7. PROCEDURE:
Version No: 03 Department: Power Plant SMP No: 2201/INST/WI-01 Revision No: 01 Revision Date:
FIG-1
7.14. Open the screwed cover on the right side of the transmitter. Remove the supply /signal
cable from the transmitter. Refer FIG-2 for cable connection.
Version No: 03 Department: Power Plant SMP No: 2201/INST/WI-01 Revision No: 01 Revision Date:
FIG-2
7.15. Remove the sensor from the flow through chamber pot.
7.16. Clean the electrode tip with DM water and make it dry by a Clean proper cloth or tissue
paper.
7.17. Clean the flow through chamber pot thoroughly with help of brush and flush it by
opening the isolation valve & drain valve.
7.18. Mount the sensor carefully in to the flow through chamber (pot) carefully.
7.19. Connect the supply /signal cable from the transmitter. Refer FIG-2 for cable connection.
7.20. Check the reading in the display .The MyPro CLM 431(Transmitter) indicates errors by
means of an alarm Symbol flashing on the display. It also outputs an error current of 22 +/- 0.5
mA at the current output.
7.21. Refer 7.2 diagnostic codes of The MyPro CLM 431 manual for error identification.
7.22. Update the PM checklist & cancel the PTW.
DURING CALIBRATION
Version No: 03 Department: Power Plant SMP No: 2201/INST/WI-01 Revision No: 01 Revision Date:
FIG-3
7.26. Check the calibration settings in the transmitter / analyzer by operating 4 keys (shown in
FIG-4) and verify all the parameters.
7.27. Immerse the ConduMax W CLS 21 electrode on different Buffer solution (as per the
setting in the transmitter / analyzer), check the measured value and output signal (mA).
7.28. Carry out the two point calibration of the transmitter / analyzer in both the regions by
following t the method as per FIG-4.
Version No: 03 Department: Power Plant SMP No: 2201/INST/WI-01 Revision No: 01 Revision Date:
FIG-4
7.29. If the system accuracy is falling under the acceptable limits ( SSL/CPP/ INST/FILE/29)
then mount
Back the sensor in the process carefully and normalize the measurement System.
Version No: 03 Department: Power Plant SMP No: 2201/INST/WI-01 Revision No: 01 Revision Date:
7.30. Else if the system accuracy is not falling under the acceptable limits
(SSL/CPP/INST/FILE/29) then follow the Troubleshooting section of OEM manual to rectify the
system defects as per OEM
Recommendation.
7.31. Return the PTW, prepare the calibration report and maintain the required records.
8. QUALITY:
10. ENVIRONMENT:
10.1.Handle the maintenance waste and spillages properly.
11. OHSAS:
11.1. Ensure PPE, Helmet, adequate lighting near the work place.
11.2. Ensure healthiness & safety of the entire activities with respect electrical system and chemical
hazards.
11.3. Ensure deployment of a group of people (2 or more) while carrying out job in an isolated or
deserted place or in night shift.
12. ENERGY:
Not Applicable
Version No: 03 Department: Power Plant SMP No: 2201/INST/WI-01 Revision No: 01 Revision Date: