LEGEND 13 CONCENTRATE THICKENING 27 CONCENTRATE TRUCK ROAD
30° ITEM DESCRIPTION

PLANT NORTH
14 CONCENTRATE FILTRATION 28 EMERGENCY RUN OFF POND
1 TRUCK WORKSHOP 15 CONCENTRATE STORAGE & LOADOUT 29 CONTRACTORS OFFICES
TR

2 YARD & WASH BAY 16 FLOTATION TAILINGS THICKENING 30 REFER 105230-GX-00000-31344-002


UE

1
N

3 SULPHIDE PRIMARY CRUSHING 17 SERVICES - RAW & POTABLE WATER 31 MPP LAYDOWN AREA
OR

SULPHIDE STOCKPILE FEED SERVICES - PROCESS WATER REFER 105230-GX-00000-31344-002


TH

4 18 32
5 SULPHIDE STOCKPILE & RECLAIM 19 REAGENTS - LIME 33 ADMIN & INTEGRATED OPERATIONS CENTRE
6 MILL FEED 20 REAGENTS - COLLECTOR & FROTHER 34 CHANGE ROOM
7 GRINDING 21 REAGENTS - SECONDARY COLLECTOR 35 REFER 105230-GX-00000-31344-002
8 ROUGHER FLOTATION 22 REAGENTS - FLOCCULANT 36 EXISTING MAIN ACCESS ROAD
9 CONCENTRATE REGRIND 23 SERVICES - FLOTATION AIR 37 EXISTING OXIDE PROCESS PLANT
N 7900 m PRIMARY CRUSHING
10 CLEANER 1 & SCAVENGER FLOTATION 24 SERVICES - PLANT AIR 38 EXISTING STOCKPILE
11 CLEANER 2 & 3 FLOTATION 25 MAIN SUBSTATION 39 REFER 105230-GX-00000-31344-002
12 SAMPLING AND OSA 26 MALE/FEMALE ABLUTIONS (TBA) 40 REFER 105230-GX-00000-31344-002

YOR
CONVE
E FEED
2

IL
STOCKP
N 7800 m

EXISTIN
G OVER
LAND CO 10°
NVEYOR

SETTLING POND

3 CONS THICKENING
REGRIND ME
DO
Ø 81m
· RL 868.000

GRINDING E-ROOM
CONS FILTRATION SAG MILL FEED CONVEYOR
FLOTATION E-ROOM
N 7700 m
FLOTATION
PEBBLE RECYCLE · RL 872.000

WATER SERVICES BALL BUNKERS


GRINDING

4
STOCKPILE & RECLAIM

TAILINGS THICKENING
· RL 856.600

N 7600 m

NON PROCESS INFRASTRUCTURE

5
MAIN SUBSTATION

NOTE: 10 0 10 20 30 40 50m
THIS DRAWING IS USING THE DEVELOPMENT 1 : 1000
PROJECT PLANT COORDINATE SYSTEM (PCS).

DRAWN J. CIFUENTES 07.ENE.2023 CLIENT COPYRIGHT © Ausenco

CHECKED A. CONTRERAS 07.ENE.2023 Ausenco MANTOVERDE S.A. PROJECT No SCALE 1:1000 SIZE
0 J.C.G. 07 ENE 2023 ISSUED FOR CONSTRUCTION A.C. R.E. E.C.
105230-EE-00000-31344-002
105230-EE-00000-31344-001
ELECT EQUIP & INSTALLATION - PROCESS PLANT SITE PLAN
ELECT EQUIP & INSTALLATION - OVERALL SITE PLAN
D
C
AD
AD
17 SEP 2021 BRISBANE SCOPE COMPLETION
9 JULY 2021 ISSUED FOR INTERNAL USE
AD CG BM
DESIGNED R. ESCUDERO 07.ENE.2023
Santiago,
Chile
TITLE MANTOVERDE DEVELOPMENT PROJECT 105230-01 SHEET 1 OF 1 A1
CLIENT DRAWING No.
105230-GX-00000-31344-002 PROCESS PLANT - SITE PLAN No.1 B AD 31 MAR 2021 ISSUED FOR INTERNAL USE
E. CID
T +56 2 937 0000 PROCESS PLANT DRAWING No REV
DES. APPR 07.ENE.2023 W www.ausenco.com
105230-GX-00000-31344-001 OVERALL SITE PLAN A AD 24 MAR 2021 PRELIMINARY ISSUE