Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

CASE

N-307-1
CASES OF ASME BOILER AND PRESSURE VESSEL CODE

Approval Date: December 5, 1984


See Numeric Index for expiration
and any reaffirmation dates.

Case N-307-1 (1) The procedure qualification shall be docu-


Revised Ultrasonic Examination Volume for Class mented in a Certification Report. Procedure qualification
1 Bolting, Table IWB-2500-1, Examination records shall be retained for the service life of the bolt
Category B-G-1, When the Examinations Are or stud examined. The Certification Report shall include
Conducted From the Center-Drilled Hole at least the following items:
Section XI, Division 1 (a) identification of procedure qualified;
(b) personnel performing and witnessing the
Inquiry: When ultrasonic examinations are con- qualification tests;
ducted from the center-drilled hole of Class 1 bolts (c) description and drawings of the qualification
or studs to satisfy the examination requirements of specimens and the calibration blocks, as applicable;
Section XI, Division 1, Table IWB-2500,1, Examina- (d) calibration and sensitivity details;
tion Category B-G-1, may the examination volume be (e) methods of identifying flaw indications and
limited to the cylindrical region defined by A-B-C-D- discriminating between flaw indications and nonrelevant
E-F-A in Fig. 1? indications such as indications from probe list-off,
plating thickness changes, or permeability changes in
Reply: It is the opinion of the Committee that, ferromagnetic material;
when conducting ultrasonic examinations from the (f) procedure for interpretation of results;
center-drilled hole of Class 1 bolts or studs to satisfy (g) qualification results; and
the examination requirements of Section XI, Division (h) signature of the Authorized Nuclear Inservice
1, Table IWB-2500-1, Examination Category B-G-1, Inspector (ANII).
the examination volume may be limited to the cylin- (2) Eddy current examinations shall be performed
drical region defined by A-B-C-D-E-F-A in Fig. 1 if in accordance with a written procedure. Each procedure
the center bore hole surface is examined with a quali- shall include at least the following information:
fied supplemental ultrasonic, surface, or eddy current (a) bolt or stud configuration to be examined,
procedure. The examination procedure shall be quali- including, as applicable, lengths, diameters, thread sizes,
fied to cover the entire inner bore surface. If eddy plating and base materials, and product forms (e.g.,
forging, bar, bolt or stud, rolled or cut threads);
current examination is used, the following require-
(b) surface condition requirements and any ap-
ments shall apply.
plicable preparation methods;
(a) The procedure qualification shall demonstrate the
(c) sizes and types of probes, including descrip-
ability to detect and measure the length of the maximum
tion and part or drawing numbers, and lengths of
allowable flaws of IWB-3515.1. Qualification of the
probe cable;
procedure shall include detection of at least one crack (d) manufacturers and models of eddy current
in each material type (ferromagnetic or nonferromag- equipment qualified;
netic) to be examined. The length of the crack open (e) data recording equipment and methods;
to the surface shall not exceed the maximum allowable (f) examination frequencies;
length of IWB-3515.1 for nonaxial flaws. The crack (g) maximum scanning speed permitted and
shall be located in a bore hole surface and oriented demonstrated by procedure qualification;
circumferentially. Alternatively, the crack may be lo- (h) calibration procedure and calibration stan-
cated in a block with different geometry if the qualifica- dards;
tion demonstrates cracks can be detected in bore holes. (i) examination technique (e.g., scanning in-
Demonstration may be performed by showing equivalent structions, hand probe, and mechanized probe device);
response in both geometries (bore hole and block) using (j) reporting instructions;
calibration discontinuities specified by the qualified (k) personnel qualification requirements;
procedure. (l) reference to the Certification Report.

485

This is Electrontic File Page # 485


CASE (continued)

N-307-1
CASES OF ASME BOILER AND PRESSURE VESSEL CODE

FIG. 1 REVISED EXAMINATION VOLUME FOR CLASS 1 BOLTING WHEN SCANNED FROM THE CENTER-
DRILLED HOLE
486

You might also like