in total quality, reengineering, digitized data & records, manage the big data on total business,
planned improvements in eliminations of wastages - PDCA cycle & value engineering, artificial intelligence,
robotization, customer driven individual roles will be in final stages of SF.
15.6 Industry 4.0 Readiness Check Points
The Industry 4.0 Readiness check Points prepared by the expert for self-assessment of the industry / company for
enabling them planning for the improvement through preparedness in technology, techniques, process,
digitization etc. The unchanged version of the expert’s descriptions is mentioned in the below tables.
Table No. 97: Industry 4.0 readiness check points, product and services
Readiness Level 1 Level 2 Level 3 Level 4
Marks
level Beginner Intermediate Experienced Expert
Product Product allows Majority of Products can Late
customisation for no products are be largely differentiation
individualisation, made in large customised but available for
standardised batch sizes still have most make-to-
mass production with limited standardised order products
late base (batch size 1
differentiation
Digital Products show Products show Products Products
features of only physical value only exhibit some exhibit high
products value from digital features digital features
intellectual and value from and value from
property intellectual intellectual
licensing property property
licensing licensing
Data-driven Data-driven Data-driven Data-driven Data-driven
services services are services are services are services are
offered without offered with offered with fully integrated
customer little customer customer with the
integration integration integration customer
Level of Data is not used 0-20% of 20-50% of More than
product data collected data collected data 50% of
usage is used is used collected data
is used
Share of Data-driven Data-driven Data-driven Data-driven
revenue services account services services services play
for an initial account for a account for a an important
share of revenue moderate share significant role in revenue
(<2.5%) of revenue share of (>10%)
(2.5-7.5%) revenue (7.5-
10%)
Table No. 98: Industry 4.0 Readiness Check Points, Manufacturing and Operations
Readiness Level 1 Level 2 Level 3
level Beginner Intermediate Experienced
Level 4 Expert Marks
Some
Most machines
machines and Machines and
Few machines and system
system systems can be
can be infrastructures
infrastructures controlled
Automation controlled can be
can be completely
through controlled
controlled through
automation through
through automation
automation
automation
Machine and Machines and Machines and Machines and
operation Machines and
systems have systems are to systems are
system systems are
no M2M some extent partially
integration fully integrated
capability interoperable integrated
(M2M)
Machines
Significant already meet
Some Machines and
Equipment overhaul some of the
machines and systems already
readiness for required to requirements
systems can meet all future
Industry 4 meet Industry and can be
be upgraded requirements
4 model upgraded
where required
Autonomously
guided Autonomously
Autonomously Autonomously
Autonomously workpieces guided
guided guided
guided are not in use, workpieces
workpieces workpieces are
workpieces but there are used in
are not in use widely adopted
pilots selected areas
underway
Self-
optimising
processes are
Self- Self-optimising
not in use, but Self-optimising
Self-optimising optimisation processes are
there are pilots processes are
processes processes are used in
in more widely used
not in use selected areas
advanced
areas of the
business
Complete
Some
Most processes digital
Digital No digital processes use
use digital modelling used
modelling modelling digital
modelling for all relevant
modelling
processes
Data is
Comprehensive
collected
Required data Comprehensive automated
manually
Operations is collected digital data digital data
when
data collection digitally in collection in collection
required, e.g.
certain areas multiple areas across the entire
sampling for
process
quality control
Data is
Comprehensive
collected
Required data Comprehensive automated
manually
Operations is collected digital data digital data
when
data collection digitally in collection in collection
required, e.g.
certain areas multiple areas across the entire
sampling for
process
quality control
All data is used
Some data is
Data is only not only to
used to control
used for Some data is optimise
Operations and optimise
quality and used to control processes, but
data usage processes, e.g.
regulatory processes also for
predictive
purposes decision
maintenance
making
Cloud solution Cloud Initial Pilot solutions Multiple
usage solutions not solutions implemented in solutions
in use planned for some areas of implemented
cloud-based the business across the
software, data business
storage and
data analysis
IT security
Comprehensive solutions have
IT security been
IT security solutions have implemented
IT security
IT and data solutions have been for all relevant
solutions are
security been partially implemented areas and are
planned
implemented with plans reviewed
developed to frequently to
close any gaps ensure
compliance
Table No. 99: Industry 4.0 Readiness Check Points, Strategy and Organization
Readiness Level 1 Level 2 Level 3 Level 4
Marks
level Beginner Intermediate Experienced Expert
Industry 4 is
recognised Industry 4
Industry 4
at strategy has
strategy has
Degree of departmental Industry 4 is been
been
strategy level but is included in the communicated
implemented
implementation not business strategy to the business
across the
integrated and is widely
business
into the understood
strategy
Business
Industry 4 metrics and
Structured set of metrics ae personal
KPIs are not
business metrics widely development
focused
Measurement exist, with some understood in plans are
around
measurement of the business and focused
Industry 4
Industry 4 drivers used in monthly around
reporting Industry 4
objectives
Initial
Industry 4
Industry 4 Industry 4 Industry 4
investments
investments investments in investments in
Investments across the
in one more advanced multiple
entire
business business areas business areas
business
area
Developed
Employees
Technology digital and data Leading edge
have little or
focused areas of analysis skills digital and
People no
the business have across most analytics
capabilities experience
employees with areas of the skills across
with digital
some digital skills business, e.g. the business
technologies
production
Departments
There is limited are open to
The business Departments are
interaction cross
operates in open to cross
Collaboration between company
functional functional
departments, e.g. collaboration
silos collaboration
S&OP process to drive
improvements
Widespread
Leadership team
support for
Leadership recognise the
Industry 4
team do not Leadership team financial benefits
within both
recognise are investigating to be obtained
Leadership the leadership
the value of potential Industry through Industry
team and
Industry 4 4 benefits 4 and are
across the
investments developing plans
wider
to invest
business
No ongoing
Annual Quarterly
review of
No sizeable cost/benefit cost/benefit
cost/benefit
Finance Industry 4 analysis of analysis of
analysis for
investment Industry 4 Industry 4
Industry 4
investment investment
investment
Table No. 100: Industry 4.0 Readiness Check Points, Supply Chain
Readiness Level 1 Level 2 Level 3 Level 4
Marks
level Beginner Intermediate Experienced Expert
Inventory Computer
control Inventory
database is used Computer database
Real-time database
which is used with smart
using real- levels are
manually updated devices updating
which is updated
understood by smart devices
time data with inventory inventory levels
management levels
Fully integrated
Basic Data transfer
Ad hoc systems with
Supply reactive
communication between key
suppliers/customers
and data sharing strategic
chain communication
where required suppliers/customers
for appropriate
with suppliers processes (e.g.
integration and customers
with suppliers (e.g. customer
real-time integrated
and customers inventory levels)
planning
Site location,
Site location,
capacity, inventory
capacity, Site location,
Supply No integration inventory and capacity, inventory
and operations are
visible in real-time
chain with suppliers operations are and operations are
throughout supply
or customers visible between visible throughout
visibility first tier suppliers supply chain
chain and used for
monitoring and
and customers
optimisation
Moderate Moderate response Immediate
response to to changes in response to
Supply Slow response market changes market changes in market
chain to market and general environment and environment and
changes customer individual individual
flexibility requirements customer customer
shifts requirements requirements
Improvements Some
Long materials Differentiated
have been improvements have
lead time stocking policies
identified to been implemented
Lead times resulting in
reduce lead times to reduce lead
and lead times to
high inventory meet make-to-order
for some times on key
levels efficiently
materials materials
Table No. 101: Industry 4.0 Readiness Check Points, Model of Business Planning
Readiness Level 1 Level 2 Level 3
Level 4 Expert Marks
level Beginner Intermediate Experienced
Aware of High awareness ‘As a service’
‘As a
concept with and has been
service’ No
some initial implementation implemented and
business awareness
plans for plans are in is being offered
model
development development to the customer
Some data is Most data is
analysed and analysed and the All relevant data
Data is not
Data driven features in key result is is analysed and
widely
decisions business reports considered when informs business
analysed
to review making business decisions
performance decisions
Product can be
Product can be tracked through
tracked as it manufacturing Product can be
Limited
Real-time moves between and distribution tracked along the
product
tracking manufacturing until it reaches complete
tracking
and internal the customers lifecycle
distribution sites distribution
centre
Some machines Machines are
Some machines
Equipment are self- generally self-
alert operators of
is manually diagnosing, diagnosing and
Real-time a performance
maintained automatically the maintenance
and issue which
in line with passing schedule adjusts
automated enables them to
the information to itself based on
scheduling manually
maintenance the maintenance real time data
schedule a
schedule scheduling inputs from the
maintenance task
system machine
Integrated
Online Integration Integrated
customer
Integrated presence is within the online channels and
experience
marketing separated and offline individualised
management
channels from offline channels but not customer
across all
channels between them approach
channels
Main
Some areas of IT systems
business Complete IT
IT the business are support all
process support of
supported supported by IT company
supported processes but not
business systems and processes and
by IT fully integrated
integrated are integrated
systems
Table No. 102: Industry 4.0 Readiness Check Points, Legal Consideration
Readiness Level 1 Level 2 Level 3
Level 4 Expert Marks
level Beginner Intermediate Experienced
Contracting Some changes to Some 'flagship' projects All contracting is
Contracting processes contracting utilise new contracting behavioural and
are linear processes to reflect models but it is not incentivises all parties
models and operational standard across the to achieve the best
unchanged changes board result
Working party has
New risks New risks New risks identified
assessed the changing
not identified and/or and assessed, and
Risk identified or assessed but no limited mitigations put
risk profile and has
procedures in place to
assessed mitigations planned in place
mitigate these
Good understanding Conducted a recent
Have internal
No data with robust policies and General Data Protection
Data policies but do not
protection procedures but haven't Regulation audit and
ensure compliance
protection policies or updated for General are confident of
in engagement with
procedures Data Protection compliance including
suppliers/customers
Regulation in light of Industry 4
Intellectual property in Intellectual property in
Intellectual Awareness of
products and services is products and services is
property in intellectual
identified and in part identified and
new property in new
Intellectual assessments made as to assessments made as to
products products and
whether whether
property and services services, but no
registrations/contractual registrations/contractual
is not legal protections
rights required, and if rights required and, if
identified or identified or
required, appropriate required, appropriate
protected applied for
steps taken steps taken
15.7 Benefits of Smart Factory and Industry 4.0
There are immense benefits of SF from creating safe environment to product & service quality, reduced times,
total supply chain, total services to customers for business and optimum utilization of all resources. System
Efficiency and Effectiveness are means SF.
Most of the leading automobile industries transforming towards smart manufacturing for the global
competitiveness and market advantages with domination. As per PwC study, 59% of manufacturers in the United
Stated (US) are currently using some sort of robotics technology, mainly in the automotive industries for
assembly and machining applications.
SF is so far not extensively progressed in SAC countries except some MNCs and their suppliers. Now it is at
awareness and understanding stages in world-wide through Hi-tech industries. In five leading Asian countries are
also leading in making smart factories. Cost of automated technologies in SM with comparison of Labours cost,
non-availability of digitized manufacturing techniques, problem of initial investment, market risk, lack of
awareness of the entrepreneurs, absence of sector-wise govt. study etc. are the factors for slow progress of SF for
smart manufacturing in developing countries. It is manufacturing of tomorrow, so there is immense opportunity
of SF implementation in global manufacturing industries.
SME Corner
Industry 4.0 is the next generation manufacturing strategy and a method of technological change for
competency in the global market and industry. It advocates radical process change and industrial
revolution, through techniques of production, control and monitoring. It is a change in dimension of
the production, materials planning for best method of business for direct and instant communication
to the customers.
The unchanged version of the expert's descriptions on the readiness of the Industry 4.0 is enclosed
to verify the standing of the factory to introduce the smart manufacturing techniques.
Before implementation and investment on smart manufacturing, factory must make the smart
factory in the existing set up with the techniques for best quality, best price and on-time delivery.
Self-assessment questions
1. Requirement Analysis: as per existing gap as per customer, market and business
2. Improvement Planning: plan for improvement with the production people from workplace
3. Base the plan with employee information, involvement and improvement
4. System improvement depends on technology and techniques and management
5. Make foundation/ set up of the organization with continuous progress
6. Start the culture of quality and value-based thinking in the system
Open ere<<
Blind »pot
or Arona
Not known
toothers
Hidden area
Unknown
or f a c a d e
The Johari window is a technique that helps people for better understand their relationship with themselves and
others. It was created by psychologists Joseph Luft (1916–2014) and Harrington Ingham (1916–1995) in 1955,
and is used primarily in self-help groups and corporate settings as an experimental exercise.
This quadrant of the Johari window shows the state of an individual known to him but not known to the others.
Essential W h a t t h e Gusto n
imple
Productivity, Quality, I
and process i r m a n c e . W a s t a g e nedi md
1
R e q u ire d c o u ntry- w i s e c u s t o m e rs
n e e d o f s t a n d a r d s a n d Test
From the above description, one could understand the points that, it is observed in all customer requirements
related, industry and obvious related improvements are essential to the companies for improvements. But the
most important improvements are technical and process related which directed towards the productivity, quality,
efficiency and cost reduction. In next pages some planning areas of improvements are suggested for industry.
Basic Plant necessities: Data, Documents, Records, Formats, check points, analysis and planning etc.
Essential Technical Improvements: 5S, Kaizen, Time of Operations and Calculation of Productivity and
Quality etc.
Natural Techniques: What the workmen, operators do for improvement in working, time and workplace
arrangement and Internal modifications as per customer’s requirement or visit.
Leyel of Techniques
_ _J-, _
Basic Plant] Technical Natural Planned of State of the
Improvement high-level art
Necessities Techniques Techniques technology
State of the art technology: Interventions of new technology, automation, digitization, Robotics in work, could
computing SCADA (supervisory control and data acquisition) or journey towards Industry 4.0 etc., are the latest
technologies.
16.8 Intrinsic problems of the Plant and industry on efficiency
It is discussed in the initial chapter in the gaps of the MSME sectors, various regions have specific and different
problems.
1. Understanding about the Plant
2. Limited Focused areas on Customer, Plant, production and efficiency
3. Over-focused on profit
4. Cost, quality and price are not highlighted
5. Skills and competency
6. Wastage and Non-value additions
7. Techniques of manufacturing and production
8. Entrepreneurship in business
9. Customer-centered production/ manufacturing planning
Types of Planning
Investment
S h o r t Term Long Term Based
Stage – I
1. Readiness and encouragement from management
2. Basic and preliminary data, records and information points
3. Primary Information to identify the problems
4. Line, Production and products / item / units etc.
5. Identify the areas of improvements (productivity with targeted quality)
Stage – II
1. Analysis the problems
2. Prepare all technical methods for application
3. Make out suggestion for implementation
4. Product testing and verification points from customers
Stage – III
1. Awareness of the problems
2. Apply implementation planning
3. Implementation of the primary problems
4. Short terms training
Discipline
i) Discipline in the material handling
ii) Discipline in quality
iii) Disciplined attitude towards involvement
iv) Time of working
Activities – Visual of Lean Activities
Methods under Lean implementation/ wastage reduction
1) Visual board must be at each unit
2) Display about Lean Teams
3) Display of Lean activities and achievements in the month/ quarter in unit’s visual board
4) Display the technical activities completed under lean with achievements in the visual board
5) Priority on supervisors’ and workers’ views
6) Best, New suggestions/ Kaizens at the unit level
7) Focus on best achievements
Practicing areas – I
1. Cleaning the working place in the shop floor
2. Meeting with Groups
3. Feedback/ easy flow of information
4. Reorientation of the Line working
5. Practice of Target in every day
6. Target Reducing rework in every day basis
7. Trust and confidence among workmen
Practicing areas – II
1. Alternation of the Lines / Cellular manufacturing, where is required for adjustment of the Lines
2. Sitting arrangements with directions as per the Flow and study-based line design
3. Not gathering unnecessarily in the workplace or in front of the supervisors
4. No. additional Item in the lines ( a list of minimum items which should be in the lines is enclosed)
5. Cleaning Drum/ dust bins in a periodic gap in the sections / Lines
6. Selection of the Best workers and use in a critical areas / activities / operation to estimate & upkeep the
production standard
7. Changes of the supervisors in different Lines/ working areas, Job Rotations
8. Apply Skills upgradation techniques
9. Constant discussion and meeting with supervisors for Improvement
Supervision - I
1. Cleaning the space of work
2. Use of all tools and equipment, machines for production and changeovers
3. Workmen / operator’s discipline, disharmony and overstressed
Supervision - II
1) Keeping view of Materials movements
2) Making Lots (when applicable), product-wise scheduling
3) Manpower availability and absence-based planning and information Time office or HR
4) Basic Recording keeping process are maintained or any deviation
5) Machine speed, any kind of abnormalities, scope of further improvement and workmen encouragement
Other Items
1. Water Bottle
2. Tiffin Box etc.
How to keep the factory is on right path; true path for incessant journey.
System
i) Ensure the best place to work
ii) Availability of RIGHT information at right time
iii) Resource at right place
iv) Technical machinery is using with availability
Process/ Operation
i) Uses right process to produce products and services
ii) Production system are correct
iii) Corrective tools for customers’ satisfaction
Manpower
i) Right Skills and Competency
ii) Right Attitude
System with correct techniques -> efficient organization
SME Corner
In important note to the industry, particularly to SMEs; PI, start the improvement and planning for it
immediately.
Don't wait for special day or occasion to start.
Make the Team for productivity and improvement, encourage and involve all individuals.
Improvement not always required high technical knowledge, rather simply thinking and continuous
involvement like Japanese. There is no easy way to do right thinking in difficult times and take the
easy and simple method for difficulties. There various discussion on improvement are repeatedly
highlighted in various chapters, but start with any of the techniques which the plant most required
and best to understand.
Management and owner are the first person to start any initiative.
36-37 10
Min.
2 8
Min. Min
Slow Fast
1 2 7
Choco Min. Min Min. 5 1 16 3.75 30 534 16.02 25.92
Slow Fast Slow
Mixing 3 7
M/c-1 , Min. Min
Line 1 Slow Fast
36-37 10
Min.
2 8
Orange Min. Min
Slow Fast
36-37 10
Min.
2 8
Alichi Min. Min
Slow Fast
Mixing 3 4 3
40.8- 10
M/c-2 , Marie Min Min. Min 6 2 18 3.33 26.66 700 186.66 36.4
40.9 Min.
Line 2 Fast Slow Fast
Process: Mixing Area, Line - 3
Table No. 12: Study of Mixing Area, Line - 3
Line – 3: Mixing Area
No. of Wt.
Dry Other Other Total
No. of Batch/ /Capaci
Line Mixing Mixing Total Mixing Mixing Weighments Time - Time - Batch
Product Name Batch/ Shift Per
No. M/c Temp. Time/ Machine Time Time Sec.) Loading Unloading Time
Hrs. (8 Batch
(Sec.) (Sec.) (Sec.) (Min.)
Hrs.) (kg)
Weight 4 Min.
Mixing Fast
Lin 8.5
CHOCOFILL
e– Dry 20-25 Min 3 Min. 420 180 13 80 21 5.84 46.72 36
S
3 Mixing . Medium
Final
1.5 Fast
Mixing
|MultifLjtt| PotybK
SealinglUnOM|
SZ J”""’
ir!
iids 1010 52 1420.0 ster
iim 1140 BM.O 12j0 fS.1I
M1|41gm| 1152 12 I 138 12-0 7R67 Proper:
MP4-1-------------
|*3|4t 3 m| 112 Ulttynl 1140 MO.D 12.0 S*mj
NOTE: Balancing of the Output of M/c 19 would be reviewed with M -1 & M - 3. Manpower Utilization is Calculated as per the Study Based
Proposed Manpower. For Clarity of the CT & PN Sheet, Pl. follow the Excel Sheet submitted by study Team
Manually Chute Filling (MP4 -1 & 2) and ABM
Table No.17: Manually Chute Filling
Only For Manually Chute Filling (MP4-1 & 2) and ABM
Lines -1 Standard Wt. - 41 & 82 g m Cream-Bounce
No. of Proposed Total
No. of Chutes
No. of Biscuits Manpower Biscuits/ Existing
Feeding Position Manpower Proposed
Operations Biscuits per Output/ Mints. In No. of Remark
per - Utilization Manpower
Feeding Manpower Min. (In the Manpower
Mint. Nearest
per Mint. Nos.) Convey or
Reliever
Required
for the
worker
Chute
16 95 1520 15200 12539.8 82.499 10 working
Feeding
near
cooling
conveyor
pillar.
Annexure – II
Recommendation is supported by Time Study Summary sheet details (as per the WS Norms)
The Recommended Manpower is applicable for a Single Shift of 8 Hrs. These TSS (Time Study Summary) developed through Videos of the
Activities with Manual Observation. An Adjustment of 5% Time Allowance is given Standard Time of every Operation. Decision on no. of
Reliever is flexible and its final decision is exclusively depending on Top Management discretion.
Manpower with
Manpower
6.5 Hrs Working
Hrs Work
and relieve of
Packing Standard 8Hr relieve of
S. M/C- Type of Weight Video TSS 1.5hrs
Speed Section BPH Standard Size Time Packed
No. No. packing (gm) No. No.
Capacity (Sec) Box/Tray Stnd.
1 MP 8 MP 1 MP 8
Hr P with Hr P
Reliever R
P-
1 52 240 16 T 43200 600 Box wP 8ml 21 256 576.00 91.41 6.30 98.44
002
P-
2 54 8T 21600 704 Box wp 5ml 23 504.14 245.45 46.42 5.29 49.99
003
P-
3 54 8T 21600 600 Box Wp 15ml 24 344.45 288.00 67.93 4.24 73.16
010
P-
4 55 7D 6480 24 Box wP 750ml 34 47 2160.00 497.87 4.34 536.17
008
P-
5 36 12 D 12000 24 Tray 500gm 38 22.3 4000.00 1049.33 3.81 1130.04
009
6ml P-
6 53 150 10 T 27000 585 Box WT 46 302.59 369.23 77.33 4.77 83.28
Squr 013
P-
7 32 9D 7320 20 Tray 1000gm 115 28.48 2928.00 821.63 3.56 884.83
014
P-
8 51 101 9D 12120 70 Box WP 180 ml 116 112 1385.14 208.93 6.63 225.00
016
P-
9 44 111 10D 13320 56 Box 485 252 119 66.62 1902.86 351.25 5.42 378.26
015
P-
10 51 85 6 7,650 50 Tray 180ml 239 48.62 1224.00 481.28 2.54 518.31
017
P-
11 44 114 10 D 13680 46 Box 450ml 242 54.15 2379.13 432.13 5.51 465.37
018
P-
12 42 184 12 T 33120 416 Box 30ml 244 193.35 636.92 121.02 5.26 130.33
012
P-
13 43 170 12 T 30600 126 Tray 60ml 245 49.71 1942.86 470.73 4.13 506.94
011
650ml P-
14 41 97 10D 11640 32 Tray 246 37.14 2910.00 630.05 4.62 678.51
Beer 021
P-
15 36 138 12 D 16560 33 Box 500ml 206 247 33.41 4014.55 700.39 5.73 754.27
019
16 35 103 10 D 12360 60 Tray 100ml 162 249 P-20 33.55 1648.00 697.47 2.36 751.12
P-
17 32 108 10D 12960 32 Tray 400gm 252 22.17 3240.00 1055.48 3.07 1136.67
025
P-
18 43 170 12T 30600 228 Box 60ml 67 255 147.74 1073.68 158.39 6.78 170.57
024
P-
19 44 115 10D 13800 35 Tray 450ml 256 256 28.22 3154.29 829.20 3.80 892.98
023
P-
20 55 88 9D 10560 40 Box WS 375ml 250 65.94 2112.00 354.87 5.95 382.17
026
P-
21 33 20880 540 Box Wp 20ml 27 254 338.08 309.33 69.21 4.47 74.54
027
232 8+8T
P-
22 33 20880 692 Box WP 9ml 19.5 260 275.64 241.39 84.89 2.84 91.42
028
P-
23 34 103 8D 12960 60 Tray 180ml 140 258 31.89 1728.00 733.77 2.35 790.22
029
P-
24 31 61 9D 7320 20 Tray WS 750ml 514 259 40.79 2928.00 573.67 5.10 617.80
030
P-
25 55 88 8D 9381 40 Box WS 375ml 286 257 61.79 1876.20 378.70 4.95 407.83
031
P-
26 52 240 21600 600 Box Wp 8ml 22 261 211.79 288.00 110.49 2.61 118.99
032
8+8T
P-
27 52 224 20160 960 Box WT 5ml 14.5 240 578.17 168.00 40.47 4.15 43.59
022
P-
28 42 168 12T 30240 416 Box Wp 20ml 32 269 171.05 581.54 136.80 4.25 147.33
034
P-
29 43 172 12T 30960 104 Tray 46ml 53 270 50.43 2381.54 464.01 5.13 499.70
035
30 32 106 10D 12720 106 Box 200ml 140 272 P- 68.89 960.00 339.67 2.83 365.80
—036
P-
31 53 150 10T 27000 560 Box Wp 12ml 25 273 251.18 385.71 93.16 4.14 100.33
037
P-
32 34 60 7D 10800 46 Tray 180ml 190 274 36.83 1878.26 635.35 2.96 684.22
038
P-
33 31 63 9D 7560 24 Tray 750ml 485 278 24.19 2520.00 967.34 2.61 1041.75
039
P-
34 53 148 10T 26640 143 Tray(Ex) 10ml 25 262 60.39 1490.35 387.48 3.85 417.29
040
35 44 106 12D 12720 48 Tray 456gm 270 288 50.16 2120.00 466.51 4.54 502.39
36 42 182 12T 32760 512 Box WP 10ml 88 292 218.81 511.88 106.94 4.79 115.17
P-
37 43 172 12T 30960 104 Tray 46ml 53 270 50.43 2381.54 464.01 5.13 499.70
035
38 32 118 10D 14160 24 Tray 25gm 82 295 14.23 4720.00 1644.41 2.87 1770.91
39 33 224 16T 40320 450 Box WP 25gm 29 296 200.94 716.80 116.45 6.16 125.41
40 51 114 10D 13680 63 Box WS 180ml 160 300 75.78 1737.14 308.79 5.63 332.54
41 34 70 7T 12600 53 Tray 180ml 157 301 31.04 1901.89 753.87 2.52 811.86
42 36 136 12T 16320 33 Box 500ml 200 302 31 3956.36 754.84 5.24 812.90
43 55 95 10D 11400 42 Tray 375ml 259 303 42.37 2171.43 552.28 3.93 594.76
44 53 150 10T 27000 896 Box WT 6ml 25 304 521.03 241.07 44.91 5.37 48.37
P-
45 43 178 12T 31860 312 Box WP 32ml 50 305 168.03 816.92 139.26 5.87 149.97
045
P-
46 35 110 9D 13200 24 Tray 200gm 154 306 15.17 4400.00 1542.52 2.85 1661.17
046
P-
47 31 60 8D 7940 18 Box 1000gm 308 29.78 3528.89 785.76 4.49 846.21
047
P-
48 32 68 7D 8160 24 Tray 200gm 310 18.71 2720.00 1250.67 2.17 1346.87
048
P-
49 55 95 10D 11160 40 Tray 375ml 312 48.39 2232.00 483.57 4.62 520.77
049
P-
50 42 182 12T 32760 452 Box WP 18ml 311 210.07 579.82 111.39 5.21 119.96
050
P-
51 31 71 9D 8520 45 Box (L,P) 300ml 367 40.26 1514.67 581.22 2.61 625.93
051
P-
52 33 188 8T 16920 252 Box WP 30ml 369 117.6 537.14 198.98 2.70 214.29
052
P-
53 36 81 8D 9720 32 Tray 650ml 370 28.55 2430.00 819.61 2.96 882.66
053
P-
54 54 248 8T 22320 620 Box WP 7ml 372 479.98 288.00 48.75 5.91 52.50
054
P-
55 54 248 8T 22320 580 Box WP 15ml 398 228.48 307.86 102.42 3.01 110.29
055
P-
56 34 73 7T 13140 59 Tray 200ml 406 35.64 1781.69 656.57 2.71 707.07
056
P-
57 53 150 10T 27000 715 Box WT 6ml 407 314.08 302.10 74.50 4.05 80.23
057
P-
58 33 165 14T 29700 250 Box WP 30ml 411 126.02 950.40 185.68 5.12 199.97
058
P-
59 35 108 9D 12960 55 Tray 180ml 412 30.6 1885.09 764.71 2.47 823.53
059
P-
60 43 160 12T 28800 258 Box WP 45ml 414 127.35 893.02 183.75 4.86 197.88
060
Recommendation
1. Pl. Make a Policy to Train and/or Orientation to the New Packers who will join in the Lines before Start the Work. The Orientation will be Do
and Don’ts in the Shop Floor and Work Instructions to Retain the Efficiency Level and reduce the Efficiency loss of the New Workers. Make a
policy of the % of new packers in the Lines with the Work Contractors (i.e. - not more than 20% new Manpower in a year in the Packing
areas).
2. Form SMT (Self Management Team) of the Workers of some Workstations to look after the mutual problems in time of Duty in shop floor. It
will help the Workers about the small adjustment of the Time without any interruption in Work.
Annexure - III
KAIZEN SUGGESTION SHEET
Ideas will be collected on given sheet.
Suggestion Idea:
Suggestion Box
Action Proposed
S. Problem Identified Action to Action Target
by Maintenance Responsibility Dept. Status
No. Statement Causes be Taken Taken Date
Dept
Result Area P Q C D S M E
Kaizen Unit
Kaizen Idea: Logo
No.: Applicable Name:
Tick (√)
Kaizen Theme: Idea (Logical Correlation with Root Target:
Cause) :
Problem Status : Kaizen Start dt:
Pictures/ snapshot
Before: Kaizen Finish dt:
Team Members:
Analysis on R-C:
Results:
I
i
13 14.0 15.00 E
14 13.0 15.00
15 14.0 14.00
16 14.0 13.00
17 15.0 14.00
18 14.0 13.00
19 13.0 14.00
20 13.0 13.00
TOTAL 272.00 279.00
No. o f obsv 20.00 20.00
AVG 13.60 13.95
RATING 90.00 90.00
BASICTIME 12.24 12.56
FREQUENCY 7.00 7.00
ALLOWANCES 0.05 0.05
Other Adjustment 15.57 14.24
STAND. TIME 15.08 15.22
PN Per ST 3.98 3.94
CT Per Biscuits 1.88 1.90 STUDIED BY :
Remarks: CHECKED BY:
Bibliography and sources:
1) Remaining Management; Putting Process at the center of Business Management, By Roger Tregear Forwarded by Micheal Rosemann
2) Managing Business Process Flows; Principals of Operation Management, By Ravi Anupindi, Sunil Chopra, Sudhakar D. Deshmukh, Jan A.
Van Mieghem, Eiten Zemel
3) Jump up Kalpakjian, Serope; Schmid, Steven (2006), Manufacturing engineering and technology (5th ed.), Prentice Hall,
p. 1192, ISBN 978-7-302-12535-8.
4) Jump up "Cyberthreats, Vulnerabilities and Attacks on SCADA Networks"(PDF). Rosa Tang, berkeley.edu. Archived from the
original (PDF) on 13 August 2012. Retrieved 1 August 2012.
5) Working Paper, No. 01 / 2015; Design Principles for Industrie 4.0 Scenarios: A Literature Review By Hermann, Mario, Pentek, obias*, Otto,
Boris
6) Digital Transformation Monitor, Germany: Industrie 4.0, January 2017
7) https://en.wikipedia.org/wiki/Industry_4.0
8) White paper on Industry 4.0, Making your business more competitive, by CGI Expert, cgi.com or info@cgi.com
9) Dvorak, Paul. "Poka-Yoke Designs Make Assemblies Mistake-proof." Machine Design, 10 March 1998, 181–184.
10) Evans, James R., and William M. Lindsay. The Management and Control of Quality. South-Western Publishing, 2004.
11) Ghinato, Paulo. "Quality Control Methods: Towards Modern Approaches Through Well Established Principles." Total Quality Management 9,
no. 6 (August 1998).
12) Poka-yoke technique, methodology & design: Rajan kumar, R.K. Dwivedi , Ajay Verma
13) Foster, S. Thomas Jr. Ph.D. : “Designing and Initiating A Taguchi Experiment in a Services Setting” OM Review – Refereed: Volume 9, No. 3.
14) Taguchi, Genichi : Taguchi : Robust Technology Development : Bringing Quality Engineering Upstream ; Asme Press, New Yark, 1993
15) Taguchi, Chowdhury, Taguchi; Robust Engineering; Learn how to boost quality while reducing costs and time to market; McGraw-Hill, New
Yark,2000.
16) Dvorak, Paul. "Poka-Yoke Designs Make Assemblies Mistake-proof." Machine Design, 10 March 1998, 181–184.
17) Evans, James R., and William M. Lindsay. The Management and Control of Quality. South-Western Publishing, 2004.
Courtesy;
1) Analysis of the Methods Time Measurement (MTM) Methodology through its Application in Manufacturing Companies; Denis L. M. de
Almeida1, João C. E. Ferreira1*
2) Works Study by International Labour Organization
3) How to Calculate Method Time Measurement (MTM)? Article shared by Smriti Anand(http://www.yourarticlelibrary.com/ergonomics/work-
measurement/how-to-calculate-method-time-measurement-mtm)
4) Vorne, 1445 Industrial Dr., Itasca IL, 60143 USA, info@leanproduction.com, © 2011-2019, Vorne Industries Inc. All Rights Reserved
5) https://www.referenceforbusiness.com/management/Or-Pr/Poka-Yoke.html#ixzz6LWjn6syQ
6) https://www.wisdomjobs.com/e-university/production-and-operations-management-tutorial