BP West Nile Delta Gas Development Project: Inspection and Test Plan For Cable Pulling
BP West Nile Delta Gas Development Project: Inspection and Test Plan For Cable Pulling
BP West Nile Delta Gas Development Project: Inspection and Test Plan For Cable Pulling
REASON
REV DATE BY CHK Appr
FOR ISSUE
ELECTRONIC DOCUMENTS ARE CONTROLLED. ANY PRINTED COPY WILL BE UNCONTROLLED AND MAY BECOME OUTDATED
BP West Nile Delta
Gas Development Project
Security Classification:
WND Project Internal
REASON
REV DATE BY CHK Appr
FOR ISSUE
ELECTRONIC DOCUMENTS ARE CONTROLLED. ANY PRINTED COPY WILL BE UNCONTROLLED AND MAY BECOME OUTDATED
Inspection and Test Plan for Cable Pulling
Table of Contents
1. Scope...............................................................................................................................................................4
2. Inspection and Test Requirements...................................................................................................................4
3. Inspection and Test Records............................................................................................................................4
4. Inspection and Testing Personnel....................................................................................................................4
5. Measuring and Equipment for Cable Pulling..................................................................................................4
6. Appendices:.....................................................................................................................................................4
6.1 Appendix 1 Inspection and Test Requirements (1 Page)........................................................................4
7. Attachment......................................................................................................................................................6
7.1 Attachment 1 Inspection Test Report (PTR) (1 Page).......................................................................67.1
Attachment 1 Inspection Test Report (ITR) (1 Page).............................................................................6
Revision History
Revision Amender
Amendment Date Amendment
Number Initials
25-Oct-2017 A01 ASMM Issued for Review
17-Jan-2018 B01 ASMM Issued for implementation
23-Jan-2018 C01 AA Issued for Approval
Document
Document Name Description of Content
Number
EG001-EN-SOW- Score of Work Scope of Work
11E-0004
EG-0001-EL- Electrical Specification Electrical Specification
SPE-11E-0016
EG001-EL-MET- Method of Statement Method of Statement for Cable pulling
11Z-9008
Holds
1. Scope
Inspection and Test Plans (ITP) are documents that shall be issued by the CGE in accordance with the
Subcontract requirements (Subcontract Exhibits). Contractor will work with the CGE to develop the ITP’s for
their scope of work. This document provides this procedure covers the minimum requirements inspection and
testing related to Cable Pulling. Job Hazard Analysis for Cable Pulling installations covers the ES&H risks and
mitigation for this scope of work. Means and methods are covered by the associated execution plan(s).
Examples ITP for the Site Preparation work and explain how the ITP’s are developed by the CGE.
Definition Description of Definition
CONTRACTOR Bechtel
SUBCONTRACTOR Carlo Gavazzi Egypt (CGE)
RFE Responsible Field Engineer
JHA Job Hazard Analysis
MWR Material Withdrawal Request
ITP Inspection and Test Plan
ITR Inspection and Test Record
MTE Measuring and Test Equipment
ES&H Environmental, safety and Health
[6.] Appendices:
5.1[6.1] Appendix 1 Inspection and Test Requirements (1 Page)
Demonstrated
Inspection/Test Inspection/Test Reference Reference Method of Method of Method of System System
Evidence
Requirements Requirements Documentation Documentation verification verification verification Turnover Turnover
Report/checklist
Test or System
Activity Acceptance Subcontracto
ITP Number
Activity Description Inspection Stage/Frequency Cod/Spec/Ect
Criteria r
Bechtel Insp. Client Rep. Reference Reference Client
Performed Number
EG001-EN-
Check Drums,
SOW-11E -0004 Engineering inspection
Cable Pulling 1 Cables Receiving type ,size of Before installation
EG001-EL-SPE-
Pass/Fail N/A I S
Report
cables
11E-0016
EG001-EN-
Check Drums,
SOW-11E -0004 Cables Withdraw
Cable Pulling 2 Cables Withdraw type ,size of Before installation
EG001-EL-SPE-
Pass/Fail I H S
request
cables
11E-0016
EG001-EN-
Check
Check continuity SOW-11E -0004
Cable Pulling 3 continuity/insulation
on the drum
Before installation
EG001-EL-SPE-
Pass/Fail I HS S HI-POT
test on the drum
11E-0016
Cable route
Check drawing
Cable Pulling 4 identification with
route
Before installation Set route card Pass/Fail I H S Drawing
drawing route
Laying the cable EG001-EN-
from the drum and SOW-11E -0004 EG001-EL-MET-11Z-
Cable Pulling 5 running it on the
Visual inspection Continuous
EG001-EL-SPE-
Pass/Fail I H S
9008
cable tray 11E-0016
After installation
Cable Pulling 7 Report Progress Inspection
complete
I H S Set route data base
6.[7.] Attachment