LIGHTING LAYOUT PLAN Basement - First Floor

DL 1
DL 1

S1 DL 1
DL 1
LP1 LP1

S1
DL 1 DL 1 S1
EL
DL 2
S1 LP1
S1
LP1

EXIT S1 S1
LP1 LP1 DL 2

LP1
DL 2 LP1
EL
S1 S1
EL
LP1 EL
DL 1 DL 1
DL 1 LP1
S2 S1
S2
S1 S2
S2
LP1 LP1 EL LP1
LP1 LP1

EXIT
LP1

EL

LP1 LP1 LP1


EL

LP1
LP1 LP1

EXIT

(Basement Level) (First floor)

System Electrical Electrical Junction Box

Symbol Spesification
S1 Single Switch Boss
LP1
LED Panel 600x600, 36 watt
Remarks : Reviewed and Approved by :
DL 1 Downlight Reccesed LED 15 watt
S2 Double Switch Boss
Approved
DL 2 Downlight Reccesed LED 7 watt Wiring Line 1 3x2,5 NYM
Kabel Metal
Approved with comments
EL Emergency Light self battery
Wiring Line 2 3x2,5 NYM
Kabel Metal
Revise and Resubmit EXIT Exit Light c/w battery
Wiring Line 3 3x2,5 NYM
LED Strip Light 7,7 watt Kabel Metal
LIGHTING LAYOUT PLAN Second-Third Floor
DL 2 DL 1
DL 2 DL 1
S1 LP1 LP1 S1
DL 2
S1 PL
DL 2
LP1 EL LP1 LP1 HL HL
DL 2 S1
S1

Food Display

Food Display
LP1
DL 2 LP1

(Linear)

(Linear)

Fruit Rack
Fruit Rack
DL 21 S1 S1

Food Display (Vertical)

Food Display (Vertical)


S2 LP1 LP1 DL 2

Food Display (Island)

Food Display (Island)


S1
EL
S1 S1 EL
S1
LP1 HL HL
EXIT

DL 1
S1 LP1 LP1 LP1

Fruit Rack
LP1 LP1

EXIT
DL 1 DL 1

S2
WL
LP1 LP1
S2 S1

EXIT
LP1 EL EL HL HL
Food Display (Island)
LP1 EL LP1

Food Display (Island) LP1 LP1

S1
LP1 EL LP1 LP1 LP1 S2S2 S1S2 EL

S1 HL HL
LP1
PL LP1 EL LP1 LP1

PL
PL WL

HL HL
LP1 LP1 LP1 LP1

DL 1

(Second floor)
(Third floor)

System Electrical HL Hanging Lamp Wiring Line 1 3x2,5 NYM


Kabel Metal
Symbol Spesification Electrical Junction Box Wiring Line 2 3x2,5 NYM
Kabel Metal
LP1
LED Panel 600x600, 36 watt
Wiring Line 3 3x2,5 NYM
S1 Single Switch Boss
Kabel Metal
Remarks : Reviewed and Approved by : DL 1 Downlight Reccesed LED 15 watt

Approved DL 2 Downlight Reccesed LED 7 watt S2 Double Switch Boss


Wiring Line 4 3x2,5 NYM
Kabel Metal
EL Emergency Light self battery
Approved with comments S1 S2 Triple Switch Boss
EXIT Exit Light c/w battery
Revise and Resubmit WL Wall Lamp
LED Strip Light 7,7 watt

PL Pendant Lamp by ID Linear Lamp


LIGHTING LAYOUT PLAN Fourth-Fifth Floor
DL 1
LP1 LP1 LP1
DL 1

S1 TCW TCW TCW


DL 2 LP1 EL LP1 LP1
S1 S2 DL 1
DL 2
DL 1
S1
DL 2
S1 S1 LP1 LP1 LP1 TCW TCW EL TCW
EL
EXIT

EXIT
DL 1
EL DL 1
DL 1 DL 1
S1 S1
DL 1
S2
HL HL HL HL
LP1 LP1 LP1

DL 1 DL 1

S1
S2
HL HL HL HL
DL 1 DL 1 EL DL 1 LP1 LP1 LP1

S2
S1
DL 1
HL HL HL EL
DL 1
EL EL DL 1

S1 S1 EL LP1
LP1 LP1

DL 1 DL 1

LP1
DL 1 DL 1
DL 1

(Level 5)
(Level 4)
System Electrical HL Hanging Lamp TCW TCW Lamp

Symbol Spesification Electrical Junction Box Distribution Electrical Panel


LP1
LED Panel 600x600, 36 watt
S1 Single Switch Boss MCFA Panel
Remarks : Reviewed and Approved by : DL 1 Downlight Reccesed LED 15 watt

Approved DL 2 Downlight Reccesed LED 7 watt S2 Double Switch Boss


Wiring Line 1 3x2,5 NYM
Kabel Metal
EL Emergency Light self battery
Approved with comments S1 S2 Triple Switch Boss Wiring Line 2 3x2,5 NYM
Kabel Metal
EXIT Exit Light c/w battery
Wiring Line 3 3x2,5 NYM
Revise and Resubmit WL Wall Lamp
LED Strip Light 7,7 watt Kabel Metal

PL Pendant Lamp by ID Linear Lamp Wiring Line 4 3x2,5 NYM


Kabel Metal
POWER OUTLET PLAN BASEMENT FLOOR

System Power Spesification

Remarks : Reviewed and


Approved by :
Approved

Approved with
Comments

Revise and
Resubmit
POWER OUTLET PLAN FIRST FLOOR

System Power Spesification

Remarks : Reviewed and


Approved by :
Approved

Approved with
Comments

Revise and
Resubmit
POWER OUTLET PLAN SECOND FLOOR
System Power Spesification

Food Display

Food Display
(Linear)

(Linear)

Fruit Rack
Food Display (Vertical)

Food Display (Vertical)

Food Display (Island)

Food Display (Island)

Fruit Rack
Fruit Rack
Food Display (Island)

Food Display (Island)

Remarks : Reviewed and


Approved by :
Approved

Approved with
Comments

Revise and
Resubmit
POWER OUTLET PLAN THIRD FLOOR

System Power Spesification

WD

Remarks : Reviewed and


Approved by :
Approved

Approved with
Comments

Revise and
Resubmit
POWER OUTLET PLAN FOURTH FLOOR

System Power Spesification

Remarks : Reviewed and


Approved by :
Approved

Approved with
Comments

Revise and
Resubmit
POWER OUTLET PLAN FIFTH FLOOR

System Power Spesification

Remarks : Reviewed and


Approved by :
Approved

Approved with
Comments

Revise and
Resubmit
NEW MAIN DISTRIBUTION PANEL

UP GRADING PLN
FROM 16.5KVA TO .......KVA
131 KVA

GENERATOR
25Kva

NOTE : GENERATOR ONLY BACKUP


BASEMENT FLOOR

PLN 16.5KVA

Remarks : Reviewed and


Approved
Revise by :

Approved with
comments
Revise and
Resubmit
SINGLE LINE DIGRAM BASEMENT FLOOR

Remarks : Reviewed and


Approved
Revise by :

Approved with
comments
Revise and
Resubmit
SINGLE LINE DIGRAM FIRST FLOOR

Remarks : Reviewed and


Approved
Revise by :

Approved with
comments
Revise and
Resubmit
SINGLE LINE DIGRAM SECOND FLOOR

Remarks : Reviewed and


Approved
Revise by :

Approved with
comments
Revise and
Resubmit
SINGLE LINE DIAGRAM THIRD FLOOR
LP1 DL1 DL2 PL WL HL P1 P1F P1 P1 P1 P1 WP1

Remarks : Reviewed and


Approved by :

Approved

Approved with
comments

Revise and Resubmit


SINGLE LINE DIAGRAM FOURTH FLOOR

LP1 DL1 DL2 P1 P1F P1 P1 P1 P1 P2

Remarks : Reviewed and


Approved by :

Approved

Approved with
comments

Revise and Resubmit


SINGLE LINE DIAGRAM ROOF TOP

TCW DL1 HL P1

Remarks : Reviewed and


Approved by :

Approved

Approved with
comments

Revise and Resubmit


HVAC PLAN BASEMENT FLOOR

AIR CONDITIONING/MVAC

Remarks : Reviewed and


Approved by :

Approved

Approved with
comments

Revise and Resubmit


HVAC PLAN BASEMENT FLOOR

AIR CONDITIONING/MVAC

Remarks : Reviewed and


Approved by :

Approved

Approved with
comments

Revise and Resubmit


HVAC PLAN FIRST FLOOR

AIR CONDITIONING/MVAC

Remarks : Reviewed and


Approved by :

Approved

Approved with
comments

Revise and Resubmit


HVAC PLAN FIRST FLOOR

AIR CONDITIONING/MVAC

Remarks : Reviewed and


Approved by :

Approved

Approved with
comments

Revise and Resubmit


HVAC PLAN SECOND FLOOR

AIR CONDITIONING/MVAC

Food Display

Food Display
(Linear)

(Linear)

Fruit Rack
Food Display (Vertical)

Food Display (Vertical)

Food Display (Island)

Food Display (Island)

Fruit Rack
Fruit Rack

Food Display (Island)

Food Display (Island)

Remarks : Reviewed and


Approved by :

Approved

Approved with
comments

Revise and Resubmit


HVAC PLAN SECOND FLOOR

AIR CONDITIONING/MVAC

Food Display

Food Display
(Linear)

(Linear)

Fruit Rack
Food Display (Vertical)

Food Display (Vertical)

Food Display (Island)

Food Display (Island)

Fruit Rack
Fruit Rack

Food Display (Island)

Food Display (Island)

Remarks : Reviewed and


Approved by :

Approved

Approved with
comments

Revise and Resubmit


HVAC PLAN THIRD FLOOR

AIR CONDITIONING/MVAC

WD

Remarks : Reviewed and


Approved by :

Approved

Approved with
comments

Revise and Resubmit


HVAC PLAN THIRD FLOOR

EXHAUST FAN & FRESH AIR FAN

WD

Remarks : Reviewed and


Approved by :

Approved

Approved with
comments

Revise and Resubmit


HVAC PLAN FOURTH FLOOR

AIR CONDITIONING/MVAC

Remarks : Reviewed and


Approved by :

Approved

Approved with
comments

Revise and Resubmit


HVAC PLAN FOURTH FLOOR

EXHAUST FAN & FRESH AIR FAN

Remarks : Reviewed and


Approved by :

Approved

Approved with
comments

Revise and Resubmit


HVAC PLAN ROOF TOP

AIR CONDITIONING/MVAC

Remarks : Reviewed and


Approved by :

Approved

Approved with
comments

Revise and Resubmit


HVAC PLAN ROOF TOP

EXHAUST FAN & FRESH AIR FAN

RA RA

Remarks : Reviewed and


Approved by :

Approved

Approved with
comments

Revise and Resubmit


ROOF WATER TANK SINK
LT.5

WASTAFEL URINAL WC WC WASTAFEL WASTAFEL LT.4

SHOWER WC WC WASTAFEL WASTAFEL WASTAFEL LT.3

URINAL WC WC WASTAFEL WASTAFEL LT.2

URINAL WC WC WASTAFEL WASTAFEL LT.1

GROUND WATER TANK

SINK SINK
LT.BASEMENT
ROOF WATER TANK

SINK
LT.5

WASTAFEL URINAL FD WC FD WC FD WASTAFEL WASTAFEL


LT.4

FD WC FD WC FD WASTAFEL WASTAFEL WASTAFEL


LT.3

URINAL WC FD WC FD WASTAFEL WASTAFEL


LT.2

URINAL WC FD WC FD WASTAFEL WASTAFEL


LT.1

GROUND WATER TANK

SINK SINK
LT.BASEMENT

SEPTIC TANK
PLUMBING SYSTEM BASEMENT FLOOR

Remarks : Reviewed and


Approved by :

Approved

Approved with
comments

Revise and Resubmit


PLUMBING SYSTEM BASEMENT FLOOR

Remarks : Reviewed and


Approved by :

Approved

Approved with
comments

Revise and Resubmit


PLUMBING SYSTEM FIRST FLOOR

Remarks : Reviewed and


Approved by :

Approved

Approved with
comments

Revise and Resubmit


PLUMBING SYSTEM FIRST FLOOR

Remarks : Reviewed and


Approved by :

Approved

Approved with
comments

Revise and Resubmit


Reviewed and
Approved by :
PLUMBING SYSTEM SECOND FLOOR

Revise and Resubmit


Approved with
comments
Approved
Remarks :
Fruit Rack Fruit Rack Fruit Rack
Food Display Food Display (Island)
(Linear)
Food Display
(Linear) Food Display (Island)

Food Display (Island)

Food Display (Island)


Food Display (Vertical)
Food Display (Vertical)
Reviewed and
Approved by :
PLUMBING SYSTEM SECOND FLOOR

Revise and Resubmit


Approved with
comments
Approved
Remarks :
Fruit Rack Fruit Rack Fruit Rack
Food Display Food Display (Island)
(Linear)
Food Display
(Linear) Food Display (Island)

Food Display (Island)

Food Display (Island)


Food Display (Vertical)
Food Display (Vertical)
PLUMBING SYSTEM THIRD FLOOR

WD

Remarks : Reviewed and


Approved by :

Approved

Approved with
comments

Revise and Resubmit


PLUMBING SYSTEM THIRD FLOOR

WD

Remarks : Reviewed and


Approved by :

Approved

Approved with
comments

Revise and Resubmit


PLUMBING SYSTEM FOURTH FLOOR

Remarks : Reviewed and


Approved by :

Approved

Approved with
comments

Revise and Resubmit


PLUMBING SYSTEM FOURTH FLOOR

Remarks : Reviewed and


Approved by :

Approved

Approved with
comments

Revise and Resubmit


PLUMBING SYSTEM ROOF FLOOR

Remarks : Reviewed and


Approved by :

Approved

Approved with
comments

Revise and Resubmit


PLUMBING SYSTEM ROOF FLOOR

Remarks : Reviewed and


Approved by :

Approved

Approved with
comments

Revise and Resubmit


FIRE FIGHTING SYSTEM BASEMENT FLOOR
FIRE FIGHTING SYSTEM

Remarks : Reviewed and


Approved by :

Approved

Approved with
comments

Revise and Resubmit


FIRE FIGHTING SYSTEM FIRST FLOOR

FIRE FIGHTING SYSTEM

Remarks : Reviewed and


Approved by :

Approved

Approved with
comments

Revise and Resubmit


FIRE FIGHTING SYSTEM SECOND FLOOR

FIRE FIGHTING SYSTEM

Food Display

Food Display
(Linear)

(Linear)

Fruit Rack
Food Display (Vertical)

Food Display (Vertical)

Food Display (Island)

Food Display (Island)

Fruit Rack
Fruit Rack
Food Display (Island)

Food Display (Island)

Remarks : Reviewed and


Approved by :

Approved

Approved with
comments

Revise and Resubmit


FIRE FIGHTING SYSTEM THIRD FLOOR

FIRE FIGHTING SYSTEM

WD

Remarks : Reviewed and


Approved by :

Approved

Approved with
comments

Revise and Resubmit


FIRE FIGHTING SYSTEM FOURTH FLOOR

FIRE FIGHTING SYSTEM

Remarks : Reviewed and


Approved by :

Approved

Approved with
comments

Revise and Resubmit


FIRE FIGHTING SYSTEM ROOF FLOOR

FIRE FIGHTING SYSTEM

Remarks : Reviewed and


Approved by :

Approved

Approved with
comments

Revise and Resubmit


PROJECT : Saksi - Saksi Yehowa Indonesia
LOCATION : Jakarta

MATERIAL SPESIFICATION LIST


NO. EQUIPMENT SPECIFICATION PROPOSED BRAND PICTURE LEAD TIME
Mechanical

1 FCU Split Duct 4 PK (Indoor and Outdoor) As per specification Daikin Indent 3 weeks

2 Switch and Socket As per specification BOSS Ready Stock

3 Electrikal Cable As per specification Kabel Metal Indonesia Ready Stock


NO. EQUIPMENT SPECIFICATION PROPOSED BRAND PICTURE LEAD TIME

4 Conduit Pipe As per specification BOSS Ready Stock

5 Ducting PU As per specification TDI Ready Stock

6 Floor Socket Outlets As per specification Legrand Ready Stock

7 Cable Tray, Cable Ladder and Trunking As per specification Traytek TBA
NO. EQUIPMENT SPECIFICATION PROPOSED BRAND PICTURE LEAD TIME

8 DOWNLIGHT As per specification PHILIPS Ready Stock

9 LED Panel As per specification Philips Indent 1 week

Plumbing

1 PPR Pipe As per specification ATP TORO Ready Stock


NO. EQUIPMENT SPECIFICATION PROPOSED BRAND PICTURE LEAD TIME

2 PVC Pipe As per specification Rucika / Wavin Ready Stock

3 Fuel Tank As per specification Mild Steel Indent 2 weeks

4 Genset 25 KVA As per specification TDG TSUZUMI JAPAN TECHNOLOGI Indent 4 Weeks

5 Water Tank 2000L As per specification Penguin Indent 2 Weeks