PROJECT STATUS REPORT

PROJECT INFORMATION
PROJECT NAME/Client: LATTAFA PERFUMES IND. LLC.
Consultants: Future Engineering Consultants.
Main Contractor: Dar AlOmran Building Contracting LLC.
Third Party Inspectors: Dar Alaman for Technical Services LLC.
Steel Contractor: AFAQ Steel Sheds Fix Contracting.
DATE OF REPORT 25 – 03 - 2024
PROJECTED DATE OF COMPLETION 2024
PROJECT DATE OF START 2024
Location: Saja’a, Sharjah

PROJECT STATUS
OVERALL PROJECT STATUS IN PROGRESS
• Work continues to install sandwich panels in Block
B2.
SUMMARY
• Work continues to install steel in Block B1

PROJECT DETAILS
COMPONENT STATUS
Block B-2 [ Steel Installation] COMPLETE

Block B-2 [ Materials Test] COMPLETE

Block B-2 [ Mechanical Test] COMPLETE

Block B-2 [ Chemical Test] COMPLETE

Block B-2 [ Alignment Test] COMPLETE

Block B-2 [ Steel Installation] COMPLETE

Block B-2 [ Materials Test] COMPLETE

Block B-2 [ Mechanical Test] COMPLETE

Block B-2 [ Chemical Test] COMPLETE

Block B-2 [Sandwich panels] Delivered

Block B-1 [ Steel Installation] IN PROGRESS

Block B-1 [ Torque Test] Hold

Block B-1 [ Alignment Test] Hold

Page 1|4
Block -B2
➢ Installation work continues on Sandwich panels.

➢ 1 Shade completed.

Page 2|4
Block -A
➢ Steel Works in B1 Block is holding.

➢ Continue tightening the screws to perform the testing B1 Block.

Page 3|4
➢ Work completed as per drawings
➢ Grid [ 1 – 12 ] , Grid [ A – M]

Page 4|4