CASES OF ASME BOILER AND PRESSURE VESSEL CODE

Approval Date: February 14, 1983


See Numeric Index for expiration
and any reaffirmation dates.

Case N-369 (1) A change in the specification, type, or grade


Resistance Welding of Bellows of material in any number.
Section III, Division 1 (2) A change in the thickness of the thinnest
member of the base material of more than 10%, or
Inquiry: Is it permissible to join plies of bellows change in the overall thickness of the joint of more
elements by resistance welding prior to making the than 10%.
attachment weld to the end connector for Section III, (3) A change in the number of layers to be welded.
Division 1, Class 2, 3, and MC construction? (4) A change in the resistance welding machine
settings and process control parameters.
Reply: It is the opinion of the Committee that plies (5) A change in equipment from that used for the
of bellows elements may be joined by resistance weld- qualification of the WPS.
ing prior to making the attachment weld to the end (d) The qualification test coupons shall be prepared
connector for Section III, Division 1, Class 2, 3, and in accordance with the WPS to provide at least three
MC construction, provided that: spot welds or a 2 in. length of continuous weld, and
shall be examined as follows:
(a) The joining of the bellows elements by resistance
(1) weld surfaces shall be visually examined and
welding is a manufacturing aid, and shall not be a
shall be free from cracks, electrode pickup, flash, or pits.
structural (load carrying) weld. The bonded edges shall
(2) Transverse cross sections of each spot weld
be trimmed through the weld nugget, providing a and a longitudinal section through the center of the
homogeneous edge for welding to the end connector. continuous weld shall be etched to reveal the weld
(b) The process shall be limited to individual ply nugget and heat affected zone, and shall be visually
thicknesses that are greater than 0.005 in. but less than examined. Each section shall be free from cracks or
0.25 in., or any combination thereof. other defects in the weld nugget or base metal.
(c) A welding procedure specification (WPS) in (e) Each production weld shall be examined as de-
which the following are essential variables shall be scribed in (4)(a).
prepared and qualified; any change shall require prepara- (f) Use of this Case shall be identified in the Data
tion and qualification of a new procedure. Report.